Вы находитесь на странице: 1из 3

www.c-bg.

com
Key Risks Wording Risk Treatment Areas: info@c-bg.com
© CBG Inc. 2015 • failure to achieve strategic • regularity and depth of Context of
goals; Organization analysis,
• failure to fulfill quality communication and consideration for
objectives; the decision-making;
• slowdown in company activity • analysis and review of QMS
performance indicator growth; processes resources, including
• undesirable and not timely resources for monitoring and
recognized QMS changes… measuring;
• improvement of planning methods…

Management
Review

President Risk Manager

ISO 9001:2015 cl. 4.4.1.f; 6.1.2.b.1


More information in Risk Management in QMS Processes
Quick Reference Guide
www.c-bg.com
info@c-bg.com
© CBG Inc. 2015
Key Risks Wording Risk Treatment Areas:
• emergency stops; • maintenance programs correction,
• exceeding the period of including the period between
technical maintenance and scheduled repairs;
equipment repair; • improvement of equipment tuning
• failure to observe methods;
maintenance schedule;… • improvement of technical equipment
and materials for maintenance …

Technical
Maintenance

Process Owner Risk Manager

ISO 9001:2015 cl. 4.4.1.f; 6.1.2.b.1


More information in Risk Management in QMS Processes
Quick Reference Guide
www.c-bg.com
Key Risks Wording info@c-bg.com
© CBG Inc. 2015 Risk Treatment Areas:
• suboptimal personnel
• correction of procedures for
competence (including education,
determining the necessary
confirmed qualification, additional
expertise;
training, work experience);
• correction of hiring
• inadequate system of motivation
procedure, including New
and stimulation;
employee orientations;
• lack of employee awareness;
• use of mentoring;
• …
•…

Control of
Personnel

Process Owner Risk Manager

ISO 9001:2015 cl. 4.4.1.f; 6.1.2.b.1


More information in Risk Management in QMS Processes
Quick Reference Guide

Вам также может понравиться