Академический Документы
Профессиональный Документы
Культура Документы
FOR
BILL NO. 11
PROJECT : CMW-000-B000
3- All the attached drawings, Specifications, BOQ are only for guidance, contractor is
responsible to submit detailed design, drawings, BOQ & Specifications as required
all as per approved design without any extra time or cost .
4- All works to be done as per attached documents which are for guidance and
reference only. Contractor to handover all works in complete integration with the
requirements for the full operation of the works.
5- Contractor to submit detailed design, drawings, method statement and all the
required studies, calculations and perform all required tests & studies for approval.
6- Contractor has to verify all requirements and to acquaint him self about all the
required works to complete the scope.
Page 261
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
EXISTING CONDITIONS DIVISION 11/2/1
2
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
2 Backfilling
Backfilling required & up to the Finish level of the Facility
with approved suitable material including compaction in
layers and as shown on drawings including steps and
Item
beneath ground floor and including swimming pool
beneath as per detailed section in the drawings and all
other associated drawings.
Page 262
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
CONCRETE DIVISION 11/3/1
3
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
DIVISION 3 - CONCRETE
A Concrete
Design, Construct, Cast, complete Concrete works for the
Facility area as shown on the drawings and all as per
structural notes including plain concrete & reinforced
concrete works for all structural elements including
shuttering, concrete, curing, all additives as per approved
mix design, steel reinforcement, etc., complete for Sub-
Structure, Super Structure elements all as specified and
as on noted on drawings, including foundation of any type
as per approved soil report recommendation.
c More Economical.
Page 263
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
MASONRY DIVISION 11/4/1
4
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
DIVISION 4 - MASONRY
Page 264
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
METALS DIVISION 11/5/1
5
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
DIVISION 5 - METALS
Design, supply, installation, handing over complete Metal
works as noted in drawings and as specified in drawings
including but not limited to the following:-
2 Wall cladding M2
C Sky Lights
3 Supply, install of Sky Lights (1.0 x 2.5m) with approved
polycarbonate sheet as shown and noted on the drawing
No.
No. 11-A-2002 and all other drawings. Contractor shall
submit full shop drawings for approval.
CARRIED FORWARD
Page 265
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
METALS DIVISION 11/5/2
5
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
BROUGHT FORWARD
D Handrails
1 Aluminium Handrail for Ramps complete including
supports fixed with balusters and all accessories as LM
specified and as approved.
E Ladders
1 Steel Ladder for roof including supports and all
accessories as specified, refer Drg. 11-A-2002 & 3001 and No.
GN drawings.
Page 266
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720
11
PROJECT : CMW-000-B000
WOOD, PLASTIC DIVISION 11/6/1
AND COMPOSITES 6
ITEM UNIT TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT
REF. RATE AED
A Counters
1 Supply and Install of Vanity Counter for wash basin of
approved type all as shown on drawings. (Wash basins
and mixers measured separately in Division-22). LM
Total for Bill No. 11 - Division No. 6 : WOOD, PLASTIC AND COMPOSITES
Carried to Summary of Bill No. 11
Page 267
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
THERMAL & MOISTURE DIVISION 11/7/1
PROTECTION 7
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
THERMAL & MOISTURE PROTECTION WORK
A Sub-Structure Insulation
Supply, install & testing of approved quality waterproofing
system for all concrete surfaces (vertical & horizontal) below
plinth level including for basement walls as shown in GN-
drawings and all other associated drawings and as the
following:-.
5 Supply and Lay of water proof layer and DPC for under Block
Item
Walls of approved quality.
B Balancing tank
1 Allow for Waterproofing System of approved quality for
balancing tank. Contractor to submit complete details for
Item
approval.
C Swimming Pool
1 Allow for all Waterproofing System of approved quality for
the Swimming Pool walls, floors & slabs including pool deck
area complete, contractor to submit complete details for Item
approval, rere drg. 11-A-5004.
CARRIED FORWARD
Page 268
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
THERMAL & MOISTURE DIVISION 11/7/2
PROTECTION 7
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
BROUGHT FORWARD
E Roof Waterproofing
1 Supply and Apply of Roof waterproofing System of approved
quality for roof including complete system including but not M2
limited to the following :-
a) One Coat of cold bituminous primer.
b) Foam concrete screed 50-100mm thick Laid to fall/
density=550kg/m3.
c) Membrane 4mm. Thick. Reinforced with non woven
polyester Mat 200grm/m2 with primer.
F Insulation Layer
1 Supply and install of 5cm insulation layer to be installed by
special adhesive and including fiber mesh for external Item
elevation as specified on drawing.
H Water Bars
1 Water bars for swimming pool as required, complete.
Item
Page 269
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
OPENINGS DIVISION 11/8/1
8
TOTAL PRICE
ITEM REF. ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
DIVISION 8 - OPENINGS
A Doors
Supply and installation of Doors for the Facility all as shown
and as detailed on the Architectural drawings including all
glazing, necessary accessories, Ironmongery, door signs &
finishes as follows.
6 Type D6, 100cm (W) × 220cm (H) + fixed panel 150cm (W) No.
x 180cm (H) Aluminium framed glazed door, all as
specified.
2 Type W2, Size 600cm (W) × 100cm (H) as per drawing. No.
C Security Grill
1 Supply and installation of Aluminum security grill for
external windows and ventilators. M2
Page 270
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
FINISHES DIVISION 11/9/1
9
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
DIVISION 9 - FINISHES
CARRIED FORWARD
Page 271
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
FINISHES DIVISION 11/9/2
9
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
BROUGHT FORWARD
Skirting
1 EMP: 15mm thick cement and mix powder 1:3 mix spray
smooth plaster for internal walls complete as per drawings M2
and specifications.
CARRIED FORWARD
Page 272
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
FINISHES DIVISION 11/9/3
9
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
BROUGHT FORWARD
D EXTERNAL FINISHES
1 Supply and Apply of Plaster Works with grooves and recess
for External walls 20mm thick. Cement sand smooth
plastered including Stop Ends (Plaster Stopper) at all corners,
edges ,stainless steel mesh, crack control, plasterization M2
material etc… complete as specified on the drawing.
Page 273
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
SPECIALTIES DIVISION 11/10/1
10
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
DIVISION 10 - SPECIALTIES
A Toilet Accessories
1 Supply and installation of all toilets Accessories of
approved type, model, finish and origin including but not
limited to: soap dispenser, soap holder, paper holder,
Item
towel holder, robe hook, etc., Contractor to submit
complete details for approval.
B Mirrors
1 Supply and installation of all Mirrors for toilets of approved
type including all accessories complete. Contractor to
M2
submit complete details for approval.
C Fire Extinguishers
Supply, installation and testing of Fire Extinguishers of
approved type including fittings, etc., including but limited
to the following :- (refer to Design guidelines on Drg. GN-P-
0002).
Page 274
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
EQUIPMENT DIVISION 11/11/1
11
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
DIVISION 11 - EQUIPMENT
Design, Supply, installation, testing and commissioning of
All Swimming pool Equipments complete with all
requirements, connections, all accessories, all controls,
etc., complete as shown & specified on drawings. All as
per FINA International standard. Contractor to submit
complete details, samples, catalogues and drawings for
Engineer approval.
CARRIED FORWARD
Page 275
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
EQUIPMENT DIVISION 11/11/2
11
ITEM TOTAL PRICE
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
REF. AED
BROUGHT FORWARD
DIVISION 11 - EQUIPMENT (Cont'd.)
Page 276
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
FURNISHINGS DIVISION 11/12/1
12
TOTAL PRICE
ITEM REF. ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
DIVISION 12 - FURNISHINGS
Supply and installation of complete Furnishing as noted in
drawings and as specified in drawings including but not
limited to following:-
Page 277
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
PLUMBING DIVISION 11/22/1
22
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
DIVISION 22 - PLUMBING
CARRIED FORWARD
Page 278
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
PLUMBING DIVISION 11/22/2
22
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
BROUGHT FORWARD
CARRIED FORWARD
Page 279
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
PLUMBING DIVISION 11/22/3
22
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
BROUGHT FORWARD
CARRIED FORWARD
Page 280
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
PLUMBING DIVISION 11/22/4
22
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
BROUGHT FORWARD
f) All the required fittings and valves for over flow system
and Vacuum and suction drain
CARRIED FORWARD
Page 281
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
PLUMBING DIVISION 11/22/5
22
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
BROUGHT FORWARD
E Sanitary Wares
Sanitary wares of approved type, model, finish and origin
including but not limited to the followings:-
F Mixers
Mixers of approved type, model, finish and origin including
all accessories as per drawings and Plumbing notes
complete as follows:
Page 282
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
Heating, Ventilating and Air Conditioning DIVISION 11/23/1
(HVAC) 23
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
Total for Bill No. 11 - Division No. 23 : Heating, Ventilating and Air Conditioning (HVAC)
Carried to Summary of Bill No. 11
Page 283
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
ELECTRICAL DIVISION 11/26/1
26
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
DIVISION 26 - ELECTRICAL
Distribution Board
2 All required Distribution boards, distribution frame, motor
control center, control panels etc., shall be provided as per Item
approved electrical distribution.
CARRIED FORWARD
Page 284
BILL PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720 11
ELECTRICAL DIVISION 11/26/2
26
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
BROUGHT FORWARD
Light Fixtures
3 All light fittings & fixtures for the entire facility as per GN-E-
0001. For Internal and external lighting, generally follow the
Item
CIBSE & international standards for lighting design. the
selection and distribution of all luminaries shall be suitable for
its space.
Emergency Lighting
4 Self contained emergency lighting / exit light etc. shall be Item
provided in each area except toilets.
Civil Works
9 Allow for all the required civil and builder works, earthing
works to complete all the electrical and telecom and all other Item
systems works including trenches, manholes, cable entry
ducts and chambers, etc.
Page 285
BILL PAGE NO.
FACILITY NO. (11) - CODE 0720 11
PROJECT : CMW-000-B000
ELECTRONIC SAFETY AND SECURITY DIVISION 11/28/1
28
ITEM TOTAL PRICE
REF.
ITEM DESCRIPTION QUANTITY UNIT UNIT RATE
AED
C Civil Works
1 Allow for all the required civil and builder works to complete
all the Fire alarm and CCTV system works as required,
specified and shown on drawings. Item
Total for Bill No. 11 - Division No. 28 : ELECTRONIC SAFETY AND SECURITY
Carried to Summary of Bill No. 11
Page 286
BILL NO. PAGE NO.
PROJECT : CMW-000-B000 FACILITY NO. (11) - CODE 0720
11 11/S
SUMMARY
Division
Division Description Page No. TOTAL PRICE AED
No.
01 General Requirements - Included in BOQ (0)
03 Concrete 11/3/1
04 Masonry 11/4/1
05 Metals 11/5/2
08 Openings 11/8/1
09 Finishes 11/9/3
10 Specialties 11/10/1
11 Equipment 11/11/2
12 Furnishing 11/12/1
22 Plumbing 11/22/5
26 Electrical 11/26/2
Page 287