Вы находитесь на странице: 1из 29

CONTROL FINANCIERO MENSUAL DE OBRA

(MAYORES, MENORES, Y OBRAS NO PACTADAS CON SUS RESPECTIVOS APU PARA GESTIONAR MODIFICATORIA)

FECHA DE REPORTE DIA MES AÑO HOJA 1

OBJETO DEL CONTRATO

INTERVENTOR NIT O C.C. CONTRATO No.


CONTRATISTA NIT O C.C. CONTRATO No.

CORTE MENSUAL (anotar


CONTRATADO TOTAL OBRA A EJECUTARSE mes 3)

MAYORES MENORES
ITEM ACTIVIDAD UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL CANTIDAD VR. TOTAL CANTIDAD VALOR
CANTIDAD VALOR CANTIDAD VALOR

1 Act 1 ML 50 50,000 2,500,000 32 1600000 18 900000


2 Act 2 UND 20 20,000 400,000 15 300000 5 100000
3 Act 3 M3 33 120,000 3,960,000 60 7200000 27 3240000
4 Act 4 M2 40 50,000 2,000,000 55 2750000 15 750000
5 Act 5 ML 58 24,000 1,392,000 73 1752000 15 360000
6 Act 6 UND 12 10,500 126,000 0 0 12 126000
7 Act 7 UND 1 104,768 104,768 1 104768
8 Act 8 ML 10 204,300 2,043,000 10 2043000
9 Act 9 UND 22 12,000 264,000 20 240000 2 24000
10 Act 10 M2 5 15,720 78,600 5 78600
11 Act 11 M3 1 104,675 104,675 0 0 1 104675
12 Act 12 UND 3 50,909 152,727 3 152727

TOTAL COSTO DIRECTO 13,125,770 16221095 4350000 1254675


ADMINISTRACIÓN 30% 3,937,731 4866329 1305000 376402.5
IMPREVISTOS 3% 393,773 486633 130500 37640.25
UTILIDAD 5% 656,289 811055 217500 62733.75
IVA SOBRE UTILIDAD 19% 124,695 154100 41325 11919.4125
COSTO TOTAL 18,238,257 22539212 6044325 1743370.91
OBRAS NO PREVISTAS
TOTAL COSTO DIRECTO ONP
ADMINISTRACIÓN
IMPREVISTOS
UTILIDAD
IVA SOBRE UTILIDAD
COSTO TOTAL ONP

COSTO TOTAL FINAL OBRA

Director y/o Residente de Obra Directo Interventoría


Matricula Profesional Matricula Profesional
DE

ACULUMADO OBRA
PENDIENTE POR COBRAR
EJECUTADA

CANTIDAD VALOR CANTIDAD VALOR

0 contrato balanceado
a
al
AVANCE FINANCIERO CONTRATO DE OBRA

Contrato No.
Valor contrato: $225,000,000 Fecha de corte: 2/23/2016
Contratista: Avance Tiempo: 65 días
Fecha inicio: 12/20/2015 Avance Físico: 4.42%
Fecha terminación: 5/20/2016 Avance Financiero: 30.00%
Plazo contrato: 152 días

Millones de pesos
25,000,000

Programado Ejecutado
MES Indicador
Acumulado Acumulado
No. Fecha ($) ($) (%)
0 20/12/2015 0.00 0.00 0.00%
1 20/01/2016 4,500,000.00 5,373,173.00 19.40%
2 22/02/2016 8,650,000.00 9,935,401.00 14.86%
3 19/03/2016 13,547,800.00 12,702,956.00 -6.24%
4 5/12/2006 15,200,000.00 -100.00% Programado Acumulado
5 6/12/2006 17,581,969.00 -100.00% Ejecutado Acumulado

0
0 1 2 3 4 5
Mes
BALANCE FINANCIERO CONTRATO POR EJECUCIÓN MENSUAL O CORTE

VALOR CONTRATO INICIAL


VALOR CONTRATO A EJECUTAR 22,539,211.50
VALOR ACUMULADO CORTES 0.00 -
VALOR MENORES - -
VALOR MAYORES - -
VALOR NO PREVISTAS - -
PENDIENTE POR EJECUTAR 0.00 -
VALOR ADICION - -
SUMAS IGUALES 0.00 22,539,211.50
SUAL O CORTE

18,238,257.42

-
-
-
-

0.00
18,238,257.42
VALOR TOTAL A EJECUTAR CONTRATO

VALOR CONTRATO INICIAL A 1,860,659,429.64


VALOR MENORES B 233,858,971.58
VALOR MAYORES C 449,428,315.27
VALOR NO PREVISTAS D 188,181,720.12
TOTAL A EJECUTAR (A + C + D - B) E 2,732,128,436.61

VALOR ADICION (E - A) 871,469,006.96

2000000000
139,340,570.36
CONTROL FINANCIERO MENSUAL DE OBRA
(MAYORES, MENORES, Y OBRAS NO PACTADAS CON SUS RESPECTIVOS APU PARA

FECHA DE REPORTE DIA MES AÑO

OBJETO DEL CONTRATO

INTERVENTOR NIT O C.C.


CONTRATISTA NIT O C.C.

CONTRATADO TOTAL OBRA A EJE

MAYORES
ITEM ACTIVIDAD UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL CANTIDAD VR. TOTAL
CANTIDAD
1 PRELIMINARES
LOCALIZACIÓN, TRAZADO Y REPLANTEO CON EQUIPO
1.1 M2 7711.70 1,940.00 14,960,698.00 7,510.21 14569807.4 -
DE TOPOGRAFÍA
1.2 DEMOLICIÓN DE PAVIMENTO EN CONCRETO RÍGIDO M3 326.42 64,132.00 20,933,967.44 346.39 22214683.48 19.97
1.3 DEMOLICIÓN DE BORDILLOS EN CONCRETO ML 480.00 5,597.00 2,686,560.00 427.00 2389919 -
DEMOLICIÓN DE LOSAS SUPERIORES DE POZOS DE
1.4 UND 4.00 102,611.00 410,444.00 7.00 718277 3.00
INSPECCIÓN
EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN Y
1.5 M3 3032.76 5,138.00 15,582,320.88 4,850.00 24919300 1,817.24
CANALES
RETIRO DE SOBRANTES DE EXCAVACIÓN Y
1.6 M3 3378.20 23,174.00 78,286,360.45 4,025.84 93294816.16 647.64
ESCOMBROS, INCLUYE CARGUE

CERRAMIENTO PROVISIONAL EN TELA VERDE, INC


1.7 M2 210.00 9,618.00 2,019,780.00 210.00 2019780 -
MATERIALES NECESARIOS PARA SU CONSTRUCCIÓN

2 ESTRUCTURA DE PAVIMENTO 0 -
2.1 CONFORMACIÓN DE CALZADA EXISTENTE M2 7244.20 633.00 4,585,578.60 7,480.25 4734998.25 236.05
2.2 BASE GRANULAR TIPO INVIAS (ART. 330-07) E = 0,15M M3 1273.62 140,880.00 179,427,585.60 1,130.11 159209896.8 -

CONCRETO MR 42 KG/CM2, E = 0,19M. (INCLUYE


2.3 CURADO CON ANTISOL, ACERO DE TRANSF. DE CARGA, M2 7244.20 121,158.00 877,692,783.60 9,650.00 1169174700 2,405.80
ACERO DE ANCLAJE Y ACABADO TEXTURIZADO)
TRATAMIENTO DE JUNTAS DE DILATACIÓN PAVIMENTO,
INCLUYE CORTE DE CONCRETO CON DISCO Y SELLADO
2.4 DE JUNTAS (SELLADOR ELASTICO AUTONIVELANTE DE ML 3376.35 11,425.00 38,574,798.75 4,745.90 54221907.5 1,369.55
POLIURETANO DE ALTO DESEMPEÑO Y CORDÓN DE
ESPUMA PARA FONDO DE JUNTA)

BORDILLO DE MEDIDAS 0,175X0,50M, EN CONCRETO


2.5 CLASE D (3,000 PSI), INCLUYE ACERO DE REFUERZO ML 2671.40 56,644.00 151,318,781.60 0.00 0 -
4Ø3/8" LONGITUDINALES + 1 ESTRIBO Ø 1/4" C 0,30 M

ACERO DE 60000 PSI PARA REFUERZO LOSAS


2.6 BOCACALLES Y CIRCUNDANTES A TAPAS DE POZOS DE KG 3901.41 4,962.00 19,358,796.42 6,168.91 30610131.42 2,267.50
INSPECCIÓN
3 OBRAS DE DRENAJE 0 -

REPARACIONES DE CONEXIONES DOMICILIARIAS DE


3.1 ACUEDUCTO EN PVC DE PRESIÓN, INCLUYE TUBERÍA UND 75.00 19,605.00 1,470,375.00 55.00 1078275 -
1/2" A 1", ACCESORIOS Y MANO DE OBRA

REPARACIÓN DE CONEXIONES DOMICILIARIAS DEL


3.2 SISTEMA DE ALCANTARILLADO, INCLUYE TUBERÍA, UND 75.00 105,520.00 7,914,000.00 8.00 844160 -
ACCESORIOS Y MANO DE OBRA

TUBERÍA DE PVC DE ALCANTARILLADO CORRUGADO DE


12" PARA CONEXIÓN DE SUMIDERO A CANAL DE AGUA
3.3 LLUVIAS EXISTENTE, INCLUYE EXCAVACIÓN, BASE EN ML 2.00 106,908.00 213,816.00 1.30 138980.4 -
RELLENO SELECCIONADO, ARENA PARA NIVELACIÓN Y
ATRAQUE Y RETAPADO CON MATERIAL DE EXCAVACIÓN

RECONSTRUCCIÓN DE CUELLO DE POZO DE


INSPECCIÓN, INCLUYE SUINISTRO Y COLOCACIÓN DE
3.4 ARO-BASE CON PARRILLA DE 1/2", CONCRETO DE 3000 UND 4.00 416,775.00 1,667,100.00 7.00 2917425 3.00
PSI PARA CUELLO Y CONCRETO DE 4000 PSI PARA LOSA
SUPERIOR

CONEXIÓN DE TUBERÍA PVC ALCANTARILLADO 12" A


3.5 UND 2.00 130,739.00 261,478.00 1.00 130739 -
CANAL DE AGUAS LLUVIAS EN CONCRETO EXISTENTE
CANAL EN CONCRETO CLASE D (3000 PSI) PARA
CAPTACIÓN AGUAS LLUVIAS, SECCIÓN TRANSVERSAL
INTERNA DE 0,50X0,50M (ANCHOXALTO PROMEDIO),
3.6 INCLUYE REFUERZO, EXCAVACIÓN, RELLENO INFERIOR ML 5.00 507,180.00 2,535,900.00 5.00 2535900 -
EN MATERIAL SELECCIONADO COMPACTO AL 95% DEL
PROCTOR MODIFICADO H=0,20M Y BASE EN CONCRETO
CLASE F (2500 PSI) E=0,05M, SEGÚN DETALLE

SUMINISTRO E INSTALACIÓN DE REJILLA PARA CANAL


AGUAS LLUVIAS EN PERFIL 1 DE 6" (ANCHO=0,80 M),
3.7 PERFILES ESPACIADOS CADA 0,07MT, INCLUYE BASE ML 5.00 616,458.00 3,082,290.00 5.00 3082290 -
EN ANGULO DED 3"X3/8" Y BISAGRAS EN MÓDULO
LATERAL PARA INSPECCIÓN Y LIMPIEZA

4 SEÑALIZACIÓN Y SEGURIDAD 0 -

SUMINISTRO E INSTALACIÓN SEÑAL VERTICAL 75X75


4.1 UND 26.00 303,947.00 7,902,622.00 26.00 7902622 -
CM- SEÑALES REGLAMENTARIAS TIPO SR-01

ESTOPEROLES FRENTE A INSTITUCIONES EDUCATIVAS,


4.2 DISTRIBUCIÓN DE 4 FILAS CADA 0,30 MEDIDOS CENTRO UND 92.00 4,244.00 390,448.00 92.00 390448 -
A CENTRO

TOTAL COSTO DIRECTO 2,759,288.00 1,431,276,484.34 1597099056.41


ADMINISTRACIÓN 24% 343,506,356.24 383303773.5384
IMPREVISTOS 1% 14,312,764.84 15970990.5641
UTILIDAD 5% 71,563,824.22 79854952.8205

COSTO TOTAL 1,860,659,429.64 $ 2,076,228,773

OBRAS NO PREVISTAS
PODA DE ARBOLES REQUERIDA PARA PASO DE
49,498.00 5.00 247490 5.00
MAQUINARIA
CORTE DE ARBOL PORTE BAJO SACADO DE RAIZ,
HASTA 0.20 M DE DIAMETRO, INCLUYE RETIRO A
159,243.00 15.00 2388645 15.00
BOTADERO OFICIAL, RELLENO DE HUECO Y PERMISO
DE CORPOCESAR
CONEXIÓN DOMICILIARIA DE ALCANTARILLADO,
INCLUYE SUMINISTRO DE TUBERIA ALCANTARILLADO
PVC CORRUGADO DE 6" (160mm) LONGITUD PROMEDIO
528,429.00 22.00 11625438 22.00
6.50M, SUMINISTRO DE KIT SILLA YEE DE 8" X 6" (200 mm
X 160 mm), ACONDICIONADOR, EXCAVACIÓN Y
RETAPADO DE ZANJAS

CAJA DE INSPECCIÓN DE 60x60x60CM, EN CONCRETO


DE f'c=3.000PSI IMPERMEABILIZADO, INCLUYE
EXCAVACIÓN Y TAPE, TAPA EN CONCRETO CON
234,651.00 22.00 5162322 22.00
REFUERZO EN VARILLA Ø 3/8" CADA 0.15M, CAÑUELAS E
INCLUYE TODO LO NECESARIO PARA SU CORRECTO
FUNCIONAMIENTO

CONEXIÓN DOMICILIARIA DE ACUEDUCTO, INCLUYE


TUBERIA PVC PRESIÓN DE 1/2", TAPÓN, COLLAR DE 14,123.00 14.00 197722 14.00
DERIVACIÓN, EXCAVACION Y RELLENO

BORDILLO DE MEDIDAS 0.15X0.15M PARA CONSTRUIR


SOBRE LOSAS DE PAVIMENTO EN CONCRETO CLASE D
(3000 PSI), INCLUYE ACERO DE REFUERZO 4 Ø 3/8" 24,440.00 2,444.33 59739425.2 2,444.33
LONGITUDINALES + 1 ESTRIBO Ø 1/4" L=0.60M CADA
0.30M

MEJORAMIENTO SUBRASANTE CON PIEDRA RAJÓN DE


20 CM DE ESPESOR Y MATERIAL SELECCIONADO
86,156.00 759.02 65394127.12 759.02
PROVENIENTE DE EXCAVACION (INCLUYE, SUMINISTRO,
TRANSPORTE, EXTENDIDO Y COMPACTACIÓN)

TOTAL COSTO DIRECTO ONP 1,096,540.00 144755169.32


ADMINISTRACIÓN 24% 34741240.6368
IMPREVISTOS 1% 1447551.6932
UTILIDAD 5% 7237758.466
IVA SOBRE UTILIDAD
COSTO TOTAL ONP

COSTO TOTAL FINAL OBRA $ 188,181,720

$ 1,860,659,430 $ 2,264,410,493
Director y/o Residente de Obra
Matricula Profesional COSTO TOTAL DE OBRA
TOTAL CONTRATO NO PREVISTAS
L DE OBRA
VOS APU PARA GESTIONAR MODIFICATORIA)

HOJA 1 DE

CONTRATO No.
CONTRATO No.

ACULUMADO OBRA
OTAL OBRA A EJECUTARSE CORTE MENSUAL
EJECUTADA

MAYORES MENORES
CANTIDAD VALOR CANTIDAD VALOR
VALOR CANTIDAD VALOR

- 201.49 390,890.60

1,280,716.04 - -
- 53.00 296,641.00
307,833.00 - -

9,336,979.12 - -

15,008,455.71 - -

- - -

- - -
149,419.65 - -
- 143.51 20,217,688.80

291,481,916.40 - -
15,647,108.75 - -

- 2,671.40 151,318,781.60

11,251,335.00 - -

- - -

- 20.00 392,100.00

- 67.00 7,069,840.00

- 0.70 74,835.60

1,250,325.00 - -

- 1.00 130,739.00
- - -

- - -

- - -

- - -

- - -

345714088.668 179891516.6
82971381.28032 43173963.984
3457140.88668 1798915.166
17285704.4334 8994575.83

449428315.2684 233858971.58

247490

2388645
11625438

5162322

197722

59739425.2

65394127.12

144755169.32
34741240.6368
1447551.6932
7237758.466

188181720.116

$ 637,610,035 $ 233,858,972 BALANCE $ 0


Directo Interventoría
M
MAYORES MENORES
CONTROL FINANCIERO MENSUAL DE OBRA
(MAYORES, MENORES, Y OBRAS NO PACTADAS CON SUS RESPECTIVOS APU PARA

FECHA DE REPORTE DIA MES AÑO

OBJETO DEL CONTRATO

INTERVENTOR NIT O C.C.


CONTRATISTA NIT O C.C.

CONTRATADO TOTAL OBRA A EJE

MAYORES
ITEM ACTIVIDAD UNIDAD CANTIDAD VR. UNITARIO VR. TOTAL CANTIDAD VR. TOTAL
CANTIDAD
1 PRELIMINARES
LOCALIZACIÓN, TRAZADO Y REPLANTEO CON EQUIPO
1.1 M2 7711.70 1,940.00 14,960,698.00 7,510.21 14569807.4 -
DE TOPOGRAFÍA
1.2 DEMOLICIÓN DE PAVIMENTO EN CONCRETO RÍGIDO M3 326.42 64,132.00 20,933,967.44 346.39 22214683.48 19.97
1.3 DEMOLICIÓN DE BORDILLOS EN CONCRETO ML 480.00 5,597.00 2,686,560.00 427.00 2389919 -
DEMOLICIÓN DE LOSAS SUPERIORES DE POZOS DE
1.4 UND 4.00 102,611.00 410,444.00 7.00 718277 3.00
INSPECCIÓN
EXCAVACIÓN SIN CLASIFICAR DE LA EXPLANACIÓN Y
1.5 M3 3032.76 5,138.00 15,582,320.88 4,850.00 24919300 1,817.24
CANALES
RETIRO DE SOBRANTES DE EXCAVACIÓN Y
1.6 M3 3378.20 23,174.00 78,286,360.45 4,025.84 93294816.16 647.64
ESCOMBROS, INCLUYE CARGUE

CERRAMIENTO PROVISIONAL EN TELA VERDE, INC


1.7 M2 210.00 9,618.00 2,019,780.00 210.00 2019780 -
MATERIALES NECESARIOS PARA SU CONSTRUCCIÓN

2 ESTRUCTURA DE PAVIMENTO 0 -
2.1 CONFORMACIÓN DE CALZADA EXISTENTE M2 7244.20 633.00 4,585,578.60 7,480.25 4734998.25 236.05
2.2 BASE GRANULAR TIPO INVIAS (ART. 330-07) E = 0,15M M3 1273.62 140,880.00 179,427,585.60 1,130.11 159209896.8 -

CONCRETO MR 42 KG/CM2, E = 0,19M. (INCLUYE


2.3 CURADO CON ANTISOL, ACERO DE TRANSF. DE CARGA, M2 7244.20 121,158.00 877,692,783.60 9,650.00 1169174700 2,405.80
ACERO DE ANCLAJE Y ACABADO TEXTURIZADO)
TRATAMIENTO DE JUNTAS DE DILATACIÓN PAVIMENTO,
INCLUYE CORTE DE CONCRETO CON DISCO Y SELLADO
2.4 DE JUNTAS (SELLADOR ELASTICO AUTONIVELANTE DE ML 3376.35 11,425.00 38,574,798.75 4,745.90 54221907.5 1,369.55
POLIURETANO DE ALTO DESEMPEÑO Y CORDÓN DE
ESPUMA PARA FONDO DE JUNTA)

BORDILLO DE MEDIDAS 0,175X0,50M, EN CONCRETO


2.5 CLASE D (3,000 PSI), INCLUYE ACERO DE REFUERZO ML 2671.40 56,644.00 151,318,781.60 0.00 0 -
4Ø3/8" LONGITUDINALES + 1 ESTRIBO Ø 1/4" C 0,30 M

ACERO DE 60000 PSI PARA REFUERZO LOSAS


2.6 BOCACALLES Y CIRCUNDANTES A TAPAS DE POZOS DE KG 3901.41 4,962.00 19,358,796.42 6,168.91 30610131.42 2,267.50
INSPECCIÓN
3 OBRAS DE DRENAJE 0 -

REPARACIONES DE CONEXIONES DOMICILIARIAS DE


3.1 ACUEDUCTO EN PVC DE PRESIÓN, INCLUYE TUBERÍA UND 75.00 19,605.00 1,470,375.00 55.00 1078275 -
1/2" A 1", ACCESORIOS Y MANO DE OBRA

REPARACIÓN DE CONEXIONES DOMICILIARIAS DEL


3.2 SISTEMA DE ALCANTARILLADO, INCLUYE TUBERÍA, UND 75.00 105,520.00 7,914,000.00 8.00 844160 -
ACCESORIOS Y MANO DE OBRA

TUBERÍA DE PVC DE ALCANTARILLADO CORRUGADO DE


12" PARA CONEXIÓN DE SUMIDERO A CANAL DE AGUA
3.3 LLUVIAS EXISTENTE, INCLUYE EXCAVACIÓN, BASE EN ML 2.00 106,908.00 213,816.00 1.30 138980.4 -
RELLENO SELECCIONADO, ARENA PARA NIVELACIÓN Y
ATRAQUE Y RETAPADO CON MATERIAL DE EXCAVACIÓN

RECONSTRUCCIÓN DE CUELLO DE POZO DE


INSPECCIÓN, INCLUYE SUINISTRO Y COLOCACIÓN DE
3.4 ARO-BASE CON PARRILLA DE 1/2", CONCRETO DE 3000 UND 4.00 416,775.00 1,667,100.00 7.00 2917425 3.00
PSI PARA CUELLO Y CONCRETO DE 4000 PSI PARA LOSA
SUPERIOR

CONEXIÓN DE TUBERÍA PVC ALCANTARILLADO 12" A


3.5 UND 2.00 130,739.00 261,478.00 1.00 130739 -
CANAL DE AGUAS LLUVIAS EN CONCRETO EXISTENTE
CANAL EN CONCRETO CLASE D (3000 PSI) PARA
CAPTACIÓN AGUAS LLUVIAS, SECCIÓN TRANSVERSAL
INTERNA DE 0,50X0,50M (ANCHOXALTO PROMEDIO),
3.6 INCLUYE REFUERZO, EXCAVACIÓN, RELLENO INFERIOR ML 5.00 507,180.00 2,535,900.00 5.00 2535900 -
EN MATERIAL SELECCIONADO COMPACTO AL 95% DEL
PROCTOR MODIFICADO H=0,20M Y BASE EN CONCRETO
CLASE F (2500 PSI) E=0,05M, SEGÚN DETALLE

SUMINISTRO E INSTALACIÓN DE REJILLA PARA CANAL


AGUAS LLUVIAS EN PERFIL 1 DE 6" (ANCHO=0,80 M),
3.7 PERFILES ESPACIADOS CADA 0,07MT, INCLUYE BASE ML 5.00 616,458.00 3,082,290.00 5.00 3082290 -
EN ANGULO DED 3"X3/8" Y BISAGRAS EN MÓDULO
LATERAL PARA INSPECCIÓN Y LIMPIEZA

4 SEÑALIZACIÓN Y SEGURIDAD 0 -

SUMINISTRO E INSTALACIÓN SEÑAL VERTICAL 75X75


4.1 UND 26.00 303,947.00 7,902,622.00 26.00 7902622 -
CM- SEÑALES REGLAMENTARIAS TIPO SR-01

ESTOPEROLES FRENTE A INSTITUCIONES EDUCATIVAS,


4.2 DISTRIBUCIÓN DE 4 FILAS CADA 0,30 MEDIDOS CENTRO UND 92.00 4,244.00 390,448.00 92.00 390448 -
A CENTRO

TOTAL COSTO DIRECTO 2,759,288.00 1,431,276,484.34 1597099056.41


ADMINISTRACIÓN 24% 343,506,356.24 383303773.5384
IMPREVISTOS 1% 14,312,764.84 15970990.5641
UTILIDAD 5% 71,563,824.22 79854952.8205

COSTO TOTAL 1,860,659,429.64 $ 2,076,228,773

OBRAS NO PREVISTAS
PODA DE ARBOLES REQUERIDA PARA PASO DE
49,498.00 5.00 247490 5.00
MAQUINARIA
CORTE DE ARBOL PORTE BAJO SACADO DE RAIZ,
HASTA 0.20 M DE DIAMETRO, INCLUYE RETIRO A
159,243.00 15.00 2388645 15.00
BOTADERO OFICIAL, RELLENO DE HUECO Y PERMISO
DE CORPOCESAR
CONEXIÓN DOMICILIARIA DE ALCANTARILLADO,
INCLUYE SUMINISTRO DE TUBERIA ALCANTARILLADO
PVC CORRUGADO DE 6" (160mm) LONGITUD PROMEDIO
528,429.00 22.00 11625438 22.00
6.50M, SUMINISTRO DE KIT SILLA YEE DE 8" X 6" (200 mm
X 160 mm), ACONDICIONADOR, EXCAVACIÓN Y
RETAPADO DE ZANJAS

CAJA DE INSPECCIÓN DE 60x60x60CM, EN CONCRETO


DE f'c=3.000PSI IMPERMEABILIZADO, INCLUYE
EXCAVACIÓN Y TAPE, TAPA EN CONCRETO CON
234,651.00 22.00 5162322 22.00
REFUERZO EN VARILLA Ø 3/8" CADA 0.15M, CAÑUELAS E
INCLUYE TODO LO NECESARIO PARA SU CORRECTO
FUNCIONAMIENTO

CONEXIÓN DOMICILIARIA DE ACUEDUCTO, INCLUYE


TUBERIA PVC PRESIÓN DE 1/2", TAPÓN, COLLAR DE 14,123.00 14.00 197722 14.00
DERIVACIÓN, EXCAVACION Y RELLENO

BORDILLO DE MEDIDAS 0.15X0.15M PARA CONSTRUIR


SOBRE LOSAS DE PAVIMENTO EN CONCRETO CLASE D
(3000 PSI), INCLUYE ACERO DE REFUERZO 4 Ø 3/8" 24,440.00 2,444.33 59739425.2 2,444.33
LONGITUDINALES + 1 ESTRIBO Ø 1/4" L=0.60M CADA
0.30M

MEJORAMIENTO SUBRASANTE CON PIEDRA RAJÓN DE


20 CM DE ESPESOR Y MATERIAL SELECCIONADO
86,156.00 759.02 65394127.12 759.02
PROVENIENTE DE EXCAVACION (INCLUYE, SUMINISTRO,
TRANSPORTE, EXTENDIDO Y COMPACTACIÓN)

TOTAL COSTO DIRECTO ONP 1,096,540.00 144755169.32


ADMINISTRACIÓN 24% 34741240.6368
IMPREVISTOS 1% 1447551.6932
UTILIDAD 5% 7237758.466
IVA SOBRE UTILIDAD
COSTO TOTAL ONP

COSTO TOTAL FINAL OBRA $ 188,181,720

$ 1,860,659,430 $ 2,264,410,493
Director y/o Residente de Obra
Matricula Profesional COSTO TOTAL DE OBRA
TOTAL CONTRATO NO PREVISTAS
L DE OBRA
VOS APU PARA GESTIONAR MODIFICATORIA)

HOJA 1 DE

CONTRATO No.
CONTRATO No.

ACULUMADO OBRA
OTAL OBRA A EJECUTARSE CORTE MENSUAL
EJECUTADA

MAYORES MENORES
CANTIDAD VALOR CANTIDAD VALOR
VALOR CANTIDAD VALOR

- 201.49 390,890.60

1,280,716.04 - -
- 53.00 296,641.00
307,833.00 - -

9,336,979.12 - -

15,008,455.71 - -

- - -

- - -
149,419.65 - -
- 143.51 20,217,688.80

291,481,916.40 - -
15,647,108.75 - -

- 2,671.40 151,318,781.60

11,251,335.00 - -

- - -

- 20.00 392,100.00

- 67.00 7,069,840.00

- 0.70 74,835.60

1,250,325.00 - -

- 1.00 130,739.00
- - -

- - -

- - -

- - -

- - -

345714088.668 179891516.6
82971381.28032 43173963.984
3457140.88668 1798915.166
17285704.4334 8994575.83

449428315.2684 233858971.58

247490

2388645
11625438

5162322

197722

59739425.2

65394127.12

144755169.32
34741240.6368
1447551.6932
7237758.466

188181720.116

$ 637,610,035 $ 233,858,972 BALANCE $ 0