Вы находитесь на странице: 1из 1

Doha Petroleum Construction Co.

Ltd
Post Box 1744, Doha - Qatar. Tel: 4600350 - Fax: 4601066
Project EPIC FOR UPGRADATION OF AC UPS UNITS IN NGL3,
INSPECTION & TEST PLAN Job No, J 24555

MESAIEED ELECTRICAL Ref. No.


Revision
3513-M3GE-2-25-0019
A
Contract No. GC12105200 Date 13-08-2013
Page 6 of 29
Project No. 3513
Item Process Quality Control QC Procedure/ Acceptance Criteria Verifying Inspection Points
No. Description Activity Spec. Reference Value Code/Standard Documents Responsibility DOPET QP Remarks

ES.2.06.0001
Witness/Verification of Procedure for
Phasing Check and Electrical Site
cable connection bolt Electrical Inspection
Bolt Torque Test for Installation Superintendent
3.12 tightness compliance to Installations Report No. W W
Cable Termination/ Recommended QC Inspector
project specifications 3513-M3GE-2- EI-E/013
Connection Practices/ (E&I)
/approved drawings 05-0020
Installation Manual

4 Testing and Commissioning

Procedure for
Witness/Verification of
Electrical IR Value Project
dressing including
Installations LV Cable Compliance with Inspection Engineer/
glanding/termination
Cable meggering and 3513-M3GE-2- Project Report No. Commissioning
4.1 activity & cable insulation 600/1000V H W
continuity test 05-0020 Specifications and EI-E/008B Coordinator
resistance / continuity test / – min
Project Spec. - AFC Drawing EI-E/008C QC Inspector
test results compliance to
3513-M3GE-2 - 10MΩ (E&I)
project specifications
14-0003

Project
Procedure for ES.2.06.0001
Check and verify the earth Engineer/
Testing of Earth Electrical Electrical Inspection
loop resistance & rod/grid Commissioning
4.2 loop/Grounding Installations Installation Report No. H W
resistance compliance to Coordinator
System 3513-M3GE-2- Recommended EI-E/007B
project specifications QC Inspector
05-0020 Practices
(E&I)

DOC NO : 3513-M3GE-2-25-0019 REV. A PAGE 6 OF 29