Вы находитесь на странице: 1из 27

BILL OF QUANTITIES

FOR

FACILITY NO. (11) - CODE 0720

BILL NO. 11

PROJECT : CMW-000-B000

Design & Built Notes


1- This Contract is Design and Build Contract.
2- Contractor is fully responsible to design, construct, complete and handover all works
as per the requirements in fully functional and operational conditions.

3- All the attached drawings, Specifications, BOQ are only for guidance, contractor is
responsible to submit detailed design, drawings, BOQ & Specifications as required
all as per approved design without any extra time or cost .

4- All works to be done as per attached documents which are for guidance and
reference only. Contractor to handover all works in complete integration with the
requirements for the full operation of the works.

5- Contractor to submit detailed design, drawings, method statement and all the
required studies, calculations and perform all required tests & studies for approval.

6- Contractor has to verify all requirements and to acquaint him self about all the
required works to complete the scope.

Page 261
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
EXISTING CONDITIONS DIVISION 11/2/1
2
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED

DIVISION 2 - EXISTING CONDITIONS

Division 31 and Division 32 and all related General


specifications divisions are also included in this Division.
Division 2, Section 02 32 00 Geotechnical Investigation -
Soil Investigation work is included in External works BOQ.

A Division 31 - Earth work


1 Excavation
Excavation required to the foundation level of the Facility
including compaction at the excavated levels, replacement
of any soft or undesirable materials all as per the drawings
and as per soil report recommendations and including
Item
excavation for swimming pool, aprons, ramp, steps etc..
Complete, cartaway surplus as directed and the works
including shoring & dewatering.

2 Backfilling
Backfilling required & up to the Finish level of the Facility
with approved suitable material including compaction in
layers and as shown on drawings including steps and
Item
beneath ground floor and including swimming pool
beneath as per detailed section in the drawings and all
other associated drawings.

3 Anti Termite Treatment


Supply and spray the soil under the ground floor slab by
an approved treatment to protect the facility from termite
attacks , refer note - 16 - Materials on the drawing no. GN-
S-0001, all as per supplier's recommendation a continuous
Item
trench around the building shall be dug and treated by the
approved solution , a guarantee for the building protection
for a period not less than twenty years to be provided by
the contractor.

B Division 32 - Exterior Improvements


1 Kerb Stone works for apron
Supply and Install of Kerb stone including all layers
including excavation, haunching, bedding, paint complete LM
around the building as per the drawing.

2 Interlocking Paving works


Supply and Installation of Interlocking 6cm thick. of
approved quality & type around the building including all
M2
layers, 15cm aggregate base course and 5cm black
crushed sand, etc..., complete as shown on drawings.

Total for Bill No. 11 - Division No. 2 : EXISTING CONDITIONS


Carried to Summary of Bill No. 11

Page 262
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
CONCRETE DIVISION 11/3/1
3
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED

DIVISION 3 - CONCRETE

A Concrete
Design, Construct, Cast, complete Concrete works for the
Facility area as shown on the drawings and all as per
structural notes including plain concrete & reinforced
concrete works for all structural elements including
shuttering, concrete, curing, all additives as per approved
mix design, steel reinforcement, etc., complete for Sub-
Structure, Super Structure elements all as specified and
as on noted on drawings, including foundation of any type
as per approved soil report recommendation.

Contractor to submit all details for approval for all the


required design, shop drawings and submittals for all
elements such as foundations, Tie beams, Ground slabs,
Columns, pedestals, Walls, Beams, Suspended slabs,
swimming pool flooe & walls, Balancing tank, Steps,
Ramps, Parapets, etc.., to complete the construction of the
facility.
Contractor should design the most suitable Structural Item
System and framing layout based on :-

a Nature of Building (Requirements).

b Suitable for Construction works.

c More Economical.

Refer to Structural Notes on drawing no. CMW-000-B000-


GN-S-0001.

Important Note :- Contractor should follow note on drawing


for the design of the foundations and all structural
elements.

Contractor should follow the design codes and standards


as per structural note on drawing.

Total for Bill No. 11 - Division No. 3 : CONCRETE


Carried to Summary of Bill No. 11

Page 263
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
MASONRY DIVISION 11/4/1
4
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED

DIVISION 4 - MASONRY

A Supply and construct of all masonry works for the


complete facility (hollow and solid) internally and
externally, hollow thermo insulated concrete blocks with
polystyrene insulation boards to be used for all external
walls, normal hollow blocks for internal walls, and solid
blocks to be used for under ground block works and toilet
& wet areas partitions including steel mesh reinforcement,
Block work with mortar as per specifications also including
stiffeners etc..., and the works to include Precast concrete
Lintels and sills all as per architectural drawings, notes on
the General architectural, structural drawings including but
not limited to the following items:-

1 Solid concrete blocks 20cm thick M2

2 Solid concrete blocks 10cm thick M2

3 Hollow thermo insulated concrete blocks with polystyrene


insulation board for external walls 25cm thickness. M2

4 Normal hollow blocks for internal walls 20cm thick M2

Total for Bill No. 11 - Division No. 4 : MASONRY


Carried to Summary of Bill No. 11

Page 264
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
METALS DIVISION 11/5/1
5
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED

DIVISION 5 - METALS
Design, supply, installation, handing over complete Metal
works as noted in drawings and as specified in drawings
including but not limited to the following:-

A Steel Structure works


1 Design, supply, installation, handing over complete of
Steel Structure works complete to cover the area as
shown on the drawings for the facility including portal
frame steel truss frame, steel columns and all bracings,
supports as per approved design and roof system
complete with all steel structural elements that required to
complete the construction of the facility and all accessories
also including fire proofing (type-2 as per GN-A-0001) as Item
per note-5 on drg. 11-A-2002 and painting for the steel
structure etc... complete all as shown on the architectural
drawings and as per the General Structural Notes,
specifications and codes on drawing GN-S-0001, etc...
and all other associated drawings all as approved by the
Engineer.

B Roof and Wall Cladding works


Supply, installation, handing over complete covering works
for the Facility with Sandwich panel consists of outerskin
0.7mm thick aluminium polyster coated outer skin sheet
having profile 45/150, insulation 50mm thick injected
polyurethane foam insulation and inner skin-0.7mm thick
aluminium shallow profile polyster coated, all as shown on
the architectural drawings and all other associated
drawings to cover the facility, complete including
Aluminium Sheet gutter and rain water down pipes and all
the required accessories and fittings all as approved by
the Engineer including all the required accessories, curved
eave, ridge, rain water disposal system gutters, down pipe
etc.

1 Roof cladding (area to be measured on horizontal plan) M2

2 Wall cladding M2

C Sky Lights
3 Supply, install of Sky Lights (1.0 x 2.5m) with approved
polycarbonate sheet as shown and noted on the drawing
No.
No. 11-A-2002 and all other drawings. Contractor shall
submit full shop drawings for approval.

CARRIED FORWARD

Page 265
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
METALS DIVISION 11/5/2
5
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
BROUGHT FORWARD

DIVISION 5 - METALS (Cont'd.)

D Handrails
1 Aluminium Handrail for Ramps complete including
supports fixed with balusters and all accessories as LM
specified and as approved.

2 Stainless steel Handrail for Pool steps 81cm high


complete including supports fixed with balusters and all No.
accessories as specified and as approved.

3 Stainless steel Handrail for Pool steps 61cm high


complete including supports fixed with balusters and all No.
accessories as specified and as approved.

E Ladders
1 Steel Ladder for roof including supports and all
accessories as specified, refer Drg. 11-A-2002 & 3001 and No.
GN drawings.

F Grating & Covers

1 Heavy duty Ductile Iron Cover 100x100cm for Sump pit as


shown on drawing No. 11-A-2001 , complete. Item

2 Ductile Iron Cover for balancing tank access opening as


per drawing No. 11-A-5001 , complete.. No.

Total for Bill No. 11 - Division No. 5 : METALS


Carried to Summary of Bill No. 11

Page 266
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720
11
PROJECT : CMW-000-B000
WOOD, PLASTIC DIVISION 11/6/1
AND COMPOSITES 6
ITEM UNIT TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF. RATE AED

DIVISION 6 - WOOD, PLASTIC AND COMPOSITES

A Counters
1 Supply and Install of Vanity Counter for wash basin of
approved type all as shown on drawings. (Wash basins
and mixers measured separately in Division-22). LM

B Lockers & benches


1 Supply and install Lockers (type-2) as shown on drawing
no. 11-A-2001 and as per GN drawing, complete. No.

2 Supply and install Benches as shown on drawing no. 11-A-


2001 and as per GN drawing, complete. No.

C GRP Ladder for Balancing tank


1 Supply and installation of GRP Ladder for balancing tank
complete all as required, shown on drg. 11-A-2001 & 5001, Item
contractor to submit details for approval etc.

D Floor Mounted Cubicles Partition


1 Supply, install Floor mounted 2.0m high, 13mm thick
compact laminated sanitary grade partitions with complete
accessories, door, knobs, hinges, supports, complete as M2
shown on drawings, refer Drg. 11-A-2001 & 5001 for
showers & toilets.

Total for Bill No. 11 - Division No. 6 : WOOD, PLASTIC AND COMPOSITES
Carried to Summary of Bill No. 11

Page 267
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
THERMAL & MOISTURE DIVISION 11/7/1
PROTECTION 7
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
THERMAL & MOISTURE PROTECTION WORK

A Sub-Structure Insulation
Supply, install & testing of approved quality waterproofing
system for all concrete surfaces (vertical & horizontal) below
plinth level including for basement walls as shown in GN-
drawings and all other associated drawings and as the
following:-.

1 Bitumen primer Item

2 Two layers of SBS Type Water proofing membrane as per


Item
approval.

3 Protection board Item

4 Polythene Sheet Gauge 1000 two layers, as noted, shown on


Item
the drawings

5 Supply and Lay of water proof layer and DPC for under Block
Item
Walls of approved quality.

B Balancing tank
1 Allow for Waterproofing System of approved quality for
balancing tank. Contractor to submit complete details for
Item
approval.

C Swimming Pool
1 Allow for all Waterproofing System of approved quality for
the Swimming Pool walls, floors & slabs including pool deck
area complete, contractor to submit complete details for Item
approval, rere drg. 11-A-5004.

D Wet Area Waterproofing


1 Allow for Waterproofing System of approved quality for Wet
Areas (Toilets, showers, etc.,). M2

CARRIED FORWARD

Page 268
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
THERMAL & MOISTURE DIVISION 11/7/2
PROTECTION 7
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED

BROUGHT FORWARD

THERMAL & MOISTURE PROTECTION (Cont'd.)

E Roof Waterproofing
1 Supply and Apply of Roof waterproofing System of approved
quality for roof including complete system including but not M2
limited to the following :-
a) One Coat of cold bituminous primer.
b) Foam concrete screed 50-100mm thick Laid to fall/
density=550kg/m3.
c) Membrane 4mm. Thick. Reinforced with non woven
polyester Mat 200grm/m2 with primer.

d) 50mm of extruded polystyrene rigid foam board insulation.

e) Non-woven polyester synthetic fabric filter membrane.


f) Roofing concrete tiles loose laid on uPVC spacer blocks.

2 Supply and apply of Roof Skirting waterproofing System of


approved quality for roof and top roof including waterproofing
membrane 4mm thick with primer, wadi gravel, Aluminum
faced waterproofing membrane, Aluminum Flashing and LM
groove in concrete wall with mastic Sealant etc.

F Insulation Layer
1 Supply and install of 5cm insulation layer to be installed by
special adhesive and including fiber mesh for external Item
elevation as specified on drawing.

G Construction and Expansion Joints


1 Supply and install of all the required Construction and
Item
Expansion Joints as required.

H Water Bars
1 Water bars for swimming pool as required, complete.
Item

Total for Bill No. 11 Division 7 : THERMAL & MOISTURE PROTECTION


Carried to Summary of Bill No. 11

Page 269
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
OPENINGS DIVISION 11/8/1
8
TOTAL PRICE
ITEM REF. ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED

DIVISION 8 - OPENINGS
A Doors
Supply and installation of Doors for the Facility all as shown
and as detailed on the Architectural drawings including all
glazing, necessary accessories, Ironmongery, door signs &
finishes as follows.

1 Type D1, Size 200cm (W) × 220cm (H) Aluminium framed


double shutter half glazed and half aluminium sandwich No.
panel door, all as specified.

2 Type D2, 180cm (W) × 220cm (H) Timber framed rebated


flush door with vision panel, all as specified. No.

3 Type D3, 160cm (W) × 220cm (H) Aluminium framed


aluminium flush door with sandwich panel, all as specified. No.

4 Type D4, 100cm (W) × 220cm (H) Aluminium framed


aluminium flush door with sandwich panel, all as specified. No.

5 Type D5, 100cm (W) × 220cm (H) Timber framed rebated


flush door with vision panel, all as specified. No.

6 Type D6, 100cm (W) × 220cm (H) + fixed panel 150cm (W) No.
x 180cm (H) Aluminium framed glazed door, all as
specified.

7 Type D7, 180cm (W) × 240cm (H) Aluminium framed No.


aluminium flush door with sandwich panel, all as specified.

B Windows and Ventilators


Supply and installation of windows and ventilators as
shown on the Architectural drawings complete including all
accessories and ironmongery. All windows / ventilators to
be double glazed and as follows:-

1 Type W1, Size 160cm (W) × 120cm (H) sliding No.

2 Type W2, Size 600cm (W) × 100cm (H) as per drawing. No.

C Security Grill
1 Supply and installation of Aluminum security grill for
external windows and ventilators. M2

Total for Bill No. 11 Division 8 : OPENINGS


Carried to Summary of Bill No. 11

Page 270
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
FINISHES DIVISION 11/9/1
9
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED

DIVISION 9 - FINISHES

A Floor Finishes Works


Supply and Lay of Floor Finishes for the building as per plan
drawings and as specified on the drawings 04-A-2002 and
including Strip to separate between two different types of
Flooring and as follows:-

1 TER: 30x30x3cm Terrazzo tiles with marble chips of


approved color, make and pattern over cement/sand mortar M2
as specified.

2 TER: Treads & Risers of approved type Terrazo for all


LM
entrances steps as specified.

3 CER1: 20x20cm non-slip Ceramic tiles of approved colour,


make and pattern over cement/sand mortar for wet area as M2
specified.

4 RUB: 10mm thick Versatile rubber flooring, non slip, Resilient


against mechanical impact, sound and shock absorbent, low M2
noise level of approved type, complete all as specified.

5 CON: Smooth Trowel Concrete Flooring with approved floor


hardener and final top surface epoxy paint as per drawings
M2
and specifications (Concrete measured separately)

6 TILE-1: Supply & fixing of 11.7X24.5cm Swimming Pool


(floor) extruded Tiles min. 1cm thick of approved color, make
& pattern as per drawings and specifications include for
racing lanes tile markers and all special ceramic fittings,
M2
borders, etc. Contractor to submit complete details and
design, shape for approval and include for all required special
ceramic fittings for swimming pool.

7 TILE-2: Supply & fixing of 11.7X24.5cm Pool Deck Tiles min.


1cm thick of approved color, make & pattern complete with all
special ceramic fittings, borders, etc.as noted in drawing and
specifications. Contractor to submit complete details and M2
design, shape for approval and include for all required special
ceramic fittings for swimming pool.

8 HDPE: HDPE lining for internal finish of balancing water


tank (floor, walls, ceiling etc.) complete. M2

CARRIED FORWARD

Page 271
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
FINISHES DIVISION 11/9/2
9
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
BROUGHT FORWARD

DIVISION 9 - FINISHES (Cont'd.)

A Floor Finishes Works (Cont'd.)

9 Threshold: Supply and fix granite threshold of approved


quality. LM

Skirting

10 SMW-S: 10cm high Solid maple wood skirting with


LM
polyurethane finish, as per drawings and specifications.

11 TER-S: 10cm high set-in terrazzo skirting as per drawings


LM
and specifications.

B Wall Finishes Works

1 EMP: 15mm thick cement and mix powder 1:3 mix spray
smooth plaster for internal walls complete as per drawings M2
and specifications.

2 Gold Fenomastic Paint System for internal walls as specified,


from approved manufacturer, color to choice of Architect, M2
refer EMP.

3 CER: 20x30cm glazed Ceramic Tiles of approved quality and


color over cement/sand grout as noted on drawings and M2
specifications.

4 EN: 20x25cm glazed Ceramic Tiles for Pool deck of


approved quality, design & shape and color over
cement/sand grout as noted on drawings and specifications. M2
Contractor to submit design for approval.

5 EN: Alkyd enamel paint non-yellowing, lead free comprising


of 5 coats, complete system for walls for pool deck as
specified, from approved manufacturer, color and design to M2
choice of Architect. Contractor to submit design for approval.

6 TILE-1: 11.7X24.5cm for swimming pool (walls) extruded


tiles of approved design, color, make & pattern complete with
all special ceramic fittings, marking, borders, etc, as noted in M2
drawing and specifications. Contractor to submit complete
details and design for approval.

CARRIED FORWARD

Page 272
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
FINISHES DIVISION 11/9/3
9
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
BROUGHT FORWARD

DIVISION 9 - FINISHES (Cont'd.)


INTERNAL FINISHES (Cont'd.)
B Wall Finishes Works
7 Anti fungus paint for walls and ceiling above false ceiling with
M2
approved type.

8 12mm thick Gypsum board covering 2.5m above finish level


for all internal steel structure column including finishing with Item
paint s as per drg. 11-A-2001.

9 Mirror wall cladding laminated to 18mm thick MDF board for


Gymnasium area as detailed on Drg. no. 11-A-5005 of
M2
approved type including all accessories and required related
works.
C Ceiling Finishes Works
1 CIL: 12mm thick cement sand 1:4 mix smooth plaster for
M2
internal ceilings complete as per drawings and specifications.

2 Alkyd Enamel Paint System for internal ceilings as specified,


from approved manufacturer, color to choice of Architect, M2
refer CIL.

3 ALU-1: 600x600x0.7mm perforated Aluminum concealed


tiles false ceiling with acoustic tissue at back side complete M2
as per drawings and specifications.

4 ALU-2: 600x600x0.7mm plain Aluminum tiles false ceiling


with complete suspension system as per drawings and M2
specifications.

D EXTERNAL FINISHES
1 Supply and Apply of Plaster Works with grooves and recess
for External walls 20mm thick. Cement sand smooth
plastered including Stop Ends (Plaster Stopper) at all corners,
edges ,stainless steel mesh, crack control, plasterization M2
material etc… complete as specified on the drawing.

2 Supply and apply External Painting (reflective thermal


insulation textured coating base on Acrylic ) from approved
M2
manufacturer for External surface and parapets as per
drawings, color to choice of user and Architect.

3 2cm deep recessed ares of International approved symbols


and logos in plaster, refer to note-2 on drg. 11-A-3001, Item
complete all as per drawings.

Total for Bill No. 11 - Division No. 9 : FINISHES


Carried to Summary of Bill No. 11

Page 273
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
SPECIALTIES DIVISION 11/10/1
10
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED

DIVISION 10 - SPECIALTIES

A Toilet Accessories
1 Supply and installation of all toilets Accessories of
approved type, model, finish and origin including but not
limited to: soap dispenser, soap holder, paper holder,
Item
towel holder, robe hook, etc., Contractor to submit
complete details for approval.

B Mirrors
1 Supply and installation of all Mirrors for toilets of approved
type including all accessories complete. Contractor to
M2
submit complete details for approval.

C Fire Extinguishers
Supply, installation and testing of Fire Extinguishers of
approved type including fittings, etc., including but limited
to the following :- (refer to Design guidelines on Drg. GN-P-
0002).

1 Fire Extinguishers of approved type Item

2 Fire Extinguisher Cabinets Item

Total for Bill No. 11 - Division No. 10 : SPECIALTIES


Carried to Summary of Bill No. 11

Page 274
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
EQUIPMENT DIVISION 11/11/1
11
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED

DIVISION 11 - EQUIPMENT
Design, Supply, installation, testing and commissioning of
All Swimming pool Equipments complete with all
requirements, connections, all accessories, all controls,
etc., complete as shown & specified on drawings. All as
per FINA International standard. Contractor to submit
complete details, samples, catalogues and drawings for
Engineer approval.

Swimming Pool Equipments refer Drg. 11-A-5002 &


A
5003
1 Low type adjustable Starting Block complete all as per
drawings. No.

2 Removable Touch Pads as per FINA standards complete


with all required electrical works and connections and all No.
accessories as specified on drawing.

3 3m Diving Board Tower assembly-Heel mount as per FINA


international standard complete with all required
accessories as specified on drawing. Item

4 Lanes Rope fixing points and including the Floating Lane


Ropes complete all as per FINA international standard
complete with all required accessories as specified on Item
drawing.

5 Stainless steel Lane Rope Winder complete with all


required accessories as specified on drawing.
Item

6 Non slip surface recessed steps (refer step-1) complete


with all required works and all accessories as per drawing.
No.

7 Non slip surface recessed steps (refer step-2) complete


with all required works and all accessories as per drawing.
No.

8 False start Indicator (1 nos.) complete with 2m high


stainless steel posts, uPVC floating balls, all accessories &
fixings complete all as per FINA international standards, Item
Contractor to submit full details for Engineer approval.

CARRIED FORWARD

Page 275
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
EQUIPMENT DIVISION 11/11/2
11
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
BROUGHT FORWARD
DIVISION 11 - EQUIPMENT (Cont'd.)

A Swimming Pool Equipments (Cont'd)

9 Turning Indicators (2 nos.) complete with 2m high


stainless steel posts, triangular water repellent flags, all
accessories & fixings complete all as per FINA Item
international standards, Contractor to submit full details for
Engineer approval.

10 Allow for swimming pool floor marking as per FINA


international standards, Contractor to submit full details for
Engineer approval. Item

11 Foot Disinfection Basins requirements as shown on Item


drawing 11-A-2001 & 5004 .

12 Pool Cleaning System including all necessary equipment,


leaf skimmer, leaf rack, etc. all as required. Contractor to
Item
submit full details for approval.

Total for Bill No. 11 - Division No. 11 : EQUIPMENT


Carried to Summary of Bill No. 11

Page 276
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
FURNISHINGS DIVISION 11/12/1
12
TOTAL PRICE
ITEM REF. ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED

DIVISION 12 - FURNISHINGS
Supply and installation of complete Furnishing as noted in
drawings and as specified in drawings including but not
limited to following:-

A Swimming pool Seats


1 Supply and installation of Swimming pool Seats as specified
on drawing 11-A-5001 from approved manufacturer.
Contractor to submit full details to Engineer for approval. 32 No.

2 Supply of Spare Seats. 4 No.

Total for Bill No. 11 Division 12 : FURNISHINGS


Carried to Summary of Bill No. 11

Page 277
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
PLUMBING DIVISION 11/22/1
22
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED

DIVISION 22 - PLUMBING

A WATER SUPPLY WORKS


Design, supply, install, test and commissioning of all Water
Supply work for the Facility internally complete for cold and
hot water supply, including all piping, valves, fixing, fittings,
all accessories, etc., all as per Design Guidelines and the
works including but not limited to the followings and
including all related works:- Refer drawing no. GN-P-0002.

Contractor is fully responsible to design, construct and


handover all works in full functional and operational
conditions and submit full details calculations, drawings for
Engineer's approval.

The following BOQ items are only for Guidance,


Contractor to submit full detailed BOQ and include in the
tender lump sum price all requirements for the satisfactory
completion of the works and as per the Design Guidelines
on drawing no. GN-P-0002, even if it is not mentioned in
the BOQ without any extra cost or time.

1 Cold domestic water supply piping works for the Facility


internally as per Design guidelines including water meter,
riser, fixing, fittings, all valves and all accessories, etc.,
complete. All internal water pipelines to be Polypropylene Item
(PPR).
Contractor to submit full detailed design, calculations,
drawings for Engineer's approval.

2 Hot domestic water piping works for the Facility internally


as per Design guidelines including riser, fixing, fittings, all
valves and all accessories, etc., complete. Hot domestic
water shall be generated through indirect solar water Item
heating system including all components (Solar panels,
calorifiers, pumps, tanks, etc.,) and to be delivered to
kitchen, toilets & other spaces as required.

Contractor to submit full detailed design, calculations,


drawings for Engineer's approval.

CARRIED FORWARD

Page 278
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
PLUMBING DIVISION 11/22/2
22
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED

BROUGHT FORWARD

DIVISION 22 - PLUMBING (Cont'd.)

B Water Supply and Filtration system (Swimming Pool )


Design, supply, install, testing, commissioning of all Water
Supply and Filtration System for the Swimming Pool as per
drg no. 04-P-2001 & GN-P-6001 and all related drawings.
Contractor to submit full design details & calculation for
Engineer approval as per guidelines on the drawing,
including but not limited to the followings:-

1 Allow for complete Design, supply, installation, testing,


commissioning and training of all Equipments, pumps,
filters, fittings, accessories, etc., as shown and specified
on the drawings complete. The Contractor is responsible
for all the required water supply works for the swimming Item
pool and to handover in full functional and operational
condition including all the requirements as shown on the
drawing including but not limited to the followings:-
a) All required water feeding pipeline of all dia's including
connections for all systems.
b) Inlet Fitting (IF) with all the required connections,
stainless steel.
c) All Pumps
Included in the
d) Automatic Chemical dosing system complete with
above
chemical tank, controllers, dosing pumps etc..as per
drawings and specifications.

e) Filtration System including all type of fittings, valves,


connectors, Filters.
f) Stainless steel Sterilizers

2 All type of Valves, connections, gate valves, isolation


valves, butterfly valves, ball valves, electrical valves,
bypass solenoid valves, check valves, thermostatic valves,
non-return valve, flexible connectors and including
plumbing fittings, valves, floating valve, accessories to Item
complete the works for the Swimming Pool Balancing
Tank, complete all as required and as per drawings and
specifications.

3 Allow for all requirements for control system for all


Item
Equipments including control cables, containment, etc.,
complete.

CARRIED FORWARD

Page 279
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
PLUMBING DIVISION 11/22/3
22
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED

BROUGHT FORWARD

DIVISION 22 - PLUMBING (Cont'd.)

C FOUL DRAINAGE WORKS

Design, supply, installation, testing and commissioning of


complete Foul Drainage works for the Facility internally
including all drainage pipelines, fittings & accessories with
all required civil works all as per Design Guidelines and
the works including but not limited to the following and
including all related works:- Refer drawing no. GN-P-0002.

Contractor is fully responsible to design, construct and


handover all works in full functional and operational
conditions and submit full details calculations, drawings for
Engineer's approval.

The following BOQ items are only for Guidance,


Contractor to submit full detailed BOQ and include in the
tender lump sum price all requirements for the satisfactory
completion of the works and as per the Design Guidelines
on drawing no. GN-P-0002, even if it is not mentioned in
the BOQ without any extra cost or time.

1 Foul drainage piping works internally, double stack (soil &


waste) with vent pipe connected to both soil and waste
pipe by gravity system, including all connections, fittings,
floor traps, clean-outs, gulley traps and including Item
inspection chambers & GRP pipeline around the facility,
etc., complete.
Contractor to submit full details design, calculations,
drawings for Engineer's approval.

2 Roof rainwater points 30x30cm rain water outlet with


gravel guard and concealed PVC rain water down pipe
Item
(not exposed).

CARRIED FORWARD

Page 280
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
PLUMBING DIVISION 11/22/4
22
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
BROUGHT FORWARD

DIVISION 22 - PLUMBING (Cont'd.)

D Drainage works (Swimming Pool)


Design, Supply, Installation, testing and commissioning of
all Drainage system works for the Swimming Pool.
Contractor has to submit full design details for approval,
including but not limited to the followings:

1 All Equipments, pumps, fittings, accessories, etc., as


shown and specified on the drawings complete. Contractor
to submit full details and design for approval and the
contractor is responsible for all the required drainage
works for the swimming pool and to hand over in full
functional and operational condition including all the Item
requirements as shown on the drawings including but not
limited to the followings:-

It shall be the responsibility of the contractor to submit all


hydraulic calculations including piping size, systems head
calculations, friction losses, etc. to the Engineer for
approval.

a) Vacuum and suction line from swimming pool to filter


pump.
b) Grating and suction Main Drain
c) Over flow fitting (OF) Brackets, Stainless Steel
d) Vacuum Fitting (VF) Stainless Steel
Included in the
e) Over Flow Line from swimming pool to balancing tank, above
Balancing tank over flow to Sump Pit, Non-leak flanges for
pool body, plant room and balancing tank.

f) All the required fittings and valves for over flow system
and Vacuum and suction drain

g) Submersible pump set, all as required.

h) Grating around swimming pool including pool deck &


showers area.

CARRIED FORWARD

Page 281
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
PLUMBING DIVISION 11/22/5
22
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
BROUGHT FORWARD

DIVISION 22 - PLUMBING (Cont'd.)

Sanitary Wares and Mixers


Supply, installation and testing of all Sanitary Wares and
Mixers for toilets including all fittings complete as per
approved Design and Plumbing Notes complete with all
accessories.

E Sanitary Wares
Sanitary wares of approved type, model, finish and origin
including but not limited to the followings:-

1 Water Closet (WC) western type No.

2 Wash Basin counter mounted (counter measured with


No.
Division 06).

F Mixers
Mixers of approved type, model, finish and origin including
all accessories as per drawings and Plumbing notes
complete as follows:

1 Wash Basin Mixer self closing type No.

2 Shower Mixer No.

3 Hose spray (HS) No.

4 Shower mixer for swimming pool deck showers. No.

Total for Bill No. 11 - Division No. 22 : PLUMBING


Carried to Summary of Bill No. 11

Page 282
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
Heating, Ventilating and Air Conditioning DIVISION 11/23/1
(HVAC) 23
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED

DIVISION 23 - Heating, Ventilating and Air Conditioning


(HVAC)
All related General specifications divisions are also included
in this Division.

Design, supply, delivery, installation, testing and


commissioning of Heating, Ventilating and Air Conditioning
System (HVAC) complete with all Equipments as per
approved capacities (outdoor & indoor units), ducting with
insulation and complete fittings, piping with insulation, all
valves, fittings and accessories, Systems and all accessories,
all required controls, fittings and accessories, as shown on the
drawings and as per Mechanical Design Guidelines attached,
GN drawings details including all related works, supports,
foundations, etc., and the works including but not limited to the
followings:- (refer drawing no. GN-drawings).

Contractor is fully responsible for design, supply, inspection,


testing and commissioning in conformity with the specified
requirements for all the items and handover all works in full
functional and operational conditions and submit full detailed
calculations, drawings for Engineer approval.

Contractor should follow the Mechanical Design Guide Lines


attached and verify all the requirements for these Guide Lines.

A HVAC system for the Facility


1 • Heating and cooling shall be provided by means of
reversible DX ducted split units and DX Variable Refrigerant
Volume (VRV) heat pump units.
• Swimming pool area – Two numbers package DX type
mechanical dehumidification units capable of providing
heating, cooling, dehumidification, ventilation and pool water
heating. Item
• Gymnasium - Two numbers VRV recirculating type AHU with
provision for outdoor air intake.
• Office, locker and store - Reversible ducted split units.
• Services - Reversible decorative split units.
• Extract from toilets and showers shall be ducted to the roof-
mounted twin extract fan.

Contractor to submit full detailed design, calculations and


drawings for Engineer approval.

Total for Bill No. 11 - Division No. 23 : Heating, Ventilating and Air Conditioning (HVAC)
Carried to Summary of Bill No. 11

Page 283
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
ELECTRICAL DIVISION 11/26/1
26
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED

DIVISION 26 - ELECTRICAL

1 Design, Supply, installation, testing and commissioning of


complete Electrical, telecommunication and low current
services works as noted on drawings GN-E-0001 & TD
drawings and other associated drawings for the complete
Facility, contractor shall handover the works in complete
operational & functional condition.

2 Follow the latest version of electrical regulations applicable for


local Power Distribution Company as applicable. Also follow
international standards BS 7671, NFPA 70 and NFPA 72 etc.
as applicable.

3 Follow Local Communication Authority and relevant


international standards for telecommunication systems.

4 Check and verify the space requirements for electrical and


telecom service rooms in the facility. coordinate with the
architect for the incorporation of these spaces requirements
and also shafts for horizontal and vertical cable routing etc. as
applicable.

5 The scope of work includes but not limited to the design,


supply, delivery to site, installation, commissioning, testing,
maintenance and guarantee of the various complete systems
and works outlined briefly below.

6 Contractor to submit complete detailed design supported with


calculations for Engineer approval.

7 Refer to Table-1 on drg. no. GN-E-0001 for the systems


required.
The scope of works including but not limited to the following
items:

Wiring, Cabling and Conduits


1 Follow the latest electricity wiring regulation applicable for the
local power distribution authority. Item
Supply and install all conduits, cable tray, HDGI cable tray,
trunking, fittings, junction boxes, draw boxes, etc. and
including all wiring and power cabling connections to all power
outlets, etc.

Distribution Board
2 All required Distribution boards, distribution frame, motor
control center, control panels etc., shall be provided as per Item
approved electrical distribution.

CARRIED FORWARD

Page 284
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
ELECTRICAL DIVISION 11/26/2
26
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED

BROUGHT FORWARD

DIVISION 26 - ELECTRICAL (Cont'd.)

Light Fixtures
3 All light fittings & fixtures for the entire facility as per GN-E-
0001. For Internal and external lighting, generally follow the
Item
CIBSE & international standards for lighting design. the
selection and distribution of all luminaries shall be suitable for
its space.

Emergency Lighting
4 Self contained emergency lighting / exit light etc. shall be Item
provided in each area except toilets.

Switches, Power Socket, Detectors, Isolators


5 All Switches, Power Sockets, Motion sensors, Isolators for the
facility complete all as specified. Power outlets, sockets shall
be distributed throughout all areas. All required power outlets
(sockets, fuse connection units, isolators, control panels etc.) Item
shall be provided. Switches and lighting control: Motion
detectors shall be provided in corridors and toilets. photocells/
daylight sensors for external lighting. Other areas shall be
controlled via switches and/or dimmers.

Communication and data network


6 Tele Communication and data network system including MDF,
Item
IDF, Outlets for voice and data, all cabling and conduits, cable
trays, trunking, etc. complete all as specified.

IF Satellite Antenna Distribution System


7 IF Satellite Antenna Distribution System for the facility Item
complete all as specified.

Lightning Protection System


8 Lightning protection system for the building. System design
shall conform to BSEN 62305. Risk evaluation and the
achieved protection level calculations shall be submitted for Item
approval.

Civil Works
9 Allow for all the required civil and builder works, earthing
works to complete all the electrical and telecom and all other Item
systems works including trenches, manholes, cable entry
ducts and chambers, etc.

Total for Bill No. 11 - Division No. 26 : ELECTRICAL


Carried to Summary of Bill No. 11

Page 285
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
ELECTRONIC SAFETY AND SECURITY DIVISION 11/28/1
28
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

Design, Supply, installation, testing and commissioning of


complete Electronic Detection and Alarm System as shown
on drawings, TD drawings and other associated drawings for
the complete Facility including but not limited to the following
items:-
Contractor to submit complete detailed design supported with
calculations for Engineer approval.

A Fire Alarm System


1 Fire alarm system including but not limited to (panel, sensors,
manual call points, bells, AC duct sensors etc.) shall be
Item
provided in all areas except toilets.

B Wiring Provision for Future CCTV System


1 Provide wiring provision for the future CCTV system to
monitor the facility. Item

C Civil Works
1 Allow for all the required civil and builder works to complete
all the Fire alarm and CCTV system works as required,
specified and shown on drawings. Item

Total for Bill No. 11 - Division No. 28 : ELECTRONIC SAFETY AND SECURITY
Carried to Summary of Bill No. 11

Page 286
BILL NO. PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720
11 11/S
SUMMARY
Division
Division Description Page No. TOTAL PRICE AED
No.
01 General Requirements - Included in BOQ (0)

02 Existing Conditions 11/2/1

03 Concrete 11/3/1

04 Masonry 11/4/1

05 Metals 11/5/2

06 Wood, Plastics and Composites 11/6/1

07 Thermal and Moisture Protection 11/7/2

08 Openings 11/8/1

09 Finishes 11/9/3

10 Specialties 11/10/1

11 Equipment 11/11/2

12 Furnishing 11/12/1

13 Special Construction - Not Used

14 Conveying Equipment - Not Used

21 Fire Suppression - Not Used

22 Plumbing 11/22/5

23 Heating, Ventilating and Air Conditioning (HVAC) 11/23/1

25 Integrated Automation - Not Used

26 Electrical 11/26/2

28 Electronic Safety and Security 11/28/1

31 Earthworks - Included in Div 02

32 Exterior Improvements - Included in Div 02

33 Utilities - Not Used

35 Waterway and Marine Construction - Not Used

41 Material Processing and Handling Equipment - Not Used

44 Pollution and Waste Control Equipment - Not Used

46 Water and Wastewater Equipment - Not Used

Total for Bill No. 11 - Carried to Grand Summary of the project

Contractor's Stamp Contractor's Authorized Signature

Page 287