1 STANDARD Page 1 1of 22: Section 6 – Procedure Pre-Qualification Testing of The
Approved Systems Add after 1st paragraph: “Within 4 days of completing all prequalification testing, the coating applicator shall submit CONTRACTOR / COMPANY a written comprehensive report of the test result of procedure qualification.”
1.2 STANDARD Page 12 of 22: Section 6 – Procedure Pre-Qualification Testing of The
Approved Systems Delete Table 6.1.
1.3 STANDARD Page 13 of 22: Section 6 – Procedure Pre-Qualification Testing of The
Approved Systems Add the following in the Table 6.2