Supplier Data

Engineering & General Equipment Ltd. (Centralube)


LUBRICATION RECIRCULATION MODULE

(Document No.TI 1471 Issue A)

Document No: TP0000056 (Was ALC0193)


Issue: C
Date: November 2003

Brush Electrical Machines Ltd.


PO Box 18, Loughborough, Leicestershire, LE11 1HJ, England
Telephone: +44 (1509) 611511 Telefax: +44 (1509) 610440
E-Mail: sales@bem.fki-et.com Web site: http://www.fki-et.com/bem

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

CUSTOMER: BRUSH ELECTRICAL MACHINES LTD

CUSTOMER ORDER NOS: BE 706779 & BEB 83201

EGE LTD
Contract Ref: J23250 & J24358

No. of Consoles: 111 off

Serial Nos: 27-864 to 27-891


27-955 to 27-959
27-980 to 27-1005
27-1059 to 27-1110

Page 1

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

I NDEX
1.0 EQUIPMENT SPECIFICATION

1.1 General Details

1.2 Reservoir (Tank)

1.3 Pumps

1.4 Air Blast Cooler

1.5 Filter/Strainers

1.6 Air Cleaner

1.7 Heaters

1.8 Valves

1.9 Pipework

1.10 Instrumentation

1.11 Terminal Enclosures

1.12 Paintwork

2.0 PRE-INSTALLATION TEST AND FLUSHING PROCEDURES

3.0 INSTALLATION AND COMMISSIONING

4.0 FAULT FINDING

5.0 MAINTENANCE/DATA SHEETS

6.0 DRAWINGS
Page 2

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

1.0 EQUIPMENT SPECIFICATION

1.1 General Details

Each Lubrication Module comprises a fabricated steel reservoir surmounted by three


vertically mounted pumps (2 – AC and 1 – DC) driven through the top of the reservoir.
The pumps are electrically driven and oil flow is directed to a cooler and thence
through a filter to the two delivery outlet flanges of the module.

The Reservoir is equipped with heaters to improve cold start conditions and the
module is equipped with pressure and temperature instruments.

1.2 Reservoir (Tank)

Construction is an all welded fabrication executed in 6mm mild steel plate, suitably
stiffened to prevent deflection or distortion. Mounting pads are provided for pumps,
heaters and air cleaner, together with flanged return connection points. The drain
point is fitted with a lockable gate valve. An internal baffle plate separates the return
flow from the suction zone to promote deaeration. The reservoir is fitted with a
pressurised filler/breather and sampling points and painted internally and externally in
accordance with ‘Brush’ specifications (see 1.12).

1.3 Pumps

1.3.1 A.C. Powered (P3001 and P3003) – Duty and Standby

The system is equipped with two vertically mounted AC driven pumps


capable of delivering 345 litres/min of ISO VG 32 oil against 4 bar head with
7 bar relief valve.

1.3.2 D.C. Powered (P3002) – Emergency Standby

A D.C. Powered Pump capable of delivering 209 litres/min of ISOVG 32 oil


provides emergency power failure back-up.

Page 3

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

1.0 EQUIPMENT SPECIFICATION (Contd./)

1.3 Pumps (Contd/)

1.3.3 Motor Details (AC – M3001/M3003, DC – M3002)

AC - Marelli Motors 400v, 3ph, 50Hz/460v, 3ph,60Hz


7.5kW, 2945/3500 rpm, wired Delta
12.7 A F.L.C.
Frame size D132MD – IP55, Tropicalised

DC - Thrige Scott
4kW, 1950rpm, 125v DC compound wound, 36.4A
F.L.C., I.E.C. 34:1, Pure D.C.
Frame size LAK132C
Fitted with 35w, 110v AC anti-condensation heater

1.4 Air Blast Cooler (AC3001)

1.4.1 The system is equipped with a twin Air Blast Cooler horizontally
mounted and fitted with two 50% duty motorised fans.
(Air travel is vertically upwards).

Performance parameters as follows:-

Oil flow rate = 282 Litres/min


Temperature IN = 76.7°C
Temperature OUT = 65°C
Heat Dissipation = 95kW
Ambient air temperatures = -10 to + 50°C max

1.4.2 Motor Details (M3007 and M3005)

Marelli Motors 400v, 3ph, 50Hz/460v, 3ph, 60Hz


1.7kW, 1400rpm, wired star
3.6A F.L.C.

Page 4

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

1.0 EQUIPMENT SPECIFICATION (Contd/)

1.5 Filters/Strainers

1.5.1 Each pump is fitted with a strainer at the foot of the suction pipe.
Filtration rating 125µm.

1.5.2 The main filter unit (F3001 and F3002) is a duplex filter, with 2.1/2” S.A.E.
connections and fitted with disposable paper, 10µm, elements and a visual
indicator set at 2.2 bar.

1.6 Air Cleaner (OME3001)

The reservoir is vented via a ‘Trion’ T1001 electrostatic air cleaner, which serves to
attract any residual oil mist, carried over. Air is discharged to atmosphere via an
extractor fan.

Any oil extracted is piped back to the reservoir via 10mm o.d. tubing.

Unit voltage is 110v, 1ph, 60Hz having 50w power consumption.

Extractor Fan Motor Details:-

0.55kW, 460v, 3ph, 50Hz, 1.4A F.L.C., tropicalised.

1.7 Heaters (H3004-1, H3004-2 and H3004-3)

The reservoir is equipped with three oil immersion heaters each rated at 1.76kW.
They are suitable for Dual Voltage, 415/460v, 3ph, 50/60Hz. They are withdrawable
and rated at 4w/in2 .

All three heaters are controlled by 1 thermostat (TSH3003) having a range of 5° to


80°C (set @ 20°C).

Page 5

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

1.0 EQUIPMENT SPECIFICATION (Contd/)

1.8 Valves

1.8.1 Pressure Control (PCV3001)

Dumping flow prior to cooler and with external pressure sensing at module
discharge point. ESME 1.1/2”, Type: R1490 Diaphragm Control Valve.
Range 1.0 to 2.3 bar.

1.8.2 Check Valves

Non-Return Valve, Wafer type, located in pipework immediately downstream


of each pump.

1.8.3 Temperature Control Valve (TCV3001)

‘AMOT’, 3 way, mixing type, 2.1/2” n.b. flanged ANSI 125lb, located after the
cooler.

The valve is actuated by an integral thermostat set at 54°C.

1.8.4 Instrument Valves

Instrument isolation valves are stainless steel needle valves, with integral
hex head bleed plug.

1.9 Pipework

1.9.1 Pipework is constructed from 40mm (1.1/2”) and 65mm (2.1/2”)


n.b. API 5L seamless pipe and BS1740 fittings utilising
screwed connection, back-welded to effect total seal at all joints.

All pipework after filter is stainless steel.

Page 6

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

1.0 EQUIPMENT SPECIFICATION (Contd/)

1.10 Instrumentation

Note: All instruments are Dual scale (°C/°F – Bar/Psi)

1.10.1 Pressure

a] ‘Star Instruments, pressure gauges are provided, monitoring


pressure at pumps delivery connections, cooler discharge and at
outlet of lubrication module. Size: 100mm∅ dial, liquid filled
Range: 0-11 bar Tag Nos: PI3001 to PI3006.

b] A ‘Star Instruments’ differential pressure gauge monitors


pressure drop across the filter unit and hence condition of
element. Size: 100mm∅ dial, liquid filled. Range: 0 to 4 bar
(PDI3001)

c] ‘Pyropress’ Model P2103 Pressure switches, range 0.5 to 2.5


bar, monitor output from pumps. Tag Nos. PSL3001 to
PSL3003. Set at 1.3 bar falling.

d] A ‘Delta’ differential pressure switch, type DP2503


(PDSH3001), monitors filter conditions. Range: 0.5 to 5.5 bar
Set at 2.5 bar rising.

e] A “Delta” pressure transmitter (PT3004) is located on the


outlet of the lubrication module. Range: 4-20mm up to 5 bar.

1.10.2 Temperature

a] Temperature gauges are provided monitoring oil temperature


into and out of the cooler, system supply and tank.
They have dial 100mm∅ dial.
Range: 0°C to 100°C. Sensors are located in thermowells
(TI3001 to TI3004).

Page 7

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

1.0 EQUIPMENT SPECIFICATION (Contd/)

1.10 Instrumentation (Contd/)

1.10.2 Temperature (Contd/)

b] For Heater Control see Section 1.7

c] ‘Sensing Devices’ ‘3 wire’ Temperature RTD’s are provided for


cooler fan control, remote monitoring of tank and system
supply temperatures. (TE3001, TE3002 and TE3005)

1.10.3 Level

a] The Reservoir is equipped with 4 off ‘TAV’, type 70A, Level


Switches. 1 off located at low level (300mm) and 3 off at
low/low level (480mm). Tag Nos: LSL3001 and LSLL3001 to
LSLL3003.

b] The Reservoir is equipped with a Seetru Quickmount sight


gauge (LI3001), complete with integral shut-off valves, top and
bottom. Valves incorporate automatic shut off ball in the event
of glass breakage.

1.11 Terminal Enclosures

The Unit is equipped with three terminals enclosures, grouped as follows:-

a] Digital - Drawing No.J24358-05-01


Enclosure ‘Klippon’ TB11EX. (G.D.)

b] Power - Drawing No. J24358-05-02


Enclosure ‘Klippon’ TB11EX. (G.P.)

c] Analogue - Drawing No.J24358-05-03


Enclosure ‘Klippon’ TB10EX. (G.A.)

Page 8

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

1.0 EQUIPMENT SPECIFICATION (Contd/)

1.12 Paintwork

The Interior of reservoir is painted in accordance with ‘Brush’ specification


PS2265.
The Exterior of reservoir & pipework is painted in accordance with ‘Brush’
specification PS2828, finish colour light blue to BS4800 18E51.

2.0 PRE-INSTALLATION TEST AND FLUSHING PROCEDURE

2.1 The Systems have been thoroughly flushed through and tested in respect of
both performance and cleanliness at fabrication Works.

3.0 INSTALLATION AND COMMISSIONING

3.1 Installation

The Lubrication Units should be installed on flat level surface.

The terminating pipe connections are as follows:-

Lubrication
Feedlines – 2 off - 2.1/2” NB ANSI 150# Flange

Lubrication
Return Line – 2 off - 4” ANSI 150# Flange

3.2 Services

Pumps )
Heaters )
Air Blast Cooler Fans ) 380-415v, 3ph, 50Hz / 440-480v, 3ph, 60Hz
Precipitator Fan )
Precipitator 110-120v, 1ph, 50/60Hz
Emergency Pump 125v Pure D.C.

Page 9

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

3.0 INSTALLATION AND COMMISSIONING

3.3 Pipework

Install site pipework, ensuring all traces of swarf, weld splatter and debris are thoroughly
removed before making connections.

3.4 Commissioning

a] Flushing

Before connection to lubrication module, site installed system pipework must


be thoroughly flushed through to remove foreign solids. Use either the same
oil as the final fill, or flushing oil as recommended by the lubricant supplier.

Before commencing flushing, bypass the lubrication points with flexible hoses
or temporary pipework to avoid possible damage by loose abrasive matter.
Thoroughly flush pipework via external flushing circuit until system is clean.

To dislodge dirt and scale, site piping should be hammered, with soft mallet during
flushing; special attention being paid to the areas of site welds.

In all, flushing should continue for at least 48 hours or until the test screen
meets required standard.

After flushing, drain the oil and connect oil lubrication system to system
pipework.

Page 10

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

3.0 INSTALLATION AND COMMISSIONING (Contd/)

b] Checking Main Items of System

Check that the tank is filled to run down level.

Note: If the pipework is extensive, or considerable oil is held in the


equipment, it may be necessary to top up the tank. Never fill the tank
whilst system is running.

On initial start up, ensure pipework system has been filled with oil and oil is
returning to the tank. Check all flanges and unions for tightness; adjust as
necessary to accommodate any loosening arising in transit. Switch off pump
and wait for available oil to drain back to the tank. Note level of tank in this
condition. This is the run down level and maximum to be encountered. More
oil may then be added to bring the level to approximately 150mm below tank
top.

Check that all switches are set to the desired set point.

Check that the heaters thermostat is set to desired operating temperature.

Air Blast Cooler

Check operation of fans and oil Temperature control valve

c] Running Tests and Adjustments

Ensure the system is at minimum permissive cold start of 20°C

If required, the two AC pumps may be initially run together to provide greater oil
flow to the generator.

Adjust pressure control valve (PCV3001) as necessary – factory set at 1.7 bar.

See Schematic Drawing J24358-01-01 for details of factory settings on all


switches.

Page 11

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)


4.0 FAULT FINDING

Action in the event of trouble, is best determined by reference to the chart below:-

CONDITION CAUSE ACTION

System will not start Incorrect electrical supply to pump Check electrics
motor and/or pressure switch
interlocks

Pump jammed Investigate cause and rectify

Other switch interlocks(levels etc) Check electrics

System will not build up Leaking pipework Locate and repair


required pressure
Loss of pump prime Check suction pipework for leaks.
Check if relief valve jammed open

Blocked system filtered Inspect, clean or replace

Low oil level in tank Check and top us.


Investigate loss of oil

Pump relief valve bypassing Check and re-set, repair or


replace

Control valve incorrectly set Check and adjust

Faulty pump Check and re-set, repair or


replace

Oil in tank too cold, i.e. too viscous Check heater/temperature

Page 12

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

4.0 FAULT FINDING

CONDITION CAUSE ACTION

High differential pressure Filter dirty/blocked Clean or replace element as


across filter necessary

Oil fails to reach points of Flow control valve wrongly adjusted Check and re-set
application

Blockage or restriction in delivery line Trace, clean out or replace, as


necessary

Oil temperature abnormally Oil cooler not operating correctly Check and adjust
high

Air flow restricted Check and clear

Oil temperature too low Tank heater set too high or not cutting Check and re-set or replace
out

System builds up abnormally Pressure relief valve incorrectly set or Check and adjust or clean as
high pressure blocked necessary

Blockage in system pipework Check and clear as necessary

Page 13

Homepage Previous Document


ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

5.0 MAINTENANCE SHEETS

MS11-36A Pressure Control Valve

MS11-37A Temperature Control Valve

MS12-29 Pumps

MS12-30 A.C. Pump Motors

MS12-31 D.C. Pump Motor

MS15-19 Air Blast Cooler

MS21-14A Electrostatic Precipitator

MS21-8 Sight Gauge

MS4-39 Filter

MS6-22 Level Switches

MS7-21 Immersion Heaters

MS8-39 Pressure Switches

MS8-40 Differential Pressure Switches

MS8-46 Pressure Transmitter

Page 14

Homepage Previous Document


Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
Homepage Previous Document
ENGINEERING & GENERAL EQUIPMENT LTD.

OPERATING AND MAINTENANCE INSTRUCTIONS


FOR
LUBRICATION RECIRCULATION MODULE
SERVING BDAX-7-290ER
TP & M TWIN PAC GENERATOR

T.I. 1471 (Issue A)

6.0 DRAWINGS

6.1 Pump and Module Drawings

Oil Recirculation Module G.A. EGE Drg No. J24358-02-01

Oil Recirculation Module


Schematic Diagram EGE Drg No. J24358-01-01

Parts List EGE Drg No. J24358-pl-001

6.2 Terminal Box Drawings

Digital Terminal Box EGE Drg No. J24358-05-01

Power Terminal Box EGE Drg No. J24358-05-02

Analogue EGE Drg No. J24358-00-03

6.3 Spares Drawings

Spares G.A. EGE Drg No. J24358-02-02

Spares Parts List EGE Drg No. J24358-pl-004

Page 15

Homepage Previous Document


Homepage Previous Document
Homepage Previous Document
Homepage Previous Document

Вам также может понравиться