SVI Project Phase-1

as of 9-Jan-2017 Last Issued : None


S/N Discipline Area Description Eqnquiry released PO Aging Days TES Released
date
1 Service Contract 1,014
1.1 Civil Chemical Civil Work Contract -4 for CS2 Recovery, CS2 3/Oct/16 1,046 15/Nov/16
Production, Acid Plant, WSA
Civil Work Contract -5 for ETP, Pipe Bridge,
1.2 Civil BOP Cooling Tower, Soft Water, N2 10/Oct/16 1,039 12/Dec/16

Civil Work Contract -7 for Hollow Block for 3 Main


1.3 Civil Fiber Plant 19/Oct/16 1,030
Building
1.4 Mech All Third Party Inspection 5/Nov/16 1,013 5/Jan/17
1.5 HVAC All HVAC Engineering Services 14/Nov/16 1,004
1.6 Mech All HAZOP Study Consultant 5/Jan/17 952
2 Frame Contract 1,019
2.1 Instrument All Field Bus Junction Box 29/Sep/16 1,050
2.2 Instrument All PTFE Lined Butterfly Valves 30/Sep/16 1,049
2.3 Elecrical All Transformers (distribution) 14/Oct/16 1,035 31/Dec/16
2.4 Instrument All Field instruments (F,T,Pr,Analyzers) 21/Oct/16 1,028
2.5 Mech. All Pumps (Centrifugal) 25/Oct/16 1,024
2.6 Elecrical All MCC 29/Nov/16 989
2.7 Elecrical All VFD 28/Dec/16 960
3 Mech. Take Out Items 979
3.1 Mech. Spinning Nolap Roller 25/Jul/16 1,116 1/Sep/16
3.2 Mech. Spinning Strapping machine 23/Oct/16 1,026
3.3 Mech. Viscose Screw Pump 25/Oct/16 1,024
3.4 Mech. Spinning Screw Pump 25/Oct/16 1,024
3.5 Mech. WSA WSA Condenser Steel Parts Outside Shop 11/Nov/16 1,007
fabricated
3.6 Mech. CS2 Recovery Alkaline wash fan, foul gas fan, fresh air fan 18/Nov/16 1,000
3.7 Mech. Spinbath Barometric seal tank (PP) 30/Nov/16 988
3.8 Mech. CS2 Recovery Pumps for CS2 Recovery 5/Dec/16 983
3.9 Mech. WSA BFW Pump 13/Dec/16 975
3.10 Mech. Spinning Diaphragm Pump 15/Dec/16 973
3.11 Mech. Spinning Dosing Pump 17/Dec/16 971
3.12 Mech. Spinning Special Centrifugal Hypo Pump 17/Dec/16 971
3.13 Mech. Spinning Submersible Pump 17/Dec/16 971
3.14 Mech. Spinning Lobe Pump 17/Dec/16 971
3.15 Mech. CS2 SULFUR FLARE RECEIVER 23/Dec/16 965
3.16 Mech. CS2 CS2 FLARE RECEIVER 23/Dec/16 965
3.17 Mech. Spinning Gear Pump 23/Dec/16 965
3.18 Mech. CS2 CANNED PUMP 23/Dec/16 965
Strainer and Filters for Viscose, Spinning,
3.19 Mech. Fiber Plant 23/Dec/16 965
Spinbath
3.20 Mech. CS2 SULFUR SCRUBBER 24/Dec/16 964
3.21 Mech. CS2 LEAN OIL TANK 24/Dec/16 964
3.22 Mech. CS2 COLLECTION CS2 TANK SS 316 24/Dec/16 964
3.23 Mech. CS2 FURNACE BLOWING TANK 24/Dec/16 964
3.24 Mech. CS2 PRIMARY CS2 SEPARATOR 24/Dec/16 964
3.25 Mech. CS2 STILL REFLUX VESSEL 24/Dec/16 964
3.26 Mech. CS2 CS2 DAY TANKS (4NOS) 24/Dec/16 964
3.27 Mech. WSA SO2 Converter Plates. 28/Dec/16 960
3.28 Mech. Spinning Hermatically Sealed Magnetic Drive Pumps 30/Dec/16 958
3.29 Mech. WSA Acid Vessel-LLI as it is ECTFE lined Item 31/Dec/16 957
3.30 Mech. CS2 Recovery Nitrogen Storage Tank, Compressed Air Storage 4/Jan/17 953
Tank
3.31 Mech. WSA Instrument Air receiver 4/Jan/17 953
4 Mech. Long Lead 998
Pneumatic Special Valve for Xanthator - DN 800 -
4.1 Mech. Viscose 20/Sep/16 1,059 23/Dec/16
14 nos
4.2 Mech. Viscose Drum Filter - 6 nos 10/Oct/16 1,039 5/Dec/16
4.3 Mech. Spinning Spinbath Trough (Change Order) 17/Oct/16 1,032 24/Dec/16
4.4 Mech. Viscose & Spinning Static Mixer for Viscose, Spinning 20/Oct/16 1,029
4.5 Mech. Viscose Conveyors-4nos , Frame for Fine Shredder-10 20/Oct/16 1,029
4.6 Mech. Viscose Centrifuge - 6 nos 20/Oct/16 1,029 27/Dec/16
4.7 Mech. Viscose Cell Wheels - 8 nos 20/Oct/16 1,029
4.8 Mech. Viscose Plate Frame Filters - 9 nos 20/Oct/16 1,029 9/Dec/16
4.9 Mech. Viscose Dewatering Machine-2 20/Oct/16 1,029 27/Dec/16
4.10 Mech. Viscose Washing Machine-1 20/Oct/16 1,029 27/Dec/16
4.11 Mech. Spinbath V1-V2 FRP Evaporator 24/Oct/16 1,025 26/Dec/16

Page 1 of 138
Prepared : YA Checked by : AAA Approved : MCB/PVK
as of 9-Jan-2017 Last Issued : None
S/N Discipline Area Description Eqnquiry released PO Aging Days TES Released
date
4.12 Mech. CS2 FURNACE PACKAGE 10/Nov/16 1,008
4.13 Mech. Viscose Steam Jet Ejectors - 4 sets 11/Nov/16 1,007
4.14 Mech. BOP Chiller 19/Nov/16 999
4.15 Mech. BOP Cooling Tower 19/Nov/16 999
4.16 Mech. WSA Combustor Refractory,BMS,Burner & Valve Train 22/Nov/16 996
along with bricklining supervision
Cooling air blower with inlet filter & silencer, Hot
4.17 Mech. WSA Air Blower, Clean Gas Blower 26/Nov/16 992
4.18 Mech. Viscose Back Wash Filters - 4nos 30/Nov/16 988
4.19 Mech. Spinning & Spinbath FRP Tanks for Spinning, Spinbath 30/Nov/16 988
4.20 Mech. Viscose Metal Detectors 30/Nov/16 988
4.21 Mech. Fiber Plant Agitator for Viscose, Spinning, Spinbath 6/Dec/16 982
4.22 Mech. Viscose Magnetic traps - 28 nos 8/Dec/16 980
4.23 Mech. Fiber Plant Separator for Viscose, Spinning, Spinbath 8/Dec/16 980
4.24 Mech. WSA Acid Cooler 13/Dec/16 975
Heat Exchangers and Plate Heat Exchanger for
4.25 Mech. Fiber Plant 16/Dec/16 972
Viscose, Spinning, Spinbath
4.26 Mech. CS2 SULFUR CONDENSER 22/Dec/16 966
4.27 Mech. Spinning Steam Injector 23/Dec/16 965
4.28 Mech. CS2 FLARE STACK (STEAM JACKETED) 23/Dec/16 965
4.29 Mech. Viscose & Spinbath Blowers & Fans for Viscose, Spinbath 26/Dec/16 962
4.30 Mech. Viscose Air Cooler - 4 nos 28/Dec/16 960
4.31 Mech. WSA Boiler 30/Dec/16 958
4.32 Mech. WSA NAOH Scrubber Vessel & Quench Vessel 31/Dec/16 957
5 Electrical
5.1 N/A
6 Instrument
6.1 N/A
7 Civil 959
7.1 CIVIL CS2 Recovery Cement - Release orders 29/Dec/16 959
7.2 CIVIL Spinbath Roof Material 30/Dec/16 958
8 Automation 988

Viscose, Spinbath, DCS Contract (controller, network equipment,


8.1 Automation Spinning, CS2 control room equipment, operator station, 1/Nov/16 1,017
Production, Acid Plant, furniture including foundation Field Bus Bar
CS2 Recovery, BOP Power supplies and accessorises)

control system including cabinet, network and


8.2 Automation WSA 1/Nov/16 1,017
Hardware
8.3 Automation Viscose UPS 20KVA, incl. Battery backup 15/Dec/16 973
8.4 Automation Spinning UPS 60KVA, incl. Battery backup 15/Dec/16 973
8.5 Automation Spinbath UPS 20KVA, incl. Battery backup 15/Dec/16 973
8.6 Automation CS2 Production UPS 30KVA, incl. Battery backup 15/Dec/16 973

Page 2 of 138
Prepared : YA Checked by : AAA Approved : MCB/PVK
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start


EVAPORATOR Fabrication and Erection of Clean (A)
1 UG-FTPL-P087 MECHANICAL P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18
UPGRADE Condensate Tank (451-T-022)
Vol: 200m3, dim: 5 m x 11.15 m ht, 14.486 T F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18
SA 516 Gr.70 A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18

EVAPORATOR Fabrication and Erection of Intemediate (B)


2 UG-FTPL-P087 MECHANICAL P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18
UPGRADE Condensate Tank (451-T-026)
Vol: 200m3, dim: 5 m x 11.15 m ht, 14.486 T F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18
SA 516 Gr.70 A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18

EVAPORATOR Package A: Evaporator Building Steel


3 UG-FTPL-P095 MECHANICAL P 25-May-18 30-May-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18
UPGRADE Structure
Steel structure: 43.5 T, railing: 2.3T, Platform:
F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18
8.8T, Fasteners:0.59T
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18

EVAPORATOR Package B: Steel structure for Effect 1E


4 UG-FTPL-P095 MECHANICAL P 25-May-18 30-May-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18
UPGRADE Column & Surface Condenser
Steel structure: 6.5T, Fasteners:0.071T F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18

A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18

EVAPORATOR Package D: Evaporator Equipment


5 UG-FTPL-P095 MECHANICAL P 25-May-18 30-May-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18
UPGRADE Installation
F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18

EVAPORATOR Remove soap separate tank c/w insulation &


6 UG-FTPL-P097 MECHANICAL P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE cladding (451-T-026)
7.6T, 5.2 m x 8 m ht, 135 m3, CS F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

EVAPORATOR Remove soap storage tank c/w insulation &


7 UG-FTPL-P097 MECHANICAL P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE cladding (451-T-022)
6.8T, 4.8 m x 8 m ht, 115 m3, CS F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

EVAPORATOR
8 UG-FTPL-P097 MECHANICAL Chop & Blind pipe (Tank 451-T-022) P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE
DN 80 1 lot, DN 100 2 lot, DN 150 1 lot, DN
F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
200 2 lot, DN 100 2 lot
SS A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 3 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start

EVAPORATOR
9 UG-FTPL-P097 MECHANICAL Chop & Blind pipe (Tank 451-T-026) P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE
DN 100 2 lot F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
SS A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

EVAPORATOR Remove pipe from soap separate to soap


10 UG-FTPL-P097 MECHANICAL P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE storage tank

DN 400 x 5000 mm length, elevation 8 m, SS F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

EVAPORATOR
11 UG-FTPL-P097 MECHANICAL Remove pipe from WBL tank P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE
DN 400 x 9000 mm length, elevation 10 m,
F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
SS
A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

EVAPORATOR Install blind flange c/w bolt & nut for WBL tank
12 UG-FTPL-P097 MECHANICAL P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE (ANSI #150)
DN 400, elevation 10 m, SS, Material by
F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
contractor
A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

EVAPORATOR
13 UG-FTPL-P097 MECHANICAL Remove soap pipe from IBL tank P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE
DN 350 x 3500 mm length, elevation 10 m F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
CS A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

EVAPORATOR Install blind flange c/w bolt & nut for IBL
14 UG-FTPL-P097 MECHANICAL P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE nozzle (ANSI #150)
DN 350, elevation 10 m, CS, Material by
F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
contractor
A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

EVAPORATOR Remove pipe from soap storage, soap


15 UG-FTPL-P097 MECHANICAL P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE separate and soap skimming tank
DN 150 x 9000 mm length, elevation 9 m, SS,
F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
On roof
A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

EVAPORATOR Remove pipe from soap separation to soap


16 UG-FTPL-P097 MECHANICAL P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE skimming
DN 150 x 5000 length, elevation 9.5 m, SS,
F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
On roof
A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 4 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start


EVAPORATOR
17 UG-FTPL-P097 MECHANICAL Remove level transmitter 2 unit P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE
DN 80, elevation 9 m, on roof F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18

EVAPORATOR Insulation and cladding for Clean (A)


18 UG-FTPL-P100 MECHANICAL P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE condensate tank
Area 210 m2, insulation thk 100 mm, 2.1 T,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
210 m2
AISI 304 Thk 0.4 A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR Insulation and cladding for Intermediate (B)


19 UG-FTPL-P100 MECHANICAL P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE condensate tank
Area 210 m2, insulation thk 100 mm, 2.1 T,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
210 m2
AISI 304 Thk 0.4 A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR
20 UG-FTPL-P100 MECHANICAL Insulation and cladding for Effect 1E P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Area 222 m2, Insulation thk 100 mm, 2.442T,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
cladding 244.2 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR
21 UG-FTPL-P100 MECHANICAL Insulation and cladding for LPH3 P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Area 44 m2, Insulation thk 60 mm, 290.4 kg,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
cladding 48.4 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR
22 UG-FTPL-P100 MECHANICAL Insulation and cladding for LPH4 P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Area 48 m2, Insulation thk 100 mm, 316.8kg,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
cladding 52.8 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR
23 UG-FTPL-P100 MECHANICAL Insulation and cladding for LSCF P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Area 8 m2, Insulation thk 60 mm, 52.8kg,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
cladding 8.8 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR Insulation and cladding for B Condensate


24 UG-FTPL-P100 MECHANICAL P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE Flash Tank
Area 5 m2, Insulation thk 60 mm, 33 kg,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
cladding 5.5 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 5 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start


EVAPORATOR
25 UG-FTPL-P100 MECHANICAL Insulation and cladding for HCFT P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Area 8 m2, Insulation thk 60 mm, 52.8 kg,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
cladding 8.8 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 6 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start


EVAPORATOR
26 UG-FTPL-P100 MECHANICAL Insulation and cladding for Pipe/Tube - NB 25 P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Dia: 0.0337m, length: 30m, area to be
insulated: 3.65 m2, Insulation thk: 50 mm,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Mean dia of insulation: 0.0837 m, rockwool
49.9 kgs, SS cladding thk 0.4 mm: 14.5 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR
27 UG-FTPL-P100 MECHANICAL Insulation and cladding for Pipe/Tube - NB 50 P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Dia: 0.0603m, length: 54m, area to be
insulated:11.76 m2, Insulation thk: 60 mm,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Mean dia of insulation: 0.1203 m, rockwool
154.9 kgs, SS cladding thk 0.4 mm: 35.2 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR
28 UG-FTPL-P100 MECHANICAL Insulation and cladding for Pipe/Tube - NB 80 P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Dia: 0.0889m, length: 106m, area to be
insulated: 34.04 m2, Insulation thk: 60 mm,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Mean dia of insulation: 0.1489 m, rockwool
376.3 kgs, SS cladding thk 0.4 mm: 80 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR Insulation and cladding for Pipe/Tube - NB


29 UG-FTPL-P100 MECHANICAL P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE 100
Dia: 0.1143m, length: 261m, area to be
insulated: 107.78 m2, Insulation thk: 60 mm,
Mean dia of insulation: 0.1743 m, rockwool F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
1084.7 kgs, SS cladding thk 0.4 mm: 220.9
m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR Insulation and cladding for Pipe/Tube - NB


30 UG-FTPL-P100 MECHANICAL P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE 150
Dia: 0.1683m, length: 245m, area to be
insulated: 148.97 m2, Insulation thk: 60 mm,
Mean dia of insulation: 0.2283 m, rockwool F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
1333.7 kgs, SS cladding thk 0.4 mm: 255.2
m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR Insulation and cladding for Pipe/Tube - NB


31 UG-FTPL-P100 MECHANICAL P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE 200

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 7 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start

Dia: 0.2191m, length: 340m, area to be


insulated: 269.13 m2, Insulation thk: 60 mm,
Mean dia of insulation: 0.2791 m, rockwool F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
2262.7 kgs, SS cladding thk 0.4 mm: 416.5
m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR Insulation and cladding for Pipe/Tube - NB


32 UG-FTPL-P100 MECHANICAL P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE 300
Dia: 0.3239m, length: 88m, area to be
insulated: 102.98 m2, Insulation thk: 60 mm,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Mean dia of insulation: 0.3839 m, rockwool
134.3 kgs, SS cladding thk 0.4 mm: 141.1m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR Insulation and cladding for Pipe/Tube - NB


33 UG-FTPL-P100 MECHANICAL P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE 350
Dia: 0.3556m, length: 160m, area to be
insulated: 205.55 m2, Insulation thk: 80 mm,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Mean dia of insulation: 0.4356m, rockwool
2215.8 kgs, SS cladding thk 0.4 mm: 298 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR Insulation and cladding for Pipe/Tube - NB


34 UG-FTPL-P100 MECHANICAL P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE 400
Dia: 0.4064m, length: 17m, area to be
insulated: 24.96 m2, Insulation thk: 80 mm,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Mean dia of insulation: 0.4864 m, rockwool
262.9 kgs, SS cladding thk 0.4 mm: 34.8 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR Insulation and cladding for Pipe/Tube - NB


35 UG-FTPL-P100 MECHANICAL P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE 450

Dia: 0.4570m, length: 56m, area to be


insulated: 92.46 m2, Insulation thk: 60 mm,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Mean dia of insulation: 0.5170 m, rockwool
690.4 kgs, SS cladding thk 0.4 mm: 116.7 m2

A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR Insulation and cladding for Pipe/Tube - NB


36 UG-FTPL-P100 MECHANICAL P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE 1200
Dia: 1.2191m, length: 20m, area to be
insulated: 88.09 m2, Insulation thk: 50 mm,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Mean dia of insulation: 1.2691 m, rockwool
504.4 kgs, SS cladding thk 0.4 mm: 95.3 m2
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 8 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start


A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19

EVAPORATOR
37 UG-FTPL-P115 MECHANICAL Removing existing primary air register P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18

EVAPORATOR
38 UG-FTPL-P115 MECHANICAL Modification existing primary air port register P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
Cut and make a new holes (80 x 230 mm) on
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
the existing from plate
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18

EVAPORATOR
39 UG-FTPL-P115 MECHANICAL Modification existing primary air port register P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
Fabrication & installation of frame F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18

EVAPORATOR
40 UG-FTPL-P115 MECHANICAL Modification existing primary air port register P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
Fabrication at workshop & install swivel plate F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18

EVAPORATOR Install existing modification of primary air


41 UG-FTPL-P115 MECHANICAL P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT registeer
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18

EVAPORATOR
42 UG-FTPL-P115 MECHANICAL Install new port rodder system P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18

EVAPORATOR Install control box manifold, hoses & fittings


43 UG-FTPL-P115 MECHANICAL P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT new port rodder system
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18

EVAPORATOR
44 UG-FTPL-P115 MECHANICAL Install new support stand control box P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18

EVAPORATOR
45 UG-FTPL-P115 MECHANICAL Finishing CS only (primary coat) 125 micron P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 9 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start


A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18

EVAPORATOR
46 UG-FTPL-P134 CIVIL Soil excavations 196.96 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
47 UG-FTPL-P134 CIVIL Chipping concrete 130 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
48 UG-FTPL-P134 CIVIL Back fill 27 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
49 UG-FTPL-P134 CIVIL Sands 53.14 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
50 UG-FTPL-P134 CIVIL Lean concrete 20.33 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
51 UG-FTPL-P134 CIVIL Concrete K225 110.1 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
52 UG-FTPL-P134 CIVIL Concrete K300 127.25 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
53 UG-FTPL-P134 CIVIL Reinforcement rebar 18370 kg P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
54 UG-FTPL-P134 CIVIL Formwork 190.9 m2 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 10 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start


EVAPORATOR
55 UG-FTPL-P134 CIVIL Anchor bolt installation 60 pcs P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
56 UG-FTPL-P134 CIVIL Provide and fixing pocket for shear key 27 set P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
57 UG-FTPL-P134 CIVIL Grouting 9.38 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
58 UG-FTPL-P134 CIVIL Brick masonry 25 m2 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR
59 UG-FTPL-P134 CIVIL Plastering 50 m2 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18

EVAPORATOR Cut existing ducting and head of existing


60 UG-FTPL-P147 MECHANICAL
RETROFIT vessel & existing nozzles
P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
Evap effect 1ABC F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

EVAPORATOR Remove existing lamella module complete


61 UG-FTPL-P147 MECHANICAL
RETROFIT with existing accessoris
P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
Evap effect 1ABC F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

EVAPORATOR Assembly & install new 1ABC lamella module


62 UG-FTPL-P147 MECHANICAL
RETROFIT complete with accessoris
P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
Evap effect 1ABC F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

EVAPORATOR Re-weld existing head of vessel ducting &


63 UG-FTPL-P147 MECHANICAL
RETROFIT existing nozzles
P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
Evap effect 1ABC F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 11 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start


EVAPORATOR
64 UG-FTPL-P147 MECHANICAL
RETROFIT
Inspection & Testing P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
Evap effect 1ABC F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

Evap effect 2A Install supporting structure of droplet


65 UG-FTPL-P147 MECHANICAL
(Demister) separator
P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

Evap effect 2B Install supporting structure of droplet


66 UG-FTPL-P147 MECHANICAL
(Demister) separator
P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

Cut existing ducting & head of existing vessel


67 UG-FTPL-P147 MECHANICAL Stripper condenser
& existing nozzles
P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

Remove existing module package complete


68 UG-FTPL-P147 MECHANICAL Stripper condenser
with existing support & accessoris
P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

69 UG-FTPL-P147 MECHANICAL Stripper condenser Install new module complete with accessoris P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

Re-weld existing head of vessel existing pipe


70 UG-FTPL-P147 MECHANICAL Stripper condenser
& existing nozzles
P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

71 UG-FTPL-P147 MECHANICAL Stripper condenser Inspection & testing P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

Fabrication lifting beam for old package


72 UG-FTPL-P147 MECHANICAL Stripper condenser
lamella concentrator 1ABC
P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

Fabrication lifting beam for old package


73 UG-FTPL-P147 MECHANICAL Stripper condenser
lamella stripper condenser
P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 12 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start


A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18

74 UG-FTPL-P159 PIPING EVAP Upgrade Piping works (Pre-fabrication st site) P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE A F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

75 UG-FTPL-P159 PIPING EVAP Upgrade Pipe support works P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE A Install primary pipe support F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
Fabrication & Install secondary pipe support A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 13 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start


76 UG-FTPL-P159 PIPING EVAP Upgrade Valve installation P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18

Manual Valve, safety valve, sight glass,


PACKAGE A F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
desuperheater nozzle, control & on/off valve

A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

77 UG-FTPL-P159 PIPING EVAP Upgrade Painting pipe works P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
Sandblasting / wire brush, primary coat,
PACKAGE A F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
secondary coat, finish coat
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

Vapour duct modification hook up H022 &


78 UG-FTPL-P159 PIPING EVAP Upgrade
H032
P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE B F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

Vapour duct modification - blanking details


79 UG-FTPL-P159 PIPING EVAP Upgrade
B004 & B005
P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE B F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

Vapour duct modification - blanking details


80 UG-FTPL-P159 PIPING EVAP Upgrade
B006
P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE B F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

Vapour duct modification hook up - B010,


81 UG-FTPL-P159 PIPING EVAP Upgrade
H037 & H042
P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE B F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

82 UG-FTPL-P159 PIPING EVAP Upgrade Effects / Equipments blanking details 1 P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
452-B-012, 452-B-013, 452-B-014, 452-B-
PACKAGE B F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
016, 452-B-022, 452-B-023, 452-B-024
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

83 UG-FTPL-P159 PIPING EVAP Upgrade Effects / Equipment blanking details - 2 P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
452-B-001, 452-B-002, 452-B-003, 452-B-
PACKAGE B 007, 452-B-008, 452-B-009, 452-B-017, 452- F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
B-018, 452-B-019
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

84 UG-FTPL-P159 PIPING EVAP Upgrade Modification nozzle N5 - Liquor inlet - effect 4 P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE B F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 14 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual

Bid Closing
Enquiry No

QTY BOQ

Standard
Enquiry Document / BOQ Technical Clarification TES
S/No

Issue Call

Unit
Discipline Area Description
For Tender

Submittal Approval Start Signoff Start

85 UG-FTPL-P159 PIPING EVAP Upgrade Supply & Install vortex breaker - effect 5 P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE B F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

Modification nozzle overflow from WBL tank 3


86 UG-FTPL-P159 PIPING EVAP Upgrade
& 4 to spill tank
P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE C F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

Modification nozzle overflow from WBL tank


87 UG-FTPL-P159 PIPING EVAP Upgrade
to spill tank
P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE C F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

Modification nozzle overflow from spill tank to


88 UG-FTPL-P159 PIPING EVAP Upgrade
water seal tank
P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE C F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

Modification nozzle overflow from water seal


89 UG-FTPL-P159 PIPING EVAP Upgrade
tank to drain canal
P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE C F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

90 UG-FTPL-P159 PIPING EVAP Upgrade Fabrication water seal tank P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE C F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19

91 UG-FTPL-P179 EIA EVAP Upgrade EIA Installation work P 15-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 27-Dec-18 30-Dec-18 31-Dec-18
F 11-Jan-19 16-Jan-19 19-Jan-19 22-Jan-19 23-Jan-19 26-Jan-19 4-Feb-19
A 11-Jan-19 16-Jan-19 19-Jan-19 22-Jan-19 23-Jan-19 26-Jan-19 4-Feb-19

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 15 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site

1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 12-Jun-18 11-Jun-18 12-Jun-18 14-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 97 2-Jan-19 2-Jan-19
29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 15-Sep-18 14-Sep-18 15-Sep-18 17-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 97 2-Jan-19 2-Jan-19
29-Jul-18 30-Jul-18 4-Sep-18 5-Sep-18 5-Sep-18 5-Sep-18 6-Sep-18 6-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 97 2-Jan-19 2-Jan-19

1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 12-Jun-18 11-Jun-18 12-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 97 2-Jan-19 2-Jan-19
29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 15-Sep-18 14-Sep-18 15-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 97 2-Jan-19 2-Jan-19
29-Jul-18 30-Jul-18 4-Sep-18 5-Sep-18 5-Sep-18 5-Sep-18 6-Sep-18 6-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 97 2-Jan-19 2-Jan-19

13-Jun-18 14-Jun-18 17-Jun-18 18-Jun-18 21-Jun-18 24-Jun-18 23-Jun-18 24-Jun-18 26-Jun-18 25-Jun-18 26-Jun-18 27-Jun-18 28-Jun-18 120 15-Jan-19 15-Jan-19

29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 15-Sep-18 14-Sep-18 15-Sep-18 17-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 134 31-Jan-19 31-Jan-19
29-Jul-18 30-Jul-18 4-Sep-18 5-Sep-18 8-Sep-18 11-Sep-18 11-Sep-18 11-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 140 31-Jan-19 31-Jan-19

Arrived by
13-Jun-18 14-Jun-18 17-Jun-18 18-Jun-18 21-Jun-18 24-Jun-18 23-Jun-18 24-Jun-18 26-Jun-18 23-Jun-18 24-Jun-18 25-Jun-18 26-Jun-18 20-Sep-18
Valmet
Arrived by
29-Jul-18 30-Jul-18 8-Sep-18 25-Feb-37 18-Aug-55 10-Feb-74 14-Sep-18 15-Sep-18 17-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 20-Sep-18
Valmet
Arrived by
29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 13-Sep-18 11-Sep-18 11-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 20-Sep-18
Valmet

13-Jun-18 14-Jun-18 17-Jun-18 18-Jun-18 21-Jun-18 24-Jun-18 23-Jun-18 24-Jun-18 26-Jun-18 23-Jun-18 24-Jun-18 25-Jun-18 26-Jun-18 98 25-Dec-18 26-Dec-18
29-Jul-18 30-Jul-18 8-Sep-18 25-Feb-37 18-Aug-55 10-Feb-74 14-Sep-18 15-Sep-18 17-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 142 2-Feb-19 2-Feb-19
29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 13-Sep-18 11-Sep-18 11-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 137 28-Jan-19 2-Feb-19

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 23-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 15-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 15-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18

8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 16 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18

8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18

8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18

8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18

8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18

8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18

8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18

8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 17 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site

12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 39 1-Apr-19 1-Apr-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

17-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 39 1-Apr-19 1-Apr-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

17-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

29-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

29-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

29-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 18 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 19 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 20 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19

17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 21 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19

31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 13-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 0
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19

31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 14-May-19

5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 0 30-Dec-99 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 15-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 0 30-Dec-99 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 16-May-19

5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 0 30-Dec-99 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 17-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99

31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 20-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99

31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 21-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 0 30-Dec-99 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 22-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99

31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 23-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 22 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 16-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 23 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99

25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 27 30-Dec-99 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 0 30-Dec-99 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 24 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 25 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 15-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 15-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 15-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 15-Feb-19

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 26 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 5-Apr-19

7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 30-Mar-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 30-Mar-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 30-Mar-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19

7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 27 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00

TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery


PR Marian PO Marian PR SAP PO SAP Contract Date/ Required
NTP date
Done Done Done Done Award Date on Site
Lead Time
Finish Start Finish Start Finish Submittal Approval ETA site

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 8-Apr-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19

3-Jan-19 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 14-Jan-19 18-Jan-19 21-Jan-19 23-Jan-19 24-Jan-19 25-Jan-19 26-Jan-19 27-Jan-19 30-Dec-99 15-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 30-Dec-99 15-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 0 30-Dec-99 15-Feb-19
0

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 28 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)

PT Juhdi Sakti Ladder & handrail


Engineering 48-74078
installation pending

0
PT Juhdi Sakti Ladder & handrail
0 Engineering 48-74078
installation pending
0
0
0
PT Juhdi Sakti
0 Engineering Installed 48-74078

0
0

PT Juhdi Sakti
Engineering Installed 48-74078

0
1
PT Juhdi Sakti Done for Spiral heat
0 Engineering exchager 1 & 2, stripper 48-74078
condensate pump 1 & 2
5

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705

2
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 29 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
JOB DONE 48-74705

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 30 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)

2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2

9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

0
0
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 31 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)

9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 32 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)

PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

0
9

PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

0
0
9

PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

0
0
9

PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

0
9

PT Ayam Mas
Yet To start 48-76501
Putra Mandiri
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 33 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)

PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

0
9

PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

0
0
9

PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

30-Dec-99
0
9

PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

0
0
9

PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

0
0
9

PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 34 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
PT AyamContr.)
Supplier/ Mas
Yet To start 48-76501
Putra Mandiri

0
0
124
PT Judhi Sakti
ASD JOB 48-75386
Engineering

0
124
PT Judhi Sakti
ASD JOB 48-75386
Engineering

0
124
PT Judhi Sakti
ASD JOB 48-75386
Engineering

0
124
PT Judhi Sakti
ASD JOB 48-75386
Engineering

0
124
PT Judhi Sakti
ASD JOB 48-75386
0 Engineering

124
PT Judhi Sakti
ASD JOB 48-75386
0 Engineering

124
PT Judhi Sakti
ASD JOB 48-75386
Engineering

0
124
PT Judhi Sakti
ASD JOB 48-75386
0 Engineering

124
PT Judhi Sakti
ASD JOB 48-75386
Engineering
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 35 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
PT Judhi Sakti
ASD JOB 48-75386
Engineering

PT Multi
Adverindo JOB ONGOING 48-73790

PT Multi
Adverindo JOB ONGOING 48-73790

PT Multi
Adverindo JOB ONGOING 48-73790

PT Multi
Adverindo JOB ONGOING 48-73790

PT Multi
Adverindo JOB ONGOING 48-73790

PT Multi
Adverindo JOB ONGOING 48-73790

PT Multi
Adverindo JOB ONGOING 48-73790

PT Multi
Adverindo JOB ONGOING 48-73790

PT Multi
Adverindo JOB ONGOING 48-73790

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 36 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)

PT Multi
Adverindo JOB ONGOING 48-73790

PT Multi
Adverindo JOB ONGOING 48-73790

PT Multi
Adverindo JOB ONGOING 48-73790

PT Multi
Adverindo JOB ONGOING 48-73790
0
0
43388
PT Multi
0 Adverindo YET TO START 48-73790
0
0
122
PT Ayam Mas
ASD JOB 48-75425
Putra Mandiri

122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0

122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0

122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 37 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)

122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0

122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0

122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0

122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0

122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0

122
PT Ayam Mas
0 ASD JOB 48-75425
Putra Mandiri
0

122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0

122
PT Ayam Mas
0 ASD JOB 48-75425
Putra Mandiri
0

122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0

122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 38 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
PT Ayam Mas
ASD JOB 48-75425
Putra Mandiri
0

45 JOB ONGOING
PT Nusareka
5 (progress as on 48-76479
Prima Engineering
5 04.04.19 : 50%)

45
PT Nusareka
Job Ongoing 48-76479
Prima Engineering

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 39 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)

99

PT Nusareka
Yet to start 48-76479
Prima Engineering

93
PT Nusareka
Job Ongoing 48-76479
Prima Engineering

134
PT Nusareka
ASD JOB 48-76479
Prima Engineering

134
PT Nusareka
ASD JOB 48-76479
Prima Engineering

134
PT Nusareka
ASD JOB 48-76479
Prima Engineering

134
PT Nusareka
ASD JOB 48-76479
Prima Engineering

134
PT Nusareka
ASD JOB 48-76479
Prima Engineering

134

PT Nusareka
ASD JOB 48-76479
Prima Engineering

134
PT Nusareka
ASD JOB 48-76479
Prima Engineering

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 40 of 138
Rev.0

This Issue: 5-Apr-19


Last issue : None

Awarded to

Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
48-76479

134
PT Nusareka
ASD JOB 48-76479
Prima Engineering

134
PT Nusareka
ASD JOB 48-76479
Prima Engineering

134
PT Nusareka
ASD JOB 48-76479
Prima Engineering

134
PT Nusareka
ASD JOB 48-76479
Prima Engineering

134
PT Nusareka
ASD JOB 48-76479
Prima Engineering

102
PT Nusareka
Yet to start 48-76479
Prima Engineering

19
0 Purindo Job ongoing 48-76204
0

Prepared by : Checked by : Approved by :


LMS WZT/SP/NCH VAS
Page 41 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - MECHANICAL ITEMS Rev: 0
5.00 3.00 14.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 4.00 1.00 1.00 0.00 0.00 This issue : 5-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Bid Closing

Shipment
Standard

STATUS
QTY BOQ

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
S/No

Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
Clean (A) Condensate Tank (451-T-
1 UG-FTPL-P087 1 Unit P 13-May-18 18-May-18 21-May-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18 12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 25-Jun-18 25-Jun-18 25-Jun-18 25-Jun-18 87 2-Jan-19 3-Jan-19 1
022)
PT Judhi Sakti Water filling ongoing. PO:
Vol 200 m3 F 13-May-18 18-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 88 2-Jan-19 3-Jan-19 1 Engineering Insulation to start 48-74078
Dimension 5 m x 11.15 m ht. Wt:
A 13-May-18 18-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 89 2-Jan-19 3-Jan-19 1
14.4867T. SA 516 Gr.70
0
Intermediate (B) Condensate Tank
2 UG-FTPL-P087 1 Unit P 13-May-18 18-May-18 21-May-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18 12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 25-Jun-18 25-Jun-18 25-Jun-18 26-Jun-18 87 2-Jan-19 3-Jan-19 1
(451-T-022)
PT Judhi Sakti Water filling ongoing. PO:
Vol 200 m3 F 13-May-18 18-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 9-Sep-18 25-Feb-37 17-Aug-55 6-Feb-74 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 19-Sep-18 105 2-Jan-19 3-Jan-19 1
Engineering Insulation to start 48-74078
Dimension 5 m x 11.15 m ht. Wt:
A 13-May-18 18-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 2-Jan-19 3-Jan-19 1
14.4867T. SA 516 Gr.70
0
Effect 1E Circulation Pump (452-P-
3 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 15-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 6-Apr-19 50
002) PO:
Andritz China Arrived
Centrifugal Pump, Material SS 304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 88 15-Feb-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 88 15-Feb-19
0
4 UG-FTPL-P080 WBL Feed Pump #1 (452-P-008) 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 9-Apr-19 53
PO:
Andritz China Arrived
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19
0
WBL Feed Pump #2 Pump (452-P-
5 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 25-Jun-19 130
009) PO:
Andritz China Installation after ASD
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19
0
A Condensate transfer pump tank
6 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 31-Mar-19 44
farm from storage tank (452-P-015) PO:
Andritz China Installed
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 31-Mar-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19 31-Mar-19
0
B Condensate transfer pump tank
7 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 31-Mar-19 44
farm (452-P-016) PO:
Andritz China Installed
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 31-Mar-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19 31-Mar-19
0
Stripped condensate pump #1 (452-
8 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 22-Jan-19 30-Jan-19 8
P-018) PO:
Andritz China Installed
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 22-Jan-19 30-Jan-19 8 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 22-Jan-19 30-Jan-19 8
0
Stripped condensate pump #2 (452-
9 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 22-Jan-19 30-Jan-19 8
P-019) PO:
Andritz China Installed
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 22-Jan-19 31-Jan-19 9 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 22-Jan-19 1-Feb-19 10
0
10 UG-FTPL-P080 HBL Transfer pump (452-P-001) 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 31-Mar-19 44
PO:
Andritz China Installed
Centrifugal Pump, Material Duplex F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 31-Mar-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19 31-Mar-19
0
11 UG-FTPL-P080 Effect 5 pump (452-P-004) 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 6-Apr-19 50
PO:
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 Andritz China Arrived
48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19
0
12 UG-FTPL-P080 HBL Pump 1 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 9-Apr-19 53
PO:
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 Andritz China Arrived
48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19
0
13 UG-FTPL-P080 HBL Pump 2 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 25-Jun-19 130
PO:
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 Andritz China Installation after ASD
48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19
0
Foundation bolts & templates (Type-
14 UG-FTPL-P093 1 lot P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 16-Jul-18 16-Jul-18 30 31-Oct-18 7-Dec-18 37
1) PT Doksa Multiline PO:
SA36 F 25-May-18 30-May-18 2-Jun-18 10-Sep-18 11-Sep-18 14-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 25-Sep-18 27-Sep-18 1-Oct-18 2-Oct-18 26-Sep-18 26-Sep-18 26-Sep-18 35 31-Oct-18 7-Dec-18 37 Engineering Arrived 48-73848
129.6 kg A 25-May-18 30-May-18 2-Jun-18 10-Sep-18 11-Sep-18 14-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 1-Oct-18 1-Oct-18 1-Oct-18 1-Oct-18 30 31-Oct-18 7-Dec-18 37
0
Foundation bolts & templates (Type-
15 UG-FTPL-P093 1 lot P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 16-Jul-18 16-Jul-18 30 31-Oct-18 7-Dec-18 37
2) PT Doksa Multiline PO:
SA36 F 25-May-18 30-May-18 2-Jun-18 10-Sep-18 14-Feb-37 25-Jul-55 2-Jan-74 14-Jun-92 28-Nov-10 15-May-29 31-Oct-47 21-Apr-66 27-Sep-18 22-Sep-18 22-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 26-Sep-18 27-Sep-18 35 31-Oct-18 7-Dec-18 37 Engineering Arrived 48-73848
116.56 kg A 25-May-18 30-May-18 2-Jun-18 10-Sep-18 11-Sep-18 14-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 1-Oct-18 1-Oct-18 1-Oct-18 1-Oct-18 30 31-Oct-18 7-Dec-18 37
0
Part list Hot insulation (Dec-100 kg/m3) 720 rolls 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 28-Feb-19 31-May-19 92
Rockwool PO:
Insulation vessel 50 Thk. x 600 x 5000 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 28-Feb-19 Malaysia Arrived 48-75745
Rockwool
5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 19-Jan-19 40 28-Feb-19
(Wire Blanket)
0
Part list Plate For Cladding 410 sht 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
PipeLine Arrived
Insulation vessel Pl. 0.4t x 1220 x 2440 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 48-75641
Equipment Gr
SA 240 - 304 - 2B 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19

Part list Flat Bar 420 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
Insulation vessel FB. 3t x 30 x 6000 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 PipeLine Arrived 48-75641
SS 201 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19 Equipment Gr

Part list Flat Bar 12 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
Insulation vessel FB. 8t x 30 x 6000 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 PipeLine Arrived 48-75641
SS 201 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19 Equipment Gr

Part list Hex Bolt + Nut + Washer 160 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19
Tunas chipta PO:
Insulation vessel M.10 x 75 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 Arrived at site
manunggal 48-75611
4.6 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19

Part list Rivet 20000 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
Insulation vessel Ø 4.0 mm x 12 mm 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 PipeLine Arrived 48-75641
Aluminium 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19 Equipment Gr

Part list Sealent / Silicon 200 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 49 12-Feb-19 31-May-19
Insulation vessel 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 49 12-Feb-19 Hokindo Jaya PO:
Baharu Arrived at site 48-75614
5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 27 12-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 1 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1/2" - 25 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 1 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1/2" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 42 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - MECHANICAL ITEMS Rev: 0
5.00 3.00 14.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 4.00 1.00 1.00 0.00 0.00 This issue : 5-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Bid Closing

Shipment
Standard

STATUS
QTY BOQ

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
S/No

Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Rockwool PO:
Time Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 2 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1/2" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 84 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1" - 25 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 4 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 41 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 208 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 2" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 43 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 2" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 120 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 3" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 8 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 3" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 125 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 4" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 28 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 4" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 1 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 5" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 152 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 6" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 190 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 6" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 54 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 6" - 80 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 540 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 8" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 112 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 8" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 36 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 8" - 80 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 76 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 10" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 1 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 10" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 13 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 10" - 80 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 6 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 12" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Pipe Insulation (Den-100kg/m3) 84 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 12" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19

Part list Plate for Cladding 400 sht 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
Insulation pipe Pl. 0.4t x 1220 x 2440 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 PipeLine Arrived 48-75641
SA 240 - 304 - 2B 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19 Equipment Gr

Part list Rivet 35000 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
Insulation pipe Ø 4.0 mm x 12 mm 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 PipeLine Arrived 48-75641
Aluminium 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19 Equipment Gr

Part list Sealent / Silicon 350 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 49 12-Feb-19 31-May-19
Hokindo Jaya PO:
Insulation pipe 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 49 12-Feb-19 Arrived at site
Baharu 48-75614
5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 27 12-Feb-19

Part list Wire Rope 25 kg 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 31 25-Jan-19 31-May-19 126
Willich Isolasi PO:
Insulation pipe Ø 0.8 mm 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 31 25-Jan-19 Arrived at site
Pratama 48-75606
Galvanized 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 9 25-Jan-19

34 UG-FTPL-P125 Desuperheating Nozzle (452-V1078) 1 Unit P 20-Aug-18 23-Aug-18 26-Aug-18 11-Oct-18 12-Oct-18 15-Oct-18 16-Oct-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 14-Nov-18 15-Nov-18 18-Nov-18 20-Nov-18 24-Nov-18 25-Nov-18 26-Nov-18 26-Nov-18 26-Nov-18 107 10-Mar-19 10-Apr-19 31
PO:
Spirax Sarco Arrived
Spec: DN400, CS F 20-Aug-18 23-Aug-18 26-Aug-18 11-Oct-18 12-Oct-18 15-Oct-18 16-Oct-18 12-Nov-18 27-Nov-18 19-Dec-18 20-Dec-18 23-Dec-18 24-Dec-18 27-Dec-18 29-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 7-Jan-19 7-Jan-19 107 10-Mar-19 48-75420
A 20-Aug-18 23-Aug-18 26-Aug-18 11-Oct-18 12-Oct-18 15-Oct-18 16-Oct-18 12-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 19-Dec-18 19-Dec-18 19-Dec-18 19-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 7-Jan-19 7-Jan-19 107 10-Mar-19
0
35 UG-FTPL-P095 Steel structure material P 25-May-18 30-May-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 13-Jun-18 14-Jun-18 17-Jun-18 18-Jun-18 21-Jun-18 22-Jun-18 24-Jun-18 25-Jun-18 26-Jun-18 26-Jun-18 26-Jun-18 26-Jun-18 26-Jun-18 116 15-Jan-19 15-Jan-19 0

Steel structure: 43.5 T, railing: 2.3T, PT Judhi Sakti PO:


F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 13-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 17-Sep-18 17-Sep-18 17-Sep-18 17-Sep-18 136 31-Jan-19 31-Jan-19 0 Arrived at site
Platform: 8.8T, Fasteners:0.59T Engineering 48-74078

A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 13-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 17-Sep-18 17-Sep-18 17-Sep-18 17-Sep-18 136 31-Jan-19 31-Jan-19 0
Prepared by : Checked by : 0 Approved by :
LMS 37 UG-FTPL-P165 Additional platforms P 5-Nov-18 7-Nov-18 10-Nov-18 20-Nov-18 21-Nov-18 24-Nov-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18
WZT/NCH/SP 7-Dec-18 10-Dec-18 12-Dec-18 16-Dec-18 17-Dec-18 18-Dec-18 18-Dec-18 18-Dec-18 72 28-Feb-19 28-Feb-19 0
PT Weltes Energy Foundation ongoing; to PO: VAS
F 20-Nov-18 21-Nov-18 24-Nov-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18
Page 43 of 138 4-Jan-19 4-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 8-Jan-19 9-Jan-19 9-Jan-19 50 28-Feb-19 28-Feb-19
Nusantara be installed 48-75429
A 20-Nov-18 21-Nov-18 24-Nov-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 4-Jan-19 4-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 8-Jan-19 9-Jan-19 9-Jan-19 50 28-Feb-19 28-Feb-19
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - ELECTRICAL ITEMS Rev.0
3 20 1 3 1 3 1 3 1 3 2 1 3 1 1 This issue : 5-Apr-19
P: Plan, F: ForeP: Plan, F: Forecast, A: Actual Last issue : None

Shipment Status
Bid Closing
Enquiry No

QTY BOQ

Standard

STATUS
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Arrive site
S/No

Float
Issue Call PR In Required

Unit
Description Date/ NTP date (Vendor/ Remarks
For Tender system on Site
Award Date Supplier/ Contr.)
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
1 UG-FTPL-P107 MCC 1 Set P 30-Jun-18 4-Jul-18 7-Jul-18 2-Aug-18 3-Aug-18 6-Aug-18 7-Aug-18 10-Aug-18 11-Aug-18 14-Aug-18 15-Aug-18 18-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 26-Aug-18 157 30-Jan-19 14-Mar-19 43
PO:
F 30-Jun-18 4-Jul-18 7-Jul-18 2-Aug-18 3-Aug-18 6-Aug-18 7-Aug-18 10-Aug-18 11-Aug-18 14-Aug-18 15-Aug-18 18-Aug-18 14-Sep-18 30-Sep-18 1-Oct-18 1-Oct-18 1-Oct-18 150 28-Feb-19 14-Mar-19 14 Cipta Elektrik INSTALLED
48- 73744
A 30-Jun-18 4-Jul-18 7-Jul-18 2-Aug-18 3-Aug-18 6-Aug-18 7-Aug-18 10-Aug-18 11-Aug-18 14-Aug-18 15-Aug-18 18-Aug-18 14-Sep-18 30-Sep-18 1-Oct-18 1-Oct-18 1-Oct-18 163 13-Mar-19 14-Mar-19 1
0
2 UG-FTPL-P108 Heavy Liquor Pump Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 10-Apr-19 85
22kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 Siemens INSTALLED
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19 5-Apr-19
0

3 UG-FTPL-P108 Circulation Pump EF1E Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 11-Feb-19 21-Feb-19 10
PO:
Siemens ARRIVED
250kW, 1500 rpm, IP rating - IP 48- 73546
55, Y/D
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 219 20-Mar-19 8-Apr-19 19
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 187 20-Mar-19
0
Steam Condensate Transfer
4 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Pump Motor
PO:
11kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
DOL
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19 5-Apr-19
0
Liquor Transfer Pump EF 5
5 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Motor
PO:
55kW, 1500 rpm, IP rating - IP 55, Siemens ARRIVED
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 8-Apr-19 48- 73546
DOL
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
Intermediate Condensate
6 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Transfer Pump Motor
PO:
37kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19 5-Apr-19
0
7 UG-FTPL-P108 New WBL Pump 1 Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
37kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 10-Apr-19 Siemens ARRIVED
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
8 UG-FTPL-P108 New WBL 2 Pump Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
37kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 23-May-19 Siemens Installation during ASD
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
9 UG-FTPL-P108 Vaccum Pump 1 Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 11-Feb-19 21-Feb-19 10
55kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 219 20-Mar-19 6-Apr-19 17 Siemens ARRIVED
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 187 20-Mar-19
0
10 UG-FTPL-P108 Vaccum Pump 2 Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 11-Feb-19 21-Feb-19 10
55kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 219 20-Mar-19 6-Apr-19 17 Siemens ARRIVED
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 187 20-Mar-19
0
Intermediate Condensate
11 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Pump Motor
PO:
45kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
Clean Condensate Tank Pump
12 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Motor
PO:
45kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
Stripped Condensate Pump
14 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Motor
PO:
15kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19 5-Apr-19
0
Stripped Condensate Pump
15 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Motor
PO:
15kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19 5-Apr-19
0
16 UG-FTPL-P108 HBL Pump Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
15kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 10-Apr-19 Siemens ARRIVED
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
17 UG-FTPL-P108 HBL Pump Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
15kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 23-May-19 Siemens Installation during ASD
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
Power Cable, N2XY 0.4/0.6/1
18 UG-FTPL-P142 1200 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
4C x 50 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
19 UG-FTPL-P142 500 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84
kV Installation ongoing
PO:
Esindo (Progress as on
(3C x 150 +70) F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0

Prepared : Checked : WZT/NCH/SP Approved :


LMS Page 44 of 138 VAS
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - ELECTRICAL ITEMS Rev.0
3 20 1 3 1 3 1 3 1 3 2 1 3 1 1 This issue : 5-Apr-19
P: Plan, F: ForeP: Plan, F: Forecast, A: Actual Last issue : None

Shipment Status
Bid Closing
Enquiry No

QTY BOQ

Standard

STATUS
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Arrive site
S/No

Float
Issue Call PR In Required

Unit
Description Date/ NTP date (Vendor/ Remarks
For Tender system on Site
Award Date Supplier/ Contr.)
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Power Cable, N2XY 0.4/0.6/1
20 UG-FTPL-P142 250 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
4C x 6 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
21 UG-FTPL-P142 1000 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
4C x 16 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
22 UG-FTPL-P142 1000 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
4C x 2.5 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
23 UG-FTPL-P142 1000 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
4C x 35 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
24 UG-FTPL-P142 2000 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
7C x 1.5 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
25 UG-FTPL-P142 350 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
3 x 240 + 95 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
26 UG-FTPL-P142 2000 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
3C x 1.5 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
27 UG-FTPL-P142 200 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
1C x 95 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
27 UG-FTPL-P149 Cable Tray P 2-Nov-18 8-Nov-18 11-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 60 16-Feb-19 7-Mar-19 19 Installation ongoing
Surya Cakra PO:
F 27-Nov-18 10-Dec-18 27-Dec-18 10-Jan-19 11-Jan-19 11-Jan-19 12-Jan-19 12-Jan-19 13-Jan-19 13-Jan-19 14-Jan-19 14-Jan-19 22-Jan-19 23-Jan-19 23-Jan-19 24-Jan-19 25-Jan-19 60 16-Feb-19 7-Mar-19 19 (Progress as on
Mandiri 48- 75928
A 27-Nov-18 11-Dec-18 27-Dec-18 10-Jan-19 11-Jan-19 11-Jan-19 12-Jan-19 12-Jan-19 13-Jan-19 13-Jan-19 14-Jan-19 14-Jan-19 22-Jan-19 23-Jan-19 23-Jan-19 24-Jan-19 25-Jan-19 60 16-Feb-19 12-Mar-19 24 05.04.19: 83%)
0

Prepared : Checked : WZT/NCH/SP Approved :


LMS Page 45 of 138 VAS
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0

3 10 1 3 1 3 1 3 1 3 3 3 2 4 1 0 0 0 This issue : 16-Apr-19


P: Plan, F: For P: Plan, F: Forecast, A: Actual Last issue : None

Bid Closing
QTY BOQ

Arrive site
Shipment
Standard

STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery

ORDER
Contract

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
S/No

Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Orifice Plate, Size: 400, wall
1 thickness 9.53 mm, outside pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
dia: 406.40 mm, ANSI 300# PO:
Arrived
48- 75808
452-FIC-1020 F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 11-Apr-19
Flow, LP steam to Effect 1E A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
0
Orifice Plate, Size: 250, wall
2 thickness 2.60 mm, outside pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
dia: 273. mm, ANSI 300# PO:
Arrived
48- 75808
452-FI-1118 F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 15-May-19 0
Flow, Condensate to pulp mill A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
0
Orifice Plate, Size: 400, wall
3 thickness 9.53 mm, outside pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
dia: 406.40 mm, ANSI 300# PO:
Arrived
48- 75808
452-FIC-1020 F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 11-Apr-19 0
Flow, LP steam to Effect 1E A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
0
Pressure Transmitter (452-PT-
4 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1124)
Pressure, Sealing water. Process PO:
conn: 1/2" NPT, 2" pipe mounted, Arrived
Manifold type:2-way, Electrical
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 15-May-19 0 48- 75808
conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
5 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1130)
Pressure, Instrument Air. Process PO:
conn: 1/2" NPT, 2" pipe mounted, Arrived
Manifold type:2-way, Electrical
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 5-May-19 0 48- 75808
conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
6 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1054)
Pressure, Interm Condensate.
Process conn: 1/2" NPT, 2" pipe PO:
Arrived
mounted, Manifold type:2-way, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 27-Apr-19 0 48- 75808
Electrical conn: 1/2" NPT, IP65,
Glycerine filled
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
7 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1051)
Pressure, Liquor effect 5 to
concentrator. Process conn: 2" PO:
Arrived
Flanged, ANSI 150#, Direct F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 19-Apr-19 0 48- 75808
mounted, Electrical conn: 1/2"
NPT, IP65, 1 x 1.5 m capillary
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
8 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1027)
Pressure, Effect 1E, Vapour side. PO:
Process conn: 3" Flanged, ANSI Arrived
150#, Direct mounted, Electrical
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 0 48- 75808
conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 30-Dec-99 0

Pressure Transmitter (452-PT-


9 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1037)
Pressure, Steam condensate. PO:
Process conn: 1/2" NPT, 2" pipe Arrived
mounted, Manifold type:2-way,
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 0 48- 75808
Electrical conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Mar-19 30-Dec-99 0

Pressure Transmitter (452-PT-


10 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1028)
Pressure, Effect 1E, Liquor Side. PO:
Process conn: 3" Flanged, ANSI Arrived
150#, Direct mounted, Electrical
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 0 48- 75808
conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
11 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1032)
Pressure, Liquor effect 1E
circulation. Process conn: 1/2" PO:
Arrived
NPT, 2" pipe mounted, Manifold F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 0 48- 75808
type:2-way, Electrical conn: 1/2"
NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 30-Dec-99 0

Pressure Transmitter (452-PT-


12 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1101)
Pressure, Vapour effect 2AB PO:
Process conn: 1/2" NPT, 2" pipe Arrived
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 15-May-19 0 48- 75808
mounted, Manifold type:2-way,
Electrical conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 30-Dec-99 0

Pressure Transmitter (452-PT-


13 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1136)
Pressure, Vapour Eff3 inlet-1. PO:
Process conn: 1/2" NPT, 2" pipe Arrived
mounted, Manifold type:2-way,
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 11-Apr-19 0 48- 75808
Electrical conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
14 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1137)
PO:
Arrived
48- 75808
Prepared : Checked : WZT/NCH/SP Approved : VAS
LMS Page 46 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0

3 10 1 3 1 3 1 3 1 3 3 3 2 4 1 0 0 0 This issue : 16-Apr-19


P: Plan, F: For P: Plan, F: Forecast, A: Actual Last issue : None

Bid Closing
QTY BOQ

Arrive site
Shipment
Standard

STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery

ORDER
Contract

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
S/No

Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Pressure, Vapour Eff3 inlet-2. PO:
Process conn: 1/2" NPT, 2" pipe Arrived
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 11-Apr-19 0 48- 75808
mounted, Manifold type:2-way,
Electrical conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 30-Dec-99 0

Pressure Transmitter (452-PT-


15 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1063)
Pressure, Vapour to surface
condenser. Process conn: 1/2" PO:
Arrived
NPT, 2" pipe mounted, Manifold F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 0 48- 75808
type:2-way, Electrical conn: 1/2"
NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 30-Dec-99 0

Pressure Transmitter (452-PT-


16 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1008)

PO:
Arrived
48- 75808

Prepared : Checked : WZT/NCH/SP Approved : VAS


LMS Page 47 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0

3 10 1 3 1 3 1 3 1 3 3 3 2 4 1 0 0 0 This issue : 16-Apr-19


P: Plan, F: For P: Plan, F: Forecast, A: Actual Last issue : None

Bid Closing
QTY BOQ

Arrive site
Shipment
Standard

STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery

ORDER
Contract

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
S/No

Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Pressure liquor flash tanks.
Process conn: 2" flanged ANSI PO:
Arrived
150#, 2" pipe mounted, Manifold F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 14-May-19 0 48- 75808
type:2-way, Electrical conn: 1/2"
NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
17 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1022)
Pressure, LP Steam to effect 1E. PO:
Process conn: 1/2" NPT, 2" pipe Arrived
mounted, Manifold type:2-way,
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 48- 75808
Electrical conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
18 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1031)
Pressure, Vapour effect 1E. PO:
Process conn: 1/2" NPT, 2" pipe Arrived
mounted, Manifold type:2-way,
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 48- 75808
Electrical conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Pressure Transmitter (452-PT-


19 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1012)
Pressure, Heavy liquor pump. PO:
Process conn: 2" flanged, ANSI Arrived
150#, direct mounted, Electrical
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 48- 75808
conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Pressure Transmitter (452-PT-


20 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1005)
Pressure liquor flash tanks. PO:
Arrived
Process conn: 2" pipe mounted, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 48- 75808
Electrical conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Pressure Differential
21 Transmitter (452-FI-1118). Tag: 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
452-FT-1118)
PO:
Flow, condensate to pulp mill, process Arrived
conn: 1/2" NPT, Manifold type: 3 way, 48- 75808
Electrical conn: 1/2" NPT, IP65, 2" pipe F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 15-May-19
mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Differential
22 Transmitter (452-FI-1143). Tag: 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
452-FT-1143) PO:
Flow, mill water to wash, process conn: Arrived
48- 75808
1/2" NPT, Manifold type: 3 way, Electrical F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 15-May-19
conn: 1/2" NPT, IP65, 2" pipe mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Pressure Differential
23 Transmitter (452-FIC-1020). 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Tag: 452-FT-1020)
PO:
Flow, LP steam to effect 1E, process conn: Arrived
48- 75808
1/2" NPT, Manifold type: 3 way, Electrical F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 11-Apr-19
conn: 1/2" NPT, IP65, 2" pipe mounting

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Pressure Differential
24 Transmitter (452-LI-1112). Tag: 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
452-LT-1112)
PO:
Level, intermediate condensate tank, Arrived
process conn: 1/2" NPT, Manifold type: 2 48- 75808
way, Electrical conn: 1/2" NPT, IP65, 2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19
pipe mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Pressure Differential
25 Transmitter (452-LI-1113). Tag: 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
452-LT-1113)
PO:
Level, clean condensate tank, process Arrived
conn: 1/2" NPT, Manifold type: 2 way, 48- 75808
Electrical conn: 1/2" NPT, IP65, 2" pipe F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19
mounting

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Pressure Differential
26 Transmitter (452-LIC-1001). 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Tag: 452-LT-1001) PO:
Level, heavy liquor flash tank 1, process Arrived
48- 75808
conn: 2 x 3 ANSI 150# Flanged, Electrical F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19
conn: 1/2" NPT, IP65, 2" pipe mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Pressure Differential
27 Transmitter (452-LIC-1035). 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Tag: 452 LT-1035)
PO:
Level, steam condensate flash tank, Arrived
process conn: 2 x 1" ANSI 150# Flanged, 48- 75808
Electrical conn: 1/2" NPT, IP65, 2" pipe F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 8-Apr-19
mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Pressure Differential
28 Transmitter (452-LIC-1053). 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Tag: 452-LT-1053) PO:
Level, interm condensate tank, process Arrived
48- 75808
conn: 2 x 1" ANSI 150#, Electrical conn: F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19
1/2" NPT, IP65, 2" pipe mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Pressure Differential
29 Transmitter (452-DI-1014). Tag: 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
452-DT-1014)
PO:
Arrived
48- 75808

Prepared : Checked : WZT/NCH/SP Approved : VAS


LMS Page 48 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0

3 10 1 3 1 3 1 3 1 3 3 3 2 4 1 0 0 0 This issue : 16-Apr-19


P: Plan, F: For P: Plan, F: Forecast, A: Actual Last issue : None

Bid Closing
QTY BOQ

Arrive site
Shipment
Standard

STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery

ORDER
Contract

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
S/No

Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
PO:
Density, Heavy liquor flash tank 1, process Arrived
48- 75808
conn: 2 x 3" ANSI 150#, Electrical conn: F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19
1/2" NPT, IP65, 2" pipe mounting

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Temperature Transmitter
30 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1045)
PO:
Temperature, liquor LPH 4 In, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 18-Apr-19 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
31 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1046) PO:
Temperature, liquor LPH 4 Out, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
32 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1021)
Temperature LP Steam to effect 1E, 2" PO:
Arrived
pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 11-Apr-19 48- 75808
NPT(F)
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
33 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1024)
PO:
Temperature Liquor effect 1E, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 11-Apr-19 48- 75808

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
34 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1085)
Temperature, Condensate pot tank outlet, PO:
Arrived
2" pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 15-May-19 48- 75808
NPT(F)

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
35 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1134) PO:
Temperature, wash liquor, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-May-19 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
36 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1042)
PO:
Temperature liquor LPH 3, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 48- 75808

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
37 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1060)
Temperature, Surface Condenser outlet, 2" PO:
Arrived
pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 48- 75808
NPT(F)

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
38 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1058)
Temperature, WW surface condenser, 2" PO:
Arrived
pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 48- 75808
NPT(F)

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
39 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1002)
Temperature heavy liquor flash tank 1, 2" PO:
Arrived
pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 48- 75808
NPT(F)

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
40 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1098)

Temperature heavy liquor flash tank PO:


Arrived
(existing), 2" pipe mounting, IP56, elec F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 13-May-19 48- 75808
conn: 1/2" NPT(F)

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
41 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1072)
Temperature warm foul condensate, 2" PO:
Arrived
pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 15-May-19 48- 75808
NPT(F)

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
42 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1073)
PO:
Temperature, stripped condensate, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 11-Apr-19 48- 75808

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
43 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1082)
Temperature, Fould condensate to stripper, PO:
Arrived
2" pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 15-May-19 48- 75808
NPT(F)

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Temperature Transmitter
44 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1083)
PO:
Temperature, Stripped condensate, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 15-May-19 48- 75808

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Prepared : Checked : WZT/NCH/SP Approved : VAS


LMS Page 49 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0

3 10 1 3 1 3 1 3 1 3 3 3 2 4 1 0 0 0 This issue : 16-Apr-19


P: Plan, F: For P: Plan, F: Forecast, A: Actual Last issue : None

Bid Closing
QTY BOQ

Arrive site
Shipment
Standard

STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery

ORDER
Contract

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
S/No

Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Temperature Transmitter
45 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1142)
PO:
Temperature, CNCG temperature, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 48- 75808

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

46 Thermowell (452-TW-1002) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature Heavy liquor flash tank 1, Lt:
200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Black liquor, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
48- 75808
strong, thick

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

47 Thermowell (452-TW-1024) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65

Temperature Liquor Effect 1E, Lt: 250 mm,


PO:
Extension: 50 mm, element lt: 300 mm, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
outer dia: 6 mm, Black liquor, strong, thick 48- 75808

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

48 Thermowell (452-TW-1042) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature Liquor LPH 3, Lt: 200 mm,
PO:
Extension: 50 mm, element lt: 250 mm, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 Arrived
outer dia: 6 mm, Black liquor, weak 48- 75808

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

49 Thermowell (452-TW-1045) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65

Temperature, Liquor LPH 4 In, Lt: 200 mm, PO:


Extension: 50 mm, element lt: 250 mm, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 18-Apr-19 Arrived
outer dia: 6 mm, Black liquor,intermediate 48- 75808

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

50 Thermowell (452-TW-1046) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65

PO:
Arrived
48- 75808

Prepared : Checked : WZT/NCH/SP Approved : VAS


LMS Page 50 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0

3 10 1 3 1 3 1 3 1 3 3 3 2 4 1 0 0 0 This issue : 16-Apr-19


P: Plan, F: For P: Plan, F: Forecast, A: Actual Last issue : None

Bid Closing
QTY BOQ

Arrive site
Shipment
Standard

STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery

ORDER
Contract

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
S/No

Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Temperature, Liquor LPH 4 Out, Lt: 200
PO:
mm, Extension: 50 mm, element lt: 250 F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 Arrived
mm, outer dia: 6 mm, Black liquor, weak 48- 75808

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

51 Thermowell (452-TW-1072) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature Warm Foul Condensate, Lt:
200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Condensate 3, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 Arrived
concentration, sulphate, heavily 48- 75808
contaminated

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

52 Thermowell (452-TW-1073) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, stripped condensate, Lt: 200
mm, Extension: 50 mm, element lt: 250
PO:
mm, outer dia: 6 mm, Condensate 3, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
concentration, sulphate, heavily 48- 75808
contaminated

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

53 Thermowell (452-TW-1082) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, Foul condensate to stripper,
Lt: 200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Condensate 3, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
concentration, sulphate, heavily 48- 75808
contaminated

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

54 Thermowell (452-TW-1083) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, Stripped condensate, Lt: 200
mm, Extension: 50 mm, element lt: 250 PO:
mm, outer dia: 6 mm, Condensate 3, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
concentration, sulphate, heavily 48- 75808
contaminated

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

55 Thermowell (452-TW-1085) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, condensate pot tank outlet,
Lt: 200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Condensate 1, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
48- 75808
concentration, sulphate

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

56 Thermowell (452-TW-1098) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature Heavy liquor flash tank
(existing), Lt: 200 mm, Extension: 50 mm, PO:
element lt: 250 mm, outer dia: 6 mm, Black F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 13-May-19 Arrived
48- 75808
liquor, strong, thick

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

57 Thermowell (452-TW-1134) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature wash liquor, Lt: 200 mm, PO:
Extension: 50 mm, element lt: 250 mm, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 29-Apr-19 Arrived
outer dia: 6 mm, Black liquor, weak 48- 75808

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

58 Thermowell (452-TW-1142) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature CNCG, temperature, Lt: 200
mm, Extension: 50 mm, element lt: 250 PO:
mm, outer dia: 6 mm, Gas, non- F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 Arrived
48- 75808
condensable sulphurous, sulphate H2S

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

59 Thermowell (452-TW-1021) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature LP steam to effect 1E, Lt: 200
mm, Extension: 50 mm, element lt: 250 PO:
mm, outer dia: 6 mm, Steam, live, LP=< F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
48- 75808
0.5 Mpa

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

60 Thermowell (452-TW-1058) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, WW surface condenser, Lt:
200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Water, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
48- 75808
mechanically treated

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

61 Thermowell (452-TW-1060) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, surface condenser outlet, Lt:
200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Steam, flash, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 Arrived
48- 75808
alkaline

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19

Conductivity Transmitter (452-


62 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
QT-1055)
2" pipe or wall mounted, elec conn: 1/2" PO:
Arrived
NPT, flow media: condensate 2, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 19-Apr-19 48- 75808
concentration, sulphate, contaminated

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Conductivity Transmitter (452-


63 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
QT-1034)
2" pipe or wall mounted, elec conn: 1/2" PO:
Arrived
NPT, flow media: live steam condensate, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 48- 75808
low pressure

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19

Magnetic Flowmeter (452-FT-


64 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1110)
PO:
2" pipe or wall mounted, elec conn: 1/2" Arrived
NPT, flow media: black liquor,weak F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 48- 75808

A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Prepared : Checked : WZT/NCH/SP Approved : VAS
LMS Page 51 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0

3 10 1 3 1 3 1 3 1 3 3 3 2 4 1 0 0 0 This issue : 16-Apr-19


P: Plan, F: For P: Plan, F: Forecast, A: Actual Last issue : None

Bid Closing
QTY BOQ

Arrive site
Shipment
Standard

STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery

ORDER
Contract

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
S/No

Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
65 Digital 1PR x 1.5 mm2 600 m P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 5-Oct-18 5-Oct-18 62 17-Dec-18 10-Mar-19 83
PO:
D1P, 2 x 1.5 + OS F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 21-Oct-18 21-Oct-18 21-Oct-18 57 17-Dec-18 83 ARRIVED
48- 73461
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 16-Oct-18 15-Oct-18 16-Oct-18 62 17-Dec-18 83
0
66 Digital 2PR x 1 mm2 600 m P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 62 17-Dec-18 10-Mar-19 83
PO:
D2P, 2 x (2 x 1.0) + OS F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 21-Oct-18 21-Oct-18 21-Oct-18 57 17-Dec-18 83 ARRIVED
48- 73461
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 16-Oct-18 15-Oct-18 16-Oct-18 62 17-Dec-18 83
0
67 Analog 1PR x 1.5mm2 3000 m P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 62 17-Dec-18 10-Mar-19 83
PO:
A1P, 2 x 1.5 +OS F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 21-Oct-18 21-Oct-18 21-Oct-18 57 17-Dec-18 83 ARRIVED
48- 73461
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 16-Oct-18 15-Oct-18 16-Oct-18 62 17-Dec-18 83
0
68 Analog 16 PR x 1 mm2 1200 m P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 62 17-Dec-18 10-Mar-19 83
PO:
A16 x (2 x 1.0 + IS) + OS F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 21-Oct-18 21-Oct-18 21-Oct-18 57 17-Dec-18 83 ARRIVED
48- 73461
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 16-Oct-18 15-Oct-18 16-Oct-18 62 17-Dec-18 83
0
69 Digital 16 PR x 1 mm2 800 m P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 62 17-Dec-18 10-Mar-19 83
PO:
D16P, 16 x (2x 1)+OS F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 21-Oct-18 21-Oct-18 21-Oct-18 57 17-Dec-18 83 ARRIVED
48- 73461
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 16-Oct-18 15-Oct-18 16-Oct-18 62 17-Dec-18 83
0
70 Control Valve (452-LV-1103) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Level, liquor to effect 2A, ball valve, ASTM
A312 TP 304. pipe size: 200 mm, Outside PO:
dia: 219.1 mm, wall thickness: 2.6 mm, F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2
Flange pressure class ANSI 150#, Conn 48- 76427
type: Flanged

A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18
0
71 Control Valve (452-HV-1135) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Automatic Valve, ball valve, ASTM A312
TP 316. Pipe size: 50 mm, Outside dia: PO:
60.3 mm, wall thickness: 1.6 mm, Flange F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 19-Apr-19 9
pressure class ANSI 150#, Conn type: 48- 76427
Flanged

A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19
0
71 Control Valve (452-LV-1104B) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Level, liquor to effect 1A, ball valve, ASTM
A312 TP 304. Pipe size: 150 mm, Outside PO:
dia: 168.3 mm, wall thickness: 2 mm, F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2 48- 76427
Flange pressure class ANSI 150#, Conn
type: Flanged

A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
71 Control Valve (452-LV-1105B) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Level, liquor to effect 1B, ball valve, ASTM
A312 TP 304. Pipe size: 150 mm, Outside PO:
dia: 168.3 mm, wall thickness: 2 mm, F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2
Flange pressure class ANSI 150#, Conn 48- 76427
type: Flanged

A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
71 Control Valve (452-LV-1106B) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Level, liquor to effect 1C, ball valve, ASTM
A312 TP 304. Pipe size: 150 mm, Outside PO:
dia: 168.3 mm, wall thickness: 2 mm, F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2
Flange pressure class ANSI 150#, Conn 48- 76427
type: Flanged

A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
71 Control Valve (452-PV-1005) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 127 14-Mar-19 29-Mar-19 15
Pressure liquor flash tanks,, API 5L. Pipe PO:
size: 200mm. Outside dia: 219.1 mm, wall F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 127 6-Apr-19 7-Apr-19 1 INSTALLED
thickness: 8.18mm, Butterfly valve 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 127 6-Apr-19 7-Apr-19 1
0
71 Control Valve (452-FV-1020) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Flow, LP steam to effect 1E, butterfly valve,
ASTM A 106 Gr B. Pipe size: 400mm, PO:
Outside dia: 406.4 mm, wall thickness: F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2
48- 76427
9.53 mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
71 Control Valve (452-PV-1063A) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15

Pressure, Vapour to surface condenser, PO:


ASTM A312 TP 304. Butterfly valve. Pipe Arrived
F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 19-Apr-19 28 48- 76427
line size: 300. Outside dia: 323.9 mm, wall
thickness: 3.2 mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
71 Control Valve (452-TV-1058) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Temperature, WW surface condenser,
Butterfly valve, ASTM A312 TP 304. Pipe: PO:
200 mm, Outside dia: 219.1 mm, wall F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19 9-Apr-19 3 Arrived
48- 76427
thickness: 2.6 mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19
0
71 Control Valve (452-TV-1060) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Temperature, surface condenser outlet,
Butterfly valve, ASTM A312 TP 304. Pipe PO:
size: 250 mm, Outside dia: 273 mm, wall F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 19-Apr-19 28 Arrived
48- 76427
thickness: 2.6 mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
71 Control Valve (452-TV-1061) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Temperature, existing surface condenser
outlet, Butterfly valve, ASTM A312 TP 304. PO:
Pipe: 200 mm, Outside dia: 219.1 mm, wall F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19 15-May-19 39 Arrived
48- 76427
thickness: 8.18 mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19
0
71 Control Valve (452-TV-1021) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Temperature LP Steam to effect 1E, globe
valve, ASTM A106 Gr B, Pipe size: 25mm . PO:
Outside dia: 33.4 mm, wall thickness: 4.55 F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19 7-Apr-19 1 INSTALLED
48- 76427
mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19 7-Apr-19
0
71 Control Valve (452-LV-1035) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Level, steam condensate flash tank,
segment valve, ASTM A106 Gr B. Pipe PO:
size: 150 mm, Outside dia: 168.3 mm, wall F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 9-Apr-19 18 Arrived
48- 76427
thickness: 7.11 mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
71 Control Valve (452-FV-1110) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15

Prepared : Checked : WZT/NCH/SP Approved


PO: : VAS
LMS Page 52 of 138 48- 76427
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0

3 10 1 3 1 3 1 3 1 3 3 3 2 4 1 0 0 0 This issue : 16-Apr-19


P: Plan, F: For P: Plan, F: Forecast, A: Actual Last issue : None

Bid Closing
QTY BOQ

Arrive site
Shipment
Standard

STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery

ORDER
Contract

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
S/No

Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Flow, wash liquor to concentrator, segment
valve, ASTM A312 TP 304. Pipe size: PO:
100mm, Outside dia: 114.3 mm, wall F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 11-Apr-19 1
48- 76427
thickness: 2 mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 -43565
0
71 Control Valve (452-LV-1131) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Level, liquor effect 3B, segment valve,
ASTM A312 TP 304. Pipe size: 200mm, PO:
Outside dia: 219.1 mm, wall thickness: 2.6 F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 16-May-19 55 Arrived
48- 76427
mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0

Prepared : Checked : WZT/NCH/SP Approved : VAS


LMS Page 53 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0

3 10 1 3 1 3 1 3 1 3 3 3 2 4 1 0 0 0 This issue : 16-Apr-19


P: Plan, F: For P: Plan, F: Forecast, A: Actual Last issue : None

Bid Closing
QTY BOQ

Arrive site
Shipment
Standard

STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery

ORDER
Contract

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
S/No

Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
71 Control Valve (452-LV-1133A) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Level, effect 4, segment valve, ASTM A312
PO:
TP 304. Pipe: 200mm, Outside dia: 219.1 F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 19-Apr-19 Arrived
mm, wall thickness: 2.6 mm 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
71 Control Valve (452-LV-1133B) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Level, liquor effect 4, segment valve,
ASTM A312 TP 304. Pipe: 200mm, PO:
Outside dia: 219.1 mm, wall thickness: 2.6 F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 19-Apr-19 28 Arrived
48- 76427
mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
71 Control Valve (452-LV-1053A) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Level, Interm cond tank, segment valve,
ASTM A312 TP 304. Pipe size: 200mm, PO:
Outside dia: 219.1 mm, wall thickness: 2.6 F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 27-Apr-19 36 Arrived
48- 76427
mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
71 Control Valve (452-LV-1053C) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15

Level, interm cond to spill, segment valve, PO:


ASTM A312 TP 304. Pipe size: 200mm, Arrived
F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 26-Apr-19 35 48- 76427
Outside dia: 219.1 mm, wall thickness: 2.6
mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
71 452-HV-1017 - Automatic valve 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
PO:
Ball valve, 150 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
452-HV-1099 -Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
input/interaction
PO:
Arrived
Ball valve, 50 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19 14-May-19 38 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19
0
452-HV-1094 - Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
input/interaction
PO:
Ball valve, 50 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 11-Apr-19 1 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 -43565
0
71 452-HV-1091 - Effect 2B Vent 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
PO:
Ball valve, 50 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19 9-Apr-19 3 Arrived
48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19
0
71 452-HV-1092 - Effect 2A Vent 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
PO:
Ball valve, 50 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 19-Apr-19 9
48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 -43565
0
452-HV-1138 - Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Input/interaction
PO:
Ball valve, 20 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 15-May-19 35 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 -43565
0
452-HV-1144 - Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
input/interaction
PO:
Ball F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
452-HV-1038 - Automatic valve
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
1E
PO:
Arrived
Ball valve, 100 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19 9-Apr-19 3 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19
0
452-HV-1070 - Automatic valve
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
HL Flash 1 to storage
PO:
Ball valve, 150 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 15-May-19 18 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
452-HV-1071 - Automatic valve
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
HL flash 1 to storage
PO:
Ball valve, 150 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 15-May-19 18 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
452-HV-1033 - Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
input/Interaction
PO:
Arrived
Butterfly valve, 150 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 9-Apr-19 18 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
452-HV-1036 - Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
input/interaction
PO:
INSTALLED
Butterfly valve, 150 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 7-Apr-19 16 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 7-Apr-19 16
0
452-HV-1096 - Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
input/interaction
PO:
Arrived
Butterfly valve, 200 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19 1-May-19 25 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19
0
452-HV-1097 - Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
input/interaction
PO:
Arrived
Butterfly valve, 200 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19 9-Apr-19 3 48- 76427

Prepared : Checked : WZT/NCH/SP Approved : VAS


LMS Page 54 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0

3 10 1 3 1 3 1 3 1 3 3 3 2 4 1 0 0 0 This issue : 16-Apr-19


P: Plan, F: For P: Plan, F: Forecast, A: Actual Last issue : None

Bid Closing
QTY BOQ

Arrive site
Shipment
Standard

STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery

ORDER
Contract

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
S/No

Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date PO:
Lead Arrived
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site 48- 76427
Time
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19
0
452-HV-1120 - Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
input/interaction
PO:
INSTALLED
Butterfly valve, 250 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 7-Apr-19 16 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 7-Apr-19 16
0
452-HV-1121 - Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
input/interaction
PO:
INSTALLED
Butterfly valve, 250 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 7-Apr-19 16 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 7-Apr-19 16

Prepared : Checked : WZT/NCH/SP Approved : VAS


LMS Page 55 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0

3 10 1 3 1 3 1 3 1 3 3 3 2 4 1 0 0 0 This issue : 16-Apr-19


P: Plan, F: For P: Plan, F: Forecast, A: Actual Last issue : None

Bid Closing
QTY BOQ

Arrive site
Shipment
Standard

STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery

ORDER
Contract

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required

Float
S/No

Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time

71

71

71

71

71

71

71

71

71

71

71

Prepared : Checked : WZT/NCH/SP Approved : VAS


LMS Page 56 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
1 UG-FTPL-P123 Ball Valve 15 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 15, V001 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material:PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
Socket weld, Pressure class: 800
0
2 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 15, V050 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 5-Apr-19
Flanged, Pressure class: 150
0
3 UG-FTPL-P123 Ball Valve 36 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 15, V080 30 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: PTFE, connection 6 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
Socket weld, Pressure class: 800
0
4 UG-FTPL-P123 Globe Valve 8 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 15, V208 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 14-Mar-19 10-Apr-19 27
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 64 14-Mar-19
Socket weld, Pressure class: 800
0
5 UG-FTPL-P123 Ball Valve 14 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 25, V001 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material:PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 Project01: -43542
Socket weld, Pressure class: 800 For 7 nos
0
6 UG-FTPL-P123 Globe Valve 11 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 25, V208 7 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 14-Mar-19 10-Apr-19 27 Shipment 1 (7 nos)
PT Budijaya Makmur Sentosa Arrived
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Shipment 2 (4 nos)
Pratama
Project01: PT Jason International 48-75405
seat material:STELL, connection 4 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 5-Apr-19 arrived on 05.04.19
For 4 nos
Socket weld, Pressure class: 800
0
7 UG-FTPL-P123 Ball Valve 9 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V001 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material:PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
Socket weld, Pressure class: 800
0
8 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V001 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material:STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99 30-Dec-99
Socket weld, Pressure class: 800
0
8 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V003 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material:PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
Socket weld, Pressure class: 800
0
9 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V041 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material:STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 5-Apr-19
Flanged, Pressure class: 150
0
10 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V046 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
Flanged, Pressure class: 150
0
11 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V080 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99
socket weld, Pressure class: 800

12 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V080 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99
Threaded, Pressure class: 800

13 UG-FTPL-P123 Globe Valve 5 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V208 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 14-Mar-19 10-Apr-19 27
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 14-Mar-19 30-Dec-99
Socket weld, Pressure class: 800

14 UG-FTPL-P123 Globe Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V208 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99 0
Socket weld, Pressure class: 800

15 UG-FTPL-P123 Ball Valve 3 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 80, V041 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99 0
Flanged, Pressure class: 150

16 UG-FTPL-P123 Ball Valve 14 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 80, V046 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99 0
Flanged, Pressure class: 150

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 57 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
17 UG-FTPL-P123 Globe Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 80, V208 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19
socket weld, Pressure class: 800
0
18 UG-FTPL-P123 Ball Valve 8 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 100, V046 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99
Flanged, Pressure class: 150

19 UG-FTPL-P123 Swing check Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 100, V602 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Budi Jaya PO:
PT Mitra Wira Pratama Arrived
seat material: PTFE, connection Makmur Sentosa PT Jason International 48-75436
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99
between flanges (wafer), Pressure
class: 150

20 UG-FTPL-P123 Ball Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V041 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99 0
flanged, Pressure class: 150

21 UG-FTPL-P123 Butterfly Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V101 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 10-Apr-19 11-Apr-19 1
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: EPDM, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 10-Apr-19
flanged, Pressure class: 150

21 UG-FTPL-P123 Butterfly Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V101 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 22-Mar-19 10-Apr-19 19
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira PO:
PT Mitra Wira Pratama Arrived
seat material: EPDM, connection Pratama PT Jason International 48-75405
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 22-Mar-19 30-Dec-99
between flanges (wafer), Pressure
class: 150

22 UG-FTPL-P123 Butterfly Valve 4 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V107 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 10-Apr-19 11-Apr-19 1
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Pratama PT Jason International 48-75405
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 10-Apr-19
between flanges (wafer), Pressure
class: 150

23 UG-FTPL-P123 Wedge gate Valve 4 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V307 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99 0
Flanged, Pressure class: 150

24 UG-FTPL-P123 Swing check Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V602 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Budi Jaya PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Makmur Sentosa PT Jason International 48-75436
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99 0
between flanges (wafer), Pressure
class: 150

25 UG-FTPL-P123 Swing check Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V607 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
Body:CS, Disk:SS, Spindle:SS, Body PT Budi Jaya PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Makmur Sentosa PT Jason International 48-75436
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99 0
between flanges (wafer), Pressure
class: 150

26 UG-FTPL-P123 Butterfly Valve 25 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 200, V107 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 10-Apr-19 11-Apr-19 1
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Pratama PT Jason International 48-75405
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 10-Apr-19
between flanges (wafer), Pressure
class: 150

27 UG-FTPL-P123 Wedge gate Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 200, V307 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99 0
Flanged, Pressure class: 150

28 UG-FTPL-P123 Swing check Valve 3 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 200, V602 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Budi Jaya PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Makmur Sentosa PT Jason International 48-75436
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
between flanges (wafer), Pressure
class: 150
0
29 UG-FTPL-P123 Butterfly Valve 13 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 250, V107 3 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 10-Apr-19 11-Apr-19 1
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Pratama PT Jason International 48-75405
10 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 10-Apr-19
between flanges (wafer), Pressure
class: 150

30 UG-FTPL-P123 Steam trap valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN25, pressure class 150, connect PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
flange, Mat body CS A106 Gr B, 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 24-Mar-19 10-Apr-19 17 PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
Disk SS, Spindle SS, Seat SS
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99 0
0
31 UG-FTPL-P131 PIPE 310-010 21.3x1.6 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 Project01:
23-Feb-19 74
Hebei Penxin Hebei Penxin Pipeline Equipment
1st Shipment on Jan 17/19, Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 2019 3 Pipeline Shipment 6
Jason International shipment 48-75365
DN 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 ETA Belawan Port Feb Equipment Group
0 4/5, 2019 Sin Ghee Huat Coorporation
2nd Shipment on Jan 24, 2019
0 12, 2019
ETA Belawan Port Feb
32 UG-FTPL-P131 PIPE 310-010 33.7x1.6 72 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
3rd Shipment on Jan 31, 2019 Hebei Penxin Hebei Penxin Pipeline Equipment
ETA Belawan Port Feb Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 17, 2019 Pipeline Jason International Shipment 6
shipment 48-75365
DN 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
33 UG-FTPL-P131 PIPE 310-010 60.3x1.6 105 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
34 UG-FTPL-P131 PIPE 310-010 88.9x1.6 110 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 58 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
35 UG-FTPL-P131 PIPE 310-010 114.3x2 90 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
36 UG-FTPL-P131 PIPE 310-010 168.3x2 63 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
37 UG-FTPL-P131 PIPE 310-010 219.1x2.6 426 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

38 UG-FTPL-P131 PIPE 310-010 273x2.6 54 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

39 UG-FTPL-P131 PIPE 310-010 406.4x4 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

40 UG-FTPL-P131 PIPE 310-010 21.3x1.6 35 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

41 UG-FTPL-P131 PIPE 310-010 26.9x1.6 15 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

42 UG-FTPL-P131 PIPE 310-010 33.7x1.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

43 UG-FTPL-P131 PIPE 310-010 48.3x1.6 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

44 UG-FTPL-P131 PIPE 310-010 60.3x1.6 204 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
45 UG-FTPL-P131 PIPE 310-010 88.9x1.6 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

46 UG-FTPL-P131 PIPE 310-010 114.3x2 32 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

47 UG-FTPL-P131 PIPE 310-010 139.7x2 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

48 UG-FTPL-P131 PIPE 310-010 168.3x2 179 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

49 UG-FTPL-P131 PIPE 310-010 219.1x2.6 189 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

50 UG-FTPL-P131 PIPE 310-010 273x2.6 26 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

51 UG-FTPL-P131 PIPE 310-010 323.9x3.2 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

52 UG-FTPL-P131 PIPE 310-010 355.6x3.2 53 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

53 UG-FTPL-P131 PIPE 310-010 406.4x4 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
54 UG-FTPL-P131 PIPE 310-010 457x4 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 450 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

55 UG-FTPL-P131 PIPE 310-010 508x5 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

56 UG-FTPL-P131 PIPE ANSI B36.10 XS 21.3x3.73 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

57 UG-FTPL-P131 PIPE ANSI B36.10 STD 21.3x2.77 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

58 UG-FTPL-P131 PIPE ANSI B36.10 STD 26.7x2.87 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

59 UG-FTPL-P131 PIPE ANSI B36.10 XS 33.4x4.55 40 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

60 UG-FTPL-P131 PIPE ANSI B36.10 STD 33.4x3.38 32 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

61 UG-FTPL-P131 PIPE ANSI B36.10 STD 48.3x3.68 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

62 UG-FTPL-P131 PIPE ANSI B36.10 XS 60.3x5.54 79 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
63 UG-FTPL-P131 PIPE ANSI B36.10 STD 60.3x3.91 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

64 UG-FTPL-P131 PIPE ANSI B36.10 STD 73.0x5.16 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

65 UG-FTPL-P131 PIPE ANSI B36.10 STD 88.9x5.49 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 59 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
66 UG-FTPL-P131 PIPE ANSI B36.10 STD 114.3x6.02 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

67 UG-FTPL-P131 PIPE ANSI B36.10 STD 141.3x6.55 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

68 UG-FTPL-P131 PIPE ANSI B36.10 STD 168.3x7.11 131 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

69 UG-FTPL-P131 PIPE ANSI B36.10 STD 219.1x8.18 92 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

70 UG-FTPL-P131 PIPE ANSI B36.10 STD 273.0x9.27 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

71 UG-FTPL-P131 PIPE ANSI B36.10 STD 323.8x9.53 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
72 UG-FTPL-P131 PIPE ANSI B36.10 STD 406.4x9.53 60 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

73 UG-FTPL-P131 PIPE API 5L STD 88.9x5.49 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

74 UG-FTPL-P131 PIPE API 5L STD 114.3x6.02 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

75 UG-FTPL-P131 PIPE API 5L STD 168.3x7.11 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

76 UG-FTPL-P131 PIPE API 5L STD 219.1x8.18 100 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

77 UG-FTPL-P131 PIPE API 5L STD 273.0x9.27 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

78 UG-FTPL-P131 PIPE API 5L STD 323.8x9.53 74 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

79 UG-FTPL-P131 PIPE API 5L STD 406.4x9.53 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

80 UG-FTPL-P131 PIPE API 5L STD 457.0.4x9.53 9 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 450 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

81 UG-FTPL-P131 PIPE API 5L STD 508.0x9.53 30 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
82 UG-FTPL-P131 PIPE API 5L STD 1066.8x9.53 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 1050 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

83 UG-FTPL-P131 PIPE API 5L STD 1219.0x9.53 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 1200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

84 UG-FTPL-P131 ELBOW 90deg SW ANSI B16.11 CL 3000 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

85 UG-FTPL-P131 ELBOW 90deg SW ANSI B16.11 CL 3000 35 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

86 UG-FTPL-P131 ELBOW 90deg SW ANSI B16.11 CL 3000 25 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

87 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 10 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

88 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

89 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 42 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

90 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 43 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

91 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 9 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
92 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

93 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

94 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 450 DN2 450 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

95 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

96 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 1200 DN2 1200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 60 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
97 UG-FTPL-P131 MITER ELBOW ; 311-010 : 90DEG BW 1D 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 1050 DN2 1050 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

98 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 21.3x2.0 25 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

99 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 26.9x2.0 22 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 20 DN2 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

100 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 33.7x2.0 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

101 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 48.3x2.0 22 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 40 DN2 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
102 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 60.3x2.0 73 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

103 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 88.9x2.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

104 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 114.3x2.6 24 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

105 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 139.7x2.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

106 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 168.3x2.6 44 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

107 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 219.1x3.2 62 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

108 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 273x4.0 15 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

109 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 323.9x4.0 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

110 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 355.6x5.0 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 350 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

111 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 406.4x5.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

112 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 508.0x6.3 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 500 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
113 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 33.7x2.0 52 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

114 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 60.3x2.0 36 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

115 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 88.9x2.6 29 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

116 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 114.3x2.6 29 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

117 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 168.3x2.6 35 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

118 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 219.1x3.2 59 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

119 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 273x4.0 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

120 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 406.4x5.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

121 UG-FTPL-P131 ELBOW 45deg SW ANSI B16.11 CL 3000 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

122 UG-FTPL-P131 ELBOW 45deg SW ANSI B16.11 CL 3000 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

123 UG-FTPL-P131 ELBOW 45deg SW ANSI B16.11 CL 3000 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

124 UG-FTPL-P131 ELBOW 45deg BW ANSI B16.9 STD 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

125 UG-FTPL-P131 ELBOW 45deg BW ANSI B16.9 STD 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

126 UG-FTPL-P131 ELBOW 45deg BW ANSI B16.9 STD 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

127 UG-FTPL-P131 ELBOW 45deg BW ANSI B16.9 STD 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 61 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
128 UG-FTPL-P131 ELBOW 45deg BW ANSI B16.9 STD 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

129 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 21.3x2.0 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

130 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 26.9x2.0 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 20 DN2 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

131 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 48.3x2.0 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 40 DN2 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

132 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 60.3x2.0 25 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

133 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 88.9x2.6 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

134 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 114.3x2.6 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

135 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 139.7x2.6 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

136 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 168.3x2.6 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

137 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 219.1x3.2 29 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

138 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 323.9x4.0 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

139 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 355.6x5.0 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 350 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

140 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 406.4x5.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

141 UG-FTPL-P131 MITER ELBOW ; 311-010 : 90DEG BW 1D 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 1200 DN2 1200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

142 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 33.7x2.0 9 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

143 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 60.3x2.0 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

144 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 88.9x2.6 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

145 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 114.3x2.6 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

146 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 168.3x2.6 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

147 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 219.1x3.2 33 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

148 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 273x4.0 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

149 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 406.4x5.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

150 UG-FTPL-P131 REDUCER 312-010 C 50/25 x 2.0 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

151 UG-FTPL-P131 REDUCER 312-010 C 80/50 x 2.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

152 UG-FTPL-P131 REDUCER 312-010 C 100/65 x 2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

153 UG-FTPL-P131 REDUCER 312-010 C 100/80 x 2.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

154 UG-FTPL-P131 REDUCER 312-010 C 150/100 x 2.0 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

155 UG-FTPL-P131 REDUCER 312-010 C 150/80 x 2.0 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

156 UG-FTPL-P131 REDUCER 312-010 C 200/100 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

157 UG-FTPL-P131 REDUCER 312-010 C 200/125 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

158 UG-FTPL-P131 REDUCER 312-010 C 200/150 x 2.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

159 UG-FTPL-P131 REDUCER 312-010 C 250/150 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Pipeline Shipment 5
Prepared by : Checked by : Equipment Group
Jason International
Sin Ghee Huat Coorporation
shipment Approved by :
48-75365
LMS WZT/NCH/SP VAS
Page 62 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

160 UG-FTPL-P131 REDUCER 312-010 C 250/200 x 2.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

161 UG-FTPL-P131 REDUCER 312-010 E 200/100 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

162 UG-FTPL-P131 REDUCER 312-010 E 200/150 x 2.6 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

163 UG-FTPL-P131 REDUCER 312-010 E 250/125 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

164 UG-FTPL-P131 REDUCER 312-010 E 250/150 x 2.6 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

165 UG-FTPL-P131 REDUCER 312-010 C 100/50 x 2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

166 UG-FTPL-P131 REDUCER 312-010 C 150/125 x 2.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

167 UG-FTPL-P131 REDUCER 312-010 C 200/125 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

168 UG-FTPL-P131 REDUCER 312-010 C 200/150 x 2.6 9 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

169 UG-FTPL-P131 REDUCER 312-010 C 250/200 x 2.6 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

170 UG-FTPL-P131 REDUCER 312-010 C 400/200 x 4.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 400 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

171 UG-FTPL-P131 REDUCER 312-010 C 400/250 x 4.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 400 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

172 UG-FTPL-P131 REDUCER 312-010 C 500/350 x 5.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 500 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

173 UG-FTPL-P131 REDUCER 312-010 E 150/100 x 2.0 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

174 UG-FTPL-P131 REDUCER 312-010 E 200/150 x 2.6 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

175 UG-FTPL-P131 REDUCER 312-010 E 250/150 x 2.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

176 UG-FTPL-P131 REDUCER 312-010 E 250/200 x 2.6 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

177 UG-FTPL-P131 REDUCER 312-010 E 350/300 x 3.2 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 350 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

178 UG-FTPL-P131 REDUCER 312-010 E 500/300 x 5.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

179 UG-FTPL-P131 REDUCER E 450/125 x 5.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A240 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 450 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

180 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

181 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

182 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

183 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

184 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

185 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 300 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

186 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 350 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

187 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 600 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

188 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 800 DN2 600 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

189 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

190 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 63 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
191 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

192 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

193 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

194 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

195 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

196 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 450 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

197 UG-FTPL-P131 END CAP, SW ,ANSI B16.11 CLASS 3000 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

198 UG-FTPL-P131 END CAP, SW ,ANSI B16.11 CLASS 3000 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

199 UG-FTPL-P131 END CAP, SW ,ANSI B16.11 CLASS 3000 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

200 UG-FTPL-P131 END CAP, BW ,ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

201 UG-FTPL-P131 END CAP, BW ,ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

202 UG-FTPL-P131 END CAP, BW ,ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 600 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

203 UG-FTPL-P131 END CAP, BW ,ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 700 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

204 UG-FTPL-P131 END CAP, BW ANSI B16.9 SCH10S 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

205 UG-FTPL-P131 TEE PIECE 313-011 25/25 x 1.6/1.6 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

206 UG-FTPL-P131 TEE PIECE 313-011 50/25 x 1.6/1.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

207 UG-FTPL-P131 TEE PIECE 313-011 50/50 x 1.6/1.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

208 UG-FTPL-P131 TEE PIECE 313-011 80/80 x 2.0/2.0 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

209 UG-FTPL-P131 TEE PIECE 313-011 100/100 x 2.0/2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 DN3 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

210 UG-FTPL-P131 TEE PIECE 313-011 200/100 x 4.0/2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

211 UG-FTPL-P131 TEE PIECE 313-011 200/200 x 4.0/4.0 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

212 UG-FTPL-P131 TEE PIECE 313-011 250/150 x 5.0/3.2 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

213 UG-FTPL-P131 TEE PIECE 313-011 250/200 x 5.0/4.0 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

214 UG-FTPL-P131 TEE PIECE 313-011 250/250 x 5.0/5.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

215 UG-FTPL-P131 TEE PIECE 313-011 400/200 x 8.0/3.2 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

216 UG-FTPL-P131 TEE PIECE 313-011 50/40 x 1.6/1.6 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 DN3 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

217 UG-FTPL-P131 TEE PIECE 313-011 100/100 x 2.0/2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

218 UG-FTPL-P131 TEE PIECE 313-011 100/100 x 2.0/2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 DN3 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

219 UG-FTPL-P131 TEE PIECE 313-011 150/150 x 3.2/3.2 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

220 UG-FTPL-P131 TEE PIECE 313-011 200/200 x 4.0/4.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

221 UG-FTPL-P131 TEE PIECE 313-011 250/200 x 5.0/4.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

222 UG-FTPL-P131 TEE PIECE 313-011 250/250 x 5.0/4.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Prepared by : Checked by : Pipeline Jason International shipment Approved by :
48-75365
LMS WZT/NCH/SP Equipment Group Sin Ghee Huat Coorporation VAS
Page 64 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

223 UG-FTPL-P131 TEE PIECE 313-011 300/300 x 5.0/4.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 300 DN2 300 DN3 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

224 UG-FTPL-P131 TEE PIECE 313-011 350/200 x 6.3/4.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 350 DN2 350 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

225 UG-FTPL-P131 TEE PIECE 313-011 400/250 x 8.0/3.2 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 DN3 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

226 UG-FTPL-P131 TEE BW ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

227 UG-FTPL-P131 TEE BW ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 DN3 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

228 UG-FTPL-P131 TEE BW ANSI B16.9 STD 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

229 UG-FTPL-P131 TEE BW ANSI B16.9 STD 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

230 UG-FTPL-P131 TEE BW ANSI B16.9 STD 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Pipeline Equipment
Hebei Penxin Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Group
Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

231 UG-FTPL-P131 TEE BW ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 DN3 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

232 UG-FTPL-P131 TEE BW ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 800 DN2 800 DN3 800 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

233 UG-FTPL-P131 TEE SW ANSI B16.11 CL3000 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

234 UG-FTPL-P131 Equal Tee, NB 1050 , Sch. Std (Fabricated) 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
API 5L Gr.B Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 1050 DN2 1050 DN3 1050 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

235 UG-FTPL-P131 REINFORCING PLATE 313-014 80 / 15 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

236 UG-FTPL-P131 REINFORCING PLATE 313-014 80 / 25 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 80 DN2 80 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

237 UG-FTPL-P131 REINFORCING PLATE 313-014 150 / 25 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 150 DN2 150 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

238 UG-FTPL-P131 REINFORCING PLATE 313-014 150 / 50 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 150 DN2 150 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

239 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 15 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

240 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 25 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

241 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 80 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

242 UG-FTPL-P131 REINFORCING PLATE 313-014 250 / 15 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 250 DN2 250 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

243 UG-FTPL-P131 REINFORCING PLATE 313-014 250 / 25 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 250 DN2 250 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

244 UG-FTPL-P131 REINFORCING PLATE 313-014 250 / 50 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 250 DN2 250 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

245 UG-FTPL-P131 REINFORCING PLATE 313-014 400 / 150 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 400 DN2 400 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 65 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
246 UG-FTPL-P131 REINFORCING PLATE 313-014 400 / 50 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 400 DN2 400 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

247 UG-FTPL-P131 REINFORCING PLATE 313-014 50 / 15 14 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 50 DN2 50 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

248 UG-FTPL-P131 REINFORCING PLATE 313-014 50 / 20 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 50 DN2 50 DN3 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

249 UG-FTPL-P131 REINFORCING PLATE 313-014 100 / 25 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 100 DN2 100 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

250 UG-FTPL-P131 REINFORCING PLATE 313-014 150 / 50 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 150 DN2 150 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

251 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 15 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

252 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 25 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

253 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 50 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

254 UG-FTPL-P131 REINFORCING PLATE 313-014 250 / 50 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 250 DN2 250 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

255 UG-FTPL-P131 REINFORCING PLATE 313-014 350 / 50 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 350 DN2 350 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

256 UG-FTPL-P131 REINFORCING PLATE 313-014 450 / 125 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 450 DN2 450 DN3 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

257 UG-FTPL-P131 REINFORCING PLATE 313-014 450 / 80 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 450 DN2 450 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

258 UG-FTPL-P131 RF Pad Plate, 200 x 10 Thk. OD 1469 / ID 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
SA 516 Gr.70 Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 1100 DN2 1100 DN3 1050 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

259 UG-FTPL-P131 RF Pad Plate, 100x6 Thk. OD 663 /ID 463 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
SA 36 Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 800 DN2 800 DN3 450 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

260 UG-FTPL-P131 REINFORCING PLATE FOR HOOK UP & TIE IN 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
SA 36 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

261 UG-FTPL-P131 SOCKOLET CL3000 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

262 UG-FTPL-P131 SOCKOLET CL3000 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

263 UG-FTPL-P131 SOCKOLET CL3000 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

264 UG-FTPL-P131 SOCKOLET CL3000 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

265 UG-FTPL-P131 SOCKOLET CL3000 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

266 UG-FTPL-P131 SOCKOLET CL3000 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

267 UG-FTPL-P131 SOCKOLET CL3000 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

268 UG-FTPL-P131 SOCKOLET CL3000 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

269 UG-FTPL-P131 SOCKOLET CL3000 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

270 UG-FTPL-P131 SOCKOLET CL3000 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

271 UG-FTPL-P131 SOCKOLET CL3000 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 500 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

272 UG-FTPL-P131 WELDOLET STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

273 UG-FTPL-P131 WELDOLET STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

274 UG-FTPL-P131 WELDOLET STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 500 DN3 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

275 UG-FTPL-P131 WELDOLET STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 500 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

277 UG-FTPL-P131 FLANGE SW ANSI B16.5 RF. CL.150 10 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 66 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
278 UG-FTPL-P131 FLANGE SW ANSI B16.5 RF. CL.150 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

279 UG-FTPL-P131 FLANGE SW ANSI B16.5 RF. CL.150 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 65 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

280 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

281 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

282 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

283 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 42 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

284 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 27 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

285 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

286 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

287 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 350 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

288 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

289 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

290 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

291 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 38 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

292 UG-FTPL-P131 LOOSE FLANGE , ASME B16.5 315-013 ; CL 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 65 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

293 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 26 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

294 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 43 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

295 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 14 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

296 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010; CL. 62 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

297 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 56 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

298 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 31 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

299 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

300 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

301 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 500 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

302 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

303 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

304 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

305 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

306 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

307 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

308 UG-FTPL-P131 Plate Flange , 70 Thk. OD 1274 / ID 1120 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
SA 516 Gr.70 Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 67 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
309 UG-FTPL-P131 Spade BlankPlate, 35 Thk. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
SA 516 Gr.70 Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

310 UG-FTPL-P131 Plate 6 Thk. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
SA 36 Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
2 Sq.M 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

311 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 15 x 21.3 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

312 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 25 x 33.7 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

313 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 50 x 60.3 26 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

314 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 80 x 88.9 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

315 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 100 x 114.3 23 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

316 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 125 x 139.7 10 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

317 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 150 x 168.3 32 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

318 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 200 x 219.1 21 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

319 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 250 x 273 19 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

320 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 300 x 323.9 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

321 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 400 x 406.4 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

322 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 500 x 508 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

323 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 25 x 33.7 10 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

324 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 50 x 60.3 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

325 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 65 x 76.1 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 65 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

326 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 80 x 88.9 23 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

327 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 100 x 114.3 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

328 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 125 x 139.7 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

329 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 150 x 168.3 30 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

330 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 200 x 219.1 35 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

331 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 250 x 273 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

332 UG-FTPL-P131 Vacuum Ring, 60x8 Thk. - OD 936 / ID 816 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
SA 36 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

333 UG-FTPL-P131 Vacuum Ring, 40x6 Thk. - OD 540 / ID 460 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
SA 36 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0

334 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

335 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 23 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

336 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 44 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

337 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 65 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

338 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 33 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

339 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 49 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 68 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
340 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 17 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

341 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 104 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

342 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 83 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

343 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 43 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

344 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

345 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 350 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

346 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

347 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 500 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

348 UG-FTPL-P131 Bolt ISO 4014 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 DN2 60 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

349 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

350 UG-FTPL-P131 Bolt ISO 4014 136 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 75 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

351 UG-FTPL-P131 Bolt ISO 4014 404 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 90 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

352 UG-FTPL-P131 Bolt ISO 4014 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

353 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

354 UG-FTPL-P131 Bolt ISO 4014 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 180 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

355 UG-FTPL-P131 Bolt ISO 4014 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

356 UG-FTPL-P131 Bolt ISO 4014 132 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 90 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

357 UG-FTPL-P131 Bolt ISO 4014 336 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

358 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 110 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

359 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 160 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

360 UG-FTPL-P131 Bolt ISO 4014 204 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 180 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

361 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 205 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

362 UG-FTPL-P131 Bolt ISO 4014 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 240 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

363 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 335 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

364 UG-FTPL-P131 Bolt ISO 4014 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 110 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

365 UG-FTPL-P131 Bolt ISO 4014 132 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 120 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

366 UG-FTPL-P131 Bolt ISO 4014 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 130 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

367 UG-FTPL-P131 Bolt ISO 4014 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 140 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

368 UG-FTPL-P131 Bolt ISO 4014 96 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

369 UG-FTPL-P131 Bolt ISO 4014 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 220 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

370 UG-FTPL-P131 Bolt ISO 4014 72 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 DN2 130 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 69 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
371 UG-FTPL-P131 Bolt ISO 4014 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 DN2 140 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

372 UG-FTPL-P131 Bolt ISO 4014 24 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 30 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

373 UG-FTPL-P131 Bolt ISO 4014 44 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 30 DN2 180 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

374 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

375 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

376 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

377 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 56 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

378 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

379 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 256 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 90 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

380 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 115 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

381 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 66 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 155 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

382 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 190 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

383 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 215 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

384 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 80 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

385 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 165 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

386 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 180 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

387 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 DN2 115 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

388 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 DN2 205 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

389 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 DN2 215 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

390 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

391 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

392 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

393 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 44 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 90 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

394 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 28 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 140 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

395 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 155 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

396 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 52 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

397 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 48 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 220 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

398 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M12 28 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 194 Gr 2H 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

399 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M16 64 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 194 Gr 2H 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

400 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M20 378 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 194 Gr 2H 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

401 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M24 112 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 194 Gr 2H 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 70 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
402 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M27 56 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 194 Gr 2H 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

403 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M12 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 563 CS 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

404 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M16 36 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 563 CS 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

405 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M20 84 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 563 CS 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

406 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M24 100 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 563 CS 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

407 UG-FTPL-P131 Hexagon nut ISO 4032 32 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

408 UG-FTPL-P131 Hexagon nut ISO 4032 580 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

409 UG-FTPL-P131 Hexagon nut ISO 4032 760 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

410 UG-FTPL-P131 Hexagon nut ISO 4032 292 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

411 UG-FTPL-P131 Hexagon nut ISO 4032 92 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

412 UG-FTPL-P131 Hexagon nut ISO 4032 68 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 30 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

413 UG-FTPL-P131 Washer ISO 7091 106 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

414 UG-FTPL-P131 Washer ISO 7091 1302 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

415 UG-FTPL-P131 Washer ISO 7091 2323 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

416 UG-FTPL-P131 Washer ISO 7091 871 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

417 UG-FTPL-P131 Washer ISO 7091 273 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation

418 UG-FTPL-P131 Washer ISO 7091 132 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 30 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
419 UG-FTPL-P136 Pipe slide, insulated 370-010 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 15 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19

420 UG-FTPL-P136 Pipe slide, insulated 370-010 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 37 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 25 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19

212 UG-FTPL-P136 Pipe slide, insulated 370-011 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 29 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 100 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

213 UG-FTPL-P136 Pipe slide, insulated 370-011 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 89 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

214 UG-FTPL-P136 Pipe slide, insulated 370-011 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 47 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

215 UG-FTPL-P136 Pipe slide, insulated 370-011 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 21 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 80 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

216 UG-FTPL-P136 Pipe slide, insulated, 2-sided, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

217 UG-FTPL-P136 Pipe slide, insulated, 2-sided, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
A283 Gr.D/A36 3 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 400 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

218 UG-FTPL-P136 Pipe slide, insulated, 2-sided, 370-014 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 600 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

219 UG-FTPL-P136 Pipe slide, insulated, 2-sided, 370-014 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 750 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

220 UG-FTPL-P136 Pipe slide, insulated, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 119 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

221 UG-FTPL-P136 Pipe slide, insulated, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 14 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

222 UG-FTPL-P136 Pipe slide, insulated, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 12 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 300 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

223 UG-FTPL-P136 Pipe slide, insulated, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 11 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 400 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

224 UG-FTPL-P136 Pipe slide, insulated, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Bina Karya Logam Arrived 48-75747
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 71 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
A283 Gr.D/A36 3 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 500 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
0 30-Dec-99 30-Dec-99 0
225 UG-FTPL-P136 Pipe slide, insulated, 370-014 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 1200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

226 UG-FTPL-P136 Pipe slide, insulated, 370-014 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 600 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

227 UG-FTPL-P136 Pipe slide, uninsulated 370-018 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

228 UG-FTPL-P136 Pipe slide, uninsulated 370-018 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 28 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

229 UG-FTPL-P136 Pipe slide, uninsulated 370-018 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 3 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 80 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

230 UG-FTPL-P136 Pipe slide, uninsulated, 370-019 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 2 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

83 UG-FTPL-P136 Pipe slide, uninsulated, 370-019 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 9 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 350 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

84 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 6 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 100 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

85 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 15 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

86 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 15 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

87 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 18 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

88 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 5 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 25 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

89 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 5 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

90 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 2 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 400 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

91 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 26 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

92 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 65 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

93 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 3 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 80 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

94 UG-FTPL-P136 U-bolt Support, A, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 13 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 15 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

95 UG-FTPL-P136 U-bolt Support, A, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 2 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 25 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

96 UG-FTPL-P136 U-bolt Support, A, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 21 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

97 UG-FTPL-P136 U-bolt Support, C, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 7 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 15 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

98 UG-FTPL-P136 U-bolt Support, C, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 25 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

99 UG-FTPL-P136 U-bolt Support, C, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

100 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A 106 Gr B 8 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

101 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
API 5L Gr B 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 100 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

102 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A 106 Gr B 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

103 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 304 ( C max 0.05%) 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

104 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 316 ( C max 0.05%) 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 100 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

105 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 316 ( C max 0.05%) 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

106 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A790M Gr S32205 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 80 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

107 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
API 5L Gr B 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 72 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
108 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
API 5L Gr B 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 300 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

109 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A 106 Gr B 8 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

110 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A 106 Gr B 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

111 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 304 ( C max 0.05%) 20 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

112 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 304 ( C max 0.05%) 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

113 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 316 ( C max 0.05%) 12 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

114 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 316 ( C max 0.05%) 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

115 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 316 ( C max 0.05%) 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

116 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A790M Gr S32205 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

117 UG-FTPL-P136 Stopper 372-013 B3 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A 106 Gr B 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 400 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

118 UG-FTPL-P136 Elbow anchorage, 276 - 416.8, 373-021 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

119 UG-FTPL-P136 Elbow anchorage, 276 - 436.75, 373-021 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

120 UG-FTPL-P136 Elbow anchorage, 276 - 500.15, 373-021 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

121 UG-FTPL-P136 Elbow anchorage, 513 - 615.75, 373-021 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 500 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

122 UG-FTPL-P136 Flat Bar 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
SS 304. 6 Thk x 60 mm x 6000 2 Lgt 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

123 UG-FTPL-P136 Flat Bar 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
SS 316. 6 Thk x 60 mm x 6000 2 Lgt 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

124 UG-FTPL-P136 Flat bar 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A36. 6 Thk x 60 mm x 6000 1 Lgt 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

125 UG-FTPL-P136 Lug 372-015, heavy 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 173 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
Laxhmi_Mahesvary:
27 add qty by pak amar13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

126 UG-FTPL-P136 Lug 372-015, light 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 84 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
Laxhmi_Mahesvary:
16 add quantity by pak13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
amar
127 UG-FTPL-P136 L-BAR, 50 X 50 X 5MM 25 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 144 m 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

128 UG-FTPL-P136 L-BAR, 60 X 60 X 6MM 30 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 36 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

129 UG-FTPL-P136 L-BAR, 80 X 80 X 8MM 45 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 54 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

130 UG-FTPL-P136 L-BAR-100x100x10mm 8 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 2 Ea 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

131 UG-FTPL-P136 H-BEAM, 100 X 100 X 6 X 8MM 36 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 42 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

132 UG-FTPL-P136 H-BEAM, 150 X 150 X 7 X 10MM 80 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 90 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

133 UG-FTPL-P136 H-BEAM, 200 X 200 X 8 X 12mm 35 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 42 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

134 UG-FTPL-P136 I-BEAM-200x100x5.5x8mm 12 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A36 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

135 UG-FTPL-P136 UNP,100 X 50 X 5 MM 70.5 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 13 lgt 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
0 30-Dec-99 30-Dec-99 0
136 UG-FTPL-P136 UNP, 150 X 75 X 6.5 MM 160 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 30 lgt 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

137 UG-FTPL-P136 UNP, 200 X 75 X 7.5 MM 30 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 6 Ea 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

138 UG-FTPL-P136 Plate 10 Thk. 11 sq m m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 6 sht 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

139 UG-FTPL-P136 Plate 12 Thk. 3.5 sq m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 2 Ea 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
murni (48-76098) 48-76098
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 73 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/
Sumber Contr.)
Seta PO:
Time murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
0
140 UG-FTPL-P136 Plate 2 Thk. 1 sq m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
SA240 Gr.304L 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

141 UG-FTPL-P136 Plate 16 Thk. 0.5 sq m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 1 sht 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

142 UG-FTPL-P136 Plate 20 Thk. 0.5 sq m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
SA516 Gr.70 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

143 UG-FTPL-P136 M12x270 anchors bolt 68 Nos 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
8.8HDG/ Equivalent 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

144 UG-FTPL-P136 M20x450 anchors bolt 4 Nos 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
8.8HDG/ Equivalent 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0

145 UG-FTPL-P136 M12 HILTI HIT - CT1 WITH 8.8 84 Nos 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Apr-19 2-Feb-19 -70
THREADED ROD HIT-V-F, FZV
EMBEDMENT DEPTH 90mm / Equivalent
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 12-Feb-19 12-Feb-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 14-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 12-Feb-19 12-Feb-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 14-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 0 30-Dec-99 30-Dec-99 0
0 30-Dec-99 30-Dec-99 0

146 UG-FTPL-P136 M16 HILTI HIT - CT1 WITH 8.8 8 Nos 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Apr-19 2-Feb-19 -70
THREADED ROD HIT-V-F, FZV
EMBEDMENT DEPTH 90mm / Equivalent
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 12-Feb-19 12-Feb-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 14-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 12-Feb-19 12-Feb-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 14-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 0 30-Dec-99 30-Dec-99 0

147 UG-FTPL-P126 452-V1031 1 Ea 5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 85 27-Dec-18 12-Mar-19 75

Foul condensate preheater, thermal Budijaya Makmur Sentosa


expansion, ANSI 150, Set pressure: 6, PO:
5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 28-Feb-19 12 Budijaya Mitra Wira Pratama Arrived
Temp: 121 C, Inlet size: 25, relief to Jason International 48-74069
atm., Media: Hot condensate, Density:
942, Connection type: Flanged
5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 0
0
148 UG-FTPL-P126 452-V1205 1 Ea 5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 85 27-Dec-18 12-Mar-19 75

Foul condensate preheater, thermal Budijaya Makmur Sentosa


expansion, ANSI 150, Set pressure: 6, PO:
5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 0 28-Feb-19 30-Dec-99 12 Budijaya Mitra Wira Pratama Arrived
Temp: 121 C, Inlet size: 25, relief to Jason International 48-74069
atm., Media: Hot condensate, Density:
942, Connection type: Flanged
5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 0 30-Dec-99 30-Dec-99 0
0
149 UG-FTPL-P126 452-V1036 1 Ea 5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 85 27-Dec-18 12-Mar-19 75
LPH 3 O/L, thermal expansion, ANSI
150, Set pressure: 9, Temp: 103 C, Inlet Budijaya Makmur Sentosa
PO:
size: 50, relief to atm., Media: Liquor, 5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 0 28-Feb-19 30-Dec-99 12 Budijaya Mitra Wira Pratama Arrived
Density: 1117, Connection type: Jason International 48-74069
Flanged
5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 0 30-Dec-99 30-Dec-99 0
0
150 UG-FTPL-P126 452-V1037 1 Ea 5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 85 27-Dec-18 12-Mar-19 75

Surface condenser I/L, thermal Budijaya Makmur Sentosa


expansion, ANSI 150, Set pressure: 3.5, PO:
5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 30-Dec-99 28-Feb-19 30-Dec-99 12 Budijaya Mitra Wira Pratama Arrived
Temp: 45 C, Inlet size: 50, relief to atm., Jason International 48-74069
Media: Warm water, Density: 998,
Connection type: Flanged
5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 30-Dec-99 30-Dec-99 30-Dec-99

151 UG-FTPL-P137 Thermowell Boss 6 Pcs 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 69 26-Dec-18 10-Apr-19 105 Budijaya Makmur Sentosa
Jason PO:
NPT 1" 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12-Jan-19 88 Jason International Arrived
International 3S International 48-74052
SS 304L 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18

152 UG-FTPL-P137 Thermowell Boss 7 Pcs 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 69 26-Dec-18 10-Apr-19 105 Budijaya Makmur Sentosa
Jason PO:
NPT 1" 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12-Jan-19 88 Jason International Arrived
International 3S International 48-74052
SS 316L 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18

153 UG-FTPL-P137 Thermowell Boss 2 Pcs 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 69 26-Dec-18 10-Apr-19 105 Budijaya Makmur Sentosa
Jason PO:
NPT 1" 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12-Jan-19 88 Jason International Arrived
International 3S International 48-74052
CS 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 74 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
154 Additional manual valve Ball Valve; DN15 - V001 1 Pcs 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19 30-Mar-19 18

Mitra Wira PO:


452-F-1014 Body: SS, Disk: SS, Spindle SS, Seat mat: 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19 Arrived
Pratama 48-76521
PTFE, Socket Weld. Pressure class 800
7-Jan-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19

155 Additional manual valve Ball Valve; DN15 - V080 15 Pcs 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19 30-Mar-19 18

Mitra Wira PO:


452-F-1014 Body: SS, Disk: SS, Spindle SS, Seat mat: 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19 Arrived
Pratama 48-76521
PTFE, Threaded. Pressure class 800
7-Jan-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19

153 Additional manual valve Ball Valve; DN50 - V041 2 Pcs 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19 30-Mar-19 18

Body: SS, Disk: SS, Spindle SS, Seat mat: Mitra Wira PO:
452-F-1014 STELL, PTFE, threaded. Pressure class 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19 Arrived
Pratama 48-76521
150
7-Jan-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19

154 Additional primary support Pipe slide, insulated 370-010 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 15 4 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

155 Additional primary support Pipe slide, insulated 370-011 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 100 5 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

156 Additional primary support Pipe slide, insulated, 370-012 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 200 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

157 Additional primary support Pipe slide, uninsulated, 370-019 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 150 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

158 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 15 4 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

159 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 50 9 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

160 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 65 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

161 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 100 5 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

162 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 125 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

163 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 150 11 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

164 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 200 40 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

165 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 250 5 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

166 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 450 2 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

167 Additional primary support U-bolt Support, A, DN15, 371-031 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
Tunas Cipta PO:
31-Dec-18 15 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Manunggal 48-76781
452-P-1185-002-A AISI 304 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

168 Additional primary support U-bolt Support, A, DN50, 371-031 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
Tunas Cipta PO:
31-Dec-18 50 8 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Manunggal 48-76781
452-P-1185-002-A AISI 304 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

169 Additional primary support U-bolt Support, C, DN15, 371-031 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
Tunas Cipta PO:
31-Dec-18 15 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Manunggal 48-76781
452-P-1185-002-A AISI 304 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

170 Additional primary support U-bolt Support, C, DN50, 371-031 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
Tunas Cipta PO:
31-Dec-18 100 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Manunggal 48-76781
452-P-1185-002-A AISI 304 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

171 Additional primary support Stopper 372-013 B1 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 80 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A ASTM A312 TP 304 ( C max 0.05%) 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

172 Additional primary support Stopper 372-013 B1 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 150 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A ASTM A312 TP 304 ( C max 0.05%) 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

173 Additional primary support Stopper 372-013 B1 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 150 12 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A ASTM A312 TP 316 ( C max 0.05%) 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

174 Additional primary support Stopper 372-013 B2 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 150 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A ASTM A 106 Gr B 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

175 Additional primary support Stopper 372-013 B2 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 100 4 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A API 5L Gr B 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

176 Additional primary support Stopper 372-013 B2 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 200 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A API 5L Gr B 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

177 Additional primary support Stopper 372-013 B2 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 200 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A ASTM A312 TP 316 ( C max 0.05%) 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

178 Additional primary support Elbow anchorage, 276 - 416.8, 373-021 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 250 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A A283 Gr.D/A36 - HDG 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

179 Additional primary support Elbow anchorage, 276 - 436.75, 373-021 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 250 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A A283 Gr.D/A36 - HDG 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

180 Additional primary support Elbow anchorage, 276 - 500.15, 373-021 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 250 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A A283 Gr.D/A36 - HDG 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 75 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
181 Additional primary support Elbow anchorage, 513 - 615.75, 373-021 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 500 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A A283 Gr.D/A36 - HDG 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19

Hanger Rod Support Assembly as per Lisega


182 Additional primary support
Drawing No. 25-3-61751
15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 21-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 30 28-Mar-19 20-Mar-19 -17
PT Binder PO:
31-Dec-18 750 1 Pcs 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 21-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 Indonesia 48-76820
452-P-1185-002-A 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 21-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19

Spring Support Assembly as per Lisega Drawing


183 Additional primary support
No. 111-3-61751
15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 21-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 30 28-Mar-19 20-Mar-19 -17
PT Binder PO:
31-Dec-18 600 1 Pcs 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 21-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 Indonesia 48-76820
452-P-1185-002-A 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 21-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19 22-Feb-19

184 Additional piping REDUCER 312-010 C 25/15 x 2.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN1 25; DN2 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

185 Additional piping REDUCER 312-010 C 50/25 x 2.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN1 50 ; DN2 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99 30-Dec-99
186 Additional piping REDUCER 312-010 E 200/100 x 2.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN1 200 ; DN2 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99 30-Dec-99
187 Additional piping PIPE 310-010 21.3x1.6 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
188 Additional piping PIPE 310-010 26.9x1.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
189 Additional piping PIPE 310-010 60.3x1.6 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
190 Additional piping PIPE 310-010 88.9x1.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
191 Additional piping PIPE 310-010 114.3x2 10 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
192 Additional piping PIPE 310-010 139.7x2 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
193 Additional piping PIPE 310-010 168.3x2 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
194 Additional piping PIPE 310-010 219.1x2.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
195 Additional piping PIPE 310-010 21.3x1.6 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

196 Additional piping PIPE 310-010 60.3x1.6 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

197 Additional piping PIPE 310-010 168.3x2 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

198 Additional piping PIPE 310-010 219.1x2.6 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

199 Additional piping PIPE 310-010 273x2.6 26 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

200 Additional piping PIPE API 5L STD 168.3x7.11 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
API 5L Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

201 Additional piping PIPE API 5L STD 219.1x8.18 0.5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
API 5L Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

202 Additional piping PIPE API 5L STD 273.0x9.27 1.5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
API 5L Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

203 Additional piping PIPE ANSI B36.10 XS 21.3x3.73 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

204 Additional piping PIPE ANSI B36.10 STD 60.3x3.91 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

205 Additional piping PIPE ANSI B36.10 STD 73.0x5.16 1.5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

206 Additional piping PIPE ANSI B36.10 STD 168.3x7.11 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

207 Additional piping PIPE ANSI B36.10 STD 219.1x8.18 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

208 Additional piping PIPE ANSI B36.10 STD 273.0x9.27 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

209 Additional piping ELBO 90deg SW ANSI B16.11 CL3000 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

210 Additional piping ELBOW 90deg 1.5D 311-010 21.3x2.0 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

211 Additional piping ELBOW 90deg 1.5D 311-010 33.7x2.0 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

212 Additional piping ELBOW 90deg 1.5D 311-010 60.3x2.0 5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
PO:
Pipeline
Prepared by : Checked by : Equipment Gr Approved by :
48-76770
LMS WZT/NCH/SP VAS
Page 76 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

213 Additional piping ELBOW 90deg 1.5D 311-010 88.9x2.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

214 Additional piping ELBOW 90deg 1.5D 311-010 114.3x2.6 5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

215 Additional piping ELBOW 90deg 1.5D 311-010 139.7x2.6 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 125 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

216 Additional piping ELBOW 90deg 1.5D 311-010 168.3x2.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

217 Additional piping ELBOW 90deg 1.5D 311-010 21.3x2.0 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

218 Additional piping ELBOW 90deg 1.5D 311-010 60.3x2.0 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

219 Additional piping ELBOW 90deg 1.5D 311-010 168.3x2.6 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

220 Additional piping ELBOW 90deg 1.5D 311-010 219.1x3.2 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

221 Additional piping ELBOW 90deg 1.5D 311-010 273x4.0 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

222 Additional piping ELBOW 45deg 1.5D 311-010 88.9x2.6 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

223 Additional piping ELBOW 45deg 1.5D 311-010 114.3x2.6 7 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

224 Additional piping ELBOW 45deg 1.5D 311-010 273.0x4.0 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

225 Additional piping ELBOW 45deg 1.5D 311-010 323.9x4.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 300 ; DN 300 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

226 Additional piping ELBOW 45deg 1.5D 311-010 355.6x5.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 350 ; DN 350 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

227 Additional piping ELBOW 45deg 1.5D 311-010 406.4x5.0 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 400 ; DN 400 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

228 Additional piping ELBOW 45deg 1.5D 311-010 88.9x2.6 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

229 Additional piping ELBOW 45deg 1.5D 311-010 168.3x2.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

230 Additional piping ELBOW 45deg 1.5D 311-010 219.1x3.2 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 ASTM A403 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
217 Additional piping ELBOW 45deg 1.5D 311-010 273x4.0 7 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

218 Additional piping ELBO 45deg SW ANSI B16.11 CL3000 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

219 Additional piping REDUCER 312-010 C 40/15 x 2.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 40 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

220 Additional piping REDUCER 312-010 C 100/40 x 2.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 40 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

221 Additional piping REDUCER 312-010 C 100/80 x 2.0 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

222 Additional piping REDUCER 312-010 E 300/250 x 3.2 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 300 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

223 Additional piping REDUCER 312-010 E 300/250 x 3.2 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 350 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

224 Additional piping REDUCER 312-010 C 200/125 x 2.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

225 Additional piping REDUCER 312-010 C 250/100 x 2.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

226 Additional piping REDUCER 312-010 E 250/100 x 2.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

227 Additional piping REDUCER BW CONC ANSI B16.9 STD 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 234 Gr WPB PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

228 Additional piping REDUCER BW ECC ANSI B16.9 STD 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 234 Gr WPB PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

229 Additional piping REDUCER BW ECC ANSI B16.9 STD 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 234 Gr WPB PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 400 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 77 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
230 Additional piping REINFORCING PLATE 313-014 50 / 15 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 50 ; DN 50 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19

217 Additional piping REINFORCING PLATE 313-014 80 / 20 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 80 ; DN 80 ; DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19

218 Additional piping REINFORCING PLATE 313-014 100 / 15 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 100 ; DN 100 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19

219 Additional piping REINFORCING PLATE 313-014 125 / 20 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 125 ; DN 125 ; DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19

220 Additional piping REINFORCING PLATE 313-014 100 / 25 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 100 ; DN 100 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19

221 Additional piping REINFORCING PLATE 313-014 200 / 25 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 200 ; DN 200 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19

222 Additional piping REINFORCING PLATE 313-014 200 / 80 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 200 ; DN 200 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19

223 Additional piping REINFORCING PLATE 313-014 250 / 50 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 250 ; DN 250 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19

224 Additional piping TEE PIECE 313-011 15/15 x 1.6/1.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

225 Additional piping TEE PIECE 313-011 50/50 x 1.6/1.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

226 Additional piping TEE PIECE 313-011 100/100 x 2.0/2.0 5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

227 Additional piping TEE PIECE 313-011 150/150 x 3.2/3.2 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

228 Additional piping TEE PIECE 313-011 200/100 x 4.0/2.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

229 Additional piping TEE PIECE 313-011 200/200 x 4.0/4.0 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

230 Additional piping TEE PIECE 313-011 250/150 x 5.0/3.2 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 ASTM A403 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 250 ; DN 250 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
217 Additional piping TEE PIECE 313-011 250/200 x 5.0/4.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

218 Additional piping TEE BW ANSI B16.9 STD 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 234 Gr WPB PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

219 Additional piping TEE SW ANSI B16.11 CL3000 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

220 Additional piping TEE SW ANSI B16.11 CL3000 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

221 Additional piping FLANGE SW ANSI B16.5 RF. CL.150 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

222 Additional piping FLANGE SLIP-ON ANSI B16.5 RF. CL.150 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 65 ; DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

223 Additional piping FLANGE SLIP-ON ANSI B16.5 RF. CL.150 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

224 Additional piping FLANGE SLIP-ON ANSI B16.5 RF. CL.150 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

225 Additional piping FLANGE SLIP-ON ANSI B16.5 RF. CL.150 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

226 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

227 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 20 ; DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

228 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

229 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

230 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 A105 HOT DIP GALV. 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

229 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 33 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

230 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 A105 HOT DIP GALV. 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 125 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

229 Additional piping LOOSE FLANGE ASME B16.5 315-010; CL. 22 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
Equipment Gr
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 78 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site Hebei Pengxin
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.) PO:
Time Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

230 Additional piping LOOSE FLANGE ASME B16.5 315-010; CL. 14 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 A105 HOT DIP GALV. 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

229 Additional piping LOOSE FLANGE ASME B16.5 315-010; CL. 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

230 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 A105 HOT DIP GALV. 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 450 ; DN 450 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

229 Additional piping BLIND FLANGE ASME B16.5 316-010 ; CL. 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

230 Additional piping BLIND FLANGE ASME B16.5 316-010 ; CL. 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 A105 HOT DIP GALV. 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

229 Additional piping COLLAR MSS SP-43 SCH10S - 15 x 21.3 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

230 Additional piping COLLAR MSS SP-43 SCH10S - 20 x 26.9 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 ASTM A403 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 20 ; DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

229 Additional piping COLLAR MSS SP-43 SCH10S - 50 x 60.3 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

230 Additional piping COLLAR MSS SP-43 SCH10S - 80 x 88.9 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 ASTM A403 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

229 Additional piping COLLAR MSS SP-43 SCH10S - 100 x 114.3 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

230 Additional piping COLLAR 314-013 ; CL.150 - 125 x 139.7 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 125 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

231 Additional piping COLLAR 314-013 PN10 - 150 x 168.3 10 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

232 Additional piping COLLAR 314-013 PN10 - 200 x 219.1 10 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

233 Additional piping COLLAR 314-013 PN10 - 250 x 273 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

234 Additional piping COLLAR MSS SP-43 SCH10S - 100 x 114.3 11 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

235 Additional piping COLLAR 314-013 ; CL.150 - 125 x 139.7 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 125 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

236 Additional piping COLLAR 314-013 PN10 - 150 x 168.3 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

237 Additional piping COLLAR 314-013 PN10 - 200 x 219.1 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

238 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

239 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 20 ; DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

240 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 11 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

241 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

242 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 65 ; DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

243 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

244 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 33 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

245 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 125 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

246 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 24 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

247 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 14 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

248 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

249 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
Equipment Gr
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 79 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site Hebei Pengxin
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.) PO:
Time Pipeline
48-76770
452-P-1184-006 DN 450 ; DN 450 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

250 Additional piping Bolt ISO 4014 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 ; DN 55 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

251 Additional piping Bolt ISO 4014 40 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 ; DN 60 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

252 Additional piping Bolt ISO 4014 136 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 90 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

253 Additional piping Bolt ISO 4014 8 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

254 Additional piping Bolt ISO 4014 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

255 Additional piping Bolt ISO 4014 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 160 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

256 Additional piping Bolt ISO 4014 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 265 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

257 Additional piping Bolt ISO 4014 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 90 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

258 Additional piping Bolt ISO 4014 168 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

259 Additional piping Bolt ISO 4014 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 180 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

260 Additional piping Bolt ISO 4014 8 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

261 Additional piping Bolt ISO 4014 8 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 240 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

262 Additional piping Bolt ISO 4014 40 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 315 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

263 Additional piping Bolt ISO 4014 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 30 ; DN 140 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

264 Additional piping HEAVY HEX BOLT ANSI B18.2.1 8 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

265 Additional piping HEAVY HEX BOLT ANSI B18.2.1 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

266 Additional piping HEAVY HEX BOLT ANSI B18.2.1 8 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 190 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

267 Additional piping HEAVY HEX BOLT ANSI B18.2.1 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 155 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

268 Additional piping HEAVY HEX BOLT ANSI B18.2.1 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 165 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

269 Additional piping HEAVY HEX BOLT ANSI B18.2.1 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 24 ; DN 180 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

270 Additional piping HEAVY HEX BOLT ANSI B18.2.1 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 307 Gr B KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

271 Additional piping HEAVY HEX BOLT ANSI B18.2.1 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 307 Gr B KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

272 Additional piping HEAVY HEX BOLT ANSI B18.2.1 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 307 Gr B KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 155 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

273 Additional piping HEAVY HEX BOLT ANSI B18.2.1 24 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 307 Gr B KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 24 ; DN 180 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

274 Additional piping HEAVY HEX NUT ANSI B18.2.2 - M12 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 194 Gr 2H KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

275 Additional piping HEAVY HEX NUT ANSI B18.2.2 - M20 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 194 Gr 2H KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

276 Additional piping HEAVY HEX NUT ANSI B18.2.2 - M24 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 194 Gr 2H KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 24 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

277 Additional piping HEAVY HEX NUT ANSI B18.2.2 - M16 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 563 CS KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

278 Additional piping Hexagon nut ISO 4032 56 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8 - Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

279 Additional piping Hexagon nut ISO 4032 164 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8 - Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 80 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Shipment
Bid Closing

STATUS
QTY BOQ

Standard

ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No

Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
KW Engineering PO:
Time
Solutions 48-76722
452-P-1184-006 DN 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

280 Additional piping Hexagon nut ISO 4032 184 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8 - Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

281 Additional piping Hexagon nut ISO 4032 24 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8 - Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 30 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

282 Additional piping Washer ISO 7091 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
Steel- Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

283 Additional piping Washer ISO 7091 192 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
Steel- Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

284 Additional piping Washer ISO 7091 192 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
Steel- Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

285 Additional piping Washer ISO 7091 52 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
Steel- Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 30 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19

286 Additional piping WELDING NIPPLE NPT-1" MALE XS L=100 5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

287 Additional piping STRAIGHT NIPPLE OTOE/PLAIN OTHER EN 23 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

288 Additional piping STRAIGHT NIPPLE OTOE/PLAIN OTHER EN 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr

Prepared by : Checked by : Approved by :


LMS WZT/NCH/SP VAS
Page 81 of 138
Rev.0

This issue : 6-Sep-17


Last issue :

Shipment Status
Arrive site
Awarded to
Required on Contract / PO Potential

S/No

Float
Discipline Area Description (Vendor/ Supplier/ Remarks
Site No. Vendors
Contr.)

1 Mechanical Ash Leaching Reject Tank 12-Jan-18 8


12-Jan-18 8
Mechanical 0
0
2 Mechanical Ash Leaching Overflow Tank/Water Seal 12-Jan-18 8
12-Jan-18 8
Mechanical 0
0
3 Mechanical Ash Leaching Ash Leaching Mix Tank 12-Jan-18 8
12-Jan-18 8
Mechanical 0
0
4 Mechanical Ash Leaching Black Liquor Pump 12-Jan-18 8
12-Jan-18 8
Mechanical 0
0
5 Mechanical Ash Leaching Acid Pump 12-Jan-18 8
12-Jan-18 8
Mechanical 0
0
6 Mechanical Ash Leaching Vent Gas Duct 12-Jan-18 8
12-Jan-18 8
Mechanical 0

7 Mechanical Ash Leaching Insulation for Equipment 12-Jan-18 8


12-Jan-18 8

0
8 Piping Ash Leaching CS Pipe 2-Feb-18 15
2-Feb-18 15
Piping 0
0
9 Piping Ash Leaching SS Pipe 2-Feb-18 15
2-Feb-18 15
Piping 0
0
10 Piping Ash Leaching Primary Support 2-Feb-18 15
2-Feb-18 15
Piping 0
0
11 Piping Ash Leaching Secondary Support 2-Feb-18 15
2-Feb-18 15
Piping 0
0
12 Piping Ash Leaching Manual Valves 2-Feb-18 15
2-Feb-18 15
Piping 0
0
13 Piping Ash Leaching Insulation 2-Feb-18 15
Prepared by :LMS/MG Checked by : VAS Approved by : VAS
Page 82 of 138
Rev.0

This issue : 6-Sep-17


Last issue :

Shipment Status
Arrive site
Awarded to
Required on Contract / PO Potential

S/No

Float
Discipline Area Description (Vendor/ Supplier/ Remarks
Site No. Vendors
Contr.)

2-Feb-18 15
Piping 0
0
14 Civil Ash Leaching Steel Structure 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
15 Civil Ash Leaching Platforms 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
16 Civil Ash Leaching Stairs 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
17 Civil Ash Leaching Ladders 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
18 Civil Ash Leaching Sprinklers 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
19 Civil Ash Leaching Safety Showers 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
20 Civil Ash Leaching Cast in Steel 14-Dec-17 14
14-Dec-17 14
0
0
21 Civil Ash Leaching Anchor Bolt 14-Dec-17 14
14-Dec-17 14
0
0
22 Civil Ash Leaching Concrete 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
23 Civil Ash Leaching Fire protection and detection system 14-Dec-17 14
14-Dec-17 14
0
0
24 Instrument Ash Leaching Control valves 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
25 Instrument Ash Leaching On/Off Valves 8-Mar-18 14
0 0 8-Mar-18 14
Prepared by :LMS/MG Checked by : VAS Approved by : VAS
Page 83 of 138
Rev.0

This issue : 6-Sep-17


Last issue :

Shipment Status
Arrive site
Awarded to
Required on Contract / PO Potential

S/No

Float
Discipline Area Description (Vendor/ Supplier/ Remarks
Site No. Vendors
Contr.)

0 0 0
0
26 Instrument Ash Leaching Transmitter 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
27 Instrument Ash Leaching On/Off Damper 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
28 Instrument Ash Leaching Refractometer 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
29 Instrument Ash Leaching Sliding Gate 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
30 Instrument Ash Leaching Zero Speed Switch 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
31 Instrument Ash Leaching Resistance Temperature Sensor 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
32 Instrument Ash Leaching Rotameter 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
33 Instrument Ash Leaching Cable for instrument 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
34 Instrument Ash Leaching Instrument cables for junction box 8-Mar-18 14
8-Mar-18 14
0
0
35 Instrument Ash Leaching Junction Box 8-Mar-18 14
8-Mar-18 14
0
0
36 Instrument Ash Leaching Multicore Cables 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
37 Instrument Ash Leaching Cable ladders 8-Mar-18 14
0 0 8-Mar-18 14
Prepared by :LMS/MG Checked by : VAS Approved by : VAS
Page 84 of 138
Rev.0

This issue : 6-Sep-17


Last issue :

Shipment Status
Arrive site
Awarded to
Required on Contract / PO Potential

S/No

Float
Discipline Area Description (Vendor/ Supplier/ Remarks
Site No. Vendors
Contr.)

0 0 0
0
38 Instrument Ash Leaching I/O Cabinet 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
39 Instrument Ash Leaching Power supply distribution 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
40 Instrument Ash Leaching Bus cable 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
41 Instrument Ash Leaching UPS 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
42 Instrument Ash Leaching PLC Cabinet 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
43 Instrument Ash Leaching MCC 8-Mar-18 14
8-Mar-18 14
0
0
44 Electrical Ash Leaching Motor for Slurry pump 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
45 Electrical Ash Leaching Motor for Vent fan 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
46 Electrical Ash Leaching Motor for Black liquor pump 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
47 Electrical Ash Leaching Motor for Reject Pump 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0

Prepared by :LMS/MG Checked by : VAS Approved by : VAS


Page 85 of 138
PROCUREMENT PLAN -
P: Plan, F: Forecast, A: Actual

Bid Closing
% Weightage

Area Mgr/

Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

(based on Material Issue Call


PR No Discipline Area Description PR In system
Cost and Servise For Tender
Contract cost) Submittal Approval Start Signoff
1 1 Mech. CS2 FURNACE PACKAGE 30-Dec-99 YK AS P 20-Nov-16 22-Nov-16 31-Dec-16 25-Nov-16 5-Dec-16 6-Dec-16 20-Dec-16
1 30-Dec-99 CS2 Furnace Box 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Burners 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Tubes Furnace/Coils 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Insulation materials 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Insulation Accessories 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Economizer (DMW heating) 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
Steam Coils Heater (wet steam
1 30-Dec-99 CS2 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
heating)
1 30-Dec-99 CS2 CH4 Preheated 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Sulfur PreHeater 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 BMS Panel 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Damper/Stack 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Oxygen Check online 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Auto Burners 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Lighter 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Plat form and Structure for Furnace 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 Instrument List 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 BMS Skid 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 KO Pot for condensate removal 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 NG Compressor system 30-Dec-99 YK HKG F 30-Oct-16 1-Nov-16 1-Nov-16 2-Nov-16 12-Nov-16 12-Nov-16 22-Nov-16
1 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 25-Dec-16 26-Dec-16 9-Jan-17
1 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 10-Nov-16 10-Nov-16 30-Dec-99 25-Nov-16 30-Dec-99 30-Dec-99 30-Dec-99
1
2 2 Mech. Spinning Spinbath Trough (Change Order) 30-Dec-99 RKV HKG P 1-Dec-16 4-Dec-16 12-Jan-17 7-Dec-16 12-Dec-16 13-Dec-16 18-Dec-16
2 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 19-Dec-16 20-Dec-16 25-Dec-16
2 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### A 17-Oct-16 17-Oct-16 30-Dec-99 19-Oct-16 12-Dec-16 13-Dec-16 18-Dec-16
2
3 3 Mech. Spinbath V1-V2 FRP Evaporator 30-Dec-99 AKP HKG P 11-Dec-16 14-Dec-16 15-Dec-16 17-Dec-16 22-Dec-16 23-Dec-16 28-Dec-16
3 30-Dec-99 Spinbath Enquiry K-061 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
3 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### A 23-Oct-16 24-Oct-16 30-Dec-99 26-Oct-16 30-Dec-99 17-Jul-16 19-Jul-16
3
Heat Exchangers and Plate Heat
4 4 Mech. Fiber Plant Exchanger for Viscose, Spinning, 30-Dec-99 DDR HKG P 11-Dec-16 14-Dec-16 2-Feb-17 17-Dec-16 28-Dec-16 29-Dec-16 9-Jan-17
Spinbath
4 30-Dec-99 Fiber Plant 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 28-Dec-16 29-Dec-16 9-Jan-17
4 30-Dec-99 Fiber Plant 30-Dec-99 30-Dec-99 ### ### A 15-Dec-16 16-Dec-16 30-Dec-99 18-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99
4
Fire Arrestor-12 nos, Cover for
5 5 Mech. Viscose Weighing Hopper-4nos, Dummy 30-Dec-99 DDR HKG P 28-Jan-17 31-Jan-17 1-Feb-17 3-Feb-17 8-Feb-17 9-Feb-17 14-Feb-17
Blind, Trays
5 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 28-Jan-17 31-Jan-17 1-Feb-17 3-Feb-17 8-Feb-17 9-Feb-17 14-Feb-17
5 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
5
6 6 Mech. Viscose Steam Jet Ejectors - 4 sets 30-Dec-99 DDR HKG P 6-Dec-16 9-Dec-16 10-Dec-16 12-Dec-16 17-Dec-16 18-Dec-16 23-Dec-16
6 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 29-Dec-16 30-Dec-16 4-Jan-17

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 86 of 138
PROCUREMENT PLAN -
P: Plan, F: Forecast, A: Actual

Bid Closing
% Weightage

Area Mgr/

Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

(based on Material Issue Call


PR No Discipline Area Description PR In system
Cost and Servise For Tender
Contract cost) Submittal Approval Start Signoff
6 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 11-Nov-16 11-Nov-16 30-Dec-99 13-Nov-16 30-Dec-99 30-Dec-99 30-Dec-99
6
7 7 Mech. Viscose & SpinningStatic Mixer for Viscose, Spinning 30-Dec-99 DDR HKG P 6-Dec-16 9-Dec-16 10-Dec-16 12-Dec-16 17-Dec-16 18-Dec-16 23-Dec-16
7 30-Dec-99Viscose & Spinning
Enquiry K-049 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 21-Dec-16 22-Dec-16 4-Jan-17
7 30-Dec-99Viscose & Spinning
30-Dec-99 30-Dec-99 ### ### A 20-Oct-16 20-Oct-16 30-Dec-99 22-Oct-16 30-Dec-99 30-Dec-99 30-Dec-99
7
Agitator for Viscose, Spinning,
8 8 Mech. Fiber Plant 30-Dec-99 DDR HKG P 5-Dec-16 8-Dec-16 2-Feb-17 11-Dec-16 25-Dec-16 26-Dec-16 9-Jan-17
Spinbath
8 30-Dec-99 Fiber Plant 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 3-Jan-17 4-Jan-17 9-Jan-17
8 30-Dec-99 Fiber Plant 30-Dec-99 30-Dec-99 ### ### A 6-Dec-16 6-Dec-16 30-Dec-99 8-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99
8
Blowers & Fans for Viscose,
9 9 Mech. Viscose & Spinbath 30-Dec-99 DDR HKG P 28-Jan-17 31-Jan-17 18-Mar-17 3-Feb-17 12-Feb-17 13-Feb-17 22-Feb-17
Spinbath
9 30-Dec-99Viscose & Spinbath
30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 6-Jan-17 7-Jan-17 12-Jan-17
9 30-Dec-99Viscose & Spinbath
30-Dec-99 30-Dec-99 ### ### A 26-Dec-16 26-Dec-16 30-Dec-99 28-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99
9
10 10 Mech. Spinning FRP Blower for Spinning 30-Dec-99 DDR HKG P 28-Dec-16 31-Dec-16 15-Feb-17 3-Jan-17 12-Jan-17 13-Jan-17 22-Jan-17
10 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### F 27-Jan-17 30-Jan-17 17-Mar-17 2-Feb-17 11-Feb-17 12-Feb-17 21-Feb-17
10 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
10
11 11 Mech. Viscose Roots Blower 30-Dec-99 DDR HKG P 28-Dec-16 31-Dec-16 15-Feb-17 3-Jan-17 12-Jan-17 13-Jan-17 22-Jan-17
11 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 3-Jan-17 6-Jan-17 21-Feb-17 9-Jan-17 18-Jan-17 19-Jan-17 28-Jan-17
11 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
11
12 12 Mech. Viscose Magnetic traps - 28 nos 30-Dec-99 DDR HKG P 4-Dec-16 7-Dec-16 8-Dec-16 10-Dec-16 15-Dec-16 16-Dec-16 21-Dec-16
12 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 19-Dec-16 20-Dec-16 30-Dec-16
12 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 8-Dec-16 8-Dec-16 30-Dec-99 10-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99
12
Conveyors-4nos , Frame for Fine
13 13 Mech. Viscose 30-Dec-99 DDR HKG P 8-Dec-16 11-Dec-16 12-Dec-16 14-Dec-16 19-Dec-16 20-Dec-16 25-Dec-16
Shredder-10
13 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 17-Nov-16 18-Nov-16 14-Dec-16
13 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 20-Oct-16 20-Oct-16 30-Dec-99 22-Oct-16 30-Dec-99 30-Dec-99 30-Dec-99
13
14 14 Mech. Viscose Centrifuge - 6 nos 30-Dec-99 DDR HKG P 8-Dec-16 11-Dec-16 12-Dec-16 14-Dec-16 19-Dec-16 20-Dec-16 25-Dec-16
14 30-Dec-99 Viscose Enquiry K-056 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
14 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 20-Oct-16 20-Oct-16 30-Dec-99 22-Oct-16 23-Dec-16 24-Dec-16 25-Dec-16
14
15 15 Mech. Viscose Cell Wheels - 8 nos 30-Dec-99 DDR HKG P 6-Dec-16 9-Dec-16 10-Dec-16 12-Dec-16 27-Dec-16 28-Dec-16 5-Jan-17
15 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 19-Nov-16 20-Nov-16 17-Dec-16
15 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 20-Oct-16 20-Oct-16 30-Dec-99 22-Oct-16 30-Dec-99 30-Dec-99 30-Dec-99
15
16 16 Mech. Viscose Plate Frame Filters - 9 nos 30-Dec-99 DDR HKG P 8-Dec-16 11-Dec-16 12-Dec-16 14-Dec-16 19-Dec-16 20-Dec-16 25-Dec-16
16 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
16 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 20-Oct-16 20-Oct-16 30-Dec-99 22-Oct-16 5-Dec-16 6-Dec-16 7-Dec-16
16
17 17 Mech. Viscose Back Wash Filters - 4nos 30-Dec-99 DDR HKG P 8-Dec-16 11-Dec-16 12-Dec-16 14-Dec-16 19-Dec-16 20-Dec-16 25-Dec-16
17 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 15-Dec-16 16-Dec-16 28-Dec-16
17 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 29-Nov-16 30-Nov-16 30-Dec-99 2-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99
17
18 18 Mech. Viscose Air Cooler - 4 nos 30-Dec-99 DDR HKG P 8-Dec-16 11-Dec-16 19-Jan-17 14-Dec-16 19-Dec-16 20-Dec-16 25-Dec-16
Prepared by : Checked by : Approved by :
Area Coordinator Scheduler PM / PD
Page 87 of 138
PROCUREMENT PLAN -
P: Plan, F: Forecast, A: Actual

Bid Closing
% Weightage

Area Mgr/

Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

(based on Material Issue Call


PR No Discipline Area Description PR In system
Cost and Servise For Tender
Contract cost) Submittal Approval Start Signoff
18 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Jan-17 31-Dec-16 3-Jan-17 4-Jan-17 7-Jan-17
18 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 28-Dec-16 28-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
18
19 19 Mech. Viscose Dewatering Machine-2 30-Dec-99 DDR HKG P 6-Dec-16 9-Dec-16 10-Dec-16 12-Dec-16 17-Dec-16 18-Dec-16 23-Dec-16
19 30-Dec-99 Viscose Enquiry K-057 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
19 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 20-Oct-16 20-Oct-16 30-Dec-99 22-Oct-16 23-Dec-16 24-Dec-16 25-Dec-16
19
20 20 Mech. Viscose Washing Machine-1 30-Dec-99 DDR HKG P 6-Dec-16 9-Dec-16 10-Dec-16 12-Dec-16 17-Dec-16 18-Dec-16 23-Dec-16
20 30-Dec-99 Viscose Enquiry K-057 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
20 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 20-Oct-16 20-Oct-16 30-Dec-99 22-Oct-16 23-Dec-16 24-Dec-16 25-Dec-16
20
Shop fabricated Tanks for Viscose -
21 21 Mech. Viscose 30-Dec-99 DDR HKG P 10-Jan-17 13-Jan-17 14-Jan-17 16-Jan-17 21-Jan-17 22-Jan-17 27-Jan-17
Lot 1
21 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 10-Jan-17 13-Jan-17 14-Jan-17 16-Jan-17 21-Jan-17 22-Jan-17 27-Jan-17
21 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
21
Valve List rev 0 for Viscose,
22 22 Mech. Fiber Plant 30-Dec-99 DDR HKG P 15-Feb-17 16-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17
Spinning, Spinbath - Release Order
22 30-Dec-99 Fiber Plant 30-Dec-99 30-Dec-99 ### ### F 15-Feb-17 16-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17
22 30-Dec-99 Fiber Plant 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
22
23 23 Mech. Spinning & Spinbath
FRP Tanks for Spinning, Spinbath 30-Dec-99 RKV HKG P 5-Nov-16 8-Nov-16 9-Nov-16 11-Nov-16 10-Dec-16 11-Dec-16 9-Jan-17
23 30-Dec-99
Spinning & Spinbath
30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 31-Dec-16 1-Jan-17 9-Jan-17
23 30-Dec-99
Spinning & Spinbath
30-Dec-99 30-Dec-99 ### ### A 29-Nov-16 30-Nov-16 30-Dec-99 6-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99
23
24 24 Mech. Spinning Steam Injector 30-Dec-99 RKV HKG P 22-Dec-16 25-Dec-16 26-Dec-16 28-Dec-16 3-Jan-17 4-Jan-17 9-Jan-17
24 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 3-Jan-17 4-Jan-17 9-Jan-17
24 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### A 23-Dec-16 23-Dec-16 30-Dec-99 24-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99
24
Separator for Viscose, Spinning,
25 25 Mech. Fiber Plant 30-Dec-99 RKV HKG P 6-Dec-16 9-Dec-16 10-Dec-16 12-Dec-16 17-Dec-16 18-Dec-16 23-Dec-16
Spinbath
25 30-Dec-99 Fiber Plant 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 23-Dec-16 24-Dec-16 1-Jan-17
25 30-Dec-99 Fiber Plant 30-Dec-99 30-Dec-99 ### ### A 8-Dec-16 8-Dec-16 30-Dec-99 10-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99
25
CS2 Condensation System
26 26 Mech. Spinning 30-Dec-99 RKV HKG P 12-Feb-17 15-Feb-17 16-Feb-17 18-Feb-17 27-Feb-17 28-Feb-17 9-Mar-17
Equipment
26 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### F 12-Feb-17 15-Feb-17 16-Feb-17 18-Feb-17 27-Feb-17 28-Feb-17 9-Mar-17
26 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
26

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 88 of 138
PROCUREMENT PLAN -
P: Plan, F: Forecast, A: Actual

Bid Closing
% Weightage

Area Mgr/

Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

(based on Material Issue Call


PR No Discipline Area Description PR In system
Cost and Servise For Tender
Contract cost) Submittal Approval Start Signoff
Shop fabricated Tanks for Spinning -
27 27 Mech. Spinning 30-Dec-99 RKV HKG P 10-Jan-17 13-Jan-17 14-Jan-17 16-Jan-17 21-Jan-17 22-Jan-17 27-Jan-17
Lot 1
27 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### F 10-Jan-17 13-Jan-17 14-Jan-17 16-Jan-17 21-Jan-17 22-Jan-17 27-Jan-17
27 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
27
28 28 Mech. Spinbath Conveyors for Spinbath - 18 nos 30-Dec-99 AKP HKG P 31-Dec-16 3-Jan-17 4-Jan-17 6-Jan-17 11-Jan-17 12-Jan-17 17-Jan-17
28 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### F 9-Jan-17 12-Jan-17 13-Jan-17 15-Jan-17 18-Jan-17 19-Jan-17 22-Jan-17
28 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
28
Shop fabricated equipments for
29 29 Mech. Spinbath 30-Dec-99 AKP HKG P 10-Jan-17 13-Jan-17 14-Jan-17 16-Jan-17 21-Jan-17 22-Jan-17 27-Jan-17
Spinbath - Lot 1
29 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### F 10-Jan-17 13-Jan-17 14-Jan-17 16-Jan-17 21-Jan-17 22-Jan-17 27-Jan-17
29 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
29
30 30 Mech. CS2 Valve List for CS2 - Release order 1 30-Dec-99 YK HKG P 15-Feb-17 17-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17
30 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### F 15-Feb-17 17-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17
30 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
30
31 31 Mech. BOP Chiller 30-Dec-99 PS HKG P 2-Mar-16 3-Mar-16 14-Jan-17 10-Mar-16 23-Dec-16 20-Dec-16 23-Dec-16
31 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 14-Dec-16 16-Dec-16 28-Dec-16
31 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### A 18-Nov-16 19-Nov-16 30-Dec-99 26-Nov-16 30-Dec-99 30-Dec-99 30-Dec-99
31
Valve List for BOP - Release Order
32 32 Mech. BOP 30-Dec-99 PS HKG P 15-Feb-17 17-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17
1
32 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### F 15-Feb-17 17-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17
32 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
32
33 33 Mech. Viscose Metal Detectors 30-Dec-99 DDR HKG P 22-Jan-17 25-Jan-17 26-Jan-17 28-Jan-17 2-Feb-17 3-Feb-17 8-Feb-17
33 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 15-Dec-16 16-Dec-16 29-Dec-16
33 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 29-Nov-16 30-Nov-16 30-Dec-99 2-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99
33
34 34 Mech. Viscose Drum Filter - 6 nos 30-Dec-99 DDR HKG P 8-Dec-16 11-Dec-16 12-Dec-16 14-Dec-16 19-Dec-16 20-Dec-16 25-Dec-16
34 30-Dec-99 Viscose Enquiry K-055 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
34 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 10-Oct-16 10-Oct-16 30-Dec-99 12-Oct-16 1-Dec-16 2-Dec-16 3-Dec-16
34
Pneumatic Special Valve for
35 35 Mech. Viscose 30-Dec-99 DDR HKG P 6-Dec-16 9-Dec-16 10-Dec-16 12-Dec-16 17-Dec-16 18-Dec-16 23-Dec-16
Xanthator - DN 800 - 14 nos
35 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
35 30-Dec-99 Viscose 30-Dec-99 30-Dec-99 ### ### A 20-Sep-16 20-Sep-16 30-Dec-99 22-Sep-16 20-Dec-16 21-Dec-16 22-Dec-16
35
Pressure Reducing Valve list Rev 1
36 36 Mech. Viscose & Spinningfor Viscose, Spinning - Release 30-Dec-99 DDR HKG P 15-Feb-17 16-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17
Order
36 30-Dec-99Viscose & Spinning
30-Dec-99 30-Dec-99 ### ### F 15-Feb-17 16-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17
36 30-Dec-99Viscose & Spinning
30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
36
37 37 Mech. Fiber Plant Metallic Tank 30-Dec-99 AKP HKG P 7-Jan-17 10-Jan-17 11-Jan-17 13-Jan-17 18-Jan-17 19-Jan-17 24-Jan-17
37 30-Dec-99 Fiber Plant 30-Dec-99 30-Dec-99 ### ### F 7-Jan-17 10-Jan-17 11-Jan-17 13-Jan-17 18-Jan-17 19-Jan-17 24-Jan-17

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 89 of 138
PROCUREMENT PLAN -
P: Plan, F: Forecast, A: Actual

Bid Closing
% Weightage

Area Mgr/

Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

(based on Material Issue Call


PR No Discipline Area Description PR In system
Cost and Servise For Tender
Contract cost) Submittal Approval Start Signoff
37 30-Dec-99 Fiber Plant 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
37
38 38 Mech. Spinbath Fork lift 30-Dec-99 AKP HKG P 28-May-17 31-May-17 1-Jun-17 3-Jun-17 5-Jun-17 6-Jun-17 7-Jun-17
38 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### F 28-May-17 31-May-17 1-Jun-17 3-Jun-17 5-Jun-17 6-Jun-17 7-Jun-17
38 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
38
Valve list Rev 1 for Spinbath -
39 39 Mech. Spinbath 30-Dec-99 AKP HKG P 15-Feb-17 16-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17
Release order
39 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### F 15-Feb-17 16-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17
39 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
39
40 40 Mech. CS2 CS2 SCRUBBER 30-Dec-99 YK AS P 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
40 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
40 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 12-Nov-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
40
41 41 Mech. CS2 CS2 SCRUBBER INTERNALS 30-Dec-99 YK AS P 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
41 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
41 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
41
42 42 Mech. CS2 ABSORBER 30-Dec-99 YK AS P 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
42 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
42 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 12-Nov-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
42
43 43 Mech. CS2 ABSORBER TRAY 30-Dec-99 YK AS P 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
43 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
43 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
43
44 44 Mech. CS2 CS2 STRIPPER COLUMN 30-Dec-99 YK AS P 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
44 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
44 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
44
45 45 Mech. CS2 STABILIZER COLUMN 30-Dec-99 YK AS P 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
45 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
45 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
45
46 46 Mech. CS2 STABILIZER PACKING RING SS316 30-Dec-99 YK AS P 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
46 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
46 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
46
47 47 Mech. CS2 STILL COLUMN 30-Dec-99 YK AS P 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
47 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
47 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
47
48 48 Mech. CS2 STILL COLUMN TRAY 30-Dec-99 YK AS P 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
48 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
48 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
48
49 49 Mech. CS2 CS2 VENT SCRUBBER 30-Dec-99 YK AS P 20-Mar-17 22-Mar-17 22-Mar-17 25-Mar-17 5-Apr-17 6-Apr-17 20-Apr-17

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 90 of 138
PROCUREMENT PLAN -
P: Plan, F: Forecast, A: Actual

Bid Closing
% Weightage

Area Mgr/

Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

(based on Material Issue Call


PR No Discipline Area Description PR In system
Cost and Servise For Tender
Contract cost) Submittal Approval Start Signoff
49 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Mar-17 22-Mar-17 22-Mar-17 25-Mar-17 5-Apr-17 6-Apr-17 20-Apr-17
49 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 12-Nov-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
49
50 50 Mech. CS2 SULFUR CONDENSER 30-Dec-99 YK AS P 20-Dec-16 22-Dec-16 22-Dec-16 25-Dec-16 7-Jan-17 7-Jan-17 20-Jan-17
50 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Dec-16 22-Dec-16 22-Dec-16 25-Dec-16 7-Jan-17 7-Jan-17 20-Jan-17
50 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 22-Dec-16 22-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
50
51 51 Mech. CS2 WASTE WATER STRIPPER 30-Dec-99 YK AS P 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
51 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
51 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 12-Nov-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
51
PACKING RINGS FOR WASTE
52 52 Mech. CS2 30-Dec-99 YK AS P 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
WATER STRIPPER
52 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
52 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
52
53 53 Mech. CS2 REACTOR SHELL 30-Dec-99 YK AS P 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
53 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
53 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
53

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 91 of 138
PROCUREMENT PLAN -
P: Plan, F: Forecast, A: Actual

Bid Closing
% Weightage

Area Mgr/

Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

(based on Material Issue Call


PR No Discipline Area Description PR In system
Cost and Servise For Tender
Contract cost) Submittal Approval Start Signoff
REACTOR PACKING -
54 54 Mech. CS2 12/25/38/50/80 AND 80mm 30-Dec-99 YK AS P 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
STACKED
54 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Feb-17 22-Feb-17 22-Feb-17 25-Feb-17 5-Mar-17 6-Mar-17 20-Mar-17
54 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
54
FLARE STACK (STEAM
55 55 Mech. CS2 30-Dec-99 YK AS P 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
JACKETED)
55 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
55 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 23-Dec-16 23-Dec-16 30-Dec-99 24-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99
55
56 56 Mech. CS2 FURNACE STEAM DRUM 30-Dec-99 YK AS P 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
56 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
56 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
56
57 57 Mech. CS2 CS2 STORAGE TANK (2NOS) 30-Dec-99 YK AS P 26-Feb-17 1-Mar-17 2-Mar-17 4-Mar-17 7-Mar-17 8-Mar-17 11-Mar-17
57 30-Dec-99 CS2 30-Dec-99 30-Dec-99 YK AS F 20-Jan-17 22-Jan-17 22-Jan-17 25-Jan-17 5-Feb-17 6-Feb-17 20-Feb-17
57 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
57
58 58 Mech. CS2 Valve List for CS2 - Release order 2 30-Dec-99 YK HKG P 22-May-17 24-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17
58 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### F 22-May-17 24-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17
58 30-Dec-99 CS2 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
58
59 59 Mech. WSA Boiler 30-Dec-99 MMR AS P 3-Feb-17 6-Feb-17 1-Apr-17 9-Feb-17 17-Feb-17 18-Feb-17 26-Feb-17
(1st & 2nd Waste Heat Recovery
Boiler, 1st & 2nd Steam Drum,
59 30-Dec-99 WSA Steam Superheater, 1st & 2nd BFW 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 19-Jan-17 21-Jan-17 5-Feb-17 6-Feb-17 21-Feb-17
Preheater, Demin Water Preheater,
Steam Cooler, Deaerator)
59 30-Dec-99 WSA 30-Dec-99 30-Dec-99 ### ### A 30-Dec-16 30-Dec-16 30-Dec-99 2-Jan-17 30-Dec-99 30-Dec-99 30-Dec-99
59
60 60 Mech. WSA Acid Cooler 30-Dec-99 MMR AS P 16-Dec-16 19-Dec-16 2-Feb-17 22-Dec-16 28-Dec-16 29-Dec-16 5-Jan-17
60 30-Dec-99 WSA 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 27-Jan-17 16-Dec-16 26-Dec-16 27-Dec-16 3-Jan-17
60 30-Dec-99 WSA 30-Dec-99 30-Dec-99 ### ### A 13-Dec-16 13-Dec-16 30-Dec-99 15-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99
60
Combustor Refractory,BMS,Burner &
61 61 Mech. WSA Valve Train along with bricklining 30-Dec-99 MMR AS P 16-Dec-16 19-Dec-16 20-Dec-16 22-Dec-16 30-Dec-16 31-Dec-16 9-Jan-17
supervision
61 30-Dec-99 WSA 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 4-Dec-16 30-Dec-99 21-Dec-16 22-Dec-16 31-Dec-16
61 30-Dec-99 WSA 30-Dec-99 30-Dec-99 ### ### A 22-Nov-16 22-Nov-16 30-Dec-99 24-Nov-16 30-Dec-99 30-Dec-99 30-Dec-99
61
Cooling air blower with inlet filter &
62 62 Mech. WSA silencer, Hot Air Blower, Clean Gas 30-Dec-99 MMR AS P 16-Dec-16 19-Dec-16 20-Dec-16 22-Dec-16 27-Dec-16 28-Dec-16 3-Jan-17
Blower
62 30-Dec-99 WSA 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 7-Jan-17 14-Jan-17
62 30-Dec-99 WSA 30-Dec-99 30-Dec-99 ### ### A 25-Nov-16 26-Nov-16 30-Dec-99 28-Nov-16 30-Dec-99 30-Dec-99 30-Dec-99
62

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 92 of 138
PROCUREMENT PLAN -
P: Plan, F: Forecast, A: Actual

Bid Closing
% Weightage

Area Mgr/

Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

(based on Material Issue Call


PR No Discipline Area Description PR In system
Cost and Servise For Tender
Contract cost) Submittal Approval Start Signoff
NAOH Scrubber Vessel & Quench
63 63 Mech. WSA 30-Dec-99 MMR AS P 3-Feb-17 6-Feb-17 18-Mar-17 9-Feb-17 14-Feb-17 15-Feb-17 21-Feb-17
Vessel
63 30-Dec-99 WSA 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 19-Jan-17 21-Jan-17 5-Feb-17 6-Feb-17 16-Feb-17
63 30-Dec-99 WSA 30-Dec-99 30-Dec-99 ### ### A 31-Dec-16 31-Dec-16 30-Dec-99 2-Jan-17 30-Dec-99 30-Dec-99 30-Dec-99
63
64 64 Mech. WSA Dampers 30-Dec-99 MMR AS P 14-Apr-17 17-Apr-17 18-Apr-17 20-Apr-17 25-Apr-17 26-Apr-17 2-May-17
64 30-Dec-99 WSA 30-Dec-99 30-Dec-99 ### ### F 1-Mar-17 4-Mar-17 5-Mar-17 7-Mar-17 19-Mar-17 20-Mar-17 30-Mar-17
64 30-Dec-99 WSA 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
64
65 65 Mech. BOP Cooling Tower 30-Dec-99 PS HKG P 18-Nov-16 19-Nov-16 11-Jan-17 26-Nov-16 19-Dec-16 13-Dec-16 19-Dec-16
65 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### F 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
65 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### A 18-Nov-16 19-Nov-16 30-Dec-99 26-Nov-16 17-Dec-16 19-Nov-16 17-Dec-16
65
Valve List for BOP - Release Order
66 66 Mech. BOP 30-Dec-99 PS HKG P 20-Feb-17 22-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17
2
66 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### F 20-Feb-17 22-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17
66 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
66
67 67 Mech. Spinbath Silk Filter with FRP Body 30-Dec-99 AKP HKG P 11-Dec-16 14-Dec-16 15-Dec-16 17-Dec-16 22-Dec-16 23-Dec-16 28-Dec-16
67 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### F 20-Oct-16 20-Oct-16 30-Dec-99 22-Oct-16 27-Oct-16 8-Jul-16 10-Jul-16
67 34 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### A 20-Oct-16 20-Oct-16 30-Dec-99 22-Oct-16 27-Oct-16 8-Jul-16 10-Jul-16
67

68 68 Mech. BOP Effluent Treatment (ETP) 30-Dec-99 PS HKG P 25-Jun-16 2-Jul-16 2-Jul-16 5-Jul-16 19-Jul-16 12-Jul-16 26-Jul-16

68 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### F 25-Jun-16 14-Jul-16 23-Dec-16 15-Aug-16 30-Aug-16 14-Nov-16 16-Nov-16

68 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### A 25-Jun-16 14-Jul-16 23-Dec-16 15-Aug-16 30-Aug-16 14-Nov-16 16-Nov-16
68
69 69 Mech. BOP Soft Water Plant 30-Dec-99 PS HKG P 9-May-16 10-May-16 30-Nov-16 17-May-16 11-Nov-16 10-Nov-16 11-Nov-16
69 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### F 10-Jun-16 10-Jun-16 30-Dec-99 17-Jun-16 11-Nov-16 11-Aug-16 11-Nov-16
69 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### A 10-Jun-16 10-Jun-16 30-Dec-99 17-Jun-16 11-Nov-16 11-Aug-16 11-Nov-16
69
70 70 Mech. BOP N2 Plant 30-Dec-99 PS HKG P 2-Mar-16 3-Mar-16 26-Nov-16 10-Mar-16 5-Nov-16 19-Oct-16 5-Nov-16
70 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### F 2-Mar-16 3-Mar-16 30-Dec-99 10-Mar-16 17-Oct-16 19-Oct-16 9-Nov-16
70 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### A 2-Mar-16 3-Mar-16 30-Dec-99 10-Mar-16 17-Oct-16 19-Oct-16 9-Nov-16
70
71 71 Mech. Spinbath Silk Filter FRP - 4 nos 30-Dec-99 AYP HKG P 29-Feb-16 7-Mar-16 7-Mar-16 10-Mar-16 24-Mar-16 17-Mar-16 2-Apr-16
71 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### F 29-Feb-16 7-Mar-16 7-Mar-16 10-Mar-16 24-Mar-16 17-Mar-16 2-Apr-16
71 182 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### A 29-Feb-16 7-Mar-16 30-Aug-16 10-Mar-16 24-Mar-16 17-Mar-16 2-Apr-16
71
1935-
72 72 Mech. Spinning Viscose Metering Pump 30-Dec-99 RKV HKG P 8-Oct-16 11-Oct-16 11-Oct-16 14-Oct-16 19-Oct-16 20-Oct-16 25-Oct-16
SVI/VSF1

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 93 of 138
PROCUREMENT PLAN -
P: Plan, F: Forecast, A: Actual

Bid Closing
% Weightage

Area Mgr/

Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

(based on Material Issue Call


PR No Discipline Area Description PR In system
Cost and Servise For Tender
Contract cost) Submittal Approval Start Signoff
72 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### F 24-Jul-16 25-Jul-16 23-Nov-16 14-Oct-16 19-Oct-16 20-Oct-16 31-Oct-16
72 103 30-Dec-99 Spinning 30-Dec-99 30-Dec-99 ### ### A 24-Jul-16 25-Jul-16 23-Nov-16 14-Oct-16 19-Oct-16 20-Oct-16 31-Oct-16
72
Mech. Metal Tanks DDR HKG
Steel Plate diameter 3.6 m & Above

Mech. Metal Tanks DDR HKG


Steel Plate diameter less than 3.6 m

SPINNING

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 94 of 138
NT PLAN - SUPPLY CONTRACT (MECHANICAL) LONG LEAD ITEMS >210 days Rev.1

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
21-Dec-16 23-Dec-16 25-Dec-16 26-Dec-16 26-Dec-16 28-Dec-16 28-Dec-16 29-Dec-16 3-Jan-17 5-Jan-17 360 31-Dec-17 5-Jan-18 5
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 69
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
10-Jan-17 12-Jan-17 14-Jan-17 15-Jan-17 15-Jan-17 17-Jan-17 17-Jan-17 18-Jan-17 23-Jan-17 25-Jan-17 360 20-Jan-18 30-Dec-99 -15
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

19-Dec-16 24-Dec-16 28-Dec-16 2-Jan-17 25-Dec-16 28-Dec-16 7-Jan-17 10-Jan-17 11-Jan-17 14-Jan-17 300 10-Nov-17 15-Nov-17 5
26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 300 17-Nov-17 30-Dec-99 -2
19-Dec-16 24-Dec-16 28-Dec-16 2-Jan-17 25-Dec-16 28-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

29-Dec-16 3-Jan-17 8-Jan-17 13-Jan-17 4-Jan-17 7-Jan-17 17-Jan-17 20-Jan-17 21-Jan-17 24-Jan-17 270 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 31-Dec-16 5-Jan-17 27-Dec-16 30-Dec-16 9-Jan-17 12-Jan-17 13-Jan-17 16-Jan-17 270 13-Oct-17 30-Dec-99 12
15-Dec-16 26-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

10-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 10-Oct-17 7

10-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 30-Dec-99 7
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

15-Feb-17 20-Feb-17 24-Feb-17 1-Mar-17 21-Feb-17 24-Feb-17 6-Mar-17 9-Mar-17 10-Mar-17 13-Mar-17 240 8-Nov-17 15-Nov-17 7

15-Feb-17 20-Feb-17 24-Feb-17 1-Mar-17 21-Feb-17 24-Feb-17 6-Mar-17 9-Mar-17 10-Mar-17 13-Mar-17 240 8-Nov-17 15-Nov-17 7
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 20-Sep-17 4
5-Jan-17 10-Jan-17 13-Jan-17 15-Jan-17 11-Jan-17 13-Jan-17 18-Jan-17 21-Jan-17 22-Jan-17 25-Jan-17 240 22-Sep-17 30-Dec-99 -2

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 95 of 138
NT PLAN - SUPPLY CONTRACT (MECHANICAL) LONG LEAD ITEMS >210 days Rev.1

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 20-Sep-17 4
5-Jan-17 10-Jan-17 13-Jan-17 15-Jan-17 11-Jan-17 13-Jan-17 18-Jan-17 21-Jan-17 22-Jan-17 25-Jan-17 240 22-Sep-17 30-Dec-99 -2
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

10-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 25-Oct-17 22
10-Jan-17 15-Jan-17 18-Jan-17 20-Jan-17 16-Jan-17 18-Jan-17 23-Jan-17 26-Jan-17 27-Jan-17 30-Jan-17 240 27-Sep-17 30-Dec-99 28
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

23-Feb-17 28-Feb-17 5-Mar-17 10-Mar-17 1-Mar-17 4-Mar-17 14-Mar-17 17-Mar-17 18-Mar-17 21-Mar-17 240 16-Nov-17 25-Nov-17 9
13-Jan-17 18-Jan-17 21-Jan-17 23-Jan-17 19-Jan-17 21-Jan-17 26-Jan-17 29-Jan-17 30-Jan-17 2-Feb-17 240 30-Sep-17 30-Dec-99 56
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

23-Jan-17 28-Jan-17 2-Feb-17 7-Feb-17 29-Jan-17 1-Feb-17 11-Feb-17 14-Feb-17 15-Feb-17 18-Feb-17 240 16-Oct-17 25-Oct-17 9
22-Feb-17 27-Feb-17 4-Mar-17 9-Mar-17 28-Feb-17 3-Mar-17 13-Mar-17 16-Mar-17 17-Mar-17 20-Mar-17 240 15-Nov-17 25-Oct-17 -21
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

23-Jan-17 28-Jan-17 2-Feb-17 7-Feb-17 29-Jan-17 1-Feb-17 11-Feb-17 14-Feb-17 15-Feb-17 18-Feb-17 240 16-Oct-17 25-Oct-17 9
29-Jan-17 3-Feb-17 8-Feb-17 13-Feb-17 4-Feb-17 7-Feb-17 17-Feb-17 20-Feb-17 21-Feb-17 24-Feb-17 240 22-Oct-17 25-Oct-17 3
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

22-Dec-16 27-Dec-16 31-Dec-16 5-Jan-17 28-Dec-16 31-Dec-16 10-Jan-17 13-Jan-17 14-Jan-17 17-Jan-17 240 14-Sep-17 15-Sep-17 1
31-Dec-16 10-Jan-17 14-Jan-17 19-Jan-17 11-Jan-17 14-Jan-17 24-Jan-17 27-Jan-17 28-Jan-17 31-Jan-17 240 28-Sep-17 30-Dec-99 -13
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 240 18-Sep-17 20-Sep-17 2
15-Dec-16 10-Jan-17 13-Jan-17 15-Jan-17 11-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 21-Jan-17 24-Jan-17 240 21-Sep-17 30-Dec-99 -1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 240 18-Sep-17 20-Sep-17 2
30-Dec-99 30-Dec-99 31-Dec-16 5-Jan-17 28-Dec-16 31-Dec-16 10-Jan-17 13-Jan-17 14-Jan-17 17-Jan-17 240 14-Sep-17 30-Dec-99 6
26-Dec-16 27-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

6-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 15-Oct-17 12
18-Dec-16 15-Jan-17 18-Jan-17 20-Jan-17 16-Jan-17 18-Jan-17 22-Jan-17 25-Jan-17 26-Jan-17 29-Jan-17 240 26-Sep-17 30-Dec-99 19
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 240 18-Sep-17 20-Sep-17 2
30-Dec-99 30-Dec-99 5-Jan-17 10-Jan-17 2-Jan-17 5-Jan-17 15-Jan-17 18-Jan-17 19-Jan-17 22-Jan-17 240 19-Sep-17 30-Dec-99 1
8-Dec-16 9-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 240 18-Sep-17 20-Sep-17 2
29-Dec-16 10-Jan-17 14-Jan-17 19-Jan-17 11-Jan-17 14-Jan-17 24-Jan-17 27-Jan-17 28-Jan-17 31-Jan-17 240 28-Sep-17 30-Dec-99 -8
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 240 18-Sep-17 20-Sep-17 2
Prepared by : Checked by : Approved by :
Area Coordinator Scheduler PM / PD
Page 96 of 138
NT PLAN - SUPPLY CONTRACT (MECHANICAL) LONG LEAD ITEMS >210 days Rev.1

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
8-Jan-17 11-Jan-17 15-Jan-17 20-Jan-17 12-Jan-17 15-Jan-17 25-Jan-17 28-Jan-17 29-Jan-17 1-Feb-17 240 29-Sep-17 30-Dec-99 -9
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 20-Sep-17 4
30-Dec-99 30-Dec-99 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 30-Dec-99 4
26-Dec-16 27-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 20-Sep-17 4
30-Dec-99 30-Dec-99 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 30-Dec-99 4
26-Dec-16 27-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

28-Jan-17 2-Feb-17 6-Feb-17 11-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
28-Jan-17 2-Feb-17 6-Feb-17 11-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 240 20-Oct-17 25-Oct-17 5
18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 240 20-Oct-17 25-Oct-17 5
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

10-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 10-Oct-17 7
10-Jan-17 15-Jan-17 19-Jan-17 22-Jan-17 16-Jan-17 18-Jan-17 25-Jan-17 28-Jan-17 29-Jan-17 1-Feb-17 180 31-Jul-17 30-Dec-99 71
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

10-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 10-Oct-17 7
10-Jan-17 15-Jan-17 19-Jan-17 22-Jan-17 16-Jan-17 18-Jan-17 25-Jan-17 28-Jan-17 29-Jan-17 1-Feb-17 180 31-Jul-17 30-Dec-99 71
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 20-Sep-17 4
2-Jan-17 10-Jan-17 14-Jan-17 17-Jan-17 11-Jan-17 13-Jan-17 20-Jan-17 23-Jan-17 24-Jan-17 27-Jan-17 180 26-Jul-17 30-Dec-99 56
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

10-Mar-17 15-Mar-17 19-Mar-17 24-Mar-17 16-Mar-17 19-Mar-17 29-Mar-17 1-Apr-17 2-Apr-17 5-Apr-17 240 1-Dec-17 10-Dec-17 9
10-Mar-17 15-Mar-17 19-Mar-17 24-Mar-17 16-Mar-17 19-Mar-17 29-Mar-17 1-Apr-17 2-Apr-17 5-Apr-17 240 1-Dec-17 10-Dec-17 9
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 97 of 138
NT PLAN - SUPPLY CONTRACT (MECHANICAL) LONG LEAD ITEMS >210 days Rev.1

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
28-Jan-17 2-Feb-17 6-Feb-17 11-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
28-Jan-17 2-Feb-17 6-Feb-17 11-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

18-Jan-17 23-Jan-17 28-Jan-17 2-Feb-17 24-Jan-17 27-Jan-17 6-Feb-17 9-Feb-17 10-Feb-17 13-Feb-17 240 11-Oct-17 15-Oct-17 4
23-Jan-17 26-Jan-17 31-Jan-17 5-Feb-17 27-Jan-17 30-Jan-17 9-Feb-17 12-Feb-17 13-Feb-17 16-Feb-17 240 14-Oct-17 30-Dec-99 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

28-Jan-17 2-Feb-17 7-Feb-17 12-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
28-Jan-17 2-Feb-17 7-Feb-17 12-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 21-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 21-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

23-Dec-16 30-Dec-16 30-Dec-16 10-Jan-17 10-Jan-17 13-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 18-Jan-17 240 15-Sep-17 30-Sep-17 15
29-Dec-16 10-Jan-17 10-Jan-17 10-Jan-17 10-Jan-17 13-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 18-Jan-17 240 15-Sep-17 30-Dec-99 15
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 21-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 21-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

9-Feb-17 14-Feb-17 18-Feb-17 23-Feb-17 15-Feb-17 18-Feb-17 28-Feb-17 3-Mar-17 4-Mar-17 7-Mar-17 210 3-Oct-17 10-Oct-17 7
30-Dec-16 12-Jan-17 16-Jan-17 21-Jan-17 13-Jan-17 16-Jan-17 26-Jan-17 29-Jan-17 30-Jan-17 2-Feb-17 210 31-Aug-17 30-Dec-99 40
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 210 19-Aug-17 25-Aug-17 6
30-Dec-99 30-Dec-99 1-Jan-17 9-Jan-17 24-Dec-16 1-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 210 19-Aug-17 30-Dec-99 6
4-Dec-16 5-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 210 17-Aug-17 6-Sep-17 20
30-Dec-99 30-Dec-99 2-Jan-17 7-Jan-17 28-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 210 17-Aug-17 30-Dec-99 21
23-Dec-16 23-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 210 20-Sep-17 25-Sep-17 5

18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 210 20-Sep-17 25-Sep-17 5
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

25-Jan-17 30-Jan-17 4-Feb-17 9-Feb-17 31-Jan-17 3-Feb-17 13-Feb-17 16-Feb-17 17-Feb-17 20-Feb-17 210 18-Sep-17 25-Sep-17 7
25-Jan-17 30-Jan-17 4-Feb-17 9-Feb-17 31-Jan-17 3-Feb-17 13-Feb-17 16-Feb-17 17-Feb-17 20-Feb-17 210 18-Sep-17 25-Sep-17 7

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 98 of 138
NT PLAN - SUPPLY CONTRACT (MECHANICAL) LONG LEAD ITEMS >210 days Rev.1

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

8-Jun-17 9-Jun-17 14-Jun-17 15-Jun-17 10-Jun-17 13-Jun-17 16-Jun-17 19-Jun-17 20-Jun-17 23-Jun-17 210 19-Jan-18 25-Jan-18 6
8-Jun-17 9-Jun-17 14-Jun-17 15-Jun-17 10-Jun-17 13-Jun-17 16-Jun-17 19-Jun-17 20-Jun-17 23-Jun-17 210 19-Jan-18 25-Jan-18 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 210 20-Sep-17 25-Sep-17 5
18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 210 20-Sep-17 25-Sep-17 5
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Apr-17 23-Apr-17 25-Apr-17 26-Apr-17 26-Apr-17 28-Apr-17 28-Apr-17 30-Apr-17 3-May-17 4-May-17 210 30-Nov-17 5-Dec-17 5

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 99 of 138
NT PLAN - SUPPLY CONTRACT (MECHANICAL) LONG LEAD ITEMS >210 days Rev.1

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
21-Apr-17 23-Apr-17 25-Apr-17 26-Apr-17 26-Apr-17 28-Apr-17 28-Apr-17 30-Apr-17 3-May-17 4-May-17 210 30-Nov-17 5-Dec-17 5
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Jan-17 23-Jan-17 25-Jan-17 26-Jan-17 26-Jan-17 28-Jan-17 28-Jan-17 31-Jan-17 3-Feb-17 5-Feb-17 210 3-Sep-17 5-Sep-17 2
21-Jan-17 23-Jan-17 25-Jan-17 26-Jan-17 26-Jan-17 28-Jan-17 28-Jan-17 31-Jan-17 3-Feb-17 5-Feb-17 210 3-Sep-17 5-Sep-17 2
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 100 of 138
NT PLAN - SUPPLY CONTRACT (MECHANICAL) LONG LEAD ITEMS >210 days Rev.1

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time

21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1

21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 5-Oct-17 1
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 5-Oct-17 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

12-Mar-17 13-Mar-17 18-Mar-17 19-Mar-17 14-Mar-17 17-Mar-17 20-Mar-17 23-Mar-17 24-Mar-17 27-Mar-17 210 23-Oct-17 25-Oct-17 2
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 243 6-Nov-17 1-Jul-17 -128
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 28-May-17 30-May-17 210 26-Dec-17 31-Dec-17 5
26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 28-May-17 30-May-17 210 26-Dec-17 31-Dec-17 5
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

27-Feb-17 7-Mar-17 11-Mar-17 19-Mar-17 8-Mar-17 11-Mar-17 27-Mar-17 30-Mar-17 31-Mar-17 3-Apr-17 210 30-Oct-17 31-Oct-17 1

22-Feb-17 28-Feb-17 4-Mar-17 12-Mar-17 1-Mar-17 4-Mar-17 12-Mar-17 15-Mar-17 16-Mar-17 19-Mar-17 180 15-Sep-17 30-Aug-17 -16

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

6-Jan-17 12-Jan-17 16-Jan-17 22-Jan-17 13-Jan-17 16-Jan-17 28-Jan-17 31-Jan-17 1-Feb-17 4-Feb-17 210 2-Sep-17 5-Sep-17 3
4-Jan-17 10-Jan-17 14-Jan-17 18-Jan-17 11-Jan-17 14-Jan-17 23-Jan-17 25-Jan-17 26-Jan-17 29-Jan-17 210 27-Aug-17 19-Sep-17 23
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

10-Jan-17 18-Jan-17 22-Jan-17 30-Jan-17 19-Jan-17 22-Jan-17 7-Feb-17 10-Feb-17 11-Feb-17 14-Feb-17 210 12-Sep-17 15-Sep-17 3

1-Jan-17 9-Jan-17 13-Jan-17 21-Jan-17 10-Jan-17 13-Jan-17 21-Jan-17 24-Jan-17 25-Jan-17 28-Jan-17 220 5-Sep-17 20-Aug-17 -16
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

4-Jan-17 9-Jan-17 13-Jan-17 18-Jan-17 10-Jan-17 13-Jan-17 23-Jan-17 26-Jan-17 27-Jan-17 30-Jan-17 210 28-Aug-17 31-Aug-17 3

15-Jan-17 20-Jan-17 24-Jan-17 29-Jan-17 21-Jan-17 24-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 195 19-Aug-17 20-Aug-17 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 101 of 138
NT PLAN - SUPPLY CONTRACT (MECHANICAL) LONG LEAD ITEMS >210 days Rev.1

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
22-Feb-17 27-Feb-17 3-Mar-17 8-Mar-17 28-Feb-17 3-Mar-17 13-Mar-17 16-Mar-17 17-Mar-17 20-Mar-17 210 16-Oct-17 20-Oct-17 4
17-Feb-17 22-Feb-17 26-Feb-17 3-Mar-17 23-Feb-17 26-Feb-17 3-Mar-17 6-Mar-17 7-Mar-17 10-Mar-17 165 22-Aug-17 15-Aug-17 -7
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

3-May-17 8-May-17 12-May-17 17-May-17 9-May-17 12-May-17 22-May-17 25-May-17 26-May-17 29-May-17 210 25-Dec-17 31-Dec-17 6
31-Mar-17 5-Apr-17 9-Apr-17 14-Apr-17 6-Apr-17 9-Apr-17 14-Apr-17 14-Apr-17 15-Apr-17 18-Apr-17 195 30-Oct-17 5-Nov-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

19-Dec-16 26-Dec-16 26-Dec-16 7-Jan-17 7-Jan-17 10-Jan-17 11-Jan-17 16-Jan-17 17-Jan-17 18-Jan-17 210 16-Aug-17 30-Aug-17 14
30-Dec-99 11-Jan-17 11-Jan-17 21-Jan-17 21-Jan-17 10-Jan-17 11-Jan-17 16-Jan-17 17-Jan-17 18-Jan-17 210 16-Aug-17 30-Dec-99 14
17-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 26-Feb-17 28-Feb-17 210 26-Sep-17 30-Sep-17 4
24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 26-Feb-17 28-Feb-17 210 26-Sep-17 30-Sep-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

29-Dec-16 3-Jan-17 8-Jan-17 13-Jan-17 4-Jan-17 7-Jan-17 17-Jan-17 20-Jan-17 21-Jan-17 24-Jan-17 270 21-Oct-17 25-Oct-17 4
12-Jul-16 12-Jul-16 17-Nov-16 18-Nov-16 19-Nov-16 20-Nov-16 21-Nov-16 22-Nov-16 23-Nov-16 24-Dec-16 0 30-Dec-99 30-Dec-99 0
12-Jul-16 12-Jul-16 17-Nov-16 18-Nov-16 19-Nov-16 20-Nov-16 21-Nov-16 22-Nov-16 23-Nov-16 30-Dec-99 0 30-Dec-99 30-Dec-99 0

2-Aug-16 7-Aug-16 24-Sep-16 1-Oct-16 8-Aug-16 22-Aug-16 29-Aug-16 1-Sep-16 9-Sep-16 30-Sep-16 304 31-Jul-17 5-Aug-17 5

16-Nov-16 17-Nov-16 12-Dec-16 13-Dec-16 14-Dec-16 15-Dec-16 16-Dec-16 23-Dec-16 23-Dec-16 23-Dec-16 0 30-Dec-99 0

16-Nov-16 17-Nov-16 12-Dec-16 13-Dec-16 14-Dec-16 15-Dec-16 16-Dec-16 23-Dec-16 23-Dec-16 23-Dec-16 0 30-Dec-99 30-Dec-99 0

1944-
11-Nov-16 18-Nov-16 26-Nov-16 29-Nov-16 29-Nov-16 29-Nov-16 30-Nov-16 3-Dec-16 4-Dec-16 4-Dec-16 240 1-Aug-17 15-Aug-17 14 IT Water
SVI/VSF1
16-Nov-16 30-Nov-16 11-Dec-16 19-Dec-16 11-Dec-16 11-Dec-16 25-Dec-16 28-Dec-16 29-Dec-16 29-Dec-16 0 30-Dec-99 30-Dec-99 0
16-Nov-16 30-Nov-16 11-Dec-16 19-Dec-16 11-Dec-16 11-Dec-16 25-Dec-16 28-Dec-16 29-Dec-16 29-Dec-16 0 30-Dec-99 30-Dec-99 0

5-Nov-16 12-Nov-16 12-Nov-16 20-Nov-16 20-Nov-16 25-Nov-16 26-Nov-16 28-Nov-16 29-Nov-16 30-Nov-16 300 26-Sep-17 30-Sep-17 4
14-Nov-16 18-Nov-16 7-Dec-16 9-Dec-16 11-Dec-16 13-Dec-16 15-Dec-16 17-Dec-16 19-Dec-16 23-Dec-16 0 30-Dec-99 30-Dec-99 0
14-Nov-16 18-Nov-16 7-Dec-16 9-Dec-16 11-Dec-16 13-Dec-16 15-Dec-16 17-Dec-16 19-Dec-16 23-Dec-16 0 30-Dec-99 30-Dec-99 0

1921-
2-Apr-16 7-Apr-16 14-Apr-16 19-Apr-16 19-Apr-16 16-Apr-16 21-Apr-16 1-Sep-16 9-Sep-16 30-Sep-16 258 15-Jun-17 20-Jun-17 5
SVI/VSF1
2-Apr-16 7-Apr-16 14-Apr-16 19-Apr-16 19-Apr-16 16-Apr-16 21-Apr-16 1-Sep-16 9-Sep-16 30-Sep-16 0 10-Sep-17 30-Dec-99 0
2-Apr-16 19-Apr-16 14-Apr-16 29-Jul-16 25-Jul-16 30-Jul-16 1-Aug-16 6-Aug-16 29-Aug-16 31-Aug-16 375 30-Dec-99 30-Dec-99 0

26-Oct-16 31-Oct-16 4-Nov-16 9-Nov-16 1-Nov-16 4-Nov-16 14-Nov-16 17-Nov-16 18-Nov-16 21-Nov-16 274 21-Aug-17 25-Aug-17 3

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 102 of 138
NT PLAN - SUPPLY CONTRACT (MECHANICAL) LONG LEAD ITEMS >210 days Rev.1

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
2-Nov-16 2-Nov-16 29-Oct-16 30-Oct-16 31-Oct-16 1-Nov-16 2-Nov-16 3-Nov-16 4-Nov-16 4-Nov-16 0 30-Dec-99 30-Dec-99 0
2-Nov-16 2-Nov-16 29-Oct-16 30-Oct-16 31-Oct-16 1-Nov-16 2-Nov-16 3-Nov-16 4-Nov-16 4-Nov-16 0 30-Dec-99 30-Dec-99 0
0 30-Dec-99 30-Dec-99 0

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 103 of 138
This issue : 30-Dec-16
Last issue : 20-Dec-16

Arrive site
Shipment
Status
Potential Vendors Remarks

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 104 of 138
This issue : 30-Dec-16
Last issue : 20-Dec-16

Arrive site
Shipment
Status
Potential Vendors Remarks

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 105 of 138
This issue : 30-Dec-16
Last issue : 20-Dec-16

Arrive site
Shipment
Status
Potential Vendors Remarks

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 106 of 138
This issue : 30-Dec-16
Last issue : 20-Dec-16

Arrive site
Shipment
Status
Potential Vendors Remarks

Carrier
Shuang Liang, Thermax
LG, System Component PVT.LTD

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 107 of 138
This issue : 30-Dec-16
Last issue : 20-Dec-16

Arrive site
Shipment
Status
Potential Vendors Remarks

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 108 of 138
This issue : 30-Dec-16
Last issue : 20-Dec-16

Arrive site
Shipment
Status
Potential Vendors Remarks

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 109 of 138
This issue : 30-Dec-16
Last issue : 20-Dec-16

Arrive site
Shipment
Status
Potential Vendors Remarks

ENMAX
THERMAX
M.E. ENERGY

ALFA LAVAL, GEA

Combustion Solution

REITZ ( Germany)

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 110 of 138
This issue : 30-Dec-16
Last issue : 20-Dec-16

Arrive site
Shipment
Status
Potential Vendors Remarks

PT. DGM
Panwater Engineering Sdn Bhd
Seagull, and Southern

Paques Envirionment
( Shanghai) Technology CO Ltd
Auqaflow Ltd, Veolia
Panca Jasa/Invent Germany
Indonesia, PT. Krida
Hangulindo
Bejing Huafu, Metito, Sentai,
PJLKrida

Beta Permesti, IT Water


Dew India, Metito
Ion Exchange, Thermax, WOG

Air Product, PT. Suzhou Since


Gas System Co. Ltd
Linde Indonesia
Nuberg Engineering

Hi-Tech Heavy Industry

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 111 of 138
This issue : 30-Dec-16
Last issue : 20-Dec-16

Arrive site
Shipment
Status
Potential Vendors Remarks

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 112 of 138
P: Plan, F: Forecast, A: Actual

Bid Closing
Area Mgr/

Standard
Engineer
% Weightage (based on Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

PR In Issue Call
PR No Discipline Area Description Material Cost and
system For Tender
Servise Contract cost)
Submittal Approval Start Signoff
1 1 CIVIL CD Filter Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
1 0 CD Filter 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
1 0 CD Filter 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
1 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
2 2 CIVIL CD Filter Rebar D16 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
2 0 CD Filter 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
2 0 CD Filter 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
2 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
3 3 CIVIL CD Filter Rebar D19 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
3 0 CD Filter 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
3 0 CD Filter 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
3 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
4 4 CIVIL CD Filter Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
4 0 CD Filter 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
4 0 CD Filter 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
4 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Lime Mud
5 5 CIVIL Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel
Lime Mud
5 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Vessel
Lime Mud
5 0 0 0 0 0 A
Vessel
5
Lime Mud
6 6 CIVIL Rebar D19 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel
Lime Mud
6 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Vessel
Lime Mud
6 0 0 0 0 0 A
Vessel
6
Lime Mud
7 7 CIVIL Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel
Lime Mud
7 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Vessel
Lime Mud
7 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Vessel
7 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
White Liquor
8 8 CIVIL Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel

White Liquor
8 0 0 0 0 0 F 25-Jul-17 30-Jul-17 31-Jul-17 5-Aug-17 6-Aug-17 8-Aug-17 11-Aug-17
Vessel

White Liquor
8 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Vessel
8 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD
Page 113 of 138
P: Plan, F: Forecast, A: Actual

Bid Closing
Area Mgr/

Standard
Engineer
% Weightage (based on Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

PR In Issue Call
PR No Discipline Area Description Material Cost and
system For Tender
Servise Contract cost)
Submittal Approval Start Signoff

White Liquor
9 9 CIVIL Rebar D19 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel

White Liquor
9 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Vessel

White Liquor
9 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Vessel
9 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
White Liquor
10 10 CIVIL Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel

White Liquor
10 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Vessel

White Liquor
10 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Vessel
10 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Lime Mud
11 11 CIVIL Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Pump
Lime Mud
11 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Pump
Lime Mud
11 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Pump
11 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Lime Mud
12 12 CIVIL Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Pump
Lime Mud
12 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Pump
Lime Mud
12 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Pump
12 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
White Liquor
13 13 CIVIL Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Pump

White Liquor
13 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Pump

White Liquor
13 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Pump
13 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99

Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD


Page 114 of 138
P: Plan, F: Forecast, A: Actual

Bid Closing
Area Mgr/

Standard
Engineer
% Weightage (based on Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

PR In Issue Call
PR No Discipline Area Description Material Cost and
system For Tender
Servise Contract cost)
Submittal Approval Start Signoff

White Liquor
14 14 CIVIL Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Pump

White Liquor
14 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Pump

White Liquor
14 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Pump
14 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Hot water
15 15 CIVIL booster pump
Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17

Hot water
15 0 booster pump
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17

Hot water
15 0 booster pump
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99

15 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99


Hot water
16 16 CIVIL booster pump
Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17

Hot water
16 0 booster pump
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17

Hot water
16 0 booster pump
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99

16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99


CD Filter
17 17 CIVIL Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Feed Pump
CD Filter
17 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Feed Pump
CD Filter
17 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Feed Pump
17 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
CD Filter
18 18 CIVIL Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Feed Pump

CD Filter
18 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Feed Pump

CD Filter
18 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Feed Pump
18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99

Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD


Page 115 of 138
P: Plan, F: Forecast, A: Actual

Bid Closing
Area Mgr/

Standard
Engineer
% Weightage (based on Enquiry Document / BOQ Technical Clarification
Priority

Buyer
S/No

PR In Issue Call
PR No Discipline Area Description Material Cost and
system For Tender
Servise Contract cost)
Submittal Approval Start Signoff
Filtering
19 19 CIVIL Compressor
Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Filtering
19 0 Compressor
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Filtering
19 0 Compressor
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
19 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Filtering
20 20 CIVIL Compressor
Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Filtering
20 0 Compressor
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Filtering
20 0 Compressor
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
20 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Booster
21 21 CIVIL Compressor
Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Booster
21 0 Compressor
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Booster
21 0 Compressor
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
21
Booster
22 22 CIVIL Compressor
Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Booster
22 0 Compressor
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Booster
22 0 Compressor
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
22 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Drainage
23 23 CIVIL Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
L50 M
Drainage
23 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
L50 M
Drainage
23 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
L50 M
23 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Drainage
24 24 CIVIL Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
L50 M
Drainage
24 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
L50 M
Drainage
24 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
L50 M
24

Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD


Page 116 of 138
PROCUREMENT PLAN - CIVIL MATERIALS
This is
Last is

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract / Potential
Date/ NTP date (Vendor/
on Site PO No. Vendors
Award Date Supplier/ Contr.)
Lead
Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 20-Jun-17 42906
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 20-Jun-17 42906
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 20-Jun-17 42906
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 20-Jun-17 42906
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 20-Jun-17 42906
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 20-Jun-17 42906
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 20-Jun-17 42906
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 20-Jun-17 42906
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

13-Aug-17 16-Aug-17 18-Aug-17 20-Aug-17 22-Aug-17 26-Aug-17 28-Aug-17 31-Aug-17 2-Sep-17 4-Sep-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD
Page 117 of 138
PROCUREMENT PLAN - CIVIL MATERIALS
This is
Last is

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract / Potential
Date/ NTP date (Vendor/
on Site PO No. Vendors
Award Date Supplier/ Contr.)
Lead
Start Finish Start Finish Start Finish Submittal Approval ETA site
Time

12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD


Page 118 of 138
PROCUREMENT PLAN - CIVIL MATERIALS
This is
Last is

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract / Potential
Date/ NTP date (Vendor/
on Site PO No. Vendors
Award Date Supplier/ Contr.)
Lead
Start Finish Start Finish Start Finish Submittal Approval ETA site
Time

12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD


Page 119 of 138
PROCUREMENT PLAN - CIVIL MATERIALS
This is
Last is

TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Float
Required Contract / Potential
Date/ NTP date (Vendor/
on Site PO No. Vendors
Award Date Supplier/ Contr.)
Lead
Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99

Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD


Page 120 of 138
Rev.0

This issue : 10-Jul-17


Last issue :

Arrive site
Shipment
Status
Remarks

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99
Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD
Page 121 of 138
Rev.0

This issue : 10-Jul-17


Last issue :

Arrive site
Shipment
Status
Remarks

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD


Page 122 of 138
Rev.0

This issue : 10-Jul-17


Last issue :

Arrive site
Shipment
Status
Remarks

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD


Page 123 of 138
Rev.0

This issue : 10-Jul-17


Last issue :

Arrive site
Shipment
Status
Remarks

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

30-Dec-99 30-Dec-99

Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD


Page 124 of 138
PROCUREMENT PLAN - A

P: Plan, F: Forecast, A: Actual

Bid Closing
Area Mgr/

Standard
Engineer
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedu

Buyer
S/No

PR In Issue Call
Discipline Area Description
system For Tender
Submittal Approval Start Signoff Start Finish Start
1 Automation CD Filter Signal Cable P 2-Jun-17 7-Jun-17 8-Jun-17 13-Jun-17 14-Jun-17 16-Jun-17 19-Jun-17 21-Jun-17 24-Jun-17 26-Jun-17
0 CD Filter 0 F 25-Jul-17 30-Jul-17 31-Jul-17 5-Aug-17 6-Aug-17 8-Aug-17 11-Aug-17 13-Aug-17 16-Aug-17 18-Aug-17
0 CD Filter 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99

Prepared : Scheduler Checked : Area Coordinator Approved : PM / PD


Page 125 of 138
T PLAN - AUTOMATION Rev.0

This issue : 10-Jul-17


Last issue :

Arrive site
Shipment
Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Status
Float
Required Contract / Potential
Date/ NTP date (Vendor/ Remarks
on Site PO No. Vendors
Award Date Supplier/ Contr.)
Lead
Finish Start Finish Submittal Approval ETA site
Time
28-Jun-17 30-Jun-17 4-Jul-17 6-Jul-17 9-Jul-17 11-Jul-17 13-Jul-17 ### 30-Dec-99 17-Oct-17 43025
20-Aug-17 22-Aug-17 26-Aug-17 28-Aug-17 31-Aug-17 2-Sep-17 4-Sep-17 ### 30-Dec-99 17-Oct-17 43025
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0

Prepared : Scheduler Checked : Area Coordinator Approved : PM / PD


Page 126 of 138
Rev.0
PROCUREMENT PLAN FOR ASH LEACHING This issue: 02 Oct 2017
Last Issue: None

Standard
S/No

Discipline Area Description Required on Site

33 Instrument Ash Leaching Cable for instrument P 8-Mar-18


F 8-Mar-18
A
34 Instrument Ash Leaching Instrument cables for junction box P 8-Mar-18
F 8-Mar-18
A
35 Instrument Ash Leaching Junction Box P 8-Mar-18
F 8-Mar-18
A
36 Instrument Ash Leaching Multicore Cables P 8-Mar-18
F 8-Mar-18
A
37 Instrument Ash Leaching Cable ladders P 8-Mar-18
F 8-Mar-18
A
38 Instrument Ash Leaching I/O Cabinet P 8-Mar-18
F 8-Mar-18
A
39 Instrument Ash Leaching Power supply distribution P 8-Mar-18
F 8-Mar-18
A
40 Instrument Ash Leaching Bus cable P 8-Mar-18
F 8-Mar-18
A
41 Instrument Ash Leaching UPS P 8-Mar-18
F 8-Mar-18
A
42 Instrument Ash Leaching PLC Cabinet P 8-Mar-18
F 8-Mar-18
A
43 Instrument Ash Leaching MCC P 8-Mar-18
F 8-Mar-18
A
44 Electrical Ash Leaching Motor for Slurry pump P 8-Mar-18
F 8-Mar-18
A
45 Electrical Ash Leaching Motor for Vent fan P 8-Mar-18
F 8-Mar-18
A
46 Electrical Ash Leaching Motor for Black liquor pump P 8-Mar-18
F 8-Mar-18
A
47 Electrical Ash Leaching Motor for Reject Pump P 8-Mar-18
F 8-Mar-18
A
ASH LEACHING MATERIAL DELIVERY SCHEDULE

Estimate Time Arrival


No Description
ETD 1 ETA BEL ETA Site
1 Motor Taiwan 30-May-18 30-Jun-18
2 MCC 28-May-18 31-May-18
3 Power Cable Delivered 19 Mar 18
4 Cable Tray Delivered 20 Mar 18
5 Pipes, fittings & valves Delivered 23 Apr 18
6 Tanks JKT 19-Apr-18 25-Apr-18
7 Pumps Fushan china 30-Jun-18
8 Instrument Cables Delivered 19 Mar 18
9 Junction Box Delivered 12 Apr 18
10 Control Valve Shanghai 7-May-18
11 Manual Valve 1st shipment (Budi jaya makmur sentosa) 15-May-18
12 Manual Valve 2nd shipment (Mitra Wira Pratama) JKT 16-Apr-18 25-Apr-18
13 On/Off Valve Shanghai 7-May-18
14 Field Instruments FOB singapore 5-Jun-18
15 H2S Detector Ready stock in JKT
16 Pipe & Pipe support material 15-May-18
17 Hoist 31-Jul-18
18 Embedded Plates 11-May-18
19 Insulation & Cladding
20 Primary & Secondary support 11-Jun-18
EVAPORATOR UPGRADE PROJECT
PROCUREMENT PLAN FOR TANK MATERIAL Rev.0

This issue : 26-Apr-18


P: Plan, F: Forecast, A: Actual 3 5 1 1 1 1 1 1 3 Last issue :

Bid Closing
Enquiry Document / Award

Area Mgr/
QTY BOQ
% Weightage Contract Awarded to

Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery

Buyer
BOQ Recommendation

Arrive site
Float
S/No

(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential

Unit

Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System

Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
1 UG-FTPL-P082 Annular Plate (A1) 10 thk 8 Pcs 6.00 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr 70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 30-Sep-18 30-Sep-18 0
1500 x 2140 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18
186.3 kg
2 UG-FTPL-P082 Bottom Plate (B1) 10 thk 2 Pcs 0.65 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
635 x 2384 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
87.2 kg
3 UG-FTPL-P082 Bottom Plate (B2) 10 thk 1 Pcs 1.2 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr .70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1500 x 2690 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
310.9 kg
4 UG-FTPL-P082 Back strip 8 thk 8 Pcs 0.1 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
50 x 1403 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
4.4 kg
5 UG-FTPL-P082 Shell Plate (S1/1) 10 thk 1 Pcs 5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1236.4 kg
6 UG-FTPL-P082 Shell Plate (S1/2) 10 thk 1 Pcs 5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1236.4 kg
7 UG-FTPL-P082 Shell Plate (S1/3) 10 thk 1 Pcs 2.5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2500 x 3139 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
616.0 kg
Shell Plate
8 UG-FTPL-P082 (S2/1,S2/2,S3/1,S3/2,S4/1& S4/2) 6 Pcs 17.85 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
6 thk
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
741.8 kg

9 UG-FTPL-P082 Shell Plate (S2/3, S3/3, S4/3) 6 thk 3 Pcs 4.45 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2500 x 3127 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
368.2 kg
10 UG-FTPL-P082 Shell Plate (S5/1) 6 thk 1 Pcs 1.365 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1150 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
341.2 kg
11 UG-FTPL-P082 Shell Plate (S5/2) 6 thk 1 Pcs 1.365 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1150 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
341.2 kg
12 UG-FTPL-P082 Shell Plate (S5/3) 6 thk 1 Pcs 0.675 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1150 x 3127 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
169.4 kg
13 UG-FTPL-P082 Roof Plate (R1) 6 thk 1 Pcs 0.94 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1500 x 4616 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
234.8 kg
14 UG-FTPL-P082 Roof Plate (R2) 6 thk 1 Pcs 1.4 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1500 x 5052 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
348.9 kg
15 UG-FTPL-P082 Roof Plate (R3) 6 thk 1 Pcs 1.235 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1500 x 4980 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
308.1 kg
16 UG-FTPL-P082 Roof Plate (R4) 6 thk 1 Pcs 0.27 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
627 x 3331 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
67.4 kg
Nozzle - N01 Clean condensate
17 UG-FTPL-P082 1 Pcs 7.7 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
inlet 219.1x12.7
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
9405 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
608 kg
18 UG-FTPL-P082 Nozzle - N01 R.F Pad 131x6 thk 1 Pcs 0.086 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg
Nozzle - N02 Pump Suction 323.9
19 UG-FTPL-P082 1 Pcs 0.338 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
x 17.48
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
202 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
26.7 kg

20 UG-FTPL-P082 Nozzle - N02 R.F Pad 180 x 10 thk 1 Pcs 0.106 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
8.37 kg
SORF Flange NB 300 150 #ASME
21 UG-FTPL-P082 1 Pcs 0.469 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
37 kg
22 UG-FTPL-P082 Nozzle - N03 Vent 219.1x12.7 1 Pcs 0.209 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
256 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
16.5 kg
23 UG-FTPL-P082 Nozzle -N03 R.F Pad 131x6 thk 1 Pcs 0.086 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg
180 Elbow NB200;L.R; Sch80;
24 UG-FTPL-P082 1 Pcs 0.771 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
BW; ASMEB16.9
SA 234 WPB F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
60.9

Prepared : MFG Checked : WZT/SP Approved : VAS


Page 129 of 138
EVAPORATOR UPGRADE PROJECT
PROCUREMENT PLAN FOR TANK MATERIAL Rev.0

This issue : 26-Apr-18


P: Plan, F: Forecast, A: Actual 3 5 1 1 1 1 1 1 3 Last issue :

Bid Closing
Enquiry Document / Award

Area Mgr/
QTY BOQ
% Weightage Contract Awarded to

Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery

Buyer
BOQ Recommendation

Arrive site
Float
S/No

(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential

Unit

Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System

Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
Nozzle - N04 Over flow
25 UG-FTPL-P082 1 Pcs 0.114 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
168.3x10.97
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
206 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
9 kg

26 UG-FTPL-P082 Nozzle - N04 R.F Pad 108 x 6 thk 1 Pcs 0.07 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
5.5 kg
27 UG-FTPL-P082 Nozzle - N05 Drain 168.3 x 10.97 1 Pcs 0.432 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
800 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
34.1 kg
28 UG-FTPL-P082 Nozzle - N05 R.F Pad 10 thk 1 Pcs 0.08 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
200 x 400 A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.3 kg
SORF Flange NB150 150# ASME
29 UG-FTPL-P082 1 Pcs 0.109 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
8.6 kg
Nozzle - N06 Stripped
30 UG-FTPL-P082 1 Pcs 2.657 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
Condensate inlet 114.3x8.56
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
9401 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
209.8 kg
31 UG-FTPL-P082 Nozzle - N06 R.F Pad 94x6 Thk 1 Pcs 0.037 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2.9 kg 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
Nozzle - I01 Inspection Hole
32 UG-FTPL-P082 1 Pcs 0.106 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
323.9x6.35
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
168 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
8.4 kg
33 UG-FTPL-P082 R.F Pad 179x6 thk 1 Pcs 0.17 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
13.4 kg
34 UG-FTPL-P082 Flange Plate 8 thk 1 Pcs 0.075 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
O.D.483/I.D.324 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
5.9 kg
35 UG-FTPL-P082 Cover Plate 8 thk 1 Pcs 0.141 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
483 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
11.1 kg
36 UG-FTPL-P082 Gasket 3 thk 1 Pcs 0.003 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
O.D.483/I.D.324 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg

37 UG-FTPL-P082 Nozzle-M01 Man hole Plate 6 thk 1 Pcs 0.189 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
200x1577 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
14.9 kg

38 UG-FTPL-P082 R.F Pad 265.5x10 thk 1 Pcs 0.641 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
50.6 kg

39 UG-FTPL-P082 Flange Plate 10 thk 1 Pcs 0.189 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
O.D.720/I.D.508 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
14.9 kg

40 UG-FTPL-P082 Cover Plate 10 thk 1 Pcs 0.393 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
720 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
31 kg

41 UG-FTPL-P082 Gasket 3 thk 1 Pcs 0.004 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
O.D.720/I.D.508 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.3 kg

Nozzle-L01 Level Indicator


42 UG-FTPL-P082 1 Pcs 0.039 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
88.9x7.62
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
200 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.1 kg

43 UG-FTPL-P082 R.F Pad 80 x 10 thk 1 Pcs 0.042 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.3 kg
SORF Flange NB80 150# ASME
44 UG-FTPL-P082 1 Pcs 0.047 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.7 kg

45 UG-FTPL-P082 Stiffener Plate 10 thk 32 Pcs 2.756 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
295 x 400 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg

46 UG-FTPL-P082 Angle 100x100x6 6 Pcs 0.454 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
650 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
5.98 kg
47 UG-FTPL-P082 Pad 6 thk 6 Pcs 0.053 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
120x120 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

Prepared : MFG Checked : WZT/SP Approved : VAS


Page 130 of 138
EVAPORATOR UPGRADE PROJECT
PROCUREMENT PLAN FOR TANK MATERIAL Rev.0

This issue : 26-Apr-18


P: Plan, F: Forecast, A: Actual 3 5 1 1 1 1 1 1 3 Last issue :

Bid Closing
Enquiry Document / Award

Area Mgr/
QTY BOQ
% Weightage Contract Awarded to

Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery

Buyer
BOQ Recommendation

Arrive site
Float
S/No

(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential

Unit

Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System

Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
0.7 kg
48 UG-FTPL-P082 Handle dia 10 mm 4 Pcs 0.01 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
285 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg
49 UG-FTPL-P082 U-bolt rod 20 3 Pcs 0.068 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
737 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.8 kg

50 UG-FTPL-P082 U-bolt rod 16 3 Pcs 0.027 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
432 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.7 kg

51 UG-FTPL-P082 Wire net 2 mm 1 Pcs 0.003 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
194 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg

52 UG-FTPL-P082 Curb angle 60x60x6 1 Pcs 1.103 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
16123 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
87.1 kg

53 UG-FTPL-P082 Plate 10 thk 1 Pcs 0.022 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
128x168 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.7 kg

54 UG-FTPL-P082 Bolt M24 12 Pcs 0.061 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

ISO 4017 CL 8.8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
55 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.4 kg

55 UG-FTPL-P082 Nut M24 12 Pcs 0.015 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.1 kg

56 UG-FTPL-P082 Washer M24 12 Pcs 0.009 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06

57 UG-FTPL-P082 Bolt M20 28 Pcs 0.071 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

ISO 4017 CL 8.8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
55 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg

58 UG-FTPL-P082 Nut M20 28 Pcs 0.021 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg

59 UG-FTPL-P082 Washer M20 28 Pcs 0.011 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03 kg

60 UG-FTPL-P082 Nut M20 6 Pcs 0.005 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg

61 UG-FTPL-P082 Lock nut M20 6 Pcs 0.005 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg

62 UG-FTPL-P082 Washer M20 6 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03

63 UG-FTPL-P082 Nut M 16 6 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03 kg

64 UG-FTPL-P082 Lock nut M 16 6 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03

65 UG-FTPL-P082 Washer M 16 6 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

F 436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.02

66 UG-FTPL-P082 H-Beam 100x100x6x8 10 Pcs 15.6 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2076 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
34.3 kg

67 UG-FTPL-P082 Cover plate 12 thk 1 Pcs 4.224 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
OD1200/ID428 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
93 kg

68 UG-FTPL-P082 Compression plate 12 thk 1 Pcs 1.023 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
OD710/ID448 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
22.5 kg

69 UG-FTPL-P082 Central drum plate 16 thk 1 Pcs 3.57 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

Prepared : MFG Checked : WZT/SP Approved : VAS


Page 131 of 138
EVAPORATOR UPGRADE PROJECT
PROCUREMENT PLAN FOR TANK MATERIAL Rev.0

This issue : 26-Apr-18


P: Plan, F: Forecast, A: Actual 3 5 1 1 1 1 1 1 3 Last issue :

Bid Closing
Enquiry Document / Award

Area Mgr/
QTY BOQ
% Weightage Contract Awarded to

Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery

Buyer
BOQ Recommendation

Arrive site
Float
S/No

(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential

Unit

Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System

Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
300 x 2086 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
78.6 kg

70 UG-FTPL-P082 Gusset plate 12 thk 10 Pcs 0.681 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
150x150 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.5 kg

71 UG-FTPL-P082 Rib plate 12 thk 10 Pcs 1.272 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
100x300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2.8 kg

72 UG-FTPL-P082 Gusset plate 12 thk 10 Pcs 0.816 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
160x160 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.8 kg

73 UG-FTPL-P082 Pad Plate 12 thk 10 Pcs 1.089 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
170 x 210 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2.4 kg

74 UG-FTPL-P082 Seating Plate 10 thk 10 Pcs 0.816 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
140 x 160 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.8 kg

75 UG-FTPL-P082 H-Beam 100x100x6x8 10 Pcs 0.909 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
120 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2 kg 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

Prepared : MFG Checked : WZT/SP Approved : VAS


Page 132 of 138
EVAPORATOR UPGRADE PROJECT
PROCUREMENT PLAN FOR TANK MATERIAL Rev.0

This issue : 26-Apr-18


P: Plan, F: Forecast, A: Actual 3 5 1 1 1 1 1 1 3 Last issue :

Bid Closing
Enquiry Document / Award

Area Mgr/
QTY BOQ
% Weightage Contract Awarded to

Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery

Buyer
BOQ Recommendation

Arrive site
Float
S/No

(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential

Unit

Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System

Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
1 UG-FTPL-P082 Annular Plate (A1) 10 thk 8 Pcs 6.00 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr 70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1500 x 2140 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18
186.3 kg
2 UG-FTPL-P082 Bottom Plate (B1) 10 thk 2 Pcs 0.65 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
635 x 2384 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
87.2 kg
3 UG-FTPL-P082 Bottom Plate (B2) 10 thk 1 Pcs 1.2 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr .70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1500 x 2690 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
310.9 kg
4 UG-FTPL-P082 Back strip 8 thk 8 Pcs 0.1 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
50 x 1403 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
4.4 kg
5 UG-FTPL-P082 Shell Plate (S1/1) 10 thk 1 Pcs 5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1236.4 kg
6 UG-FTPL-P082 Shell Plate (S1/2) 10 thk 1 Pcs 5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1236.4 kg
7 UG-FTPL-P082 Shell Plate (S1/3) 10 thk 1 Pcs 2.5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2500 x 3139 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
616.0 kg
Shell Plate
8 UG-FTPL-P082 (S2/1,S2/2,S3/1,S3/2,S4/1& S4/2) 6 Pcs 17.85 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
6 thk
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
741.8 kg

9 UG-FTPL-P082 Shell Plate (S2/3, S3/3, S4/3) 6 thk 3 Pcs 4.45 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2500 x 3127 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
368.2 kg
10 UG-FTPL-P082 Shell Plate (S5/1) 6 thk 1 Pcs 1.365 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1150 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
341.2 kg
11 UG-FTPL-P082 Shell Plate (S5/2) 6 thk 1 Pcs 1.365 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1150 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
341.2 kg
12 UG-FTPL-P082 Shell Plate (S5/3) 6 thk 1 Pcs 0.675 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1150 x 3127 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
169.4 kg
13 UG-FTPL-P082 Roof Plate (R1) 6 thk 1 Pcs 0.94 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1500 x 4616 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
234.8 kg
14 UG-FTPL-P082 Roof Plate (R2) 6 thk 1 Pcs 1.4 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1500 x 5052 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
348.9 kg
15 UG-FTPL-P082 Roof Plate (R3) 6 thk 1 Pcs 1.235 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1500 x 4980 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
308.1 kg
16 UG-FTPL-P082 Roof Plate (R4) 6 thk 1 Pcs 0.27 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
627 x 3331 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
67.4 kg
Nozzle - N01 Clean condensate
17 UG-FTPL-P082 1 Pcs 1.609 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
inlet 219.1x12.7
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
9405 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
608 kg

18 UG-FTPL-P082 Nozzle - N01 R.F Pad 131.5x6 thk 1 Pcs 0.036 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg
Nozzle - N02 Pump Suction
19 UG-FTPL-P082 1 Pcs 0.147 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
273x15.09
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
193 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
18.5 kg

20 UG-FTPL-P082 Nozzle - N02 R.F Pad 162 x 10 thk 1 Pcs 0.185 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
17.5 kg
SORF Flange NB 250 150 #ASME
21 UG-FTPL-P082 1 Pcs 0.258 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
19.5 kg
22 UG-FTPL-P082 Nozzle - N03 Vent 219.1x12.7 1 Pcs 0.262 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
256 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
16.5 kg
23 UG-FTPL-P082 Nozzle -N03 R.F Pad 131x6 thk 1 Pcs 0.126 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg
180 Elbow NB200;L.R; Sch80;
24 UG-FTPL-P082 1 Pcs 1.289 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
BW; ASMEB16.9
SA 234 WPB F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

Prepared : LMS/MFG Checked : WZT/SP Approved : VAS


Page 133 of 138
EVAPORATOR UPGRADE PROJECT
PROCUREMENT PLAN FOR TANK MATERIAL Rev.0

This issue : 26-Apr-18


P: Plan, F: Forecast, A: Actual 3 5 1 1 1 1 1 1 3 Last issue :

Bid Closing
Enquiry Document / Award

Area Mgr/
QTY BOQ
% Weightage Contract Awarded to

Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery

Buyer
BOQ Recommendation

Arrive site
Float
S/No

(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential

Unit

Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System

Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
60.9
Nozzle - N04 Over flow
25 UG-FTPL-P082 1 Pcs 0.317 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
219.1x12.7
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
206 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
13.3 kg

26 UG-FTPL-P082 Nozzle - N04 R.F Pad 139 x 6 thk 1 Pcs 0.196 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
7.4 kg
27 UG-FTPL-P082 Nozzle - N05 Drain 219.1x12.7 1 Pcs 1.505 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
800 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
51.7 kg

28 UG-FTPL-P082 Nozzle - N05 R.F Pad 139x10 thk 1 Pcs 0.197 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.2 kg
SORF Flange NB150 150# ASME
29 UG-FTPL-P082 1 Pcs 0.471 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
13.7 kg
30 UG-FTPL-P082 Curb Angle 60x60x6 1 Pcs 3.227 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
16213 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
87.1 kg
31 UG-FTPL-P082 Plate 12 thk 1 Pcs 0.139 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
169 x 219 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.5 kg
Nozzle - I01 Inspection Hole
32 UG-FTPL-P082 1 Pcs 0.356 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
323.9x6.35
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
168 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
8.4 kg
33 UG-FTPL-P082 R.F Pad 179x6 thk 1 Pcs 0.603 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
13.4 kg
34 UG-FTPL-P082 Flange Plate 8 thk 1 Pcs 0.281 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
O.D.483/I.D.324 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
5.9 kg
35 UG-FTPL-P082 Cover Plate 8 thk 1 Pcs 0.558 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
483 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
11.1 kg
36 UG-FTPL-P082 Gasket 3 thk 1 Pcs 0.011 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
O.D.483/I.D.324 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg

37 UG-FTPL-P082 Nozzle-M01 Man hole Plate 6 thk 1 Pcs 0.828 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
200x1577 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
14.9 kg

38 UG-FTPL-P082 R.F Pad 265.5x10 thk 1 Pcs 3.057 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
52.5 kg

39 UG-FTPL-P082 Flange Plate 10 thk 1 Pcs 0.907 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
O.D.720/I.D.508 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
14.9 kg

40 UG-FTPL-P082 Cover Plate 10 thk 1 Pcs 1.969 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
720 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
31 kg

41 UG-FTPL-P082 Gasket 3 thk 1 Pcs 0.02 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
O.D.720/I.D.508 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.3 kg

Nozzle-L01 Level Indicator


42 UG-FTPL-P082 1 Pcs 0.213 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
88.9x7.62
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
200 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.1 kg

43 UG-FTPL-P082 R.F Pad 86.5x 10 thk 1 Pcs 0.272 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.8 kg
SORF Flange NB80 150# ASME
44 UG-FTPL-P082 1 Pcs 0.274 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.7 kg

45 UG-FTPL-P082 Stiffener Plate 10 thk 32 Pcs 0.576 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
295 x 400 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg

46 UG-FTPL-P082 Angle 100x100x6 3 Pcs 0.048 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
650 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6 kg

Prepared : LMS/MFG Checked : WZT/SP Approved : VAS


Page 134 of 138
EVAPORATOR UPGRADE PROJECT
PROCUREMENT PLAN FOR TANK MATERIAL Rev.0

This issue : 26-Apr-18


P: Plan, F: Forecast, A: Actual 3 5 1 1 1 1 1 1 3 Last issue :

Bid Closing
Enquiry Document / Award

Area Mgr/
QTY BOQ
% Weightage Contract Awarded to

Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery

Buyer
BOQ Recommendation

Arrive site
Float
S/No

(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential

Unit

Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System

Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
47 UG-FTPL-P082 Pad 6 thk 3 Pcs 0.006 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
120x120 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.7 kg
48 UG-FTPL-P082 Handle dia 10 mm 4 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
285 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg
49 UG-FTPL-P082 U-bolt rod 20 3 Pcs 0.014 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
737 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.8 kg

50 UG-FTPL-P082 Wire net 2 mm 1 Pcs 0.001 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
194 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg

51 UG-FTPL-P082 Nut M20 6 Pcs 0.001 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8.0 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg

52 UG-FTPL-P082 Lock Nut M20 6 Pcs 0.001 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

ISO 4032 CL 8.0 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg

53 UG-FTPL-P082 Washer M20 6 Pcs 0.0005 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03 kg

54 UG-FTPL-P082 Bolt M24 12 Pcs 0.013 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

ISO 4017 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
55 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.4 kg

55 UG-FTPL-P082 Nut M24 12 Pcs 0.003 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.1 kg

56 UG-FTPL-P082 Washer M24 12 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06

57 UG-FTPL-P082 Bolt M20 28 Pcs 0.015 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4017 CL 8.8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
55 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg

58 UG-FTPL-P082 Nut M20 28 Pcs 0.004 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg

59 UG-FTPL-P082 Washer M20 28 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03 kg

60 UG-FTPL-P082 H-Beam 100x100x6x8 10 Pcs 15.6 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2076 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
34.3 kg

61 UG-FTPL-P082 Cover plate 12 thk 1 Pcs 4.224 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
OD1200/ID428 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
93 kg

62 UG-FTPL-P082 Compression plate 12 thk 1 Pcs 1.023 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
OD710/ID448 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
22.5 kg

63 UG-FTPL-P082 Central drum plate 16 thk 1 Pcs 3.57 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
300 x 2086 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
78.6 kg

64 UG-FTPL-P082 Gusset plate 12 thk 10 Pcs 0.681 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
150x150 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.5 kg

65 UG-FTPL-P082 Rib plate 12 thk 10 Pcs 1.272 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
100x300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2.8 kg

66 UG-FTPL-P082 Gusset plate 12 thk 10 Pcs 0.816 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
160x160 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.8 kg

67 UG-FTPL-P082 Pad Plate 12 thk 10 Pcs 1.089 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
170 x 210 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2.4 kg

68 UG-FTPL-P082 Seating Plate 10 thk 10 Pcs 0.816 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5

SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
140 x 160 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0

Prepared : LMS/MFG Checked : WZT/SP Approved : VAS


Page 135 of 138
EVAPORATOR UPGRADE PROJECT
PROCUREMENT PLAN FOR TANK MATERIAL Rev.0

This issue : 26-Apr-18


P: Plan, F: Forecast, A: Actual 3 5 1 1 1 1 1 1 3 Last issue :

Bid Closing
Enquiry Document / Award

Area Mgr/
QTY BOQ
% Weightage Contract Awarded to

Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery

Buyer
BOQ Recommendation

Arrive site
Float
S/No

(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential

Unit

Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System

Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
1.8 kg

69 UG-FTPL-P082 H-Beam 100x100x6x8 10 Pcs 0.909 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
120 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2 kg

Prepared : LMS/MFG Checked : WZT/SP Approved : VAS


Page 136 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - MECHANICAL ITEMS Rev: 0
5.00 3.00 14.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 This issue : 7-Feb-18
P: Plan, F: Forecast, A: Actual P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Bid Closing

Shipment
Standard
QTY BOQ
% Weightage (based on Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Area Mgr/
Priority

Engineer

Status
Buyer
S/No

Issue Call Required

Float
Contract /

Unit
Enquiry No PR No Description Material Cost and Servise PR In system Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Lead on Site PO No.
Contract cost) Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
Deform Bar (P0174); Deform Bar,
1 1 Carbon Steel, U39, Diameter: 13 212 P 20-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 28-Oct-18 30-Oct-18 2
mm, Length: 12 m, Weight: 12.51 kg

1 F 20-Sep-18
1 A 20-Sep-18
1
Deform Bar (P0174); Deform Bar,
2 2 Carbon Steel, U39, Diameter: 16 314 P 20-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 ### 28-Oct-18 30-Oct-18 2 30-Dec-99
mm, Length: 12 m, Weight: 18.95 kg 30-Dec-99 30-Dec-99

2 F 20-Sep-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99


2 A 20-Sep-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99
2
P1218_ON-
CPPU0006-0 Deform Bar (P0174); Deform Bar,
(Supply Deformed
3 3 Bar for TPLUG)
Carbon Steel, U39, Diameter: 19 263 P 20-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 ### 28-Oct-18 30-Oct-18 2 30-Dec-99
mm, Length: 12 m, Weight: 26.72 kg 30-Dec-99 30-Dec-99

3 F 20-Sep-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99


3 A 20-Sep-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99
3
Project01:
Deform Bar (P0174); Deform Bar, not yet given
4 4 Carbon Steel, U39, Diameter: 25 78 P 20-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 ### 28-Oct-18 30-Oct-18 2 30-Dec-99
mm, Length: 12 m, Weight: 46.26 kg 30-Dec-99 30-Dec-99

4 F 20-Sep-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99


4 A 20-Sep-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99
4 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0
Deform Bar (P0174); Deform Bar,
5 5 Carbon Steel, U39, Diameter: 10 14 P 20-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 ### 28-Oct-18 30-Oct-18 2
mm, Length: 12 m
5 F 20-Sep-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0
5 A 20-Sep-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0
5
6 6 P
6 F
6 A y
6 u
7 7 P d
7 F i
7 A a
7 r
8 8 P i
8 F a
8 A n
8 t
o
9 9 P :
P
9 F r
9 A e
9 v
10 10 P i
10 o
10 F u
### s
11 11 P l
11 F y
3
11 A 0
11
-
12 12 P A
u
12 F g
-
12 A
1
12
6
13 13 P

13 F
13 A
13
14 14 P
14 F
14 A
14
15 15 P
15 F
15 A
15
16 16 P

16 F
16 A
16
17 17 P

17 F
17 A
17
18 18 P

18 F
18 A
18
19 19 P
19 F
19 A
19
20 20 P
20 F
20 A
20
21 21 P
21 F
21 A
21
22 22 P
22 F
22 A
22
23 25 P
25 F

25 A
25

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 137 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - MECHANICAL ITEMS Rev: 0
5.00 3.00 14.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 1.00 1.00 1.00 1.00 This issue : 7-Feb-18
P: Plan, F: Forecast, A: Actual P: Plan, F: Forecast, A: Actual Last issue : None

Arrive site
Bid Closing

Shipment
Standard
QTY BOQ
% Weightage (based on Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to

Area Mgr/
Priority

Engineer

Status
Buyer
S/No

Issue Call Required

Float
Contract /

Unit
Enquiry No PR No Description Material Cost and Servise PR In system Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Lead on Site PO No.
Contract cost) Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
24 26 P
26 F
26 A
26
25 27 P
27 F
27 A
27
26 28 P
28 F
28 A
28
27 29 P
29 F
29 A
29
28 30 P
30 F
30 A
30
29 31 P

31 F
31 A
31
30 32 P
32 F
32 A
32
31 33 P
33 F
33 A
33
32 34 P
34 F
34 A
34
25 35 P
35 F
35 A
35
26 35 P
35 F
35 A
35
27 35 P
35 F
35 A
35
28 35
35
35
35
29 35
35
35
35
30 35
35
35
35
31 35
35
35
35
32 35
35
35
35
33 35
35
35
35

Prepared by : Checked by : Approved by :


Area Coordinator Scheduler PM / PD
Page 138 of 138