CHEMISTRY DAILY REPORT

24-Jun-18

Sl. SBU-1 SBU-2


Parameter Unit
No.
1 2 1
1 Raw water drawn from steel Cum 8341 13276
2 Net Raw Water Consn: Cum 5158 16237
3 Specific Raw water cum/MU 2880 1894
4 D.M / Hot well Make Up : Cum 0 31 153
Drum Blow down Quantity:
5 Ton 0 0 0
(calculated)
6 D.M Water Generation : Cum 680 1804
7 U.F Water Generation : Cum 2243
L.O.I of Fly ash Hopper/Composite % S/D 15.2/18.8 4.0/2.6
8
:

9 Drum water silica@ 23:00 hrs ppb S/D 148 98

10 CEP Cation Cond us/cm S/D 0.197 0.301


10 Make Up Water @23:00 hrs SBU-1 SBU-2
Hardness : ppm 80 96
TDS : ppm 192 255
Chlorides : ppm 35 54
11 CW
Hardness : ppm 696 636
TDS : ppm 2905 2346
Chlorides : ppm 462 434
12 C.W C.O.C : 8.7 6.6

13 RO PLANT
SKID IN SERVICE DP TDS TDS (RO FEED)
RO-SKID#1 S/D S/D
S/D
RO-SKID#2 S/D S/D
RO PRODUCTION (M3) 0 Utilisation as per design(%) Derated Utilisation(%)

Day Monthly Day


RO Production Cost :
(Chemical ) (Rs/cum) 0.0
0.0 37.4 0.0
14

Unit-CW Blow down SBU-1 SBU 2 CPP3&4 Total


Total CW blow down 0 0 78 78
(cum/hr)
Intake to RO Plant (cum/hr) 0 0 0 0
CT Blow down to Guard pond (excl 0 0 78 78
ROP reject) (cum/hr)

RO plant reject ( cum/hr) 0 0 0 0


Plant Outlet to Guard pond 78
(cum/hr)
AILY REPORT

SBU-2 CPP
CDQ
2 3 4 1 2
13276 24602
4652 4917 4287
16237 24665
1894 2260 2372 2540
1674 162 63 14 93

1574 0 0 - -
Total water
1804 150.2 Drawn From
Steel including
2243 117.5 CDQ in cum
3.3/3.7 13.4/12.5 8.6/13.4

417 S/D 65
0.181 S/D 0.513
SBU-2 CPP-3&4 CPP1 CPP2
96 96 92 112
60075
255 255 182 259
54 54 31 48

636 864 928 900


2346 3003 2652 2106
434 544 511 457
6.6 9.0 10.1 8.0

TDS (RO FEED) Plant Running (Hrs.) Shut down hrs


0:00 24.00
S/D
0:00 24.00
Derated Utilisation(%) PLF(%) 0.0
Monthly
RO PLANT SHUT DOWN FOR UF STORAGE TANK CIVIL MAINTANANCE
48.5 WORK.
APH O2 Analysis Report
PASS A PASS B
I/L 4.9 I/L 4.8
O/L 9.5 O/L 7.9

ESP O/L 10.2 ESP O/L 9.2