Вы находитесь на странице: 1из 11

AIRWORTHINESS DIRECTIVE

WORK ORDER
ENGINEERING AND PPC DEPARTMENT

W/O No. 1698/PPC/VII/18/ATR72-600 PRIORITY URGENT SCHEDULE 02 Jul 2018


DATE
AIRCRAFT REG. PK - NYZ / MSN. 1128 DUE AT/ON 09 Jul 2018

WORK UNIT LINE MAINTENANCE ISSUED DATE 02-Jul-2018 NAME ISSUED NURMAN

TOTAL A/C MAINT.LOG. MAN


TOTAL A/C HOURS
CYCLES PAGE HRS
TYPE Of WORK
PLEASE PERFORMED AD 2018-0105 ELECTRICAL HARNESS BRACKETS AND WIRE BUNDLES -
INSPECTION OF CLAMPS ON ELECTRICAL ROUTING AT FRAME 20 ON PK-NYZ DUE TO SCHEDULE.

REFF. EO NO : 92-003-18

ACTION TAKEN :

RESULT :

Part No. Part No.


Off On
Serial No. Serial No.
Off On
S.T.A COMPL. DATE SIGN COMPL.

Jakarta , 02 Jul 2018 CHIEF LM QA INSPECTOR


SIGN And STAMP SIGN And STAMP

Name : .............. Name : ..............


(Aprilliansah ) Date : .............. Date : ..............

NAM Form NA-E-010 R1 (Sep 2015)


DATE : 22 June 2018
ENGINEERING ORDER
ARCFT REG : PK- NYZ

SOURCE REFF : WORK AREA ZONE EO NO : EO 92-003-18


EASA AD 2018-0105, COCKPIT
230 WO NO :
SB No. ATR72-92-1044 AND CABIN

SUBJECT : ATA 92 – Electric / Electronic Common Installation – Electrical Harness Brackets


and Wire Bundles – Inspection of clamps on electrical routing at frame 20

AD REFERENCES : EASA AD 2018-0105 (Effective May 22th, 2018)

ATR REFERENCES : 1. Service Bulletin No. ATR72-92-1044 Revison 2 (April 12th, 2018)
2. AMM 06-41-20
3. AMM (JIC) 24-40-00 EAD 10000
4. AMM (JIC) 25-23-23 RAI 10000

EFFECTIVITY : ATR 72-212A aeroplanes, MSN 1048 to 1200 inclusive, 1220 to 1353 inclusive,
1355 to 1380 inclusive, 1382, 1385 and 1388.

Group 1 Aeroplanes :
PK-NYT (MSN 1170)

Group 2 Aeroplanes :
PK-NYU (MSN 1153), PK-NYV (MSN 1099), PK-NYW (MSN 1158), PK-NYY
(MSN 1093), PK-NYZ (MSN 1128)

COMPLIANCE : Accomplishment of this Service Bulletin is mandatory.


The Airworthiness Directive No. 2017-0118 has been issued by EASA

REASONS : An event was reported of several spurious alarms on a recently delivered ATR
72 aeroplane.

During subsequent trouble-shooting, damage was found on the electrical


harness wire bundle (Route 1M), due to chafing with a window blinding panel
located on the left-hand (LH) side of the fuselage, zone 231.

A bracket, necessary to maintain the harness wire bundle close to the structure
of the fuselage and avoid chafing, was missing.

The same bracket was also found missing on the right-hand (RH) side of the
fuselage, zone 232, Route 2M, although without damage on the harness wire
bundle.

A quality investigation revealed another aeroplane on the production line where


same brackets were not installed.

This condition, if not detected and corrected, may lead to wire failure (cut or
shorted) and, in case of several failures in combination, to loss of systems,
possibly resulting in reduced control of the aeroplane.

NAM Form NA-E-020A R0 (Aug 2017) Page 1 of 10


DATE : 22 June 2018
ENGINEERING ORDER
ARCFT REG : PK- NYZ

SOURCE REFF : WORK AREA ZONE EO NO : EO 92-003-18


EASA AD 2018-0105, COCKPIT
230 WO NO :
SB No. ATR72-92-1044 AND CABIN

PARTS/MATERIALS :
REQUIRED

TOOLS, OR : Use standard tools, no need of special tools


EQUIPMENT

MANHOURS :

FIGURES/OTHER : NONE
REFERENCE

OTHERS : For any defects found, report to Engineering

REVISION NOTE : Original Issue

NAM Form NA-E-020A R0 (Aug 2017) Page 3 of 10


DATE : 22 June 2018
ENGINEERING ORDER
ARCFT REG : PK- NYZ

SOURCE REFF : WORK AREA ZONE EO NO : EO 92-003-18


EASA AD 2018-0105, COCKPIT
230 WO NO :
SB No. ATR72-92-1044 AND CABIN
SIGN
ACCOMPLISHMENT INSTRUCTIONS
LAME MECH RII

A. GENERAL INFORMATION
The following instructions assume that work will be accomplished when the aircraft is
in the appropriate maintenance configuration.

B. JOB SET UP
1. De-energize the aircraft electrical network and connect the aircraft to ground
as per AMM (JIC) 24-40-00 EAD 10000. ......... ......... X

2. In passenger compartment, remove side wall panels 231DW and 232DW as


per AMM (JIC) 25-23-23 RAI 10000 (Refer to AMM 06-41-20).
......... ......... X

C. INSPECTION

NOTE : During accomplishment of this Engineering Order, fill the enclosed


Accomplishment Report and send it back to engineering services.

1. In zones 231 and 232, inspection of clamps on electrical routing.


Inspect all the parts listed in the following table.

......... ......... X

Note : Jump to Paragraph 3.E. (Close-Up) if you found the clamps


properly installed and mark the Paragraph 3.D (TASK-1) with
N/A sign

2. Please record all inspection result in ATR SB form on page 10 ......... ......... X

NAM Form NA-E-020A R0 (Aug 2017) Page 4 of 10


DATE : 22 June 2018
ENGINEERING ORDER
ARCFT REG : PK- NYZ

SOURCE REFF : WORK AREA ZONE EO NO : EO 92-003-18


EASA AD 2018-0105, COCKPIT
230 WO NO :
SB No. ATR72-92-1044 AND CABIN
SIGN
ACCOMPLISHMENT INSTRUCTIONS
LAME MECH RII

D. TASK 1 - INSTALLATION OF CLAMP

CAUTION : THIS TASK IS ONLY PRESENTED FOR ONE SIDE. PLEASE


PERFORM BOTH SIDE
1. Installation of clamps on electrical routing
Install all the parts listed in the following table

......... ......... X

See attached picture for more information

2. Perform paragraph 3.E. (CLOSE-UP) ......... ......... X

E. CLOSE-UP

1. In passenger compartment, re-install side wall panels 231DW and 232DW as ......... ......... X
per AMM (JIC) 25-23-23 RAI 10000 (Refer to AMM 06-41-20).

2. Re-energize the aircraft electrical network and disconnect the aircraft from ......... ......... X
ground as per AMM (JIC) 24-40-00 EAD 10000.

NAM Form NA-E-020A R0 (Aug 2017) Page 5 of 10


DATE : 22 June 2018
ENGINEERING ORDER
ARCFT REG : PK- NYZ

SOURCE REFF : WORK AREA ZONE EO NO : EO 92-003-18


EASA AD 2018-0105, COCKPIT
230 WO NO :
SB No. ATR72-92-1044 AND CABIN

Figure 1

NAM Form NA-E-020A R0 (Aug 2017) Page 6 of 10


DATE : 22 June 2018
ENGINEERING ORDER
ARCFT REG : PK- NYZ

SOURCE REFF : WORK AREA ZONE EO NO : EO 92-003-18


EASA AD 2018-0105, COCKPIT
230 WO NO :
SB No. ATR72-92-1044 AND CABIN

Figure 2

NAM Form NA-E-020A R0 (Aug 2017) Page 7 of 10


DATE : 22 June 2018
ENGINEERING ORDER
ARCFT REG : PK- NYZ

SOURCE REFF : WORK AREA ZONE EO NO : EO 92-003-18


EASA AD 2018-0105, COCKPIT
230 WO NO :
SB No. ATR72-92-1044 AND CABIN

Figure 3

NAM Form NA-E-020A R0 (Aug 2017) Page 8 of 10


DATE : 22 June 2018
ENGINEERING ORDER
ARCFT REG : PK- NYZ

SOURCE REFF : WORK AREA ZONE EO NO : EO 92-003-18


EASA AD 2018-0105, COCKPIT
230 WO NO :
SB No. ATR72-92-1044 AND CABIN

Figure 4

NAM Form NA-E-020A R0 (Aug 2017) Page 9 of 10


DATE : 22 June 2018
ENGINEERING ORDER
ARCFT REG : PK- NYZ

SOURCE REFF : WORK AREA ZONE EO NO : EO 92-003-18


EASA AD 2018-0105, COCKPIT
230 WO NO :
SB No. ATR72-92-1044 AND CABIN

NAM Form NA-E-020A R0 (Aug 2017) Page 10 of 10

Вам также может понравиться