1.

1 STANDARD Page 1 1of 22: Section 6 – Procedure Pre-Qualification Testing of The


Approved Systems
Add after 1st paragraph:
“Within 4 days of completing all prequalification testing, the coating applicator shall submit
CONTRACTOR / COMPANY a written comprehensive report of the test result of procedure
qualification.”

1.2 STANDARD Page 12 of 22: Section 6 – Procedure Pre-Qualification Testing of The


Approved Systems
Delete Table 6.1.

1.3 STANDARD Page 13 of 22: Section 6 – Procedure Pre-Qualification Testing of The


Approved Systems
Add the following in the Table 6.2