Prepared : YA Checked by : AAA Approved : MCB/PVK
as of 9-Jan-2017 Last Issued : None
S/N Discipline Area Description Eqnquiry released PO Aging Days TES Released
date
4.12 Mech. CS2 FURNACE PACKAGE 10/Nov/16 1,008
4.13 Mech. Viscose Steam Jet Ejectors - 4 sets 11/Nov/16 1,007
4.14 Mech. BOP Chiller 19/Nov/16 999
4.15 Mech. BOP Cooling Tower 19/Nov/16 999
4.16 Mech. WSA Combustor Refractory,BMS,Burner & Valve Train 22/Nov/16 996
along with bricklining supervision
Cooling air blower with inlet filter & silencer, Hot
4.17 Mech. WSA Air Blower, Clean Gas Blower 26/Nov/16 992
4.18 Mech. Viscose Back Wash Filters - 4nos 30/Nov/16 988
4.19 Mech. Spinning & Spinbath FRP Tanks for Spinning, Spinbath 30/Nov/16 988
4.20 Mech. Viscose Metal Detectors 30/Nov/16 988
4.21 Mech. Fiber Plant Agitator for Viscose, Spinning, Spinbath 6/Dec/16 982
4.22 Mech. Viscose Magnetic traps - 28 nos 8/Dec/16 980
4.23 Mech. Fiber Plant Separator for Viscose, Spinning, Spinbath 8/Dec/16 980
4.24 Mech. WSA Acid Cooler 13/Dec/16 975
Heat Exchangers and Plate Heat Exchanger for
4.25 Mech. Fiber Plant 16/Dec/16 972
Viscose, Spinning, Spinbath
4.26 Mech. CS2 SULFUR CONDENSER 22/Dec/16 966
4.27 Mech. Spinning Steam Injector 23/Dec/16 965
4.28 Mech. CS2 FLARE STACK (STEAM JACKETED) 23/Dec/16 965
4.29 Mech. Viscose & Spinbath Blowers & Fans for Viscose, Spinbath 26/Dec/16 962
4.30 Mech. Viscose Air Cooler - 4 nos 28/Dec/16 960
4.31 Mech. WSA Boiler 30/Dec/16 958
4.32 Mech. WSA NAOH Scrubber Vessel & Quench Vessel 31/Dec/16 957
5 Electrical
5.1 N/A
6 Instrument
6.1 N/A
7 Civil 959
7.1 CIVIL CS2 Recovery Cement - Release orders 29/Dec/16 959
7.2 CIVIL Spinbath Roof Material 30/Dec/16 958
8 Automation 988
Page 2 of 138
Prepared : YA Checked by : AAA Approved : MCB/PVK
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
EVAPORATOR
8 UG-FTPL-P097 MECHANICAL Chop & Blind pipe (Tank 451-T-022) P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE
DN 80 1 lot, DN 100 2 lot, DN 150 1 lot, DN
F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
200 2 lot, DN 100 2 lot
SS A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 3 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
EVAPORATOR
9 UG-FTPL-P097 MECHANICAL Chop & Blind pipe (Tank 451-T-026) P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE
DN 100 2 lot F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
SS A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
DN 400 x 5000 mm length, elevation 8 m, SS F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
EVAPORATOR
11 UG-FTPL-P097 MECHANICAL Remove pipe from WBL tank P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE
DN 400 x 9000 mm length, elevation 10 m,
F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
SS
A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
EVAPORATOR Install blind flange c/w bolt & nut for WBL tank
12 UG-FTPL-P097 MECHANICAL P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE (ANSI #150)
DN 400, elevation 10 m, SS, Material by
F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
contractor
A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
EVAPORATOR
13 UG-FTPL-P097 MECHANICAL Remove soap pipe from IBL tank P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE
DN 350 x 3500 mm length, elevation 10 m F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
CS A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
EVAPORATOR Install blind flange c/w bolt & nut for IBL
14 UG-FTPL-P097 MECHANICAL P 24-May-18 29-May-18 1-Jun-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18
UPGRADE nozzle (ANSI #150)
DN 350, elevation 10 m, CS, Material by
F 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
contractor
A 24-May-18 29-May-18 1-Jun-18 30-Jun-18 1-Jul-18 4-Jul-18 5-Jul-18
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
EVAPORATOR
20 UG-FTPL-P100 MECHANICAL Insulation and cladding for Effect 1E P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Area 222 m2, Insulation thk 100 mm, 2.442T,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
cladding 244.2 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
EVAPORATOR
21 UG-FTPL-P100 MECHANICAL Insulation and cladding for LPH3 P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Area 44 m2, Insulation thk 60 mm, 290.4 kg,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
cladding 48.4 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
EVAPORATOR
22 UG-FTPL-P100 MECHANICAL Insulation and cladding for LPH4 P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Area 48 m2, Insulation thk 100 mm, 316.8kg,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
cladding 52.8 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
EVAPORATOR
23 UG-FTPL-P100 MECHANICAL Insulation and cladding for LSCF P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Area 8 m2, Insulation thk 60 mm, 52.8kg,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
cladding 8.8 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
EVAPORATOR
27 UG-FTPL-P100 MECHANICAL Insulation and cladding for Pipe/Tube - NB 50 P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Dia: 0.0603m, length: 54m, area to be
insulated:11.76 m2, Insulation thk: 60 mm,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Mean dia of insulation: 0.1203 m, rockwool
154.9 kgs, SS cladding thk 0.4 mm: 35.2 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
EVAPORATOR
28 UG-FTPL-P100 MECHANICAL Insulation and cladding for Pipe/Tube - NB 80 P 4-Jun-18 9-Jun-18 12-Jun-18 15-Jun-18 16-Jun-18 19-Jun-18 20-Jun-18
UPGRADE
Dia: 0.0889m, length: 106m, area to be
insulated: 34.04 m2, Insulation thk: 60 mm,
F 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Mean dia of insulation: 0.1489 m, rockwool
376.3 kgs, SS cladding thk 0.4 mm: 80 m2
A 4-Jun-18 9-Jun-18 12-Jun-18 22-Jan-19 23-Jan-19 26-Jan-19 14-Feb-19
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
EVAPORATOR
37 UG-FTPL-P115 MECHANICAL Removing existing primary air register P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
EVAPORATOR
38 UG-FTPL-P115 MECHANICAL Modification existing primary air port register P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
Cut and make a new holes (80 x 230 mm) on
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
the existing from plate
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
EVAPORATOR
39 UG-FTPL-P115 MECHANICAL Modification existing primary air port register P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
Fabrication & installation of frame F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
EVAPORATOR
40 UG-FTPL-P115 MECHANICAL Modification existing primary air port register P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
Fabrication at workshop & install swivel plate F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
EVAPORATOR
42 UG-FTPL-P115 MECHANICAL Install new port rodder system P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
EVAPORATOR
44 UG-FTPL-P115 MECHANICAL Install new support stand control box P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
A 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
EVAPORATOR
45 UG-FTPL-P115 MECHANICAL Finishing CS only (primary coat) 125 micron P 15-Jul-18 17-Jul-18 20-Jul-18 23-Jul-18 24-Jul-18 27-Jul-18 28-Jul-18
RETROFIT
F 15-Jul-18 17-Jul-18 18-Jul-18 29-Nov-18 30-Nov-18 3-Dec-18 4-Dec-18
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 9 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
EVAPORATOR
46 UG-FTPL-P134 CIVIL Soil excavations 196.96 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
EVAPORATOR
47 UG-FTPL-P134 CIVIL Chipping concrete 130 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
EVAPORATOR
48 UG-FTPL-P134 CIVIL Back fill 27 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
EVAPORATOR
49 UG-FTPL-P134 CIVIL Sands 53.14 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
EVAPORATOR
50 UG-FTPL-P134 CIVIL Lean concrete 20.33 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
EVAPORATOR
51 UG-FTPL-P134 CIVIL Concrete K225 110.1 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
EVAPORATOR
52 UG-FTPL-P134 CIVIL Concrete K300 127.25 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
EVAPORATOR
53 UG-FTPL-P134 CIVIL Reinforcement rebar 18370 kg P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
EVAPORATOR
54 UG-FTPL-P134 CIVIL Formwork 190.9 m2 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
EVAPORATOR
56 UG-FTPL-P134 CIVIL Provide and fixing pocket for shear key 27 set P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
EVAPORATOR
57 UG-FTPL-P134 CIVIL Grouting 9.38 m3 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
EVAPORATOR
58 UG-FTPL-P134 CIVIL Brick masonry 25 m2 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
EVAPORATOR
59 UG-FTPL-P134 CIVIL Plastering 50 m2 P 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
UPGRADE
F 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
A 10-Aug-18 11-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 21-Aug-18 22-Aug-18
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
69 UG-FTPL-P147 MECHANICAL Stripper condenser Install new module complete with accessoris P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
71 UG-FTPL-P147 MECHANICAL Stripper condenser Inspection & testing P 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
F 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
A 2-Sep-18 5-Sep-18 8-Sep-18 6-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
74 UG-FTPL-P159 PIPING EVAP Upgrade Piping works (Pre-fabrication st site) P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE A F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
75 UG-FTPL-P159 PIPING EVAP Upgrade Pipe support works P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE A Install primary pipe support F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
Fabrication & Install secondary pipe support A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
77 UG-FTPL-P159 PIPING EVAP Upgrade Painting pipe works P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
Sandblasting / wire brush, primary coat,
PACKAGE A F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
secondary coat, finish coat
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
82 UG-FTPL-P159 PIPING EVAP Upgrade Effects / Equipments blanking details 1 P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
452-B-012, 452-B-013, 452-B-014, 452-B-
PACKAGE B F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
016, 452-B-022, 452-B-023, 452-B-024
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
83 UG-FTPL-P159 PIPING EVAP Upgrade Effects / Equipment blanking details - 2 P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
452-B-001, 452-B-002, 452-B-003, 452-B-
PACKAGE B 007, 452-B-008, 452-B-009, 452-B-017, 452- F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
B-018, 452-B-019
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
84 UG-FTPL-P159 PIPING EVAP Upgrade Modification nozzle N5 - Liquor inlet - effect 4 P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE B F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 14 of 138
EVAPORATOR UPGRADE PROJECT PROCURE
5.00 3.00 3.00 1.00 3.00 1.00
P: Plan, F: Forecast, A: Actual
Bid Closing
Enquiry No
QTY BOQ
Standard
Enquiry Document / BOQ Technical Clarification TES
S/No
Issue Call
Unit
Discipline Area Description
For Tender
85 UG-FTPL-P159 PIPING EVAP Upgrade Supply & Install vortex breaker - effect 5 P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE B F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
90 UG-FTPL-P159 PIPING EVAP Upgrade Fabrication water seal tank P 2-Sep-18 5-Sep-18 8-Sep-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18
PACKAGE C F 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
A 25-Oct-18 29-Oct-18 30-Oct-18 5-Jan-19 6-Jan-19 9-Jan-19 4-Feb-19
91 UG-FTPL-P179 EIA EVAP Upgrade EIA Installation work P 15-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 27-Dec-18 30-Dec-18 31-Dec-18
F 11-Jan-19 16-Jan-19 19-Jan-19 22-Jan-19 23-Jan-19 26-Jan-19 4-Feb-19
A 11-Jan-19 16-Jan-19 19-Jan-19 22-Jan-19 23-Jan-19 26-Jan-19 4-Feb-19
1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 12-Jun-18 11-Jun-18 12-Jun-18 14-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 97 2-Jan-19 2-Jan-19
29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 15-Sep-18 14-Sep-18 15-Sep-18 17-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 97 2-Jan-19 2-Jan-19
29-Jul-18 30-Jul-18 4-Sep-18 5-Sep-18 5-Sep-18 5-Sep-18 6-Sep-18 6-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 97 2-Jan-19 2-Jan-19
1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 12-Jun-18 11-Jun-18 12-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 97 2-Jan-19 2-Jan-19
29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 15-Sep-18 14-Sep-18 15-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 97 2-Jan-19 2-Jan-19
29-Jul-18 30-Jul-18 4-Sep-18 5-Sep-18 5-Sep-18 5-Sep-18 6-Sep-18 6-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 8-Sep-18 97 2-Jan-19 2-Jan-19
13-Jun-18 14-Jun-18 17-Jun-18 18-Jun-18 21-Jun-18 24-Jun-18 23-Jun-18 24-Jun-18 26-Jun-18 25-Jun-18 26-Jun-18 27-Jun-18 28-Jun-18 120 15-Jan-19 15-Jan-19
29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 15-Sep-18 14-Sep-18 15-Sep-18 17-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 134 31-Jan-19 31-Jan-19
29-Jul-18 30-Jul-18 4-Sep-18 5-Sep-18 8-Sep-18 11-Sep-18 11-Sep-18 11-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 140 31-Jan-19 31-Jan-19
Arrived by
13-Jun-18 14-Jun-18 17-Jun-18 18-Jun-18 21-Jun-18 24-Jun-18 23-Jun-18 24-Jun-18 26-Jun-18 23-Jun-18 24-Jun-18 25-Jun-18 26-Jun-18 20-Sep-18
Valmet
Arrived by
29-Jul-18 30-Jul-18 8-Sep-18 25-Feb-37 18-Aug-55 10-Feb-74 14-Sep-18 15-Sep-18 17-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 20-Sep-18
Valmet
Arrived by
29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 13-Sep-18 11-Sep-18 11-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 20-Sep-18
Valmet
13-Jun-18 14-Jun-18 17-Jun-18 18-Jun-18 21-Jun-18 24-Jun-18 23-Jun-18 24-Jun-18 26-Jun-18 23-Jun-18 24-Jun-18 25-Jun-18 26-Jun-18 98 25-Dec-18 26-Dec-18
29-Jul-18 30-Jul-18 8-Sep-18 25-Feb-37 18-Aug-55 10-Feb-74 14-Sep-18 15-Sep-18 17-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 142 2-Feb-19 2-Feb-19
29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 13-Sep-18 11-Sep-18 11-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 13-Sep-18 137 28-Jan-19 2-Feb-19
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 23-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 15-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 15-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 16 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 24-Jun-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 19-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 20-Oct-18 12 30-Oct-18 1-Nov-18
8-Jul-18 9-Jul-18 12-Jul-18 13-Jul-18 12-Oct-18 13-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12 30-Oct-18 1-Nov-18
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 39 1-Apr-19 1-Apr-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
17-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 39 1-Apr-19 1-Apr-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
17-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
29-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
29-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
29-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
28-Jul-37 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19
23-Jun-18 24-Jun-18 27-Jun-18 28-Jun-18 1-Jul-18 4-Jul-18 8-Jul-18 11-Jul-18 13-Jul-18 14-Jul-18 15-Jul-18 16-Jul-18 17-Jul-18 44 6-Apr-19 15-Apr-19
17-Feb-19 14-Feb-19 14-Feb-19 15-Feb-19 18-Feb-19 18-Feb-19 21-Feb-19 18-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 21-Feb-19 100 1-Jun-19 1-Jun-19
31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 13-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 0
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19
31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 14-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 0 30-Dec-99 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 15-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 0 30-Dec-99 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 16-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 0 30-Dec-99 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 17-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99
31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 20-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99
31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 21-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 0 30-Dec-99 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 0 0 22-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99
31-Jul-18 1-Aug-18 4-Aug-18 5-Aug-18 8-Aug-18 11-Aug-18 13-Aug-18 14-Aug-18 17-Aug-18 18-Aug-18 19-Aug-18 20-Aug-18 21-Aug-18 23-May-19
5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 5-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 22 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99
25-Aug-18 26-Aug-18 29-Aug-18 30-Aug-18 2-Sep-18 5-Sep-18 4-Sep-18 5-Sep-18 6-Sep-18 7-Sep-18 12-Sep-18 12-Sep-18 13-Sep-18 27 30-Dec-99 15-Oct-18
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 23-Sep-18 23-Sep-18 24-Sep-18 0 30-Dec-99 30-Dec-99
5-Sep-18 6-Sep-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 11-May-19
17-Dec-18 18-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 26-Dec-18 30-Dec-18 2-Jan-19 5-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 9-Jan-19 30-Dec-99 30-Dec-99
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 15-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 15-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 15-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 15-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 30-Mar-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 30-Mar-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 30-Mar-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 27 of 138
ROCUREMENT PLAN - SERVICE CONTRACT
3.00 1.00 3.00 1.00 3.00 3.00 4.00 3.00 2.00 1.00 1.00 1.00 1.00
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 10-May-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 3-Jan-19 7-Jan-19 10-Jan-19 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 27-Dec-18 8-Apr-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19
3-Jan-19 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 14-Jan-19 18-Jan-19 21-Jan-19 23-Jan-19 24-Jan-19 25-Jan-19 26-Jan-19 27-Jan-19 30-Dec-99 15-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 30-Dec-99 15-Feb-19
7-Feb-19 8-Feb-19 8-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 9-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 0 30-Dec-99 15-Feb-19
0
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
0
PT Juhdi Sakti Ladder & handrail
0 Engineering 48-74078
installation pending
0
0
0
PT Juhdi Sakti
0 Engineering Installed 48-74078
0
0
PT Juhdi Sakti
Engineering Installed 48-74078
0
1
PT Juhdi Sakti Done for Spiral heat
0 Engineering exchager 1 & 2, stripper 48-74078
condensate pump 1 & 2
5
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 29 of 138
Rev.0
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
JOB DONE 48-74705
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
2
PT Juhdi Sakti
2 Engineering JOB DONE 48-74705
2
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 31 of 138
Rev.0
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
9
PT Ayam Mas
Yet To start 48-76501
Putra Mandiri
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 33 of 138
Rev.0
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
30-Dec-99
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
0
0
9
PT Ayam Mas
Yet To start 48-76501
0 Putra Mandiri
Awarded to
Float
(Vendor/ Remarks PO Number
PT AyamContr.)
Supplier/ Mas
Yet To start 48-76501
Putra Mandiri
0
0
124
PT Judhi Sakti
ASD JOB 48-75386
Engineering
0
124
PT Judhi Sakti
ASD JOB 48-75386
Engineering
0
124
PT Judhi Sakti
ASD JOB 48-75386
Engineering
0
124
PT Judhi Sakti
ASD JOB 48-75386
Engineering
0
124
PT Judhi Sakti
ASD JOB 48-75386
0 Engineering
124
PT Judhi Sakti
ASD JOB 48-75386
0 Engineering
124
PT Judhi Sakti
ASD JOB 48-75386
Engineering
0
124
PT Judhi Sakti
ASD JOB 48-75386
0 Engineering
124
PT Judhi Sakti
ASD JOB 48-75386
Engineering
Prepared by : Checked by : Approved by :
LMS WZT/SP/NCH VAS
Page 35 of 138
Rev.0
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
PT Judhi Sakti
ASD JOB 48-75386
Engineering
PT Multi
Adverindo JOB ONGOING 48-73790
PT Multi
Adverindo JOB ONGOING 48-73790
PT Multi
Adverindo JOB ONGOING 48-73790
PT Multi
Adverindo JOB ONGOING 48-73790
PT Multi
Adverindo JOB ONGOING 48-73790
PT Multi
Adverindo JOB ONGOING 48-73790
PT Multi
Adverindo JOB ONGOING 48-73790
PT Multi
Adverindo JOB ONGOING 48-73790
PT Multi
Adverindo JOB ONGOING 48-73790
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
PT Multi
Adverindo JOB ONGOING 48-73790
PT Multi
Adverindo JOB ONGOING 48-73790
PT Multi
Adverindo JOB ONGOING 48-73790
PT Multi
Adverindo JOB ONGOING 48-73790
0
0
43388
PT Multi
0 Adverindo YET TO START 48-73790
0
0
122
PT Ayam Mas
ASD JOB 48-75425
Putra Mandiri
122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0
122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0
122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0
122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0
122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0
122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0
122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0
122
PT Ayam Mas
0 ASD JOB 48-75425
Putra Mandiri
0
122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0
122
PT Ayam Mas
0 ASD JOB 48-75425
Putra Mandiri
0
122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
0
122
PT Ayam Mas
ASD JOB 48-75425
0 Putra Mandiri
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
PT Ayam Mas
ASD JOB 48-75425
Putra Mandiri
0
45 JOB ONGOING
PT Nusareka
5 (progress as on 48-76479
Prima Engineering
5 04.04.19 : 50%)
45
PT Nusareka
Job Ongoing 48-76479
Prima Engineering
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
99
PT Nusareka
Yet to start 48-76479
Prima Engineering
93
PT Nusareka
Job Ongoing 48-76479
Prima Engineering
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
Awarded to
Float
(Vendor/ Remarks PO Number
Supplier/ Contr.)
48-76479
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
134
PT Nusareka
ASD JOB 48-76479
Prima Engineering
102
PT Nusareka
Yet to start 48-76479
Prima Engineering
19
0 Purindo Job ongoing 48-76204
0
Arrive site
Bid Closing
Shipment
Standard
STATUS
QTY BOQ
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
Clean (A) Condensate Tank (451-T-
1 UG-FTPL-P087 1 Unit P 13-May-18 18-May-18 21-May-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18 12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 25-Jun-18 25-Jun-18 25-Jun-18 25-Jun-18 87 2-Jan-19 3-Jan-19 1
022)
PT Judhi Sakti Water filling ongoing. PO:
Vol 200 m3 F 13-May-18 18-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 88 2-Jan-19 3-Jan-19 1 Engineering Insulation to start 48-74078
Dimension 5 m x 11.15 m ht. Wt:
A 13-May-18 18-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 89 2-Jan-19 3-Jan-19 1
14.4867T. SA 516 Gr.70
0
Intermediate (B) Condensate Tank
2 UG-FTPL-P087 1 Unit P 13-May-18 18-May-18 21-May-18 4-Jun-18 5-Jun-18 8-Jun-18 9-Jun-18 12-Jun-18 13-Jun-18 16-Jun-18 17-Jun-18 20-Jun-18 21-Jun-18 22-Jun-18 23-Jun-18 24-Jun-18 25-Jun-18 25-Jun-18 25-Jun-18 26-Jun-18 87 2-Jan-19 3-Jan-19 1
(451-T-022)
PT Judhi Sakti Water filling ongoing. PO:
Vol 200 m3 F 13-May-18 18-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 9-Sep-18 25-Feb-37 17-Aug-55 6-Feb-74 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 19-Sep-18 105 2-Jan-19 3-Jan-19 1
Engineering Insulation to start 48-74078
Dimension 5 m x 11.15 m ht. Wt:
A 13-May-18 18-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 9-Sep-18 10-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 2-Jan-19 3-Jan-19 1
14.4867T. SA 516 Gr.70
0
Effect 1E Circulation Pump (452-P-
3 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 15-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 6-Apr-19 50
002) PO:
Andritz China Arrived
Centrifugal Pump, Material SS 304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 88 15-Feb-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 88 15-Feb-19
0
4 UG-FTPL-P080 WBL Feed Pump #1 (452-P-008) 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 9-Apr-19 53
PO:
Andritz China Arrived
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19
0
WBL Feed Pump #2 Pump (452-P-
5 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 25-Jun-19 130
009) PO:
Andritz China Installation after ASD
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19
0
A Condensate transfer pump tank
6 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 31-Mar-19 44
farm from storage tank (452-P-015) PO:
Andritz China Installed
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 31-Mar-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19 31-Mar-19
0
B Condensate transfer pump tank
7 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 31-Mar-19 44
farm (452-P-016) PO:
Andritz China Installed
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 31-Mar-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19 31-Mar-19
0
Stripped condensate pump #1 (452-
8 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 22-Jan-19 30-Jan-19 8
P-018) PO:
Andritz China Installed
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 22-Jan-19 30-Jan-19 8 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 22-Jan-19 30-Jan-19 8
0
Stripped condensate pump #2 (452-
9 UG-FTPL-P080 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 22-Jan-19 30-Jan-19 8
P-019) PO:
Andritz China Installed
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 22-Jan-19 31-Jan-19 9 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 22-Jan-19 1-Feb-19 10
0
10 UG-FTPL-P080 HBL Transfer pump (452-P-001) 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 31-Mar-19 44
PO:
Andritz China Installed
Centrifugal Pump, Material Duplex F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 31-Mar-19 48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19 31-Mar-19
0
11 UG-FTPL-P080 Effect 5 pump (452-P-004) 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 6-Apr-19 50
PO:
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 Andritz China Arrived
48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19
0
12 UG-FTPL-P080 HBL Pump 1 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 9-Apr-19 53
PO:
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 Andritz China Arrived
48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19
0
13 UG-FTPL-P080 HBL Pump 2 1 Unit P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 88 15-Feb-19 25-Jun-19 130
PO:
Centrifugal Pump, Material SS304 F 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 10-Aug-18 89 15-Feb-19 Andritz China Installation after ASD
48-72941
A 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 14-Sep-18 15-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 90 15-Feb-19
0
Foundation bolts & templates (Type-
14 UG-FTPL-P093 1 lot P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 16-Jul-18 16-Jul-18 30 31-Oct-18 7-Dec-18 37
1) PT Doksa Multiline PO:
SA36 F 25-May-18 30-May-18 2-Jun-18 10-Sep-18 11-Sep-18 14-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 25-Sep-18 27-Sep-18 1-Oct-18 2-Oct-18 26-Sep-18 26-Sep-18 26-Sep-18 35 31-Oct-18 7-Dec-18 37 Engineering Arrived 48-73848
129.6 kg A 25-May-18 30-May-18 2-Jun-18 10-Sep-18 11-Sep-18 14-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 1-Oct-18 1-Oct-18 1-Oct-18 1-Oct-18 30 31-Oct-18 7-Dec-18 37
0
Foundation bolts & templates (Type-
15 UG-FTPL-P093 1 lot P 25-May-18 30-May-18 2-Jun-18 17-Jun-18 18-Jun-18 29-Jun-18 30-Jun-18 3-Jul-18 4-Jul-18 7-Jul-18 8-Jul-18 11-Jul-18 12-Jul-18 12-Jul-18 15-Jul-18 16-Jul-18 15-Jul-18 16-Jul-18 16-Jul-18 16-Jul-18 30 31-Oct-18 7-Dec-18 37
2) PT Doksa Multiline PO:
SA36 F 25-May-18 30-May-18 2-Jun-18 10-Sep-18 14-Feb-37 25-Jul-55 2-Jan-74 14-Jun-92 28-Nov-10 15-May-29 31-Oct-47 21-Apr-66 27-Sep-18 22-Sep-18 22-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 26-Sep-18 27-Sep-18 35 31-Oct-18 7-Dec-18 37 Engineering Arrived 48-73848
116.56 kg A 25-May-18 30-May-18 2-Jun-18 10-Sep-18 11-Sep-18 14-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 1-Oct-18 1-Oct-18 1-Oct-18 1-Oct-18 30 31-Oct-18 7-Dec-18 37
0
Part list Hot insulation (Dec-100 kg/m3) 720 rolls 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 28-Feb-19 31-May-19 92
Rockwool PO:
Insulation vessel 50 Thk. x 600 x 5000 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 28-Feb-19 Malaysia Arrived 48-75745
Rockwool
5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 19-Jan-19 40 28-Feb-19
(Wire Blanket)
0
Part list Plate For Cladding 410 sht 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
PipeLine Arrived
Insulation vessel Pl. 0.4t x 1220 x 2440 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 48-75641
Equipment Gr
SA 240 - 304 - 2B 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19
Part list Flat Bar 420 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
Insulation vessel FB. 3t x 30 x 6000 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 PipeLine Arrived 48-75641
SS 201 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19 Equipment Gr
Part list Flat Bar 12 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
Insulation vessel FB. 8t x 30 x 6000 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 PipeLine Arrived 48-75641
SS 201 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19 Equipment Gr
Part list Hex Bolt + Nut + Washer 160 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19
Tunas chipta PO:
Insulation vessel M.10 x 75 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 Arrived at site
manunggal 48-75611
4.6 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19
Part list Rivet 20000 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
Insulation vessel Ø 4.0 mm x 12 mm 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 PipeLine Arrived 48-75641
Aluminium 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19 Equipment Gr
Part list Sealent / Silicon 200 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 49 12-Feb-19 31-May-19
Insulation vessel 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 49 12-Feb-19 Hokindo Jaya PO:
Baharu Arrived at site 48-75614
5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 27 12-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 1 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1/2" - 25 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 1 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1/2" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 42 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - MECHANICAL ITEMS Rev: 0
5.00 3.00 14.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 4.00 1.00 1.00 0.00 0.00 This issue : 5-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None
Arrive site
Bid Closing
Shipment
Standard
STATUS
QTY BOQ
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Rockwool PO:
Time Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 2 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1/2" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 84 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1" - 25 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 4 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 41 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 1" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 208 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 2" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 43 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 2" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 120 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 3" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 8 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 3" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 125 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 4" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 28 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 4" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 1 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 5" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 152 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 6" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 190 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 6" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 54 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 6" - 80 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 540 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 8" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 112 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 8" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 36 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 8" - 80 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 76 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 10" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 1 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 10" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 13 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 10" - 80 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 6 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 12" - 40 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Pipe Insulation (Den-100kg/m3) 84 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 31-May-19 95
Rockwool PO:
Insulation pipe Ø 12" - 50 mm Thk. 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 40 25-Feb-19 Arrived
Malaysia 48-75745
Lt: 1000 mm ; Mat: Rockwool 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 40 25-Feb-19
Part list Plate for Cladding 400 sht 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
Insulation pipe Pl. 0.4t x 1220 x 2440 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 PipeLine Arrived 48-75641
SA 240 - 304 - 2B 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19 Equipment Gr
Part list Rivet 35000 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 31-May-19 97 Hebei Pengxin
PO:
Insulation pipe Ø 4.0 mm x 12 mm 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 60 23-Feb-19 PipeLine Arrived 48-75641
Aluminium 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 38 23-Feb-19 Equipment Gr
Part list Sealent / Silicon 350 pcs 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 49 12-Feb-19 31-May-19
Hokindo Jaya PO:
Insulation pipe 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 49 12-Feb-19 Arrived at site
Baharu 48-75614
5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 27 12-Feb-19
Part list Wire Rope 25 kg 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 31 25-Jan-19 31-May-19 126
Willich Isolasi PO:
Insulation pipe Ø 0.8 mm 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 25-Dec-18 31 25-Jan-19 Arrived at site
Pratama 48-75606
Galvanized 5-Nov-18 10-Nov-18 13-Nov-18 27-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 25-Dec-18 16-Jan-19 9 25-Jan-19
34 UG-FTPL-P125 Desuperheating Nozzle (452-V1078) 1 Unit P 20-Aug-18 23-Aug-18 26-Aug-18 11-Oct-18 12-Oct-18 15-Oct-18 16-Oct-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 14-Nov-18 15-Nov-18 18-Nov-18 20-Nov-18 24-Nov-18 25-Nov-18 26-Nov-18 26-Nov-18 26-Nov-18 107 10-Mar-19 10-Apr-19 31
PO:
Spirax Sarco Arrived
Spec: DN400, CS F 20-Aug-18 23-Aug-18 26-Aug-18 11-Oct-18 12-Oct-18 15-Oct-18 16-Oct-18 12-Nov-18 27-Nov-18 19-Dec-18 20-Dec-18 23-Dec-18 24-Dec-18 27-Dec-18 29-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 7-Jan-19 7-Jan-19 107 10-Mar-19 48-75420
A 20-Aug-18 23-Aug-18 26-Aug-18 11-Oct-18 12-Oct-18 15-Oct-18 16-Oct-18 12-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 19-Dec-18 19-Dec-18 19-Dec-18 19-Dec-18 5-Jan-19 6-Jan-19 7-Jan-19 7-Jan-19 7-Jan-19 107 10-Mar-19
0
35 UG-FTPL-P095 Steel structure material P 25-May-18 30-May-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 13-Jun-18 14-Jun-18 17-Jun-18 18-Jun-18 21-Jun-18 22-Jun-18 24-Jun-18 25-Jun-18 26-Jun-18 26-Jun-18 26-Jun-18 26-Jun-18 26-Jun-18 116 15-Jan-19 15-Jan-19 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 9-Sep-18 12-Sep-18 13-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 17-Sep-18 17-Sep-18 17-Sep-18 17-Sep-18 136 31-Jan-19 31-Jan-19 0
Prepared by : Checked by : 0 Approved by :
LMS 37 UG-FTPL-P165 Additional platforms P 5-Nov-18 7-Nov-18 10-Nov-18 20-Nov-18 21-Nov-18 24-Nov-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18
WZT/NCH/SP 7-Dec-18 10-Dec-18 12-Dec-18 16-Dec-18 17-Dec-18 18-Dec-18 18-Dec-18 18-Dec-18 72 28-Feb-19 28-Feb-19 0
PT Weltes Energy Foundation ongoing; to PO: VAS
F 20-Nov-18 21-Nov-18 24-Nov-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18
Page 43 of 138 4-Jan-19 4-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 8-Jan-19 9-Jan-19 9-Jan-19 50 28-Feb-19 28-Feb-19
Nusantara be installed 48-75429
A 20-Nov-18 21-Nov-18 24-Nov-18 15-Dec-18 16-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 24-Dec-18 27-Dec-18 28-Dec-18 31-Dec-18 4-Jan-19 4-Jan-19 6-Jan-19 7-Jan-19 8-Jan-19 8-Jan-19 9-Jan-19 9-Jan-19 50 28-Feb-19 28-Feb-19
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - ELECTRICAL ITEMS Rev.0
3 20 1 3 1 3 1 3 1 3 2 1 3 1 1 This issue : 5-Apr-19
P: Plan, F: ForeP: Plan, F: Forecast, A: Actual Last issue : None
Shipment Status
Bid Closing
Enquiry No
QTY BOQ
Standard
STATUS
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Arrive site
S/No
Float
Issue Call PR In Required
Unit
Description Date/ NTP date (Vendor/ Remarks
For Tender system on Site
Award Date Supplier/ Contr.)
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
1 UG-FTPL-P107 MCC 1 Set P 30-Jun-18 4-Jul-18 7-Jul-18 2-Aug-18 3-Aug-18 6-Aug-18 7-Aug-18 10-Aug-18 11-Aug-18 14-Aug-18 15-Aug-18 18-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 26-Aug-18 157 30-Jan-19 14-Mar-19 43
PO:
F 30-Jun-18 4-Jul-18 7-Jul-18 2-Aug-18 3-Aug-18 6-Aug-18 7-Aug-18 10-Aug-18 11-Aug-18 14-Aug-18 15-Aug-18 18-Aug-18 14-Sep-18 30-Sep-18 1-Oct-18 1-Oct-18 1-Oct-18 150 28-Feb-19 14-Mar-19 14 Cipta Elektrik INSTALLED
48- 73744
A 30-Jun-18 4-Jul-18 7-Jul-18 2-Aug-18 3-Aug-18 6-Aug-18 7-Aug-18 10-Aug-18 11-Aug-18 14-Aug-18 15-Aug-18 18-Aug-18 14-Sep-18 30-Sep-18 1-Oct-18 1-Oct-18 1-Oct-18 163 13-Mar-19 14-Mar-19 1
0
2 UG-FTPL-P108 Heavy Liquor Pump Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 10-Apr-19 85
22kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 Siemens INSTALLED
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19 5-Apr-19
0
3 UG-FTPL-P108 Circulation Pump EF1E Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 11-Feb-19 21-Feb-19 10
PO:
Siemens ARRIVED
250kW, 1500 rpm, IP rating - IP 48- 73546
55, Y/D
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 219 20-Mar-19 8-Apr-19 19
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 187 20-Mar-19
0
Steam Condensate Transfer
4 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Pump Motor
PO:
11kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
DOL
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19 5-Apr-19
0
Liquor Transfer Pump EF 5
5 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Motor
PO:
55kW, 1500 rpm, IP rating - IP 55, Siemens ARRIVED
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 8-Apr-19 48- 73546
DOL
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
Intermediate Condensate
6 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Transfer Pump Motor
PO:
37kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19 5-Apr-19
0
7 UG-FTPL-P108 New WBL Pump 1 Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
37kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 10-Apr-19 Siemens ARRIVED
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
8 UG-FTPL-P108 New WBL 2 Pump Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
37kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 23-May-19 Siemens Installation during ASD
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
9 UG-FTPL-P108 Vaccum Pump 1 Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 11-Feb-19 21-Feb-19 10
55kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 219 20-Mar-19 6-Apr-19 17 Siemens ARRIVED
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 187 20-Mar-19
0
10 UG-FTPL-P108 Vaccum Pump 2 Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 11-Feb-19 21-Feb-19 10
55kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 219 20-Mar-19 6-Apr-19 17 Siemens ARRIVED
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 187 20-Mar-19
0
Intermediate Condensate
11 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Pump Motor
PO:
45kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
Clean Condensate Tank Pump
12 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Motor
PO:
45kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
Stripped Condensate Pump
14 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Motor
PO:
15kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19 5-Apr-19
0
Stripped Condensate Pump
15 UG-FTPL-P108 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
Motor
PO:
15kW, 1500 rpm, IP rating - IP 55, Siemens INSTALLED
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 5-Apr-19 48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19 5-Apr-19
0
16 UG-FTPL-P108 HBL Pump Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
15kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 10-Apr-19 Siemens ARRIVED
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
17 UG-FTPL-P108 HBL Pump Motor 1 pcs P 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 21-Feb-19 37
15kW, 1500 rpm, IP rating - IP 55, PO:
DOL
F 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 13-Aug-18 159 15-Jan-19 23-May-19 Siemens Installation during ASD
48- 73546
A 26-Jun-18 3-Jul-18 6-Jul-18 21-Jul-18 22-Jul-18 23-Jul-18 24-Jul-18 28-Jul-18 29-Jul-18 1-Aug-18 2-Aug-18 5-Aug-18 12-Sep-18 13-Sep-18 13-Sep-18 14-Sep-18 14-Sep-18 123 15-Jan-19
0
Power Cable, N2XY 0.4/0.6/1
18 UG-FTPL-P142 1200 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
4C x 50 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
19 UG-FTPL-P142 500 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84
kV Installation ongoing
PO:
Esindo (Progress as on
(3C x 150 +70) F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Shipment Status
Bid Closing
Enquiry No
QTY BOQ
Standard
STATUS
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Arrive site
S/No
Float
Issue Call PR In Required
Unit
Description Date/ NTP date (Vendor/ Remarks
For Tender system on Site
Award Date Supplier/ Contr.)
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Power Cable, N2XY 0.4/0.6/1
20 UG-FTPL-P142 250 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
4C x 6 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
21 UG-FTPL-P142 1000 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
4C x 16 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
22 UG-FTPL-P142 1000 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
4C x 2.5 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
23 UG-FTPL-P142 1000 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
4C x 35 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
24 UG-FTPL-P142 2000 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
7C x 1.5 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
25 UG-FTPL-P142 350 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
3 x 240 + 95 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
26 UG-FTPL-P142 2000 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
3C x 1.5 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
Power Cable, N2XY 0.4/0.6/1
27 UG-FTPL-P142 200 m P 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 72 21-Dec-18 15-Mar-19 84 Installation ongoing
kV PO:
Esindo (Progress as on
1C x 95 F 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90 48- 73780
05.04.19: 46%)
A 11-Aug-18 13-Aug-18 16-Aug-18 21-Sep-18 22-Sep-18 25-Sep-18 26-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 9-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 10-Oct-18 66 15-Dec-18 15-Mar-19 90
0
27 UG-FTPL-P149 Cable Tray P 2-Nov-18 8-Nov-18 11-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Dec-18 10-Dec-18 13-Dec-18 14-Dec-18 17-Dec-18 19-Dec-18 20-Dec-18 23-Dec-18 24-Dec-18 25-Dec-18 60 16-Feb-19 7-Mar-19 19 Installation ongoing
Surya Cakra PO:
F 27-Nov-18 10-Dec-18 27-Dec-18 10-Jan-19 11-Jan-19 11-Jan-19 12-Jan-19 12-Jan-19 13-Jan-19 13-Jan-19 14-Jan-19 14-Jan-19 22-Jan-19 23-Jan-19 23-Jan-19 24-Jan-19 25-Jan-19 60 16-Feb-19 7-Mar-19 19 (Progress as on
Mandiri 48- 75928
A 27-Nov-18 11-Dec-18 27-Dec-18 10-Jan-19 11-Jan-19 11-Jan-19 12-Jan-19 12-Jan-19 13-Jan-19 13-Jan-19 14-Jan-19 14-Jan-19 22-Jan-19 23-Jan-19 23-Jan-19 24-Jan-19 25-Jan-19 60 16-Feb-19 12-Mar-19 24 05.04.19: 83%)
0
Bid Closing
QTY BOQ
Arrive site
Shipment
Standard
STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery
ORDER
Contract
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
Float
S/No
Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Orifice Plate, Size: 400, wall
1 thickness 9.53 mm, outside pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
dia: 406.40 mm, ANSI 300# PO:
Arrived
48- 75808
452-FIC-1020 F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 11-Apr-19
Flow, LP steam to Effect 1E A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
0
Orifice Plate, Size: 250, wall
2 thickness 2.60 mm, outside pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
dia: 273. mm, ANSI 300# PO:
Arrived
48- 75808
452-FI-1118 F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 15-May-19 0
Flow, Condensate to pulp mill A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
0
Orifice Plate, Size: 400, wall
3 thickness 9.53 mm, outside pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
dia: 406.40 mm, ANSI 300# PO:
Arrived
48- 75808
452-FIC-1020 F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 11-Apr-19 0
Flow, LP steam to Effect 1E A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
0
Pressure Transmitter (452-PT-
4 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1124)
Pressure, Sealing water. Process PO:
conn: 1/2" NPT, 2" pipe mounted, Arrived
Manifold type:2-way, Electrical
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 15-May-19 0 48- 75808
conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
5 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1130)
Pressure, Instrument Air. Process PO:
conn: 1/2" NPT, 2" pipe mounted, Arrived
Manifold type:2-way, Electrical
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 5-May-19 0 48- 75808
conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
6 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1054)
Pressure, Interm Condensate.
Process conn: 1/2" NPT, 2" pipe PO:
Arrived
mounted, Manifold type:2-way, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 27-Apr-19 0 48- 75808
Electrical conn: 1/2" NPT, IP65,
Glycerine filled
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
7 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1051)
Pressure, Liquor effect 5 to
concentrator. Process conn: 2" PO:
Arrived
Flanged, ANSI 150#, Direct F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 19-Apr-19 0 48- 75808
mounted, Electrical conn: 1/2"
NPT, IP65, 1 x 1.5 m capillary
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
8 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1027)
Pressure, Effect 1E, Vapour side. PO:
Process conn: 3" Flanged, ANSI Arrived
150#, Direct mounted, Electrical
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 0 48- 75808
conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 30-Dec-99 0
Bid Closing
QTY BOQ
Arrive site
Shipment
Standard
STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery
ORDER
Contract
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
Float
S/No
Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Pressure, Vapour Eff3 inlet-2. PO:
Process conn: 1/2" NPT, 2" pipe Arrived
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 11-Apr-19 0 48- 75808
mounted, Manifold type:2-way,
Electrical conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 30-Dec-99 0
PO:
Arrived
48- 75808
Bid Closing
QTY BOQ
Arrive site
Shipment
Standard
STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery
ORDER
Contract
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
Float
S/No
Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Pressure liquor flash tanks.
Process conn: 2" flanged ANSI PO:
Arrived
150#, 2" pipe mounted, Manifold F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 14-May-19 0 48- 75808
type:2-way, Electrical conn: 1/2"
NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
17 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1022)
Pressure, LP Steam to effect 1E. PO:
Process conn: 1/2" NPT, 2" pipe Arrived
mounted, Manifold type:2-way,
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 48- 75808
Electrical conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Transmitter (452-PT-
18 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
1031)
Pressure, Vapour effect 1E. PO:
Process conn: 1/2" NPT, 2" pipe Arrived
mounted, Manifold type:2-way,
F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19 48- 75808
Electrical conn: 1/2" NPT, IP65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
Pressure Differential
21 Transmitter (452-FI-1118). Tag: 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
452-FT-1118)
PO:
Flow, condensate to pulp mill, process Arrived
conn: 1/2" NPT, Manifold type: 3 way, 48- 75808
Electrical conn: 1/2" NPT, IP65, 2" pipe F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 15-May-19
mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Pressure Differential
22 Transmitter (452-FI-1143). Tag: 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
452-FT-1143) PO:
Flow, mill water to wash, process conn: Arrived
48- 75808
1/2" NPT, Manifold type: 3 way, Electrical F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 15-May-19
conn: 1/2" NPT, IP65, 2" pipe mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
Pressure Differential
23 Transmitter (452-FIC-1020). 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Tag: 452-FT-1020)
PO:
Flow, LP steam to effect 1E, process conn: Arrived
48- 75808
1/2" NPT, Manifold type: 3 way, Electrical F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 11-Apr-19
conn: 1/2" NPT, IP65, 2" pipe mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
Pressure Differential
24 Transmitter (452-LI-1112). Tag: 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
452-LT-1112)
PO:
Level, intermediate condensate tank, Arrived
process conn: 1/2" NPT, Manifold type: 2 48- 75808
way, Electrical conn: 1/2" NPT, IP65, 2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19
pipe mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
Pressure Differential
25 Transmitter (452-LI-1113). Tag: 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
452-LT-1113)
PO:
Level, clean condensate tank, process Arrived
conn: 1/2" NPT, Manifold type: 2 way, 48- 75808
Electrical conn: 1/2" NPT, IP65, 2" pipe F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19
mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
Pressure Differential
26 Transmitter (452-LIC-1001). 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Tag: 452-LT-1001) PO:
Level, heavy liquor flash tank 1, process Arrived
48- 75808
conn: 2 x 3 ANSI 150# Flanged, Electrical F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19
conn: 1/2" NPT, IP65, 2" pipe mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
Pressure Differential
27 Transmitter (452-LIC-1035). 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Tag: 452 LT-1035)
PO:
Level, steam condensate flash tank, Arrived
process conn: 2 x 1" ANSI 150# Flanged, 48- 75808
Electrical conn: 1/2" NPT, IP65, 2" pipe F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 8-Apr-19
mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
Pressure Differential
28 Transmitter (452-LIC-1053). 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Tag: 452-LT-1053) PO:
Level, interm condensate tank, process Arrived
48- 75808
conn: 2 x 1" ANSI 150#, Electrical conn: F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19
1/2" NPT, IP65, 2" pipe mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
Pressure Differential
29 Transmitter (452-DI-1014). Tag: 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
452-DT-1014)
PO:
Arrived
48- 75808
Bid Closing
QTY BOQ
Arrive site
Shipment
Standard
STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery
ORDER
Contract
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
Float
S/No
Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
PO:
Density, Heavy liquor flash tank 1, process Arrived
48- 75808
conn: 2 x 3" ANSI 150#, Electrical conn: F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19 9-Apr-19
1/2" NPT, IP65, 2" pipe mounting
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
Temperature Transmitter
30 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1045)
PO:
Temperature, liquor LPH 4 In, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 18-Apr-19 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
31 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1046) PO:
Temperature, liquor LPH 4 Out, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
32 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1021)
Temperature LP Steam to effect 1E, 2" PO:
Arrived
pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 11-Apr-19 48- 75808
NPT(F)
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
33 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1024)
PO:
Temperature Liquor effect 1E, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 11-Apr-19 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
34 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1085)
Temperature, Condensate pot tank outlet, PO:
Arrived
2" pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 15-May-19 48- 75808
NPT(F)
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
35 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1134) PO:
Temperature, wash liquor, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-May-19 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
36 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1042)
PO:
Temperature liquor LPH 3, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
37 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1060)
Temperature, Surface Condenser outlet, 2" PO:
Arrived
pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 48- 75808
NPT(F)
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
38 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1058)
Temperature, WW surface condenser, 2" PO:
Arrived
pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 48- 75808
NPT(F)
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
39 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1002)
Temperature heavy liquor flash tank 1, 2" PO:
Arrived
pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 48- 75808
NPT(F)
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
40 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1098)
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
41 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1072)
Temperature warm foul condensate, 2" PO:
Arrived
pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 15-May-19 48- 75808
NPT(F)
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
42 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1073)
PO:
Temperature, stripped condensate, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 11-Apr-19 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
43 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1082)
Temperature, Fould condensate to stripper, PO:
Arrived
2" pipe mounting, IP56, elec conn: 1/2" F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 15-May-19 48- 75808
NPT(F)
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Temperature Transmitter
44 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1083)
PO:
Temperature, Stripped condensate, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 15-May-19 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
Bid Closing
QTY BOQ
Arrive site
Shipment
Standard
STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery
ORDER
Contract
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
Float
S/No
Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Temperature Transmitter
45 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Specification (452-TT-1142)
PO:
Temperature, CNCG temperature, 2" pipe Arrived
mounting, IP56, elec conn: 1/2" NPT(F) F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
46 Thermowell (452-TW-1002) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature Heavy liquor flash tank 1, Lt:
200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Black liquor, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
48- 75808
strong, thick
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
47 Thermowell (452-TW-1024) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
48 Thermowell (452-TW-1042) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature Liquor LPH 3, Lt: 200 mm,
PO:
Extension: 50 mm, element lt: 250 mm, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 Arrived
outer dia: 6 mm, Black liquor, weak 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
49 Thermowell (452-TW-1045) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
50 Thermowell (452-TW-1046) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
PO:
Arrived
48- 75808
Bid Closing
QTY BOQ
Arrive site
Shipment
Standard
STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery
ORDER
Contract
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
Float
S/No
Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Temperature, Liquor LPH 4 Out, Lt: 200
PO:
mm, Extension: 50 mm, element lt: 250 F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 Arrived
mm, outer dia: 6 mm, Black liquor, weak 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
51 Thermowell (452-TW-1072) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature Warm Foul Condensate, Lt:
200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Condensate 3, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 Arrived
concentration, sulphate, heavily 48- 75808
contaminated
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
52 Thermowell (452-TW-1073) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, stripped condensate, Lt: 200
mm, Extension: 50 mm, element lt: 250
PO:
mm, outer dia: 6 mm, Condensate 3, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
concentration, sulphate, heavily 48- 75808
contaminated
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
53 Thermowell (452-TW-1082) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, Foul condensate to stripper,
Lt: 200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Condensate 3, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
concentration, sulphate, heavily 48- 75808
contaminated
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
54 Thermowell (452-TW-1083) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, Stripped condensate, Lt: 200
mm, Extension: 50 mm, element lt: 250 PO:
mm, outer dia: 6 mm, Condensate 3, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
concentration, sulphate, heavily 48- 75808
contaminated
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
55 Thermowell (452-TW-1085) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, condensate pot tank outlet,
Lt: 200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Condensate 1, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
48- 75808
concentration, sulphate
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
56 Thermowell (452-TW-1098) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature Heavy liquor flash tank
(existing), Lt: 200 mm, Extension: 50 mm, PO:
element lt: 250 mm, outer dia: 6 mm, Black F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 13-May-19 Arrived
48- 75808
liquor, strong, thick
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
57 Thermowell (452-TW-1134) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature wash liquor, Lt: 200 mm, PO:
Extension: 50 mm, element lt: 250 mm, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 29-Apr-19 Arrived
outer dia: 6 mm, Black liquor, weak 48- 75808
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
58 Thermowell (452-TW-1142) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature CNCG, temperature, Lt: 200
mm, Extension: 50 mm, element lt: 250 PO:
mm, outer dia: 6 mm, Gas, non- F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 Arrived
48- 75808
condensable sulphurous, sulphate H2S
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
59 Thermowell (452-TW-1021) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature LP steam to effect 1E, Lt: 200
mm, Extension: 50 mm, element lt: 250 PO:
mm, outer dia: 6 mm, Steam, live, LP=< F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
48- 75808
0.5 Mpa
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
60 Thermowell (452-TW-1058) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, WW surface condenser, Lt:
200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Water, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 12-Apr-19 Arrived
48- 75808
mechanically treated
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
61 Thermowell (452-TW-1060) 1 pcs P 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 4-Nov-18 7-Nov-18 10-Nov-18 13-Nov-18 15-Nov-18 19-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18 50 9-Jan-19 15-Mar-19 65
Temperature, surface condenser outlet, Lt:
200 mm, Extension: 50 mm, element lt: PO:
250 mm, outer dia: 6 mm, Steam, flash, F 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 9-Oct-18 10-Oct-18 11-Oct-18 12-Oct-18 15-Oct-18 18-Nov-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 11-Apr-19 19-Apr-19 Arrived
48- 75808
alkaline
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 81 15-Apr-19
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
A 20-Jul-18 23-Jul-18 26-Jul-18 5-Oct-18 6-Oct-18 18-Dec-18 10-Oct-18 11-Oct-18 18-Dec-18 21-Dec-18 22-Dec-18 5-Jan-19 22-Jan-19 23-Jan-19 22-Jan-19 23-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 24-Jan-19 50 15-Mar-19
0
Prepared : Checked : WZT/NCH/SP Approved : VAS
LMS Page 51 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN - INSTRUMENT ITEMS Rev.0
Bid Closing
QTY BOQ
Arrive site
Shipment
Standard
STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery
ORDER
Contract
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
Float
S/No
Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
65 Digital 1PR x 1.5 mm2 600 m P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 5-Oct-18 5-Oct-18 62 17-Dec-18 10-Mar-19 83
PO:
D1P, 2 x 1.5 + OS F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 21-Oct-18 21-Oct-18 21-Oct-18 57 17-Dec-18 83 ARRIVED
48- 73461
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 16-Oct-18 15-Oct-18 16-Oct-18 62 17-Dec-18 83
0
66 Digital 2PR x 1 mm2 600 m P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 62 17-Dec-18 10-Mar-19 83
PO:
D2P, 2 x (2 x 1.0) + OS F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 21-Oct-18 21-Oct-18 21-Oct-18 57 17-Dec-18 83 ARRIVED
48- 73461
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 16-Oct-18 15-Oct-18 16-Oct-18 62 17-Dec-18 83
0
67 Analog 1PR x 1.5mm2 3000 m P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 62 17-Dec-18 10-Mar-19 83
PO:
A1P, 2 x 1.5 +OS F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 21-Oct-18 21-Oct-18 21-Oct-18 57 17-Dec-18 83 ARRIVED
48- 73461
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 16-Oct-18 15-Oct-18 16-Oct-18 62 17-Dec-18 83
0
68 Analog 16 PR x 1 mm2 1200 m P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 62 17-Dec-18 10-Mar-19 83
PO:
A16 x (2 x 1.0 + IS) + OS F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 21-Oct-18 21-Oct-18 21-Oct-18 57 17-Dec-18 83 ARRIVED
48- 73461
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 16-Oct-18 15-Oct-18 16-Oct-18 62 17-Dec-18 83
0
69 Digital 16 PR x 1 mm2 800 m P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 62 17-Dec-18 10-Mar-19 83
PO:
D16P, 16 x (2x 1)+OS F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 21-Oct-18 21-Oct-18 21-Oct-18 57 17-Dec-18 83 ARRIVED
48- 73461
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 3-Oct-18 4-Oct-18 7-Oct-18 10-Oct-18 11-Oct-18 13-Oct-18 15-Oct-18 16-Oct-18 16-Oct-18 15-Oct-18 16-Oct-18 62 17-Dec-18 83
0
70 Control Valve (452-LV-1103) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 27-Sep-18 29-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Level, liquor to effect 2A, ball valve, ASTM
A312 TP 304. pipe size: 200 mm, Outside PO:
dia: 219.1 mm, wall thickness: 2.6 mm, F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2
Flange pressure class ANSI 150#, Conn 48- 76427
type: Flanged
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18
0
71 Control Valve (452-HV-1135) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Automatic Valve, ball valve, ASTM A312
TP 316. Pipe size: 50 mm, Outside dia: PO:
60.3 mm, wall thickness: 1.6 mm, Flange F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 19-Apr-19 9
pressure class ANSI 150#, Conn type: 48- 76427
Flanged
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19
0
71 Control Valve (452-LV-1104B) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Level, liquor to effect 1A, ball valve, ASTM
A312 TP 304. Pipe size: 150 mm, Outside PO:
dia: 168.3 mm, wall thickness: 2 mm, F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2 48- 76427
Flange pressure class ANSI 150#, Conn
type: Flanged
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
71 Control Valve (452-LV-1105B) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Level, liquor to effect 1B, ball valve, ASTM
A312 TP 304. Pipe size: 150 mm, Outside PO:
dia: 168.3 mm, wall thickness: 2 mm, F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2
Flange pressure class ANSI 150#, Conn 48- 76427
type: Flanged
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
71 Control Valve (452-LV-1106B) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Level, liquor to effect 1C, ball valve, ASTM
A312 TP 304. Pipe size: 150 mm, Outside PO:
dia: 168.3 mm, wall thickness: 2 mm, F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2
Flange pressure class ANSI 150#, Conn 48- 76427
type: Flanged
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
71 Control Valve (452-PV-1005) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 127 14-Mar-19 29-Mar-19 15
Pressure liquor flash tanks,, API 5L. Pipe PO:
size: 200mm. Outside dia: 219.1 mm, wall F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 127 6-Apr-19 7-Apr-19 1 INSTALLED
thickness: 8.18mm, Butterfly valve 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 127 6-Apr-19 7-Apr-19 1
0
71 Control Valve (452-FV-1020) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Flow, LP steam to effect 1E, butterfly valve,
ASTM A 106 Gr B. Pipe size: 400mm, PO:
Outside dia: 406.4 mm, wall thickness: F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 150 27-Apr-19 29-Apr-19 2
48- 76427
9.53 mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 0
0
71 Control Valve (452-PV-1063A) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Bid Closing
QTY BOQ
Arrive site
Shipment
Standard
STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery
ORDER
Contract
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
Float
S/No
Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
Flow, wash liquor to concentrator, segment
valve, ASTM A312 TP 304. Pipe size: PO:
100mm, Outside dia: 114.3 mm, wall F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 11-Apr-19 1
48- 76427
thickness: 2 mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 133 10-Apr-19 -43565
0
71 Control Valve (452-LV-1131) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
Level, liquor effect 3B, segment valve,
ASTM A312 TP 304. Pipe size: 200mm, PO:
Outside dia: 219.1 mm, wall thickness: 2.6 F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 16-May-19 55 Arrived
48- 76427
mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
Bid Closing
QTY BOQ
Arrive site
Shipment
Standard
STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery
ORDER
Contract
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
Float
S/No
Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
71 Control Valve (452-LV-1133A) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Level, effect 4, segment valve, ASTM A312
PO:
TP 304. Pipe: 200mm, Outside dia: 219.1 F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 19-Apr-19 Arrived
mm, wall thickness: 2.6 mm 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
71 Control Valve (452-LV-1133B) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Level, liquor effect 4, segment valve,
ASTM A312 TP 304. Pipe: 200mm, PO:
Outside dia: 219.1 mm, wall thickness: 2.6 F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 19-Apr-19 28 Arrived
48- 76427
mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
71 Control Valve (452-LV-1053A) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Level, Interm cond tank, segment valve,
ASTM A312 TP 304. Pipe size: 200mm, PO:
Outside dia: 219.1 mm, wall thickness: 2.6 F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 27-Apr-19 36 Arrived
48- 76427
mm
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19
0
71 Control Valve (452-LV-1053C) 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 15-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 23-Sep-18 24-Sep-18 25-Sep-18 170 14-Mar-19 29-Mar-19 15
Bid Closing
QTY BOQ
Arrive site
Shipment
Standard
STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery
ORDER
Contract
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
Float
S/No
Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date PO:
Lead Arrived
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site 48- 76427
Time
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 129 6-Apr-19
0
452-HV-1120 - Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
input/interaction
PO:
INSTALLED
Butterfly valve, 250 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 7-Apr-19 16 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 7-Apr-19 16
0
452-HV-1121 - Manual
71 1 ea P 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 13-Sep-18 14-Sep-18 17-Sep-18 18-Sep-18 21-Sep-18 24-Sep-18 25-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 7-Oct-18 8-Oct-18 157 14-Mar-19 29-Mar-19 15
input/interaction
PO:
INSTALLED
Butterfly valve, 250 mm F 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 7-Apr-19 16 48- 76427
A 12-Aug-18 13-Aug-18 15-Aug-18 31-Aug-18 1-Sep-18 2-Sep-18 3-Sep-18 6-Nov-18 7-Nov-18 10-Nov-18 11-Nov-18 15-Nov-18 18-Nov-18 21-Nov-18 23-Nov-18 27-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 28-Nov-18 114 22-Mar-19 7-Apr-19 16
Bid Closing
QTY BOQ
Arrive site
Shipment
Standard
STATUS
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Vendor Delivery
ORDER
Contract
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
Float
S/No
Unit
Description Date/ NTP date Remarks
For Tender Done Done Done Done on Site
Award Date
Lead
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
71
71
71
71
71
71
71
71
71
71
71
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
1 UG-FTPL-P123 Ball Valve 15 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 15, V001 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material:PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
Socket weld, Pressure class: 800
0
2 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 15, V050 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 5-Apr-19
Flanged, Pressure class: 150
0
3 UG-FTPL-P123 Ball Valve 36 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 15, V080 30 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: PTFE, connection 6 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
Socket weld, Pressure class: 800
0
4 UG-FTPL-P123 Globe Valve 8 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 15, V208 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 14-Mar-19 10-Apr-19 27
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 64 14-Mar-19
Socket weld, Pressure class: 800
0
5 UG-FTPL-P123 Ball Valve 14 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 25, V001 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material:PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 Project01: -43542
Socket weld, Pressure class: 800 For 7 nos
0
6 UG-FTPL-P123 Globe Valve 11 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 25, V208 7 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 14-Mar-19 10-Apr-19 27 Shipment 1 (7 nos)
PT Budijaya Makmur Sentosa Arrived
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Shipment 2 (4 nos)
Pratama
Project01: PT Jason International 48-75405
seat material:STELL, connection 4 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 5-Apr-19 arrived on 05.04.19
For 4 nos
Socket weld, Pressure class: 800
0
7 UG-FTPL-P123 Ball Valve 9 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V001 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material:PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
Socket weld, Pressure class: 800
0
8 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V001 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material:STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99 30-Dec-99
Socket weld, Pressure class: 800
0
8 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V003 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material:PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
Socket weld, Pressure class: 800
0
9 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V041 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material:STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 5-Apr-19
Flanged, Pressure class: 150
0
10 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V046 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
Flanged, Pressure class: 150
0
11 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V080 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99
socket weld, Pressure class: 800
12 UG-FTPL-P123 Ball Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V080 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99
Threaded, Pressure class: 800
13 UG-FTPL-P123 Globe Valve 5 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V208 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 14-Mar-19 10-Apr-19 27
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 14-Mar-19 30-Dec-99
Socket weld, Pressure class: 800
14 UG-FTPL-P123 Globe Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 50, V208 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99 0
Socket weld, Pressure class: 800
15 UG-FTPL-P123 Ball Valve 3 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 80, V041 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99 0
Flanged, Pressure class: 150
16 UG-FTPL-P123 Ball Valve 14 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 80, V046 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99 0
Flanged, Pressure class: 150
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
17 UG-FTPL-P123 Globe Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 80, V208 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19
socket weld, Pressure class: 800
0
18 UG-FTPL-P123 Ball Valve 8 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 100, V046 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: PTFE, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99
Flanged, Pressure class: 150
19 UG-FTPL-P123 Swing check Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 100, V602 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Budi Jaya PO:
PT Mitra Wira Pratama Arrived
seat material: PTFE, connection Makmur Sentosa PT Jason International 48-75436
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99
between flanges (wafer), Pressure
class: 150
20 UG-FTPL-P123 Ball Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V041 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 29-Mar-19 10-Apr-19 12
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99 0
flanged, Pressure class: 150
21 UG-FTPL-P123 Butterfly Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V101 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 10-Apr-19 11-Apr-19 1
PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
seat material: EPDM, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 10-Apr-19
flanged, Pressure class: 150
21 UG-FTPL-P123 Butterfly Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V101 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 22-Mar-19 10-Apr-19 19
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira PO:
PT Mitra Wira Pratama Arrived
seat material: EPDM, connection Pratama PT Jason International 48-75405
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 22-Mar-19 30-Dec-99
between flanges (wafer), Pressure
class: 150
22 UG-FTPL-P123 Butterfly Valve 4 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V107 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 10-Apr-19 11-Apr-19 1
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Pratama PT Jason International 48-75405
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 10-Apr-19
between flanges (wafer), Pressure
class: 150
23 UG-FTPL-P123 Wedge gate Valve 4 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V307 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99 0
Flanged, Pressure class: 150
24 UG-FTPL-P123 Swing check Valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V602 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Budi Jaya PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Makmur Sentosa PT Jason International 48-75436
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99 0
between flanges (wafer), Pressure
class: 150
25 UG-FTPL-P123 Swing check Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 150, V607 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
Body:CS, Disk:SS, Spindle:SS, Body PT Budi Jaya PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Makmur Sentosa PT Jason International 48-75436
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99 0
between flanges (wafer), Pressure
class: 150
26 UG-FTPL-P123 Butterfly Valve 25 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 200, V107 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 10-Apr-19 11-Apr-19 1
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Pratama PT Jason International 48-75405
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 10-Apr-19
between flanges (wafer), Pressure
class: 150
27 UG-FTPL-P123 Wedge gate Valve 2 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 200, V307 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
PT Budi Jaya PO:
Body:CS, Disk:SS, Spindle:SS, Body PT Mitra Wira Pratama Arrived
Makmur Sentosa PT Jason International 48-75436
seat material: STELL, connection 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19 30-Dec-99 0
Flanged, Pressure class: 150
28 UG-FTPL-P123 Swing check Valve 3 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 200, V602 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 18-Mar-19 10-Apr-19 23
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Budi Jaya PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Makmur Sentosa PT Jason International 48-75436
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 18-Mar-19
between flanges (wafer), Pressure
class: 150
0
29 UG-FTPL-P123 Butterfly Valve 13 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN 250, V107 3 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 10-Apr-19 11-Apr-19 1
PT Budijaya Makmur Sentosa
Body:SS, Disk:SS, Spindle:SS, Body PT Mitra Wira PO:
PT Mitra Wira Pratama Arrived
seat material: SS, connection Pratama PT Jason International 48-75405
10 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 10-Apr-19
between flanges (wafer), Pressure
class: 150
30 UG-FTPL-P123 Steam trap valve 1 Ea 21-Jul-18 23-Jul-18 28-Jul-18 31-Jul-18 3-Aug-18 4-Aug-18 7-Aug-18 8-Aug-18 11-Aug-18 12-Aug-18 15-Aug-18 16-Aug-18 19-Aug-18 21-Aug-18 23-Aug-18 26-Aug-18 27-Aug-18 28-Aug-18 28-Aug-18 28-Aug-18 93 29-Nov-18 1-Mar-19 92
DN25, pressure class 150, connect PT Budijaya Makmur Sentosa
PT Mitra Wira PO:
flange, Mat body CS A106 Gr B, 21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 22-Dec-18 24-Dec-18 26-Dec-18 27-Dec-18 28-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18 79 24-Mar-19 10-Apr-19 17 PT Mitra Wira Pratama Arrived
Pratama PT Jason International 48-75405
Disk SS, Spindle SS, Seat SS
21-Jul-18 23-Jul-18 28-Jul-18 7-Nov-18 10-Nov-18 11-Nov-18 23-Nov-18 27-Nov-18 19-Dec-18 19-Dec-18 20-Dec-18 21-Dec-18 5-Jan-19 5-Jan-19 6-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 9-Jan-19 68 5-Apr-19 30-Dec-99 0
0
31 UG-FTPL-P131 PIPE 310-010 21.3x1.6 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 Project01:
23-Feb-19 74
Hebei Penxin Hebei Penxin Pipeline Equipment
1st Shipment on Jan 17/19, Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 2019 3 Pipeline Shipment 6
Jason International shipment 48-75365
DN 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 ETA Belawan Port Feb Equipment Group
0 4/5, 2019 Sin Ghee Huat Coorporation
2nd Shipment on Jan 24, 2019
0 12, 2019
ETA Belawan Port Feb
32 UG-FTPL-P131 PIPE 310-010 33.7x1.6 72 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
3rd Shipment on Jan 31, 2019 Hebei Penxin Hebei Penxin Pipeline Equipment
ETA Belawan Port Feb Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 17, 2019 Pipeline Jason International Shipment 6
shipment 48-75365
DN 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
33 UG-FTPL-P131 PIPE 310-010 60.3x1.6 105 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
34 UG-FTPL-P131 PIPE 310-010 88.9x1.6 110 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
35 UG-FTPL-P131 PIPE 310-010 114.3x2 90 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
36 UG-FTPL-P131 PIPE 310-010 168.3x2 63 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
37 UG-FTPL-P131 PIPE 310-010 219.1x2.6 426 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
38 UG-FTPL-P131 PIPE 310-010 273x2.6 54 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
39 UG-FTPL-P131 PIPE 310-010 406.4x4 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
40 UG-FTPL-P131 PIPE 310-010 21.3x1.6 35 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
41 UG-FTPL-P131 PIPE 310-010 26.9x1.6 15 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
42 UG-FTPL-P131 PIPE 310-010 33.7x1.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
43 UG-FTPL-P131 PIPE 310-010 48.3x1.6 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
44 UG-FTPL-P131 PIPE 310-010 60.3x1.6 204 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
45 UG-FTPL-P131 PIPE 310-010 88.9x1.6 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
46 UG-FTPL-P131 PIPE 310-010 114.3x2 32 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
47 UG-FTPL-P131 PIPE 310-010 139.7x2 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
48 UG-FTPL-P131 PIPE 310-010 168.3x2 179 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
49 UG-FTPL-P131 PIPE 310-010 219.1x2.6 189 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
50 UG-FTPL-P131 PIPE 310-010 273x2.6 26 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
51 UG-FTPL-P131 PIPE 310-010 323.9x3.2 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
52 UG-FTPL-P131 PIPE 310-010 355.6x3.2 53 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
53 UG-FTPL-P131 PIPE 310-010 406.4x4 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
54 UG-FTPL-P131 PIPE 310-010 457x4 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 450 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
55 UG-FTPL-P131 PIPE 310-010 508x5 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304( C max 0.05%).ERW 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
56 UG-FTPL-P131 PIPE ANSI B36.10 XS 21.3x3.73 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
57 UG-FTPL-P131 PIPE ANSI B36.10 STD 21.3x2.77 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
58 UG-FTPL-P131 PIPE ANSI B36.10 STD 26.7x2.87 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
59 UG-FTPL-P131 PIPE ANSI B36.10 XS 33.4x4.55 40 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
60 UG-FTPL-P131 PIPE ANSI B36.10 STD 33.4x3.38 32 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
61 UG-FTPL-P131 PIPE ANSI B36.10 STD 48.3x3.68 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
62 UG-FTPL-P131 PIPE ANSI B36.10 XS 60.3x5.54 79 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
63 UG-FTPL-P131 PIPE ANSI B36.10 STD 60.3x3.91 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
64 UG-FTPL-P131 PIPE ANSI B36.10 STD 73.0x5.16 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
65 UG-FTPL-P131 PIPE ANSI B36.10 STD 88.9x5.49 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
66 UG-FTPL-P131 PIPE ANSI B36.10 STD 114.3x6.02 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
67 UG-FTPL-P131 PIPE ANSI B36.10 STD 141.3x6.55 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
68 UG-FTPL-P131 PIPE ANSI B36.10 STD 168.3x7.11 131 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
69 UG-FTPL-P131 PIPE ANSI B36.10 STD 219.1x8.18 92 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
70 UG-FTPL-P131 PIPE ANSI B36.10 STD 273.0x9.27 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
71 UG-FTPL-P131 PIPE ANSI B36.10 STD 323.8x9.53 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
72 UG-FTPL-P131 PIPE ANSI B36.10 STD 406.4x9.53 60 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 106 Gr B. Seamless 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
73 UG-FTPL-P131 PIPE API 5L STD 88.9x5.49 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
74 UG-FTPL-P131 PIPE API 5L STD 114.3x6.02 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
75 UG-FTPL-P131 PIPE API 5L STD 168.3x7.11 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
76 UG-FTPL-P131 PIPE API 5L STD 219.1x8.18 100 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
77 UG-FTPL-P131 PIPE API 5L STD 273.0x9.27 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
78 UG-FTPL-P131 PIPE API 5L STD 323.8x9.53 74 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
79 UG-FTPL-P131 PIPE API 5L STD 406.4x9.53 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
80 UG-FTPL-P131 PIPE API 5L STD 457.0.4x9.53 9 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 450 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
81 UG-FTPL-P131 PIPE API 5L STD 508.0x9.53 30 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
82 UG-FTPL-P131 PIPE API 5L STD 1066.8x9.53 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 1050 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
83 UG-FTPL-P131 PIPE API 5L STD 1219.0x9.53 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B. Welded 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
DN 1200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
84 UG-FTPL-P131 ELBOW 90deg SW ANSI B16.11 CL 3000 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
85 UG-FTPL-P131 ELBOW 90deg SW ANSI B16.11 CL 3000 35 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
86 UG-FTPL-P131 ELBOW 90deg SW ANSI B16.11 CL 3000 25 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
87 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 10 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
88 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
89 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 42 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
90 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 43 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
91 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 9 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
92 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
93 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
94 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 450 DN2 450 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
95 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
96 UG-FTPL-P131 ELBOW 90deg 1.5D BW ANSI B16.9 STD 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 1200 DN2 1200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
97 UG-FTPL-P131 MITER ELBOW ; 311-010 : 90DEG BW 1D 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
API 5L Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 1050 DN2 1050 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
98 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 21.3x2.0 25 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
99 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 26.9x2.0 22 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 20 DN2 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
100 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 33.7x2.0 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
101 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 48.3x2.0 22 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 40 DN2 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
102 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 60.3x2.0 73 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
103 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 88.9x2.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
104 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 114.3x2.6 24 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
105 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 139.7x2.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
106 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 168.3x2.6 44 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
107 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 219.1x3.2 62 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
108 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 273x4.0 15 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
109 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 323.9x4.0 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
110 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 355.6x5.0 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 350 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
111 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 406.4x5.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
112 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 508.0x6.3 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 500 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
113 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 33.7x2.0 52 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
114 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 60.3x2.0 36 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
115 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 88.9x2.6 29 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
116 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 114.3x2.6 29 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
117 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 168.3x2.6 35 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
118 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 219.1x3.2 59 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
119 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 273x4.0 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
120 UG-FTPL-P131 ELBOW 90deg 1.5D 311-010 406.4x5.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
121 UG-FTPL-P131 ELBOW 45deg SW ANSI B16.11 CL 3000 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
122 UG-FTPL-P131 ELBOW 45deg SW ANSI B16.11 CL 3000 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
123 UG-FTPL-P131 ELBOW 45deg SW ANSI B16.11 CL 3000 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
124 UG-FTPL-P131 ELBOW 45deg BW ANSI B16.9 STD 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
125 UG-FTPL-P131 ELBOW 45deg BW ANSI B16.9 STD 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
126 UG-FTPL-P131 ELBOW 45deg BW ANSI B16.9 STD 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
127 UG-FTPL-P131 ELBOW 45deg BW ANSI B16.9 STD 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
128 UG-FTPL-P131 ELBOW 45deg BW ANSI B16.9 STD 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
129 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 21.3x2.0 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
130 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 26.9x2.0 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 20 DN2 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
131 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 48.3x2.0 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 40 DN2 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
132 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 60.3x2.0 25 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
133 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 88.9x2.6 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
134 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 114.3x2.6 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
135 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 139.7x2.6 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
136 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 168.3x2.6 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
137 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 219.1x3.2 29 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
138 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 323.9x4.0 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
139 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 355.6x5.0 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 350 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
140 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 406.4x5.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
141 UG-FTPL-P131 MITER ELBOW ; 311-010 : 90DEG BW 1D 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 1200 DN2 1200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
142 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 33.7x2.0 9 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
143 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 60.3x2.0 18 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
144 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 88.9x2.6 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
145 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 114.3x2.6 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
146 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 168.3x2.6 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
147 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 219.1x3.2 33 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
148 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 273x4.0 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
149 UG-FTPL-P131 ELBOW 45deg 1.5D 311-010 406.4x5.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
150 UG-FTPL-P131 REDUCER 312-010 C 50/25 x 2.0 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
151 UG-FTPL-P131 REDUCER 312-010 C 80/50 x 2.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
152 UG-FTPL-P131 REDUCER 312-010 C 100/65 x 2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
153 UG-FTPL-P131 REDUCER 312-010 C 100/80 x 2.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
154 UG-FTPL-P131 REDUCER 312-010 C 150/100 x 2.0 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
155 UG-FTPL-P131 REDUCER 312-010 C 150/80 x 2.0 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
156 UG-FTPL-P131 REDUCER 312-010 C 200/100 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
157 UG-FTPL-P131 REDUCER 312-010 C 200/125 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
158 UG-FTPL-P131 REDUCER 312-010 C 200/150 x 2.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
159 UG-FTPL-P131 REDUCER 312-010 C 250/150 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Pipeline Shipment 5
Prepared by : Checked by : Equipment Group
Jason International
Sin Ghee Huat Coorporation
shipment Approved by :
48-75365
LMS WZT/NCH/SP VAS
Page 62 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
160 UG-FTPL-P131 REDUCER 312-010 C 250/200 x 2.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
161 UG-FTPL-P131 REDUCER 312-010 E 200/100 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
162 UG-FTPL-P131 REDUCER 312-010 E 200/150 x 2.6 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
163 UG-FTPL-P131 REDUCER 312-010 E 250/125 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
164 UG-FTPL-P131 REDUCER 312-010 E 250/150 x 2.6 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 316 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
165 UG-FTPL-P131 REDUCER 312-010 C 100/50 x 2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
166 UG-FTPL-P131 REDUCER 312-010 C 150/125 x 2.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
167 UG-FTPL-P131 REDUCER 312-010 C 200/125 x 2.6 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
168 UG-FTPL-P131 REDUCER 312-010 C 200/150 x 2.6 9 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
169 UG-FTPL-P131 REDUCER 312-010 C 250/200 x 2.6 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
170 UG-FTPL-P131 REDUCER 312-010 C 400/200 x 4.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 400 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
171 UG-FTPL-P131 REDUCER 312-010 C 400/250 x 4.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 400 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
172 UG-FTPL-P131 REDUCER 312-010 C 500/350 x 5.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 6
shipment 48-75365
DN1 500 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
173 UG-FTPL-P131 REDUCER 312-010 E 150/100 x 2.0 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
174 UG-FTPL-P131 REDUCER 312-010 E 200/150 x 2.6 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
175 UG-FTPL-P131 REDUCER 312-010 E 250/150 x 2.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
176 UG-FTPL-P131 REDUCER 312-010 E 250/200 x 2.6 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
177 UG-FTPL-P131 REDUCER 312-010 E 350/300 x 3.2 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 350 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
178 UG-FTPL-P131 REDUCER 312-010 E 500/300 x 5.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A403 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
179 UG-FTPL-P131 REDUCER E 450/125 x 5.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A240 304 ( C max 0.05%) Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 450 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
180 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
181 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
182 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
183 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
184 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
185 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 300 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
186 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 350 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
187 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 600 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
188 UG-FTPL-P131 REDUCER BW CONC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 800 DN2 600 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
189 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
190 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
191 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
192 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
193 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
194 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
195 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
196 UG-FTPL-P131 REDUCER BW ECC ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
ASTM A 234 Gr WPB Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 450 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
197 UG-FTPL-P131 END CAP, SW ,ANSI B16.11 CLASS 3000 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
198 UG-FTPL-P131 END CAP, SW ,ANSI B16.11 CLASS 3000 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
199 UG-FTPL-P131 END CAP, SW ,ANSI B16.11 CLASS 3000 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
200 UG-FTPL-P131 END CAP, BW ,ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
201 UG-FTPL-P131 END CAP, BW ,ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
202 UG-FTPL-P131 END CAP, BW ,ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 600 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
203 UG-FTPL-P131 END CAP, BW ,ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN 700 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
204 UG-FTPL-P131 END CAP, BW ANSI B16.9 SCH10S 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
205 UG-FTPL-P131 TEE PIECE 313-011 25/25 x 1.6/1.6 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
206 UG-FTPL-P131 TEE PIECE 313-011 50/25 x 1.6/1.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
207 UG-FTPL-P131 TEE PIECE 313-011 50/50 x 1.6/1.6 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
208 UG-FTPL-P131 TEE PIECE 313-011 80/80 x 2.0/2.0 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
209 UG-FTPL-P131 TEE PIECE 313-011 100/100 x 2.0/2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 DN3 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
210 UG-FTPL-P131 TEE PIECE 313-011 200/100 x 4.0/2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
211 UG-FTPL-P131 TEE PIECE 313-011 200/200 x 4.0/4.0 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
212 UG-FTPL-P131 TEE PIECE 313-011 250/150 x 5.0/3.2 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
213 UG-FTPL-P131 TEE PIECE 313-011 250/200 x 5.0/4.0 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
214 UG-FTPL-P131 TEE PIECE 313-011 250/250 x 5.0/5.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
215 UG-FTPL-P131 TEE PIECE 313-011 400/200 x 8.0/3.2 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
216 UG-FTPL-P131 TEE PIECE 313-011 50/40 x 1.6/1.6 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 DN3 40 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
217 UG-FTPL-P131 TEE PIECE 313-011 100/100 x 2.0/2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
218 UG-FTPL-P131 TEE PIECE 313-011 100/100 x 2.0/2.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 DN3 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
219 UG-FTPL-P131 TEE PIECE 313-011 150/150 x 3.2/3.2 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
220 UG-FTPL-P131 TEE PIECE 313-011 200/200 x 4.0/4.0 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
221 UG-FTPL-P131 TEE PIECE 313-011 250/200 x 5.0/4.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
222 UG-FTPL-P131 TEE PIECE 313-011 250/250 x 5.0/4.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Prepared by : Checked by : Pipeline Jason International shipment Approved by :
48-75365
LMS WZT/NCH/SP Equipment Group Sin Ghee Huat Coorporation VAS
Page 64 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
223 UG-FTPL-P131 TEE PIECE 313-011 300/300 x 5.0/4.0 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 300 DN2 300 DN3 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
224 UG-FTPL-P131 TEE PIECE 313-011 350/200 x 6.3/4.0 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 350 DN2 350 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
225 UG-FTPL-P131 TEE PIECE 313-011 400/250 x 8.0/3.2 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 DN3 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
226 UG-FTPL-P131 TEE BW ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
227 UG-FTPL-P131 TEE BW ANSI B16.9 STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 DN3 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
228 UG-FTPL-P131 TEE BW ANSI B16.9 STD 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
229 UG-FTPL-P131 TEE BW ANSI B16.9 STD 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
230 UG-FTPL-P131 TEE BW ANSI B16.9 STD 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Pipeline Equipment
Hebei Penxin Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Group
Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
231 UG-FTPL-P131 TEE BW ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 DN3 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
232 UG-FTPL-P131 TEE BW ANSI B16.9 STD 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 234 Gr WPB 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 800 DN2 800 DN3 800 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
233 UG-FTPL-P131 TEE SW ANSI B16.11 CL3000 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
234 UG-FTPL-P131 Equal Tee, NB 1050 , Sch. Std (Fabricated) 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
API 5L Gr.B Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 1050 DN2 1050 DN3 1050 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
235 UG-FTPL-P131 REINFORCING PLATE 313-014 80 / 15 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
236 UG-FTPL-P131 REINFORCING PLATE 313-014 80 / 25 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 80 DN2 80 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
237 UG-FTPL-P131 REINFORCING PLATE 313-014 150 / 25 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 150 DN2 150 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
238 UG-FTPL-P131 REINFORCING PLATE 313-014 150 / 50 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 150 DN2 150 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
239 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 15 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
240 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 25 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
241 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 80 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
242 UG-FTPL-P131 REINFORCING PLATE 313-014 250 / 15 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 250 DN2 250 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
243 UG-FTPL-P131 REINFORCING PLATE 313-014 250 / 25 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 250 DN2 250 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
244 UG-FTPL-P131 REINFORCING PLATE 313-014 250 / 50 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 250 DN2 250 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
245 UG-FTPL-P131 REINFORCING PLATE 313-014 400 / 150 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 400 DN2 400 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
246 UG-FTPL-P131 REINFORCING PLATE 313-014 400 / 50 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 400 DN2 400 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
247 UG-FTPL-P131 REINFORCING PLATE 313-014 50 / 15 14 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 50 DN2 50 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
248 UG-FTPL-P131 REINFORCING PLATE 313-014 50 / 20 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 50 DN2 50 DN3 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
249 UG-FTPL-P131 REINFORCING PLATE 313-014 100 / 25 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 100 DN2 100 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
250 UG-FTPL-P131 REINFORCING PLATE 313-014 150 / 50 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 150 DN2 150 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
251 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 15 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
252 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 25 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
253 UG-FTPL-P131 REINFORCING PLATE 313-014 200 / 50 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 200 DN2 200 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
254 UG-FTPL-P131 REINFORCING PLATE 313-014 250 / 50 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 250 DN2 250 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
255 UG-FTPL-P131 REINFORCING PLATE 313-014 350 / 50 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 350 DN2 350 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
256 UG-FTPL-P131 REINFORCING PLATE 313-014 450 / 125 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 450 DN2 450 DN3 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
257 UG-FTPL-P131 REINFORCING PLATE 313-014 450 / 80 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
ASTM A312 TP 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
DN1 450 DN2 450 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
258 UG-FTPL-P131 RF Pad Plate, 200 x 10 Thk. OD 1469 / ID 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
SA 516 Gr.70 Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 1100 DN2 1100 DN3 1050 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
259 UG-FTPL-P131 RF Pad Plate, 100x6 Thk. OD 663 /ID 463 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
SA 36 Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 800 DN2 800 DN3 450 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
260 UG-FTPL-P131 REINFORCING PLATE FOR HOOK UP & TIE IN 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
SA 36 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
261 UG-FTPL-P131 SOCKOLET CL3000 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
262 UG-FTPL-P131 SOCKOLET CL3000 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
263 UG-FTPL-P131 SOCKOLET CL3000 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
264 UG-FTPL-P131 SOCKOLET CL3000 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
265 UG-FTPL-P131 SOCKOLET CL3000 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
266 UG-FTPL-P131 SOCKOLET CL3000 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
267 UG-FTPL-P131 SOCKOLET CL3000 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
268 UG-FTPL-P131 SOCKOLET CL3000 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
269 UG-FTPL-P131 SOCKOLET CL3000 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
270 UG-FTPL-P131 SOCKOLET CL3000 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 DN3 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
271 UG-FTPL-P131 SOCKOLET CL3000 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 500 DN3 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
272 UG-FTPL-P131 WELDOLET STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 DN3 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
273 UG-FTPL-P131 WELDOLET STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
274 UG-FTPL-P131 WELDOLET STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 500 DN3 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
275 UG-FTPL-P131 WELDOLET STD 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 500 DN3 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
277 UG-FTPL-P131 FLANGE SW ANSI B16.5 RF. CL.150 10 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
278 UG-FTPL-P131 FLANGE SW ANSI B16.5 RF. CL.150 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
279 UG-FTPL-P131 FLANGE SW ANSI B16.5 RF. CL.150 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 65 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
280 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 7 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
281 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
282 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
283 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 42 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
284 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 27 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
285 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
286 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
287 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 350 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
288 UG-FTPL-P131 FLANGE SLIP-ON ANSI B16.5 RF. CL.150 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
289 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
290 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 13 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
291 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 38 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
292 UG-FTPL-P131 LOOSE FLANGE , ASME B16.5 315-013 ; CL 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 65 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
293 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 26 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
294 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 43 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
295 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 14 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
296 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010; CL. 62 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
297 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 56 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
298 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 31 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
299 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
300 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
301 UG-FTPL-P131 LOOSE FLANGE ASME B16.5 315-010 ; CL. 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 500 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
302 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
303 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 105 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
304 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
305 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
306 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
307 UG-FTPL-P131 BLIND FLANGE ASME B16.5 316-010 ; CL. 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
A105 HOT DIP GALV. 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
308 UG-FTPL-P131 Plate Flange , 70 Thk. OD 1274 / ID 1120 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
SA 516 Gr.70 Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
309 UG-FTPL-P131 Spade BlankPlate, 35 Thk. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
SA 516 Gr.70 Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
310 UG-FTPL-P131 Plate 6 Thk. 1 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
SA 36 Group Delivery in partial PO:
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 4
shipment 48-75365
2 Sq.M 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
311 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 15 x 21.3 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
312 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 25 x 33.7 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
313 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 50 x 60.3 26 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
314 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 80 x 88.9 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
315 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 100 x 114.3 23 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
316 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 125 x 139.7 10 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
317 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 150 x 168.3 32 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
318 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 200 x 219.1 21 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
319 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 250 x 273 19 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
320 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 300 x 323.9 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
321 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 400 x 406.4 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
322 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 500 x 508 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 304 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 500 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
323 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 25 x 33.7 10 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
324 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 50 x 60.3 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
325 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 65 x 76.1 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 65 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
326 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 80 x 88.9 23 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
327 UG-FTPL-P131 COLLAR MSS SP-43 SCH10S - 100 x 114.3 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
328 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 125 x 139.7 4 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
329 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 150 x 168.3 30 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
330 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 200 x 219.1 35 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
331 UG-FTPL-P131 COLLAR 314-013 ; CL.150 - 250 x 273 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A403 316 ( C max 0.05%) 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
332 UG-FTPL-P131 Vacuum Ring, 60x8 Thk. - OD 936 / ID 816 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
SA 36 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
333 UG-FTPL-P131 Vacuum Ring, 40x6 Thk. - OD 540 / ID 460 5 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74
SA 36 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3
11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0
334 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 3 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 15, DN2 15 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
335 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 23 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 25 DN2 25 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
336 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 44 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 50 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
337 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 65 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
338 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 33 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 80 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
339 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 49 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 100 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
340 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 17 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 125 DN2 125 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
341 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 104 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 150 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
342 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 83 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 200 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
343 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 43 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 250 DN2 250 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
344 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 300 DN2 300 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
345 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 2 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 350 DN2 350 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
346 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 11 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 400 DN2 400 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
347 UG-FTPL-P131 GASKET ANSI B16.21 CL150 1.5mm THICK 6 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Type AA 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 500 DN2 500 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
348 UG-FTPL-P131 Bolt ISO 4014 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 DN2 60 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
349 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
350 UG-FTPL-P131 Bolt ISO 4014 136 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 75 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
351 UG-FTPL-P131 Bolt ISO 4014 404 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 90 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
352 UG-FTPL-P131 Bolt ISO 4014 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
353 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
354 UG-FTPL-P131 Bolt ISO 4014 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 180 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
355 UG-FTPL-P131 Bolt ISO 4014 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
356 UG-FTPL-P131 Bolt ISO 4014 132 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 90 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
357 UG-FTPL-P131 Bolt ISO 4014 336 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
358 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 110 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
359 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 160 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
360 UG-FTPL-P131 Bolt ISO 4014 204 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 180 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
361 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 205 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
362 UG-FTPL-P131 Bolt ISO 4014 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 240 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
363 UG-FTPL-P131 Bolt ISO 4014 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 335 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
364 UG-FTPL-P131 Bolt ISO 4014 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 110 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
365 UG-FTPL-P131 Bolt ISO 4014 132 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 120 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
366 UG-FTPL-P131 Bolt ISO 4014 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 130 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
367 UG-FTPL-P131 Bolt ISO 4014 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 140 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
368 UG-FTPL-P131 Bolt ISO 4014 96 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 200 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
369 UG-FTPL-P131 Bolt ISO 4014 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 220 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
370 UG-FTPL-P131 Bolt ISO 4014 72 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 DN2 130 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
371 UG-FTPL-P131 Bolt ISO 4014 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 DN2 140 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
372 UG-FTPL-P131 Bolt ISO 4014 24 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 30 DN2 150 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
373 UG-FTPL-P131 Bolt ISO 4014 44 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8.8 Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 30 DN2 180 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
374 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 DN2 50 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
375 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
376 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
377 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 56 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
378 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
379 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 256 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 90 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
380 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 115 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
381 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 66 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 155 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
382 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 190 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
383 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 215 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
384 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 80 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
385 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 165 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
386 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 180 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
387 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 DN2 115 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
388 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 DN2 205 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
389 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 193 Gr B7 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 DN2 215 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
390 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
391 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 16 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 65 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
392 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 20 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 DN2 80 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
393 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 44 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 90 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
394 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 28 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 140 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
395 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 12 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 DN2 155 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
396 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 52 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 100 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
397 UG-FTPL-P131 HEAVY HEX BOLT ANSI B18.2.1 48 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 307 Gr B 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 DN2 220 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
398 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M12 28 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 194 Gr 2H 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
399 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M16 64 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 194 Gr 2H 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
400 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M20 378 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 194 Gr 2H 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
401 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M24 112 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 194 Gr 2H 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
402 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M27 56 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 194 Gr 2H 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
403 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M12 8 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 563 CS 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
404 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M16 36 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 563 CS 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
405 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M20 84 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 563 CS 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
406 UG-FTPL-P131 HEAVY HEX NUT ANSI B18.2.2 - M24 100 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
ASTM A 563 CS 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
407 UG-FTPL-P131 Hexagon nut ISO 4032 32 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
408 UG-FTPL-P131 Hexagon nut ISO 4032 580 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
409 UG-FTPL-P131 Hexagon nut ISO 4032 760 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
410 UG-FTPL-P131 Hexagon nut ISO 4032 292 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
411 UG-FTPL-P131 Hexagon nut ISO 4032 92 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
412 UG-FTPL-P131 Hexagon nut ISO 4032 68 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
8 - Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 30 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
413 UG-FTPL-P131 Washer ISO 7091 106 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 12 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
414 UG-FTPL-P131 Washer ISO 7091 1302 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 16 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
415 UG-FTPL-P131 Washer ISO 7091 2323 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 20 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
416 UG-FTPL-P131 Washer ISO 7091 871 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 24 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
417 UG-FTPL-P131 Washer ISO 7091 273 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 27 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 30-Dec-99 30-Dec-99 0 Equipment Group Sin Ghee Huat Coorporation
418 UG-FTPL-P131 Washer ISO 7091 132 11-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 84 11-Dec-18 23-Feb-19 74 Hebei Penxin Hebei Penxin Pipeline Equipment
Group Delivery in partial PO:
Steel- Hot dip galvanized 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 45 20-Feb-19 30-Dec-99 3 Pipeline Jason International Shipment 5
shipment 48-75365
DN1 30 11-Aug-18 13-Aug-18 18-Aug-18 8-Nov-18 11-Nov-18 12-Nov-18 23-Nov-18 28-Nov-18 1-Dec-18 2-Dec-18 5-Dec-18 6-Dec-18 28-Dec-18 30-Dec-18 1-Jan-19 4-Jan-19 5-Jan-19 6-Jan-19 6-Jan-19 6-Jan-19 0 Equipment Group Sin Ghee Huat Coorporation
0
419 UG-FTPL-P136 Pipe slide, insulated 370-010 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 15 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19
420 UG-FTPL-P136 Pipe slide, insulated 370-010 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 37 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 25 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19
212 UG-FTPL-P136 Pipe slide, insulated 370-011 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 29 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 100 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
213 UG-FTPL-P136 Pipe slide, insulated 370-011 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 89 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
214 UG-FTPL-P136 Pipe slide, insulated 370-011 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 47 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
215 UG-FTPL-P136 Pipe slide, insulated 370-011 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 21 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 80 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
216 UG-FTPL-P136 Pipe slide, insulated, 2-sided, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
217 UG-FTPL-P136 Pipe slide, insulated, 2-sided, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
A283 Gr.D/A36 3 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 400 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
218 UG-FTPL-P136 Pipe slide, insulated, 2-sided, 370-014 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 600 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
219 UG-FTPL-P136 Pipe slide, insulated, 2-sided, 370-014 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 750 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
220 UG-FTPL-P136 Pipe slide, insulated, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 119 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
221 UG-FTPL-P136 Pipe slide, insulated, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 14 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
222 UG-FTPL-P136 Pipe slide, insulated, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 12 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 300 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
223 UG-FTPL-P136 Pipe slide, insulated, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 11 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 400 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
224 UG-FTPL-P136 Pipe slide, insulated, 370-012 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Bina Karya Logam Arrived 48-75747
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 71 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
A283 Gr.D/A36 3 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 500 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
0 30-Dec-99 30-Dec-99 0
225 UG-FTPL-P136 Pipe slide, insulated, 370-014 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 1200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
226 UG-FTPL-P136 Pipe slide, insulated, 370-014 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 600 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
227 UG-FTPL-P136 Pipe slide, uninsulated 370-018 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
228 UG-FTPL-P136 Pipe slide, uninsulated 370-018 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 28 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
229 UG-FTPL-P136 Pipe slide, uninsulated 370-018 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 3 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 80 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
230 UG-FTPL-P136 Pipe slide, uninsulated, 370-019 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 2 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
83 UG-FTPL-P136 Pipe slide, uninsulated, 370-019 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 9 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 350 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
84 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 6 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 100 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
85 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 15 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
86 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 15 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
87 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 18 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
88 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 5 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 25 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
89 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 5 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
90 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 2 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 400 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
91 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 26 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
92 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 65 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
93 UG-FTPL-P136 Pipe clamp 370-016 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
A283 Gr.D/A36 3 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 18-Feb-19 20-Feb-19 2 Bina Karya Logam Arrived 48-75747
DN 80 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
94 UG-FTPL-P136 U-bolt Support, A, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 13 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 15 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
95 UG-FTPL-P136 U-bolt Support, A, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 2 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 25 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
96 UG-FTPL-P136 U-bolt Support, A, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 21 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
97 UG-FTPL-P136 U-bolt Support, C, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 7 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 15 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
98 UG-FTPL-P136 U-bolt Support, C, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 25 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
99 UG-FTPL-P136 U-bolt Support, C, DN15, 371-031 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 20-Feb-19 -21
Doksa Multiline
AISI 304 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived 48-75748
Engg
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
100 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A 106 Gr B 8 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
101 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
API 5L Gr B 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 100 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
102 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A 106 Gr B 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
103 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 304 ( C max 0.05%) 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
104 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 316 ( C max 0.05%) 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 100 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
105 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 316 ( C max 0.05%) 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 50 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
106 UG-FTPL-P136 Stopper 372-013 B1 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A790M Gr S32205 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 80 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
107 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
API 5L Gr B 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
108 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
API 5L Gr B 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 300 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
109 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A 106 Gr B 8 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
110 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A 106 Gr B 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
111 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 304 ( C max 0.05%) 20 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
112 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 304 ( C max 0.05%) 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
113 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 316 ( C max 0.05%) 12 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
114 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 316 ( C max 0.05%) 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 200 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
115 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A312 TP 316 ( C max 0.05%) 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
116 UG-FTPL-P136 Stopper 372-013 B2 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A790M Gr S32205 4 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 150 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
117 UG-FTPL-P136 Stopper 372-013 B3 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
ASTM A 106 Gr B 16 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 400 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
118 UG-FTPL-P136 Elbow anchorage, 276 - 416.8, 373-021 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
119 UG-FTPL-P136 Elbow anchorage, 276 - 436.75, 373-021 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
120 UG-FTPL-P136 Elbow anchorage, 276 - 500.15, 373-021 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 250 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
121 UG-FTPL-P136 Elbow anchorage, 513 - 615.75, 373-021 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 1 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
DN 500 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
122 UG-FTPL-P136 Flat Bar 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
SS 304. 6 Thk x 60 mm x 6000 2 Lgt 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
123 UG-FTPL-P136 Flat Bar 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
SS 316. 6 Thk x 60 mm x 6000 2 Lgt 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
124 UG-FTPL-P136 Flat bar 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A36. 6 Thk x 60 mm x 6000 1 Lgt 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Cancelled the PR
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
125 UG-FTPL-P136 Lug 372-015, heavy 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 173 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
Laxhmi_Mahesvary:
27 add qty by pak amar13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
126 UG-FTPL-P136 Lug 372-015, light 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A283 Gr.D/A36 84 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
Laxhmi_Mahesvary:
16 add quantity by pak13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
amar
127 UG-FTPL-P136 L-BAR, 50 X 50 X 5MM 25 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 144 m 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
128 UG-FTPL-P136 L-BAR, 60 X 60 X 6MM 30 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 36 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
129 UG-FTPL-P136 L-BAR, 80 X 80 X 8MM 45 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 54 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
130 UG-FTPL-P136 L-BAR-100x100x10mm 8 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 2 Ea 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
131 UG-FTPL-P136 H-BEAM, 100 X 100 X 6 X 8MM 36 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 42 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
132 UG-FTPL-P136 H-BEAM, 150 X 150 X 7 X 10MM 80 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 90 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
133 UG-FTPL-P136 H-BEAM, 200 X 200 X 8 X 12mm 35 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 42 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
134 UG-FTPL-P136 I-BEAM-200x100x5.5x8mm 12 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
A36 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
135 UG-FTPL-P136 UNP,100 X 50 X 5 MM 70.5 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 13 lgt 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0 Arrived
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
0 30-Dec-99 30-Dec-99 0
136 UG-FTPL-P136 UNP, 150 X 75 X 6.5 MM 160 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 30 lgt 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
137 UG-FTPL-P136 UNP, 200 X 75 X 7.5 MM 30 m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 6 Ea 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
138 UG-FTPL-P136 Plate 10 Thk. 11 sq m m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 6 sht 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
139 UG-FTPL-P136 Plate 12 Thk. 3.5 sq m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 2 Ea 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
murni (48-76098) 48-76098
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 73 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/
Sumber Contr.)
Seta PO:
Time murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
0
140 UG-FTPL-P136 Plate 2 Thk. 1 sq m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
SA240 Gr.304L 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
141 UG-FTPL-P136 Plate 16 Thk. 0.5 sq m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
Sumber Seta PO:
A36 1 sht 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
murni (48-76098) 48-76098
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
142 UG-FTPL-P136 Plate 20 Thk. 0.5 sq m 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
SA516 Gr.70 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
143 UG-FTPL-P136 M12x270 anchors bolt 68 Nos 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
8.8HDG/ Equivalent 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
144 UG-FTPL-P136 M20x450 anchors bolt 4 Nos 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Mar-19 2-Feb-19 -39
8.8HDG/ Equivalent 13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 6-Dec-18 4-Jan-19 7-Jan-19 8-Jan-19 11-Jan-19 13-Jan-19 15-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 16-Jan-19 0 30-Dec-99 30-Dec-99 0
145 UG-FTPL-P136 M12 HILTI HIT - CT1 WITH 8.8 84 Nos 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Apr-19 2-Feb-19 -70
THREADED ROD HIT-V-F, FZV
EMBEDMENT DEPTH 90mm / Equivalent
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 12-Feb-19 12-Feb-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 14-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 12-Feb-19 12-Feb-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 14-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 0 30-Dec-99 30-Dec-99 0
0 30-Dec-99 30-Dec-99 0
146 UG-FTPL-P136 M16 HILTI HIT - CT1 WITH 8.8 8 Nos 13-Aug-18 13-Aug-18 18-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 2-Sep-18 5-Sep-18 6-Sep-18 9-Sep-18 11-Sep-18 13-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 18-Sep-18 18-Sep-18 56 13-Apr-19 2-Feb-19 -70
THREADED ROD HIT-V-F, FZV
EMBEDMENT DEPTH 90mm / Equivalent
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 12-Feb-19 12-Feb-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 14-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 42 28-Feb-19 28-Feb-19 0
13-Aug-18 13-Aug-18 18-Aug-18 25-Nov-18 28-Nov-18 29-Nov-18 2-Dec-18 3-Dec-18 12-Feb-19 12-Feb-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 14-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 0 30-Dec-99 30-Dec-99 0
147 UG-FTPL-P126 452-V1031 1 Ea 5-Aug-18 7-Aug-18 12-Aug-18 17-Aug-18 20-Aug-18 21-Aug-18 24-Aug-18 25-Aug-18 28-Aug-18 29-Aug-18 1-Sep-18 17-Sep-18 20-Sep-18 22-Sep-18 24-Sep-18 27-Sep-18 28-Sep-18 29-Sep-18 30-Sep-18 3-Oct-18 85 27-Dec-18 12-Mar-19 75
151 UG-FTPL-P137 Thermowell Boss 6 Pcs 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 69 26-Dec-18 10-Apr-19 105 Budijaya Makmur Sentosa
Jason PO:
NPT 1" 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12-Jan-19 88 Jason International Arrived
International 3S International 48-74052
SS 304L 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18
152 UG-FTPL-P137 Thermowell Boss 7 Pcs 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 69 26-Dec-18 10-Apr-19 105 Budijaya Makmur Sentosa
Jason PO:
NPT 1" 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12-Jan-19 88 Jason International Arrived
International 3S International 48-74052
SS 316L 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18
153 UG-FTPL-P137 Thermowell Boss 2 Pcs 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 69 26-Dec-18 10-Apr-19 105 Budijaya Makmur Sentosa
Jason PO:
NPT 1" 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18 12-Jan-19 88 Jason International Arrived
International 3S International 48-74052
CS 26-Aug-18 28-Aug-18 29-Aug-18 4-Sep-18 7-Sep-18 15-Sep-18 18-Sep-18 19-Sep-18 22-Sep-18 23-Sep-18 26-Sep-18 27-Sep-18 30-Sep-18 5-Oct-18 9-Oct-18 15-Oct-18 17-Oct-18 18-Oct-18 18-Oct-18 18-Oct-18
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
154 Additional manual valve Ball Valve; DN15 - V001 1 Pcs 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19 30-Mar-19 18
155 Additional manual valve Ball Valve; DN15 - V080 15 Pcs 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19 30-Mar-19 18
153 Additional manual valve Ball Valve; DN50 - V041 2 Pcs 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19 30-Mar-19 18
Body: SS, Disk: SS, Spindle SS, Seat mat: Mitra Wira PO:
452-F-1014 STELL, PTFE, threaded. Pressure class 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19 Arrived
Pratama 48-76521
150
7-Jan-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 15-Feb-19 16-Feb-19 15-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 16-Feb-19 24 12-Mar-19
154 Additional primary support Pipe slide, insulated 370-010 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 15 4 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
155 Additional primary support Pipe slide, insulated 370-011 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 100 5 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
156 Additional primary support Pipe slide, insulated, 370-012 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 200 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
157 Additional primary support Pipe slide, uninsulated, 370-019 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 150 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
158 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 15 4 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
159 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 50 9 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
160 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 65 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
161 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 100 5 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
162 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 125 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
163 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 150 11 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
164 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 200 40 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
165 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 250 5 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
166 Additional primary support Pipe clamp 370-016 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
PT Bina Karya PO:
31-Dec-18 450 2 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Logam Mandiri 48-76782
452-P-1185-002-A A283 Gr.D/A36 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
167 Additional primary support U-bolt Support, A, DN15, 371-031 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
Tunas Cipta PO:
31-Dec-18 15 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Manunggal 48-76781
452-P-1185-002-A AISI 304 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
168 Additional primary support U-bolt Support, A, DN50, 371-031 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
Tunas Cipta PO:
31-Dec-18 50 8 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Manunggal 48-76781
452-P-1185-002-A AISI 304 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
169 Additional primary support U-bolt Support, C, DN15, 371-031 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
Tunas Cipta PO:
31-Dec-18 15 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Manunggal 48-76781
452-P-1185-002-A AISI 304 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
170 Additional primary support U-bolt Support, C, DN50, 371-031 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
Tunas Cipta PO:
31-Dec-18 100 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Manunggal 48-76781
452-P-1185-002-A AISI 304 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
171 Additional primary support Stopper 372-013 B1 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 80 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A ASTM A312 TP 304 ( C max 0.05%) 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
172 Additional primary support Stopper 372-013 B1 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 150 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A ASTM A312 TP 304 ( C max 0.05%) 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
173 Additional primary support Stopper 372-013 B1 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 150 12 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A ASTM A312 TP 316 ( C max 0.05%) 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
174 Additional primary support Stopper 372-013 B2 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 150 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A ASTM A 106 Gr B 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
175 Additional primary support Stopper 372-013 B2 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 100 4 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A API 5L Gr B 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
176 Additional primary support Stopper 372-013 B2 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 200 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A API 5L Gr B 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
177 Additional primary support Stopper 372-013 B2 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 200 6 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A ASTM A312 TP 316 ( C max 0.05%) 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
178 Additional primary support Elbow anchorage, 276 - 416.8, 373-021 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 250 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A A283 Gr.D/A36 - HDG 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
179 Additional primary support Elbow anchorage, 276 - 436.75, 373-021 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 250 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A A283 Gr.D/A36 - HDG 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
180 Additional primary support Elbow anchorage, 276 - 500.15, 373-021 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 250 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A A283 Gr.D/A36 - HDG 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
181 Additional primary support Elbow anchorage, 513 - 615.75, 373-021 25-Feb-19 26-Feb-19 12-Oct-37 29-May-56 17-Jan-75 5-Mar-19 27-Oct-37 7-Mar-19 7-Mar-19 7-Mar-19 3-Nov-37 2-Jul-56 30 6-Apr-19 20-Mar-19 -17
31-Dec-18 500 1 Pcs 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
452-P-1185-002-A A283 Gr.D/A36 - HDG 25-Feb-19 26-Feb-19 1-Mar-19 2-Mar-19 5-Mar-19 5-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19 7-Mar-19
184 Additional piping REDUCER 312-010 C 25/15 x 2.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN1 25; DN2 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
185 Additional piping REDUCER 312-010 C 50/25 x 2.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN1 50 ; DN2 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99 30-Dec-99
186 Additional piping REDUCER 312-010 E 200/100 x 2.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN1 200 ; DN2 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99 30-Dec-99
187 Additional piping PIPE 310-010 21.3x1.6 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
188 Additional piping PIPE 310-010 26.9x1.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
189 Additional piping PIPE 310-010 60.3x1.6 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
190 Additional piping PIPE 310-010 88.9x1.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
191 Additional piping PIPE 310-010 114.3x2 10 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
192 Additional piping PIPE 310-010 139.7x2 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
193 Additional piping PIPE 310-010 168.3x2 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
194 Additional piping PIPE 310-010 219.1x2.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
30-Dec-99
195 Additional piping PIPE 310-010 21.3x1.6 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
196 Additional piping PIPE 310-010 60.3x1.6 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
197 Additional piping PIPE 310-010 168.3x2 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
198 Additional piping PIPE 310-010 219.1x2.6 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
199 Additional piping PIPE 310-010 273x2.6 26 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
200 Additional piping PIPE API 5L STD 168.3x7.11 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
API 5L Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
201 Additional piping PIPE API 5L STD 219.1x8.18 0.5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
API 5L Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
202 Additional piping PIPE API 5L STD 273.0x9.27 1.5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
API 5L Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
203 Additional piping PIPE ANSI B36.10 XS 21.3x3.73 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
204 Additional piping PIPE ANSI B36.10 STD 60.3x3.91 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
205 Additional piping PIPE ANSI B36.10 STD 73.0x5.16 1.5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
206 Additional piping PIPE ANSI B36.10 STD 168.3x7.11 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
207 Additional piping PIPE ANSI B36.10 STD 219.1x8.18 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
208 Additional piping PIPE ANSI B36.10 STD 273.0x9.27 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
209 Additional piping ELBO 90deg SW ANSI B16.11 CL3000 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
210 Additional piping ELBOW 90deg 1.5D 311-010 21.3x2.0 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
211 Additional piping ELBOW 90deg 1.5D 311-010 33.7x2.0 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
212 Additional piping ELBOW 90deg 1.5D 311-010 60.3x2.0 5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
PO:
Pipeline
Prepared by : Checked by : Equipment Gr Approved by :
48-76770
LMS WZT/NCH/SP VAS
Page 76 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
213 Additional piping ELBOW 90deg 1.5D 311-010 88.9x2.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
214 Additional piping ELBOW 90deg 1.5D 311-010 114.3x2.6 5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
215 Additional piping ELBOW 90deg 1.5D 311-010 139.7x2.6 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 125 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
216 Additional piping ELBOW 90deg 1.5D 311-010 168.3x2.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
217 Additional piping ELBOW 90deg 1.5D 311-010 21.3x2.0 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
218 Additional piping ELBOW 90deg 1.5D 311-010 60.3x2.0 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
219 Additional piping ELBOW 90deg 1.5D 311-010 168.3x2.6 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
220 Additional piping ELBOW 90deg 1.5D 311-010 219.1x3.2 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
221 Additional piping ELBOW 90deg 1.5D 311-010 273x4.0 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
222 Additional piping ELBOW 45deg 1.5D 311-010 88.9x2.6 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
223 Additional piping ELBOW 45deg 1.5D 311-010 114.3x2.6 7 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
224 Additional piping ELBOW 45deg 1.5D 311-010 273.0x4.0 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
225 Additional piping ELBOW 45deg 1.5D 311-010 323.9x4.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 300 ; DN 300 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
226 Additional piping ELBOW 45deg 1.5D 311-010 355.6x5.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 350 ; DN 350 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
227 Additional piping ELBOW 45deg 1.5D 311-010 406.4x5.0 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 400 ; DN 400 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
228 Additional piping ELBOW 45deg 1.5D 311-010 88.9x2.6 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
229 Additional piping ELBOW 45deg 1.5D 311-010 168.3x2.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
230 Additional piping ELBOW 45deg 1.5D 311-010 219.1x3.2 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 ASTM A403 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
217 Additional piping ELBOW 45deg 1.5D 311-010 273x4.0 7 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
218 Additional piping ELBO 45deg SW ANSI B16.11 CL3000 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
219 Additional piping REDUCER 312-010 C 40/15 x 2.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 40 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
220 Additional piping REDUCER 312-010 C 100/40 x 2.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 40 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
221 Additional piping REDUCER 312-010 C 100/80 x 2.0 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
222 Additional piping REDUCER 312-010 E 300/250 x 3.2 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 300 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
223 Additional piping REDUCER 312-010 E 300/250 x 3.2 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 350 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
224 Additional piping REDUCER 312-010 C 200/125 x 2.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
225 Additional piping REDUCER 312-010 C 250/100 x 2.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
226 Additional piping REDUCER 312-010 E 250/100 x 2.6 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
227 Additional piping REDUCER BW CONC ANSI B16.9 STD 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 234 Gr WPB PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
228 Additional piping REDUCER BW ECC ANSI B16.9 STD 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 234 Gr WPB PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
229 Additional piping REDUCER BW ECC ANSI B16.9 STD 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 234 Gr WPB PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 400 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
230 Additional piping REINFORCING PLATE 313-014 50 / 15 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 50 ; DN 50 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
217 Additional piping REINFORCING PLATE 313-014 80 / 20 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 80 ; DN 80 ; DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
218 Additional piping REINFORCING PLATE 313-014 100 / 15 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 100 ; DN 100 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
219 Additional piping REINFORCING PLATE 313-014 125 / 20 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 125 ; DN 125 ; DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
220 Additional piping REINFORCING PLATE 313-014 100 / 25 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 100 ; DN 100 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
221 Additional piping REINFORCING PLATE 313-014 200 / 25 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 200 ; DN 200 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
222 Additional piping REINFORCING PLATE 313-014 200 / 80 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 200 ; DN 200 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
223 Additional piping REINFORCING PLATE 313-014 250 / 50 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
31-Dec-18 ASTM A312 TP 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
452-P-1184-006 DN 250 ; DN 250 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19
224 Additional piping TEE PIECE 313-011 15/15 x 1.6/1.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
225 Additional piping TEE PIECE 313-011 50/50 x 1.6/1.6 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
226 Additional piping TEE PIECE 313-011 100/100 x 2.0/2.0 5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
227 Additional piping TEE PIECE 313-011 150/150 x 3.2/3.2 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
228 Additional piping TEE PIECE 313-011 200/100 x 4.0/2.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
229 Additional piping TEE PIECE 313-011 200/200 x 4.0/4.0 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
230 Additional piping TEE PIECE 313-011 250/150 x 5.0/3.2 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 ASTM A403 316 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 250 ; DN 250 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
217 Additional piping TEE PIECE 313-011 250/200 x 5.0/4.0 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
218 Additional piping TEE BW ANSI B16.9 STD 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 234 Gr WPB PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
219 Additional piping TEE SW ANSI B16.11 CL3000 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
220 Additional piping TEE SW ANSI B16.11 CL3000 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
221 Additional piping FLANGE SW ANSI B16.5 RF. CL.150 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
222 Additional piping FLANGE SLIP-ON ANSI B16.5 RF. CL.150 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 65 ; DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
223 Additional piping FLANGE SLIP-ON ANSI B16.5 RF. CL.150 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
224 Additional piping FLANGE SLIP-ON ANSI B16.5 RF. CL.150 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
225 Additional piping FLANGE SLIP-ON ANSI B16.5 RF. CL.150 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 105 PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
226 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
227 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 20 ; DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
228 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
229 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
230 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 A105 HOT DIP GALV. 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
229 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 33 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
230 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 A105 HOT DIP GALV. 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 125 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
229 Additional piping LOOSE FLANGE ASME B16.5 315-010; CL. 22 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
Equipment Gr
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 78 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site Hebei Pengxin
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.) PO:
Time Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
230 Additional piping LOOSE FLANGE ASME B16.5 315-010; CL. 14 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 A105 HOT DIP GALV. 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
229 Additional piping LOOSE FLANGE ASME B16.5 315-010; CL. 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
230 Additional piping LOOSE FLANGE ASME B16.5 315-010 ; CL. 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 A105 HOT DIP GALV. 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 450 ; DN 450 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
229 Additional piping BLIND FLANGE ASME B16.5 316-010 ; CL. 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
A105 HOT DIP GALV. PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
230 Additional piping BLIND FLANGE ASME B16.5 316-010 ; CL. 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 A105 HOT DIP GALV. 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
229 Additional piping COLLAR MSS SP-43 SCH10S - 15 x 21.3 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
230 Additional piping COLLAR MSS SP-43 SCH10S - 20 x 26.9 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 ASTM A403 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 20 ; DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
229 Additional piping COLLAR MSS SP-43 SCH10S - 50 x 60.3 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
230 Additional piping COLLAR MSS SP-43 SCH10S - 80 x 88.9 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0
Hebei Pengxin PO:
31-Dec-18 ASTM A403 304 ( C max 0.05%) 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline 48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
229 Additional piping COLLAR MSS SP-43 SCH10S - 100 x 114.3 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
230 Additional piping COLLAR 314-013 ; CL.150 - 125 x 139.7 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 125 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
231 Additional piping COLLAR 314-013 PN10 - 150 x 168.3 10 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
232 Additional piping COLLAR 314-013 PN10 - 200 x 219.1 10 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
233 Additional piping COLLAR 314-013 PN10 - 250 x 273 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 304 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
234 Additional piping COLLAR MSS SP-43 SCH10S - 100 x 114.3 11 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
235 Additional piping COLLAR 314-013 ; CL.150 - 125 x 139.7 1 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 125 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
236 Additional piping COLLAR 314-013 PN10 - 150 x 168.3 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
237 Additional piping COLLAR 314-013 PN10 - 200 x 219.1 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A403 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
238 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
239 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 20 ; DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
240 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 11 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
241 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 50 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
242 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 65 ; DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
243 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 80 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
244 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 33 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 100 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
245 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 3 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 125 ; DN 125 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
246 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 24 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 150 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
247 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 14 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 200 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
248 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 250 ; DN 250 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
249 Additional piping GASKET ANSI B16.21 CL150 1.5mm THICK 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
Type AA PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
Equipment Gr
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 79 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site Hebei Pengxin
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.) PO:
Time Pipeline
48-76770
452-P-1184-006 DN 450 ; DN 450 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
250 Additional piping Bolt ISO 4014 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 ; DN 55 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
251 Additional piping Bolt ISO 4014 40 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 ; DN 60 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
252 Additional piping Bolt ISO 4014 136 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 90 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
253 Additional piping Bolt ISO 4014 8 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
254 Additional piping Bolt ISO 4014 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 150 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
255 Additional piping Bolt ISO 4014 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 160 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
256 Additional piping Bolt ISO 4014 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 265 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
257 Additional piping Bolt ISO 4014 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 90 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
258 Additional piping Bolt ISO 4014 168 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 100 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
259 Additional piping Bolt ISO 4014 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 180 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
260 Additional piping Bolt ISO 4014 8 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 200 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
261 Additional piping Bolt ISO 4014 8 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 240 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
262 Additional piping Bolt ISO 4014 40 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 315 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
263 Additional piping Bolt ISO 4014 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8.8 Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 30 ; DN 140 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
264 Additional piping HEAVY HEX BOLT ANSI B18.2.1 8 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 ; DN 50 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
265 Additional piping HEAVY HEX BOLT ANSI B18.2.1 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
266 Additional piping HEAVY HEX BOLT ANSI B18.2.1 8 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 190 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
267 Additional piping HEAVY HEX BOLT ANSI B18.2.1 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 155 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
268 Additional piping HEAVY HEX BOLT ANSI B18.2.1 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 165 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
269 Additional piping HEAVY HEX BOLT ANSI B18.2.1 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 193 Gr B7 KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 24 ; DN 180 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
270 Additional piping HEAVY HEX BOLT ANSI B18.2.1 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 307 Gr B KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 65 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
271 Additional piping HEAVY HEX BOLT ANSI B18.2.1 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 307 Gr B KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 ; DN 80 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
272 Additional piping HEAVY HEX BOLT ANSI B18.2.1 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 307 Gr B KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 ; DN 155 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
273 Additional piping HEAVY HEX BOLT ANSI B18.2.1 24 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 307 Gr B KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 24 ; DN 180 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
274 Additional piping HEAVY HEX NUT ANSI B18.2.2 - M12 4 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 194 Gr 2H KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
275 Additional piping HEAVY HEX NUT ANSI B18.2.2 - M20 32 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 194 Gr 2H KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
276 Additional piping HEAVY HEX NUT ANSI B18.2.2 - M24 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 194 Gr 2H KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 24 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
277 Additional piping HEAVY HEX NUT ANSI B18.2.2 - M16 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
ASTM A 563 CS KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
278 Additional piping Hexagon nut ISO 4032 56 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8 - Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
279 Additional piping Hexagon nut ISO 4032 164 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8 - Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
Prepared by : Checked by : Approved by :
LMS WZT/NCH/SP VAS
Page 80 of 138
EVAPORATOR UPGRADE PROJECT PROCUREMENT PLAN -PIPING ITEMS Rev.0
5.00 3.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 1.00 3.00 2.00 2.00 3.00 1.00 1.00 0.00 0.00 1 This issue : 11-Apr-19
P: Plan, F: Forecast, A: Actual Last issue : None
Arrive site
Shipment
Bid Closing
STATUS
QTY BOQ
Standard
ORDER
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Issue Call PR Marian PO Marian PR SAP PO SAP Required
S/No
Float
Unit
Enquiry No Description Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Done Done Done Done Lead on Site
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
KW Engineering PO:
Time
Solutions 48-76722
452-P-1184-006 DN 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
280 Additional piping Hexagon nut ISO 4032 184 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8 - Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
281 Additional piping Hexagon nut ISO 4032 24 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
8 - Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 30 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
282 Additional piping Washer ISO 7091 6 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
Steel- Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 12 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
283 Additional piping Washer ISO 7091 192 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
Steel- Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 16 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
284 Additional piping Washer ISO 7091 192 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
Steel- Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 20 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
285 Additional piping Washer ISO 7091 52 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 25-Mar-19 9-Apr-19 0
Steel- Hot dip galvanized KW Engineering PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
Solutions 48-76722
452-P-1184-006 DN 30 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19
286 Additional piping WELDING NIPPLE NPT-1" MALE XS L=100 5 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A 106 Gr B PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
287 Additional piping STRAIGHT NIPPLE OTOE/PLAIN OTHER EN 23 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 15 ; DN 15 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
288 Additional piping STRAIGHT NIPPLE OTOE/PLAIN OTHER EN 2 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 30 9-Apr-19 9-Apr-19 0 Hebei Pengxin
ASTM A312 TP 316 ( C max 0.05%) PO:
31-Dec-18 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Pipeline
48-76770
452-P-1184-006 DN 25 ; DN 25 15-Feb-19 16-Feb-19 17-Feb-19 17-Feb-19 18-Feb-19 19-Feb-19 18-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 19-Feb-19 Equipment Gr
Shipment Status
Arrive site
Awarded to
Required on Contract / PO Potential
S/No
Float
Discipline Area Description (Vendor/ Supplier/ Remarks
Site No. Vendors
Contr.)
0
8 Piping Ash Leaching CS Pipe 2-Feb-18 15
2-Feb-18 15
Piping 0
0
9 Piping Ash Leaching SS Pipe 2-Feb-18 15
2-Feb-18 15
Piping 0
0
10 Piping Ash Leaching Primary Support 2-Feb-18 15
2-Feb-18 15
Piping 0
0
11 Piping Ash Leaching Secondary Support 2-Feb-18 15
2-Feb-18 15
Piping 0
0
12 Piping Ash Leaching Manual Valves 2-Feb-18 15
2-Feb-18 15
Piping 0
0
13 Piping Ash Leaching Insulation 2-Feb-18 15
Prepared by :LMS/MG Checked by : VAS Approved by : VAS
Page 82 of 138
Rev.0
Shipment Status
Arrive site
Awarded to
Required on Contract / PO Potential
S/No
Float
Discipline Area Description (Vendor/ Supplier/ Remarks
Site No. Vendors
Contr.)
2-Feb-18 15
Piping 0
0
14 Civil Ash Leaching Steel Structure 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
15 Civil Ash Leaching Platforms 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
16 Civil Ash Leaching Stairs 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
17 Civil Ash Leaching Ladders 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
18 Civil Ash Leaching Sprinklers 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
19 Civil Ash Leaching Safety Showers 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
20 Civil Ash Leaching Cast in Steel 14-Dec-17 14
14-Dec-17 14
0
0
21 Civil Ash Leaching Anchor Bolt 14-Dec-17 14
14-Dec-17 14
0
0
22 Civil Ash Leaching Concrete 14-Dec-17 14
0 0 14-Dec-17 14
0 0 0
0
23 Civil Ash Leaching Fire protection and detection system 14-Dec-17 14
14-Dec-17 14
0
0
24 Instrument Ash Leaching Control valves 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
25 Instrument Ash Leaching On/Off Valves 8-Mar-18 14
0 0 8-Mar-18 14
Prepared by :LMS/MG Checked by : VAS Approved by : VAS
Page 83 of 138
Rev.0
Shipment Status
Arrive site
Awarded to
Required on Contract / PO Potential
S/No
Float
Discipline Area Description (Vendor/ Supplier/ Remarks
Site No. Vendors
Contr.)
0 0 0
0
26 Instrument Ash Leaching Transmitter 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
27 Instrument Ash Leaching On/Off Damper 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
28 Instrument Ash Leaching Refractometer 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
29 Instrument Ash Leaching Sliding Gate 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
30 Instrument Ash Leaching Zero Speed Switch 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
31 Instrument Ash Leaching Resistance Temperature Sensor 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
32 Instrument Ash Leaching Rotameter 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
33 Instrument Ash Leaching Cable for instrument 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
34 Instrument Ash Leaching Instrument cables for junction box 8-Mar-18 14
8-Mar-18 14
0
0
35 Instrument Ash Leaching Junction Box 8-Mar-18 14
8-Mar-18 14
0
0
36 Instrument Ash Leaching Multicore Cables 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
37 Instrument Ash Leaching Cable ladders 8-Mar-18 14
0 0 8-Mar-18 14
Prepared by :LMS/MG Checked by : VAS Approved by : VAS
Page 84 of 138
Rev.0
Shipment Status
Arrive site
Awarded to
Required on Contract / PO Potential
S/No
Float
Discipline Area Description (Vendor/ Supplier/ Remarks
Site No. Vendors
Contr.)
0 0 0
0
38 Instrument Ash Leaching I/O Cabinet 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
39 Instrument Ash Leaching Power supply distribution 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
40 Instrument Ash Leaching Bus cable 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
41 Instrument Ash Leaching UPS 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
42 Instrument Ash Leaching PLC Cabinet 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
43 Instrument Ash Leaching MCC 8-Mar-18 14
8-Mar-18 14
0
0
44 Electrical Ash Leaching Motor for Slurry pump 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
45 Electrical Ash Leaching Motor for Vent fan 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
46 Electrical Ash Leaching Motor for Black liquor pump 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
0
47 Electrical Ash Leaching Motor for Reject Pump 8-Mar-18 14
0 0 8-Mar-18 14
0 0 0
Bid Closing
% Weightage
Area Mgr/
Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
Bid Closing
% Weightage
Area Mgr/
Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
Bid Closing
% Weightage
Area Mgr/
Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
Bid Closing
% Weightage
Area Mgr/
Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
Bid Closing
% Weightage
Area Mgr/
Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
Bid Closing
% Weightage
Area Mgr/
Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
Bid Closing
% Weightage
Area Mgr/
Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
Bid Closing
% Weightage
Area Mgr/
Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
68 68 Mech. BOP Effluent Treatment (ETP) 30-Dec-99 PS HKG P 25-Jun-16 2-Jul-16 2-Jul-16 5-Jul-16 19-Jul-16 12-Jul-16 26-Jul-16
68 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### F 25-Jun-16 14-Jul-16 23-Dec-16 15-Aug-16 30-Aug-16 14-Nov-16 16-Nov-16
68 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### A 25-Jun-16 14-Jul-16 23-Dec-16 15-Aug-16 30-Aug-16 14-Nov-16 16-Nov-16
68
69 69 Mech. BOP Soft Water Plant 30-Dec-99 PS HKG P 9-May-16 10-May-16 30-Nov-16 17-May-16 11-Nov-16 10-Nov-16 11-Nov-16
69 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### F 10-Jun-16 10-Jun-16 30-Dec-99 17-Jun-16 11-Nov-16 11-Aug-16 11-Nov-16
69 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### A 10-Jun-16 10-Jun-16 30-Dec-99 17-Jun-16 11-Nov-16 11-Aug-16 11-Nov-16
69
70 70 Mech. BOP N2 Plant 30-Dec-99 PS HKG P 2-Mar-16 3-Mar-16 26-Nov-16 10-Mar-16 5-Nov-16 19-Oct-16 5-Nov-16
70 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### F 2-Mar-16 3-Mar-16 30-Dec-99 10-Mar-16 17-Oct-16 19-Oct-16 9-Nov-16
70 30-Dec-99 BOP 30-Dec-99 30-Dec-99 ### ### A 2-Mar-16 3-Mar-16 30-Dec-99 10-Mar-16 17-Oct-16 19-Oct-16 9-Nov-16
70
71 71 Mech. Spinbath Silk Filter FRP - 4 nos 30-Dec-99 AYP HKG P 29-Feb-16 7-Mar-16 7-Mar-16 10-Mar-16 24-Mar-16 17-Mar-16 2-Apr-16
71 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### F 29-Feb-16 7-Mar-16 7-Mar-16 10-Mar-16 24-Mar-16 17-Mar-16 2-Apr-16
71 182 30-Dec-99 Spinbath 30-Dec-99 30-Dec-99 ### ### A 29-Feb-16 7-Mar-16 30-Aug-16 10-Mar-16 24-Mar-16 17-Mar-16 2-Apr-16
71
1935-
72 72 Mech. Spinning Viscose Metering Pump 30-Dec-99 RKV HKG P 8-Oct-16 11-Oct-16 11-Oct-16 14-Oct-16 19-Oct-16 20-Oct-16 25-Oct-16
SVI/VSF1
Bid Closing
% Weightage
Area Mgr/
Standard
Engineer
Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
SPINNING
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
21-Dec-16 23-Dec-16 25-Dec-16 26-Dec-16 26-Dec-16 28-Dec-16 28-Dec-16 29-Dec-16 3-Jan-17 5-Jan-17 360 31-Dec-17 5-Jan-18 5
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 69
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
23-Nov-16 26-Nov-16 30-Nov-16 2-Dec-16 2-Dec-16 5-Dec-16 6-Dec-16 8-Dec-16 10-Dec-16 10-Dec-16 240 7-Aug-17 15-Oct-17 0
10-Jan-17 12-Jan-17 14-Jan-17 15-Jan-17 15-Jan-17 17-Jan-17 17-Jan-17 18-Jan-17 23-Jan-17 25-Jan-17 360 20-Jan-18 30-Dec-99 -15
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
19-Dec-16 24-Dec-16 28-Dec-16 2-Jan-17 25-Dec-16 28-Dec-16 7-Jan-17 10-Jan-17 11-Jan-17 14-Jan-17 300 10-Nov-17 15-Nov-17 5
26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 300 17-Nov-17 30-Dec-99 -2
19-Dec-16 24-Dec-16 28-Dec-16 2-Jan-17 25-Dec-16 28-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
29-Dec-16 3-Jan-17 8-Jan-17 13-Jan-17 4-Jan-17 7-Jan-17 17-Jan-17 20-Jan-17 21-Jan-17 24-Jan-17 270 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 31-Dec-16 5-Jan-17 27-Dec-16 30-Dec-16 9-Jan-17 12-Jan-17 13-Jan-17 16-Jan-17 270 13-Oct-17 30-Dec-99 12
15-Dec-16 26-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
10-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 10-Oct-17 7
10-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 30-Dec-99 7
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
15-Feb-17 20-Feb-17 24-Feb-17 1-Mar-17 21-Feb-17 24-Feb-17 6-Mar-17 9-Mar-17 10-Mar-17 13-Mar-17 240 8-Nov-17 15-Nov-17 7
15-Feb-17 20-Feb-17 24-Feb-17 1-Mar-17 21-Feb-17 24-Feb-17 6-Mar-17 9-Mar-17 10-Mar-17 13-Mar-17 240 8-Nov-17 15-Nov-17 7
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 20-Sep-17 4
5-Jan-17 10-Jan-17 13-Jan-17 15-Jan-17 11-Jan-17 13-Jan-17 18-Jan-17 21-Jan-17 22-Jan-17 25-Jan-17 240 22-Sep-17 30-Dec-99 -2
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 20-Sep-17 4
5-Jan-17 10-Jan-17 13-Jan-17 15-Jan-17 11-Jan-17 13-Jan-17 18-Jan-17 21-Jan-17 22-Jan-17 25-Jan-17 240 22-Sep-17 30-Dec-99 -2
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
10-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 25-Oct-17 22
10-Jan-17 15-Jan-17 18-Jan-17 20-Jan-17 16-Jan-17 18-Jan-17 23-Jan-17 26-Jan-17 27-Jan-17 30-Jan-17 240 27-Sep-17 30-Dec-99 28
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
23-Feb-17 28-Feb-17 5-Mar-17 10-Mar-17 1-Mar-17 4-Mar-17 14-Mar-17 17-Mar-17 18-Mar-17 21-Mar-17 240 16-Nov-17 25-Nov-17 9
13-Jan-17 18-Jan-17 21-Jan-17 23-Jan-17 19-Jan-17 21-Jan-17 26-Jan-17 29-Jan-17 30-Jan-17 2-Feb-17 240 30-Sep-17 30-Dec-99 56
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
23-Jan-17 28-Jan-17 2-Feb-17 7-Feb-17 29-Jan-17 1-Feb-17 11-Feb-17 14-Feb-17 15-Feb-17 18-Feb-17 240 16-Oct-17 25-Oct-17 9
22-Feb-17 27-Feb-17 4-Mar-17 9-Mar-17 28-Feb-17 3-Mar-17 13-Mar-17 16-Mar-17 17-Mar-17 20-Mar-17 240 15-Nov-17 25-Oct-17 -21
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
23-Jan-17 28-Jan-17 2-Feb-17 7-Feb-17 29-Jan-17 1-Feb-17 11-Feb-17 14-Feb-17 15-Feb-17 18-Feb-17 240 16-Oct-17 25-Oct-17 9
29-Jan-17 3-Feb-17 8-Feb-17 13-Feb-17 4-Feb-17 7-Feb-17 17-Feb-17 20-Feb-17 21-Feb-17 24-Feb-17 240 22-Oct-17 25-Oct-17 3
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
22-Dec-16 27-Dec-16 31-Dec-16 5-Jan-17 28-Dec-16 31-Dec-16 10-Jan-17 13-Jan-17 14-Jan-17 17-Jan-17 240 14-Sep-17 15-Sep-17 1
31-Dec-16 10-Jan-17 14-Jan-17 19-Jan-17 11-Jan-17 14-Jan-17 24-Jan-17 27-Jan-17 28-Jan-17 31-Jan-17 240 28-Sep-17 30-Dec-99 -13
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 240 18-Sep-17 20-Sep-17 2
15-Dec-16 10-Jan-17 13-Jan-17 15-Jan-17 11-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 21-Jan-17 24-Jan-17 240 21-Sep-17 30-Dec-99 -1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 240 18-Sep-17 20-Sep-17 2
30-Dec-99 30-Dec-99 31-Dec-16 5-Jan-17 28-Dec-16 31-Dec-16 10-Jan-17 13-Jan-17 14-Jan-17 17-Jan-17 240 14-Sep-17 30-Dec-99 6
26-Dec-16 27-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 15-Oct-17 12
18-Dec-16 15-Jan-17 18-Jan-17 20-Jan-17 16-Jan-17 18-Jan-17 22-Jan-17 25-Jan-17 26-Jan-17 29-Jan-17 240 26-Sep-17 30-Dec-99 19
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 240 18-Sep-17 20-Sep-17 2
30-Dec-99 30-Dec-99 5-Jan-17 10-Jan-17 2-Jan-17 5-Jan-17 15-Jan-17 18-Jan-17 19-Jan-17 22-Jan-17 240 19-Sep-17 30-Dec-99 1
8-Dec-16 9-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 240 18-Sep-17 20-Sep-17 2
29-Dec-16 10-Jan-17 14-Jan-17 19-Jan-17 11-Jan-17 14-Jan-17 24-Jan-17 27-Jan-17 28-Jan-17 31-Jan-17 240 28-Sep-17 30-Dec-99 -8
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 240 18-Sep-17 20-Sep-17 2
Prepared by : Checked by : Approved by :
Area Coordinator Scheduler PM / PD
Page 96 of 138
NT PLAN - SUPPLY CONTRACT (MECHANICAL) LONG LEAD ITEMS >210 days Rev.1
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
8-Jan-17 11-Jan-17 15-Jan-17 20-Jan-17 12-Jan-17 15-Jan-17 25-Jan-17 28-Jan-17 29-Jan-17 1-Feb-17 240 29-Sep-17 30-Dec-99 -9
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 20-Sep-17 4
30-Dec-99 30-Dec-99 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 30-Dec-99 4
26-Dec-16 27-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 20-Sep-17 4
30-Dec-99 30-Dec-99 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 30-Dec-99 4
26-Dec-16 27-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
28-Jan-17 2-Feb-17 6-Feb-17 11-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
28-Jan-17 2-Feb-17 6-Feb-17 11-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 240 20-Oct-17 25-Oct-17 5
18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 240 20-Oct-17 25-Oct-17 5
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
10-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 10-Oct-17 7
10-Jan-17 15-Jan-17 19-Jan-17 22-Jan-17 16-Jan-17 18-Jan-17 25-Jan-17 28-Jan-17 29-Jan-17 1-Feb-17 180 31-Jul-17 30-Dec-99 71
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
10-Jan-17 15-Jan-17 19-Jan-17 24-Jan-17 16-Jan-17 19-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 240 3-Oct-17 10-Oct-17 7
10-Jan-17 15-Jan-17 19-Jan-17 22-Jan-17 16-Jan-17 18-Jan-17 25-Jan-17 28-Jan-17 29-Jan-17 1-Feb-17 180 31-Jul-17 30-Dec-99 71
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 240 16-Sep-17 20-Sep-17 4
2-Jan-17 10-Jan-17 14-Jan-17 17-Jan-17 11-Jan-17 13-Jan-17 20-Jan-17 23-Jan-17 24-Jan-17 27-Jan-17 180 26-Jul-17 30-Dec-99 56
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
10-Mar-17 15-Mar-17 19-Mar-17 24-Mar-17 16-Mar-17 19-Mar-17 29-Mar-17 1-Apr-17 2-Apr-17 5-Apr-17 240 1-Dec-17 10-Dec-17 9
10-Mar-17 15-Mar-17 19-Mar-17 24-Mar-17 16-Mar-17 19-Mar-17 29-Mar-17 1-Apr-17 2-Apr-17 5-Apr-17 240 1-Dec-17 10-Dec-17 9
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
28-Jan-17 2-Feb-17 6-Feb-17 11-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
28-Jan-17 2-Feb-17 6-Feb-17 11-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
18-Jan-17 23-Jan-17 28-Jan-17 2-Feb-17 24-Jan-17 27-Jan-17 6-Feb-17 9-Feb-17 10-Feb-17 13-Feb-17 240 11-Oct-17 15-Oct-17 4
23-Jan-17 26-Jan-17 31-Jan-17 5-Feb-17 27-Jan-17 30-Jan-17 9-Feb-17 12-Feb-17 13-Feb-17 16-Feb-17 240 14-Oct-17 30-Dec-99 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
28-Jan-17 2-Feb-17 7-Feb-17 12-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
28-Jan-17 2-Feb-17 7-Feb-17 12-Feb-17 3-Feb-17 6-Feb-17 16-Feb-17 19-Feb-17 20-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 21-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 21-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
23-Dec-16 30-Dec-16 30-Dec-16 10-Jan-17 10-Jan-17 13-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 18-Jan-17 240 15-Sep-17 30-Sep-17 15
29-Dec-16 10-Jan-17 10-Jan-17 10-Jan-17 10-Jan-17 13-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 18-Jan-17 240 15-Sep-17 30-Dec-99 15
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 21-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 19-Feb-17 21-Feb-17 23-Feb-17 240 21-Oct-17 25-Oct-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
9-Feb-17 14-Feb-17 18-Feb-17 23-Feb-17 15-Feb-17 18-Feb-17 28-Feb-17 3-Mar-17 4-Mar-17 7-Mar-17 210 3-Oct-17 10-Oct-17 7
30-Dec-16 12-Jan-17 16-Jan-17 21-Jan-17 13-Jan-17 16-Jan-17 26-Jan-17 29-Jan-17 30-Jan-17 2-Feb-17 210 31-Aug-17 30-Dec-99 40
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
26-Dec-16 31-Dec-16 4-Jan-17 9-Jan-17 1-Jan-17 4-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 210 19-Aug-17 25-Aug-17 6
30-Dec-99 30-Dec-99 1-Jan-17 9-Jan-17 24-Dec-16 1-Jan-17 14-Jan-17 17-Jan-17 18-Jan-17 21-Jan-17 210 19-Aug-17 30-Dec-99 6
4-Dec-16 5-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
24-Dec-16 29-Dec-16 2-Jan-17 7-Jan-17 30-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 210 17-Aug-17 6-Sep-17 20
30-Dec-99 30-Dec-99 2-Jan-17 7-Jan-17 28-Dec-16 2-Jan-17 12-Jan-17 15-Jan-17 16-Jan-17 19-Jan-17 210 17-Aug-17 30-Dec-99 21
23-Dec-16 23-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 210 20-Sep-17 25-Sep-17 5
18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 210 20-Sep-17 25-Sep-17 5
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
25-Jan-17 30-Jan-17 4-Feb-17 9-Feb-17 31-Jan-17 3-Feb-17 13-Feb-17 16-Feb-17 17-Feb-17 20-Feb-17 210 18-Sep-17 25-Sep-17 7
25-Jan-17 30-Jan-17 4-Feb-17 9-Feb-17 31-Jan-17 3-Feb-17 13-Feb-17 16-Feb-17 17-Feb-17 20-Feb-17 210 18-Sep-17 25-Sep-17 7
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
8-Jun-17 9-Jun-17 14-Jun-17 15-Jun-17 10-Jun-17 13-Jun-17 16-Jun-17 19-Jun-17 20-Jun-17 23-Jun-17 210 19-Jan-18 25-Jan-18 6
8-Jun-17 9-Jun-17 14-Jun-17 15-Jun-17 10-Jun-17 13-Jun-17 16-Jun-17 19-Jun-17 20-Jun-17 23-Jun-17 210 19-Jan-18 25-Jan-18 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 210 20-Sep-17 25-Sep-17 5
18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 18-Feb-17 20-Feb-17 22-Feb-17 210 20-Sep-17 25-Sep-17 5
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 10-Nov-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Apr-17 23-Apr-17 25-Apr-17 26-Apr-17 26-Apr-17 28-Apr-17 28-Apr-17 30-Apr-17 3-May-17 4-May-17 210 30-Nov-17 5-Dec-17 5
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
21-Apr-17 23-Apr-17 25-Apr-17 26-Apr-17 26-Apr-17 28-Apr-17 28-Apr-17 30-Apr-17 3-May-17 4-May-17 210 30-Nov-17 5-Dec-17 5
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Jan-17 23-Jan-17 25-Jan-17 26-Jan-17 26-Jan-17 28-Jan-17 28-Jan-17 31-Jan-17 3-Feb-17 5-Feb-17 210 3-Sep-17 5-Sep-17 2
21-Jan-17 23-Jan-17 25-Jan-17 26-Jan-17 26-Jan-17 28-Jan-17 28-Jan-17 31-Jan-17 3-Feb-17 5-Feb-17 210 3-Sep-17 5-Sep-17 2
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1
21-Mar-17 23-Mar-17 25-Mar-17 26-Mar-17 26-Mar-17 28-Mar-17 28-Mar-17 2-Apr-17 7-Apr-17 8-Apr-17 210 4-Nov-17 5-Nov-17 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 5-Oct-17 1
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 5-Oct-17 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 210 4-Oct-17 10-Oct-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
12-Mar-17 13-Mar-17 18-Mar-17 19-Mar-17 14-Mar-17 17-Mar-17 20-Mar-17 23-Mar-17 24-Mar-17 27-Mar-17 210 23-Oct-17 25-Oct-17 2
21-Feb-17 23-Feb-17 25-Feb-17 26-Feb-17 26-Feb-17 28-Feb-17 28-Feb-17 2-Mar-17 7-Mar-17 8-Mar-17 243 6-Nov-17 1-Jul-17 -128
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 28-May-17 30-May-17 210 26-Dec-17 31-Dec-17 5
26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 26-May-17 28-May-17 30-May-17 210 26-Dec-17 31-Dec-17 5
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
27-Feb-17 7-Mar-17 11-Mar-17 19-Mar-17 8-Mar-17 11-Mar-17 27-Mar-17 30-Mar-17 31-Mar-17 3-Apr-17 210 30-Oct-17 31-Oct-17 1
22-Feb-17 28-Feb-17 4-Mar-17 12-Mar-17 1-Mar-17 4-Mar-17 12-Mar-17 15-Mar-17 16-Mar-17 19-Mar-17 180 15-Sep-17 30-Aug-17 -16
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6-Jan-17 12-Jan-17 16-Jan-17 22-Jan-17 13-Jan-17 16-Jan-17 28-Jan-17 31-Jan-17 1-Feb-17 4-Feb-17 210 2-Sep-17 5-Sep-17 3
4-Jan-17 10-Jan-17 14-Jan-17 18-Jan-17 11-Jan-17 14-Jan-17 23-Jan-17 25-Jan-17 26-Jan-17 29-Jan-17 210 27-Aug-17 19-Sep-17 23
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
10-Jan-17 18-Jan-17 22-Jan-17 30-Jan-17 19-Jan-17 22-Jan-17 7-Feb-17 10-Feb-17 11-Feb-17 14-Feb-17 210 12-Sep-17 15-Sep-17 3
1-Jan-17 9-Jan-17 13-Jan-17 21-Jan-17 10-Jan-17 13-Jan-17 21-Jan-17 24-Jan-17 25-Jan-17 28-Jan-17 220 5-Sep-17 20-Aug-17 -16
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
4-Jan-17 9-Jan-17 13-Jan-17 18-Jan-17 10-Jan-17 13-Jan-17 23-Jan-17 26-Jan-17 27-Jan-17 30-Jan-17 210 28-Aug-17 31-Aug-17 3
15-Jan-17 20-Jan-17 24-Jan-17 29-Jan-17 21-Jan-17 24-Jan-17 29-Jan-17 1-Feb-17 2-Feb-17 5-Feb-17 195 19-Aug-17 20-Aug-17 1
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
22-Feb-17 27-Feb-17 3-Mar-17 8-Mar-17 28-Feb-17 3-Mar-17 13-Mar-17 16-Mar-17 17-Mar-17 20-Mar-17 210 16-Oct-17 20-Oct-17 4
17-Feb-17 22-Feb-17 26-Feb-17 3-Mar-17 23-Feb-17 26-Feb-17 3-Mar-17 6-Mar-17 7-Mar-17 10-Mar-17 165 22-Aug-17 15-Aug-17 -7
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3-May-17 8-May-17 12-May-17 17-May-17 9-May-17 12-May-17 22-May-17 25-May-17 26-May-17 29-May-17 210 25-Dec-17 31-Dec-17 6
31-Mar-17 5-Apr-17 9-Apr-17 14-Apr-17 6-Apr-17 9-Apr-17 14-Apr-17 14-Apr-17 15-Apr-17 18-Apr-17 195 30-Oct-17 5-Nov-17 6
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
19-Dec-16 26-Dec-16 26-Dec-16 7-Jan-17 7-Jan-17 10-Jan-17 11-Jan-17 16-Jan-17 17-Jan-17 18-Jan-17 210 16-Aug-17 30-Aug-17 14
30-Dec-99 11-Jan-17 11-Jan-17 21-Jan-17 21-Jan-17 10-Jan-17 11-Jan-17 16-Jan-17 17-Jan-17 18-Jan-17 210 16-Aug-17 30-Dec-99 14
17-Dec-16 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 26-Feb-17 28-Feb-17 210 26-Sep-17 30-Sep-17 4
24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 24-Feb-17 26-Feb-17 28-Feb-17 210 26-Sep-17 30-Sep-17 4
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
29-Dec-16 3-Jan-17 8-Jan-17 13-Jan-17 4-Jan-17 7-Jan-17 17-Jan-17 20-Jan-17 21-Jan-17 24-Jan-17 270 21-Oct-17 25-Oct-17 4
12-Jul-16 12-Jul-16 17-Nov-16 18-Nov-16 19-Nov-16 20-Nov-16 21-Nov-16 22-Nov-16 23-Nov-16 24-Dec-16 0 30-Dec-99 30-Dec-99 0
12-Jul-16 12-Jul-16 17-Nov-16 18-Nov-16 19-Nov-16 20-Nov-16 21-Nov-16 22-Nov-16 23-Nov-16 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2-Aug-16 7-Aug-16 24-Sep-16 1-Oct-16 8-Aug-16 22-Aug-16 29-Aug-16 1-Sep-16 9-Sep-16 30-Sep-16 304 31-Jul-17 5-Aug-17 5
16-Nov-16 17-Nov-16 12-Dec-16 13-Dec-16 14-Dec-16 15-Dec-16 16-Dec-16 23-Dec-16 23-Dec-16 23-Dec-16 0 30-Dec-99 0
16-Nov-16 17-Nov-16 12-Dec-16 13-Dec-16 14-Dec-16 15-Dec-16 16-Dec-16 23-Dec-16 23-Dec-16 23-Dec-16 0 30-Dec-99 30-Dec-99 0
1944-
11-Nov-16 18-Nov-16 26-Nov-16 29-Nov-16 29-Nov-16 29-Nov-16 30-Nov-16 3-Dec-16 4-Dec-16 4-Dec-16 240 1-Aug-17 15-Aug-17 14 IT Water
SVI/VSF1
16-Nov-16 30-Nov-16 11-Dec-16 19-Dec-16 11-Dec-16 11-Dec-16 25-Dec-16 28-Dec-16 29-Dec-16 29-Dec-16 0 30-Dec-99 30-Dec-99 0
16-Nov-16 30-Nov-16 11-Dec-16 19-Dec-16 11-Dec-16 11-Dec-16 25-Dec-16 28-Dec-16 29-Dec-16 29-Dec-16 0 30-Dec-99 30-Dec-99 0
5-Nov-16 12-Nov-16 12-Nov-16 20-Nov-16 20-Nov-16 25-Nov-16 26-Nov-16 28-Nov-16 29-Nov-16 30-Nov-16 300 26-Sep-17 30-Sep-17 4
14-Nov-16 18-Nov-16 7-Dec-16 9-Dec-16 11-Dec-16 13-Dec-16 15-Dec-16 17-Dec-16 19-Dec-16 23-Dec-16 0 30-Dec-99 30-Dec-99 0
14-Nov-16 18-Nov-16 7-Dec-16 9-Dec-16 11-Dec-16 13-Dec-16 15-Dec-16 17-Dec-16 19-Dec-16 23-Dec-16 0 30-Dec-99 30-Dec-99 0
1921-
2-Apr-16 7-Apr-16 14-Apr-16 19-Apr-16 19-Apr-16 16-Apr-16 21-Apr-16 1-Sep-16 9-Sep-16 30-Sep-16 258 15-Jun-17 20-Jun-17 5
SVI/VSF1
2-Apr-16 7-Apr-16 14-Apr-16 19-Apr-16 19-Apr-16 16-Apr-16 21-Apr-16 1-Sep-16 9-Sep-16 30-Sep-16 0 10-Sep-17 30-Dec-99 0
2-Apr-16 19-Apr-16 14-Apr-16 29-Jul-16 25-Jul-16 30-Jul-16 1-Aug-16 6-Aug-16 29-Aug-16 31-Aug-16 375 30-Dec-99 30-Dec-99 0
26-Oct-16 31-Oct-16 4-Nov-16 9-Nov-16 1-Nov-16 4-Nov-16 14-Nov-16 17-Nov-16 18-Nov-16 21-Nov-16 274 21-Aug-17 25-Aug-17 3
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract /
Date/ Award NTP date (Vendor/
Lead on Site PO No.
Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
2-Nov-16 2-Nov-16 29-Oct-16 30-Oct-16 31-Oct-16 1-Nov-16 2-Nov-16 3-Nov-16 4-Nov-16 4-Nov-16 0 30-Dec-99 30-Dec-99 0
2-Nov-16 2-Nov-16 29-Oct-16 30-Oct-16 31-Oct-16 1-Nov-16 2-Nov-16 3-Nov-16 4-Nov-16 4-Nov-16 0 30-Dec-99 30-Dec-99 0
0 30-Dec-99 30-Dec-99 0
Arrive site
Shipment
Status
Potential Vendors Remarks
Arrive site
Shipment
Status
Potential Vendors Remarks
Arrive site
Shipment
Status
Potential Vendors Remarks
Arrive site
Shipment
Status
Potential Vendors Remarks
Carrier
Shuang Liang, Thermax
LG, System Component PVT.LTD
Arrive site
Shipment
Status
Potential Vendors Remarks
Arrive site
Shipment
Status
Potential Vendors Remarks
Arrive site
Shipment
Status
Potential Vendors Remarks
ENMAX
THERMAX
M.E. ENERGY
Combustion Solution
REITZ ( Germany)
Arrive site
Shipment
Status
Potential Vendors Remarks
PT. DGM
Panwater Engineering Sdn Bhd
Seagull, and Southern
Paques Envirionment
( Shanghai) Technology CO Ltd
Auqaflow Ltd, Veolia
Panca Jasa/Invent Germany
Indonesia, PT. Krida
Hangulindo
Bejing Huafu, Metito, Sentai,
PJLKrida
Arrive site
Shipment
Status
Potential Vendors Remarks
Bid Closing
Area Mgr/
Standard
Engineer
% Weightage (based on Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
PR In Issue Call
PR No Discipline Area Description Material Cost and
system For Tender
Servise Contract cost)
Submittal Approval Start Signoff
1 1 CIVIL CD Filter Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
1 0 CD Filter 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
1 0 CD Filter 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
1 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
2 2 CIVIL CD Filter Rebar D16 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
2 0 CD Filter 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
2 0 CD Filter 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
2 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
3 3 CIVIL CD Filter Rebar D19 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
3 0 CD Filter 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
3 0 CD Filter 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
3 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
4 4 CIVIL CD Filter Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
4 0 CD Filter 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
4 0 CD Filter 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
4 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Lime Mud
5 5 CIVIL Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel
Lime Mud
5 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Vessel
Lime Mud
5 0 0 0 0 0 A
Vessel
5
Lime Mud
6 6 CIVIL Rebar D19 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel
Lime Mud
6 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Vessel
Lime Mud
6 0 0 0 0 0 A
Vessel
6
Lime Mud
7 7 CIVIL Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel
Lime Mud
7 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Vessel
Lime Mud
7 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Vessel
7 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
White Liquor
8 8 CIVIL Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel
White Liquor
8 0 0 0 0 0 F 25-Jul-17 30-Jul-17 31-Jul-17 5-Aug-17 6-Aug-17 8-Aug-17 11-Aug-17
Vessel
White Liquor
8 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Vessel
8 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD
Page 113 of 138
P: Plan, F: Forecast, A: Actual
Bid Closing
Area Mgr/
Standard
Engineer
% Weightage (based on Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
PR In Issue Call
PR No Discipline Area Description Material Cost and
system For Tender
Servise Contract cost)
Submittal Approval Start Signoff
White Liquor
9 9 CIVIL Rebar D19 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel
White Liquor
9 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Vessel
White Liquor
9 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Vessel
9 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
White Liquor
10 10 CIVIL Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Vessel
White Liquor
10 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Vessel
White Liquor
10 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Vessel
10 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Lime Mud
11 11 CIVIL Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Pump
Lime Mud
11 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Pump
Lime Mud
11 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Pump
11 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Lime Mud
12 12 CIVIL Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Pump
Lime Mud
12 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Pump
Lime Mud
12 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Pump
12 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
White Liquor
13 13 CIVIL Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Pump
White Liquor
13 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Pump
White Liquor
13 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Pump
13 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Bid Closing
Area Mgr/
Standard
Engineer
% Weightage (based on Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
PR In Issue Call
PR No Discipline Area Description Material Cost and
system For Tender
Servise Contract cost)
Submittal Approval Start Signoff
White Liquor
14 14 CIVIL Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Pump
White Liquor
14 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Pump
White Liquor
14 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Pump
14 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Hot water
15 15 CIVIL booster pump
Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Hot water
15 0 booster pump
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Hot water
15 0 booster pump
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Hot water
16 0 booster pump
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Hot water
16 0 booster pump
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
CD Filter
18 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Feed Pump
CD Filter
18 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Feed Pump
18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Bid Closing
Area Mgr/
Standard
Engineer
% Weightage (based on Enquiry Document / BOQ Technical Clarification
Priority
Buyer
S/No
PR In Issue Call
PR No Discipline Area Description Material Cost and
system For Tender
Servise Contract cost)
Submittal Approval Start Signoff
Filtering
19 19 CIVIL Compressor
Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Filtering
19 0 Compressor
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Filtering
19 0 Compressor
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
19 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Filtering
20 20 CIVIL Compressor
Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Filtering
20 0 Compressor
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Filtering
20 0 Compressor
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
20 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Booster
21 21 CIVIL Compressor
Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Booster
21 0 Compressor
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Booster
21 0 Compressor
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
21
Booster
22 22 CIVIL Compressor
Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
Booster
22 0 Compressor
0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
Booster
22 0 Compressor
0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
22 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Drainage
23 23 CIVIL Rebar D13 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
L50 M
Drainage
23 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
L50 M
Drainage
23 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
L50 M
23 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Drainage
24 24 CIVIL Concrete raw materials 0 0 0 P 24-May-17 29-May-17 30-May-17 2-Jun-17 5-Jun-17 7-Jun-17 10-Jun-17
L50 M
Drainage
24 0 0 0 0 0 F 15-Jul-17 20-Jul-17 21-Jul-17 26-Jul-17 29-Jul-17 31-Jul-17 3-Aug-17
L50 M
Drainage
24 0 0 0 0 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
L50 M
24
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract / Potential
Date/ NTP date (Vendor/
on Site PO No. Vendors
Award Date Supplier/ Contr.)
Lead
Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 20-Jun-17 42906
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 20-Jun-17 42906
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 20-Jun-17 42906
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 20-Jun-17 42906
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 20-Jun-17 42906
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 20-Jun-17 42906
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 20-Jun-17 42906
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 20-Jun-17 42906
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
13-Aug-17 16-Aug-17 18-Aug-17 20-Aug-17 22-Aug-17 26-Aug-17 28-Aug-17 31-Aug-17 2-Sep-17 4-Sep-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD
Page 117 of 138
PROCUREMENT PLAN - CIVIL MATERIALS
This is
Last is
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract / Potential
Date/ NTP date (Vendor/
on Site PO No. Vendors
Award Date Supplier/ Contr.)
Lead
Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract / Potential
Date/ NTP date (Vendor/
on Site PO No. Vendors
Award Date Supplier/ Contr.)
Lead
Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Float
Required Contract / Potential
Date/ NTP date (Vendor/
on Site PO No. Vendors
Award Date Supplier/ Contr.)
Lead
Start Finish Start Finish Start Finish Submittal Approval ETA site
Time
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
12-Jun-17 15-Jun-17 17-Jun-17 19-Jun-17 21-Jun-17 25-Jun-17 27-Jun-17 30-Jun-17 2-Jul-17 4-Jul-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
5-Aug-17 8-Aug-17 10-Aug-17 12-Aug-17 14-Aug-17 18-Aug-17 20-Aug-17 23-Aug-17 25-Aug-17 27-Aug-17 ### 30-Dec-99 20-Jun-17 42906 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 30-Dec-99
Arrive site
Shipment
Status
Remarks
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
Prepared : Area Coordinator Checked : Scheduler Approved : PM / PD
Page 121 of 138
Rev.0
Arrive site
Shipment
Status
Remarks
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
Arrive site
Shipment
Status
Remarks
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
Arrive site
Shipment
Status
Remarks
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
Bid Closing
Area Mgr/
Standard
Engineer
Enquiry Document / BOQ Technical Clarification TES Negotiation Schedu
Buyer
S/No
PR In Issue Call
Discipline Area Description
system For Tender
Submittal Approval Start Signoff Start Finish Start
1 Automation CD Filter Signal Cable P 2-Jun-17 7-Jun-17 8-Jun-17 13-Jun-17 14-Jun-17 16-Jun-17 19-Jun-17 21-Jun-17 24-Jun-17 26-Jun-17
0 CD Filter 0 F 25-Jul-17 30-Jul-17 31-Jul-17 5-Aug-17 6-Aug-17 8-Aug-17 11-Aug-17 13-Aug-17 16-Aug-17 18-Aug-17
0 CD Filter 0 A 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
Arrive site
Shipment
Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Status
Float
Required Contract / Potential
Date/ NTP date (Vendor/ Remarks
on Site PO No. Vendors
Award Date Supplier/ Contr.)
Lead
Finish Start Finish Submittal Approval ETA site
Time
28-Jun-17 30-Jun-17 4-Jul-17 6-Jul-17 9-Jul-17 11-Jul-17 13-Jul-17 ### 30-Dec-99 17-Oct-17 43025
20-Aug-17 22-Aug-17 26-Aug-17 28-Aug-17 31-Aug-17 2-Sep-17 4-Sep-17 ### 30-Dec-99 17-Oct-17 43025
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 ### 30-Dec-99 30-Dec-99 0
Standard
S/No
Bid Closing
Enquiry Document / Award
Area Mgr/
QTY BOQ
% Weightage Contract Awarded to
Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery
Buyer
BOQ Recommendation
Arrive site
Float
S/No
(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential
Unit
Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System
Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
1 UG-FTPL-P082 Annular Plate (A1) 10 thk 8 Pcs 6.00 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr 70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 30-Sep-18 30-Sep-18 0
1500 x 2140 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18
186.3 kg
2 UG-FTPL-P082 Bottom Plate (B1) 10 thk 2 Pcs 0.65 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
635 x 2384 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
87.2 kg
3 UG-FTPL-P082 Bottom Plate (B2) 10 thk 1 Pcs 1.2 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr .70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1500 x 2690 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
310.9 kg
4 UG-FTPL-P082 Back strip 8 thk 8 Pcs 0.1 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
50 x 1403 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
4.4 kg
5 UG-FTPL-P082 Shell Plate (S1/1) 10 thk 1 Pcs 5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1236.4 kg
6 UG-FTPL-P082 Shell Plate (S1/2) 10 thk 1 Pcs 5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1236.4 kg
7 UG-FTPL-P082 Shell Plate (S1/3) 10 thk 1 Pcs 2.5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2500 x 3139 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
616.0 kg
Shell Plate
8 UG-FTPL-P082 (S2/1,S2/2,S3/1,S3/2,S4/1& S4/2) 6 Pcs 17.85 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
6 thk
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
741.8 kg
9 UG-FTPL-P082 Shell Plate (S2/3, S3/3, S4/3) 6 thk 3 Pcs 4.45 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2500 x 3127 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
368.2 kg
10 UG-FTPL-P082 Shell Plate (S5/1) 6 thk 1 Pcs 1.365 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1150 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
341.2 kg
11 UG-FTPL-P082 Shell Plate (S5/2) 6 thk 1 Pcs 1.365 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1150 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
341.2 kg
12 UG-FTPL-P082 Shell Plate (S5/3) 6 thk 1 Pcs 0.675 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1150 x 3127 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
169.4 kg
13 UG-FTPL-P082 Roof Plate (R1) 6 thk 1 Pcs 0.94 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1500 x 4616 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
234.8 kg
14 UG-FTPL-P082 Roof Plate (R2) 6 thk 1 Pcs 1.4 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1500 x 5052 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
348.9 kg
15 UG-FTPL-P082 Roof Plate (R3) 6 thk 1 Pcs 1.235 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
1500 x 4980 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
308.1 kg
16 UG-FTPL-P082 Roof Plate (R4) 6 thk 1 Pcs 0.27 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
627 x 3331 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
67.4 kg
Nozzle - N01 Clean condensate
17 UG-FTPL-P082 1 Pcs 7.7 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
inlet 219.1x12.7
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
9405 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
608 kg
18 UG-FTPL-P082 Nozzle - N01 R.F Pad 131x6 thk 1 Pcs 0.086 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg
Nozzle - N02 Pump Suction 323.9
19 UG-FTPL-P082 1 Pcs 0.338 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
x 17.48
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
202 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
26.7 kg
20 UG-FTPL-P082 Nozzle - N02 R.F Pad 180 x 10 thk 1 Pcs 0.106 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
8.37 kg
SORF Flange NB 300 150 #ASME
21 UG-FTPL-P082 1 Pcs 0.469 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
37 kg
22 UG-FTPL-P082 Nozzle - N03 Vent 219.1x12.7 1 Pcs 0.209 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
256 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
16.5 kg
23 UG-FTPL-P082 Nozzle -N03 R.F Pad 131x6 thk 1 Pcs 0.086 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg
180 Elbow NB200;L.R; Sch80;
24 UG-FTPL-P082 1 Pcs 0.771 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
BW; ASMEB16.9
SA 234 WPB F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
60.9
Bid Closing
Enquiry Document / Award
Area Mgr/
QTY BOQ
% Weightage Contract Awarded to
Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery
Buyer
BOQ Recommendation
Arrive site
Float
S/No
(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential
Unit
Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System
Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
Nozzle - N04 Over flow
25 UG-FTPL-P082 1 Pcs 0.114 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
168.3x10.97
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
206 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
9 kg
26 UG-FTPL-P082 Nozzle - N04 R.F Pad 108 x 6 thk 1 Pcs 0.07 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
5.5 kg
27 UG-FTPL-P082 Nozzle - N05 Drain 168.3 x 10.97 1 Pcs 0.432 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
800 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
34.1 kg
28 UG-FTPL-P082 Nozzle - N05 R.F Pad 10 thk 1 Pcs 0.08 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
200 x 400 A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.3 kg
SORF Flange NB150 150# ASME
29 UG-FTPL-P082 1 Pcs 0.109 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
8.6 kg
Nozzle - N06 Stripped
30 UG-FTPL-P082 1 Pcs 2.657 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
Condensate inlet 114.3x8.56
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
9401 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
209.8 kg
31 UG-FTPL-P082 Nozzle - N06 R.F Pad 94x6 Thk 1 Pcs 0.037 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2.9 kg 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
Nozzle - I01 Inspection Hole
32 UG-FTPL-P082 1 Pcs 0.106 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
323.9x6.35
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
168 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
8.4 kg
33 UG-FTPL-P082 R.F Pad 179x6 thk 1 Pcs 0.17 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
13.4 kg
34 UG-FTPL-P082 Flange Plate 8 thk 1 Pcs 0.075 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
O.D.483/I.D.324 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
5.9 kg
35 UG-FTPL-P082 Cover Plate 8 thk 1 Pcs 0.141 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
483 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
11.1 kg
36 UG-FTPL-P082 Gasket 3 thk 1 Pcs 0.003 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
O.D.483/I.D.324 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg
37 UG-FTPL-P082 Nozzle-M01 Man hole Plate 6 thk 1 Pcs 0.189 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
200x1577 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
14.9 kg
38 UG-FTPL-P082 R.F Pad 265.5x10 thk 1 Pcs 0.641 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
50.6 kg
39 UG-FTPL-P082 Flange Plate 10 thk 1 Pcs 0.189 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
O.D.720/I.D.508 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
14.9 kg
40 UG-FTPL-P082 Cover Plate 10 thk 1 Pcs 0.393 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
720 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
31 kg
41 UG-FTPL-P082 Gasket 3 thk 1 Pcs 0.004 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
O.D.720/I.D.508 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.3 kg
43 UG-FTPL-P082 R.F Pad 80 x 10 thk 1 Pcs 0.042 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.3 kg
SORF Flange NB80 150# ASME
44 UG-FTPL-P082 1 Pcs 0.047 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.7 kg
45 UG-FTPL-P082 Stiffener Plate 10 thk 32 Pcs 2.756 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
295 x 400 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg
46 UG-FTPL-P082 Angle 100x100x6 6 Pcs 0.454 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
650 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
5.98 kg
47 UG-FTPL-P082 Pad 6 thk 6 Pcs 0.053 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
120x120 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
Bid Closing
Enquiry Document / Award
Area Mgr/
QTY BOQ
% Weightage Contract Awarded to
Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery
Buyer
BOQ Recommendation
Arrive site
Float
S/No
(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential
Unit
Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System
Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
0.7 kg
48 UG-FTPL-P082 Handle dia 10 mm 4 Pcs 0.01 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
285 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg
49 UG-FTPL-P082 U-bolt rod 20 3 Pcs 0.068 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
737 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.8 kg
50 UG-FTPL-P082 U-bolt rod 16 3 Pcs 0.027 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
432 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.7 kg
51 UG-FTPL-P082 Wire net 2 mm 1 Pcs 0.003 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
194 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg
52 UG-FTPL-P082 Curb angle 60x60x6 1 Pcs 1.103 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
16123 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
87.1 kg
53 UG-FTPL-P082 Plate 10 thk 1 Pcs 0.022 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
128x168 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.7 kg
54 UG-FTPL-P082 Bolt M24 12 Pcs 0.061 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4017 CL 8.8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
55 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.4 kg
55 UG-FTPL-P082 Nut M24 12 Pcs 0.015 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.1 kg
56 UG-FTPL-P082 Washer M24 12 Pcs 0.009 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06
57 UG-FTPL-P082 Bolt M20 28 Pcs 0.071 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4017 CL 8.8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
55 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg
58 UG-FTPL-P082 Nut M20 28 Pcs 0.021 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg
59 UG-FTPL-P082 Washer M20 28 Pcs 0.011 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03 kg
60 UG-FTPL-P082 Nut M20 6 Pcs 0.005 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg
61 UG-FTPL-P082 Lock nut M20 6 Pcs 0.005 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg
62 UG-FTPL-P082 Washer M20 6 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03
63 UG-FTPL-P082 Nut M 16 6 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03 kg
64 UG-FTPL-P082 Lock nut M 16 6 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03
65 UG-FTPL-P082 Washer M 16 6 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.02
66 UG-FTPL-P082 H-Beam 100x100x6x8 10 Pcs 15.6 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
2076 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
34.3 kg
67 UG-FTPL-P082 Cover plate 12 thk 1 Pcs 4.224 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
OD1200/ID428 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
93 kg
68 UG-FTPL-P082 Compression plate 12 thk 1 Pcs 1.023 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
OD710/ID448 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
22.5 kg
69 UG-FTPL-P082 Central drum plate 16 thk 1 Pcs 3.57 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
Bid Closing
Enquiry Document / Award
Area Mgr/
QTY BOQ
% Weightage Contract Awarded to
Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery
Buyer
BOQ Recommendation
Arrive site
Float
S/No
(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential
Unit
Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System
Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
300 x 2086 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
78.6 kg
70 UG-FTPL-P082 Gusset plate 12 thk 10 Pcs 0.681 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
150x150 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.5 kg
71 UG-FTPL-P082 Rib plate 12 thk 10 Pcs 1.272 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
100x300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2.8 kg
72 UG-FTPL-P082 Gusset plate 12 thk 10 Pcs 0.816 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
160x160 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.8 kg
73 UG-FTPL-P082 Pad Plate 12 thk 10 Pcs 1.089 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
170 x 210 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2.4 kg
74 UG-FTPL-P082 Seating Plate 10 thk 10 Pcs 0.816 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
140 x 160 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.8 kg
75 UG-FTPL-P082 H-Beam 100x100x6x8 10 Pcs 0.909 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 0 30-Sep-18 30-Sep-18 0
120 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2 kg 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
Bid Closing
Enquiry Document / Award
Area Mgr/
QTY BOQ
% Weightage Contract Awarded to
Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery
Buyer
BOQ Recommendation
Arrive site
Float
S/No
(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential
Unit
Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System
Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
1 UG-FTPL-P082 Annular Plate (A1) 10 thk 8 Pcs 6.00 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr 70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1500 x 2140 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18
186.3 kg
2 UG-FTPL-P082 Bottom Plate (B1) 10 thk 2 Pcs 0.65 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
635 x 2384 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
87.2 kg
3 UG-FTPL-P082 Bottom Plate (B2) 10 thk 1 Pcs 1.2 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr .70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1500 x 2690 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
310.9 kg
4 UG-FTPL-P082 Back strip 8 thk 8 Pcs 0.1 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
50 x 1403 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
4.4 kg
5 UG-FTPL-P082 Shell Plate (S1/1) 10 thk 1 Pcs 5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1236.4 kg
6 UG-FTPL-P082 Shell Plate (S1/2) 10 thk 1 Pcs 5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1236.4 kg
7 UG-FTPL-P082 Shell Plate (S1/3) 10 thk 1 Pcs 2.5 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2500 x 3139 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
616.0 kg
Shell Plate
8 UG-FTPL-P082 (S2/1,S2/2,S3/1,S3/2,S4/1& S4/2) 6 Pcs 17.85 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
6 thk
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2500 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
741.8 kg
9 UG-FTPL-P082 Shell Plate (S2/3, S3/3, S4/3) 6 thk 3 Pcs 4.45 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2500 x 3127 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
368.2 kg
10 UG-FTPL-P082 Shell Plate (S5/1) 6 thk 1 Pcs 1.365 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1150 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
341.2 kg
11 UG-FTPL-P082 Shell Plate (S5/2) 6 thk 1 Pcs 1.365 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1150 x 6300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
341.2 kg
12 UG-FTPL-P082 Shell Plate (S5/3) 6 thk 1 Pcs 0.675 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1150 x 3127 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
169.4 kg
13 UG-FTPL-P082 Roof Plate (R1) 6 thk 1 Pcs 0.94 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1500 x 4616 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
234.8 kg
14 UG-FTPL-P082 Roof Plate (R2) 6 thk 1 Pcs 1.4 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1500 x 5052 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
348.9 kg
15 UG-FTPL-P082 Roof Plate (R3) 6 thk 1 Pcs 1.235 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
1500 x 4980 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
308.1 kg
16 UG-FTPL-P082 Roof Plate (R4) 6 thk 1 Pcs 0.27 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
627 x 3331 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
67.4 kg
Nozzle - N01 Clean condensate
17 UG-FTPL-P082 1 Pcs 1.609 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
inlet 219.1x12.7
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
9405 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
608 kg
18 UG-FTPL-P082 Nozzle - N01 R.F Pad 131.5x6 thk 1 Pcs 0.036 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg
Nozzle - N02 Pump Suction
19 UG-FTPL-P082 1 Pcs 0.147 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
273x15.09
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
193 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
18.5 kg
20 UG-FTPL-P082 Nozzle - N02 R.F Pad 162 x 10 thk 1 Pcs 0.185 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
17.5 kg
SORF Flange NB 250 150 #ASME
21 UG-FTPL-P082 1 Pcs 0.258 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
19.5 kg
22 UG-FTPL-P082 Nozzle - N03 Vent 219.1x12.7 1 Pcs 0.262 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
256 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
16.5 kg
23 UG-FTPL-P082 Nozzle -N03 R.F Pad 131x6 thk 1 Pcs 0.126 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg
180 Elbow NB200;L.R; Sch80;
24 UG-FTPL-P082 1 Pcs 1.289 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
BW; ASMEB16.9
SA 234 WPB F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
Bid Closing
Enquiry Document / Award
Area Mgr/
QTY BOQ
% Weightage Contract Awarded to
Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery
Buyer
BOQ Recommendation
Arrive site
Float
S/No
(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential
Unit
Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System
Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
60.9
Nozzle - N04 Over flow
25 UG-FTPL-P082 1 Pcs 0.317 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
219.1x12.7
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
206 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
13.3 kg
26 UG-FTPL-P082 Nozzle - N04 R.F Pad 139 x 6 thk 1 Pcs 0.196 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
7.4 kg
27 UG-FTPL-P082 Nozzle - N05 Drain 219.1x12.7 1 Pcs 1.505 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
800 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
51.7 kg
28 UG-FTPL-P082 Nozzle - N05 R.F Pad 139x10 thk 1 Pcs 0.197 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.2 kg
SORF Flange NB150 150# ASME
29 UG-FTPL-P082 1 Pcs 0.471 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
13.7 kg
30 UG-FTPL-P082 Curb Angle 60x60x6 1 Pcs 3.227 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
16213 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
87.1 kg
31 UG-FTPL-P082 Plate 12 thk 1 Pcs 0.139 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
169 x 219 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.5 kg
Nozzle - I01 Inspection Hole
32 UG-FTPL-P082 1 Pcs 0.356 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
323.9x6.35
SA 106 Gr.B F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
168 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
8.4 kg
33 UG-FTPL-P082 R.F Pad 179x6 thk 1 Pcs 0.603 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
13.4 kg
34 UG-FTPL-P082 Flange Plate 8 thk 1 Pcs 0.281 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
O.D.483/I.D.324 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
5.9 kg
35 UG-FTPL-P082 Cover Plate 8 thk 1 Pcs 0.558 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
483 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
11.1 kg
36 UG-FTPL-P082 Gasket 3 thk 1 Pcs 0.011 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
O.D.483/I.D.324 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg
37 UG-FTPL-P082 Nozzle-M01 Man hole Plate 6 thk 1 Pcs 0.828 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
200x1577 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
14.9 kg
38 UG-FTPL-P082 R.F Pad 265.5x10 thk 1 Pcs 3.057 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
52.5 kg
39 UG-FTPL-P082 Flange Plate 10 thk 1 Pcs 0.907 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
O.D.720/I.D.508 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
14.9 kg
40 UG-FTPL-P082 Cover Plate 10 thk 1 Pcs 1.969 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
720 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
31 kg
41 UG-FTPL-P082 Gasket 3 thk 1 Pcs 0.02 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
O.D.720/I.D.508 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.3 kg
43 UG-FTPL-P082 R.F Pad 86.5x 10 thk 1 Pcs 0.272 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.8 kg
SORF Flange NB80 150# ASME
44 UG-FTPL-P082 1 Pcs 0.274 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
B16.5
SA 105 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
3.7 kg
45 UG-FTPL-P082 Stiffener Plate 10 thk 32 Pcs 0.576 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
295 x 400 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6.8 kg
46 UG-FTPL-P082 Angle 100x100x6 3 Pcs 0.048 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
650 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
6 kg
Bid Closing
Enquiry Document / Award
Area Mgr/
QTY BOQ
% Weightage Contract Awarded to
Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery
Buyer
BOQ Recommendation
Arrive site
Float
S/No
(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential
Unit
Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System
Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
47 UG-FTPL-P082 Pad 6 thk 3 Pcs 0.006 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
120x120 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.7 kg
48 UG-FTPL-P082 Handle dia 10 mm 4 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 516 Gr.70 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
285 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg
49 UG-FTPL-P082 U-bolt rod 20 3 Pcs 0.014 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
737 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.8 kg
50 UG-FTPL-P082 Wire net 2 mm 1 Pcs 0.001 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
194 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg
51 UG-FTPL-P082 Nut M20 6 Pcs 0.001 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8.0 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg
52 UG-FTPL-P082 Lock Nut M20 6 Pcs 0.001 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8.0 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg
53 UG-FTPL-P082 Washer M20 6 Pcs 0.0005 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03 kg
54 UG-FTPL-P082 Bolt M24 12 Pcs 0.013 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4017 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
55 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.4 kg
55 UG-FTPL-P082 Nut M24 12 Pcs 0.003 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.1 kg
56 UG-FTPL-P082 Washer M24 12 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06
57 UG-FTPL-P082 Bolt M20 28 Pcs 0.015 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4017 CL 8.8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
55 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.2 kg
58 UG-FTPL-P082 Nut M20 28 Pcs 0.004 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
ISO 4032 CL 8 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.06 kg
59 UG-FTPL-P082 Washer M20 28 Pcs 0.002 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
F 436 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
0.03 kg
60 UG-FTPL-P082 H-Beam 100x100x6x8 10 Pcs 15.6 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
2076 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
34.3 kg
61 UG-FTPL-P082 Cover plate 12 thk 1 Pcs 4.224 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
OD1200/ID428 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
93 kg
62 UG-FTPL-P082 Compression plate 12 thk 1 Pcs 1.023 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
OD710/ID448 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
22.5 kg
63 UG-FTPL-P082 Central drum plate 16 thk 1 Pcs 3.57 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
300 x 2086 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
78.6 kg
64 UG-FTPL-P082 Gusset plate 12 thk 10 Pcs 0.681 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
150x150 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.5 kg
65 UG-FTPL-P082 Rib plate 12 thk 10 Pcs 1.272 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
100x300 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2.8 kg
66 UG-FTPL-P082 Gusset plate 12 thk 10 Pcs 0.816 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
160x160 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
1.8 kg
67 UG-FTPL-P082 Pad Plate 12 thk 10 Pcs 1.089 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
170 x 210 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2.4 kg
68 UG-FTPL-P082 Seating Plate 10 thk 10 Pcs 0.816 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
140 x 160 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
Bid Closing
Enquiry Document / Award
Area Mgr/
QTY BOQ
% Weightage Contract Awarded to
Standard
Engineer
Technical Clarification TES Negotiation Schedule Commercial Evaluation PR In Vendor Delivery
Buyer
BOQ Recommendation
Arrive site
Float
S/No
(based on Material Issue Call Date/ PR In SAP PO In SAP Required (Vendor/ Contract / Potential
Unit
Shipment
Enquiry No PR No Description Marian NTP date Remarks
Cost and Servise For Tender Award System System on Site Supplier/ PO No. Vendors
System
Status
Contract cost) Date Contr.)
Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Lead Time ETA site
1.8 kg
69 UG-FTPL-P082 H-Beam 100x100x6x8 10 Pcs 0.909 P 13-May-18 18-May-18 21-May-18 24-May-18 25-May-18 28-May-18 29-May-18 1-Jun-18 2-Jun-18 5-Jun-18 6-Jun-18 9-Jun-18 10-Jun-18 11-Jun-18 12-Jun-18 13-Jun-18 14-Jun-18 15-Jun-18 16-Jun-18 45 31-Jul-18 5-Aug-18 5
SA 36 F 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 8-Sep-18 11-Sep-18 16-Sep-18 17-Sep-18 18-Sep-18 19-Sep-18 20-Sep-18 21-Sep-18 22-Sep-18 25-Sep-18 5 30-Sep-18 30-Sep-18 15
120 mm A 13-May-18 13-May-18 21-May-18 30-Jun-18 1-Jul-18 25-Jul-18 26-Jul-18 29-Jul-18 30-Jul-18 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 0 30-Dec-99 30-Dec-99 0
2 kg
Arrive site
Bid Closing
Shipment
Standard
QTY BOQ
% Weightage (based on Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Area Mgr/
Priority
Engineer
Status
Buyer
S/No
Float
Contract /
Unit
Enquiry No PR No Description Material Cost and Servise PR In system Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Lead on Site PO No.
Contract cost) Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
Deform Bar (P0174); Deform Bar,
1 1 Carbon Steel, U39, Diameter: 13 212 P 20-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 28-Oct-18 30-Oct-18 2
mm, Length: 12 m, Weight: 12.51 kg
1 F 20-Sep-18
1 A 20-Sep-18
1
Deform Bar (P0174); Deform Bar,
2 2 Carbon Steel, U39, Diameter: 16 314 P 20-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 28-Sep-18 ### 28-Oct-18 30-Oct-18 2 30-Dec-99
mm, Length: 12 m, Weight: 18.95 kg 30-Dec-99 30-Dec-99
13 F
13 A
13
14 14 P
14 F
14 A
14
15 15 P
15 F
15 A
15
16 16 P
16 F
16 A
16
17 17 P
17 F
17 A
17
18 18 P
18 F
18 A
18
19 19 P
19 F
19 A
19
20 20 P
20 F
20 A
20
21 21 P
21 F
21 A
21
22 22 P
22 F
22 A
22
23 25 P
25 F
25 A
25
Arrive site
Bid Closing
Shipment
Standard
QTY BOQ
% Weightage (based on Enquiry Document / BOQ Technical Clarification TES Negotiation Schedule Commercial Evaluation Award Recommendation Contract Vendor Delivery Awarded to
Area Mgr/
Priority
Engineer
Status
Buyer
S/No
Float
Contract /
Unit
Enquiry No PR No Description Material Cost and Servise PR In system Date/ Award NTP date (Vendor/ Potential Vendors Remarks
For Tender Lead on Site PO No.
Contract cost) Submittal Approval Start Signoff Start Finish Start Finish Start Finish Submittal Approval Date ETA site Supplier/ Contr.)
Time
24 26 P
26 F
26 A
26
25 27 P
27 F
27 A
27
26 28 P
28 F
28 A
28
27 29 P
29 F
29 A
29
28 30 P
30 F
30 A
30
29 31 P
31 F
31 A
31
30 32 P
32 F
32 A
32
31 33 P
33 F
33 A
33
32 34 P
34 F
34 A
34
25 35 P
35 F
35 A
35
26 35 P
35 F
35 A
35
27 35 P
35 F
35 A
35
28 35
35
35
35
29 35
35
35
35
30 35
35
35
35
31 35
35
35
35
32 35
35
35
35
33 35
35
35
35