Вы находитесь на странице: 1из 6

LIST OF PROPOSED 16 CIRCLES:

SL.NO. PROPOSED CIRCLE No. of proposed ROs

1 AHMEDABAD 4

2 BANGALORE 10

3 BHOPAL 4

4 CHANDIGARH 7

5 CHENNAI 9

6 DELHI 8

7 GUWAHATI 2

8 HYDERABAD 3

9 KOLKATA 5

10 LUCKNOW 7

11 MADURAI 6

12 MANGALORE 8

13 MUMBAI 6

14 PATNA 6

15 TRIVANDRUM 9

16 VIJAYAWADA 4
Total 98

11
LIST OF PROPOSED 98 REGIONAL OFFICES:
PROPOSED
SL.NO. SL.NO. PROPOSED RO
CIRCLE
1 AHMEDABAD 1 AHMEDABAD
2 SURAT
3 JAIPUR
4 JODHPUR
2 BANGALORE 1 BANGALORE METRO- I
2 BANGALORE METRO- II
3 BANGALORE METRO- III
4 BANGALORE RURAL
5 DAVANAGERE
6 GULBARGA
7 MANDYA
8 MYSORE
9 RAICHUR
10 TUMKUR
3 BHOPAL 1 BHOPAL
2 INDORE
3 JABALPUR
4 RAIPUR
4 CHANDIGARH 1 CHANDIGARH
2 JALANDHAR
3 AMRITSAR
4 LUDHIANA
5 KARNAL
6 ROHTAK
7 SHIMLA
5 CHENNAI 1 CHENNAI -I
2 CHENNAI -II
3 KANCHEEPURAM
4 COIMBATORE
5 TIRUPPUR
6 ERODE
7 SALEM
8 PONDICHERRY
9 VELLORE

12
PROPOSED
SL.NO. SL.NO. PROPOSED RO
CIRCLE
6 DELHI 1 CENTRAL DELHI
2 NORTH DELHI
3 SOUTH DELHI
4 WEST DELHI
5 GURGAON
6 GHAZIABAD
7 MEERUT
8 DEHRADUN
7 GUWAHATI 1 GUWAHATI
2 TEJPUR
8 HYDERABAD 1 HYDERABAD
2 RANGAREDDY
3 WARANGAL
9 KOLKATA 1 KOLKATA -I
2 KOLKATA -II
3 DURGAPUR
4 BHUBANESHWAR
5 SAMBALPUR
10 LUCKNOW 1 LUCKNOW
2 BAREILLY
3 KANPUR
4 VARANASI
5 AGRA
6 ALIGARH
7 ETAH
11 MADURAI 1 MADURAI
2 TIRUNELVELI
3 TOOTHUKUDI
4 TRICHY
5 DINDIGUL
6 THANJAVUR

13
PROPOSED
SL.NO. SL.NO. PROPOSED RO
CIRCLE
12 MANGALORE 1 MANGALORE

2 BELGAUM

3 CHICKMAGALUR

4 HASSAN

5 HUBLI

6 SHIMOGA

7 UDUPI

8 GOA
13 MUMBAI 1 NORTH MUMBAI

2 SOUTH MUMBAI

3 THANE

4 PUNE

5 NAGPUR

6 AURANGABAD

14 PATNA 1 PATNA

2 PURNEA

3 GAYA

4 MUZAFFARPUR

5 JAMSHEDPUR

6 RANCHI

14
PROPOSED
SL.NO. SL.NO. PROPOSED RO
CIRCLE

15 TRIVANDRUM 1 TRIVANDRUM

2 ERNAKULAM

3 KANNUR
4 KOLLAM
5 KOTTAYAM

6 KOZHIKODE (CALICUT)

7 MALAPPURAM

8 PALAKKAD

9 THRISSUR
16 VIJAYAWADA 1 VIJAYAWADA

2 VISAKHAPATNAM

3 KURNOOL

4 TIRUPATI

15
IMPLEMENTATION PLAN :
The organizational re-structuring will be implemented in 2 Phases as under :

Availability of Premises for


Sl. Phase Circle Regional
Date proposed ROs
No. office office
Existing New

1 I 01.04.2016 2 19 9 10

2 II 01.07.2016 / 14 79 47 32
01.10.2016

Total 16 98 56 42

Implementation Plan w.e.f. 01.04.2016 for Phase-1, as under :

Sl.No. PARTICULARS

1. 2 Circles ( Bangalore and Trivandrum) with formation of 19 ROs.

2. Re-organization of 3 Corporate Credit Wings as Prime Corporate Credit


Wing, Corporate Credit Wing I & II.

3. PCBs shall directly function under PCC Wing.

4. Formation of Subsidiarie s & Associates Wing.

5. De -linking of STC from HR Wing & commence functioning as a separate


vertical.

6. Merger of LB & RRB Wing with PC&FI Wing.

7. Functioning of International Operations Wing with new responsibilities.

Phase- II :: 14 Circles consisting of 79 ROs will function with independent infrastructure


w.e.f. 01.07.2016/01.10.2016 or as decided by the MD & CEO, who is delegated with the
powers for any additions/modifications/deletions to the present/proposed structure by the
Board of Directors.

However, the business bifurcations (targets, achievement and review) will be effective
from 01.04.2016.

16

Вам также может понравиться