Hydraulic Power Tong Operation Manual
Copyright
Declaration
Though we have collated carefully,there might be s-ome bugs in
------------------------------------------------------------------------------------------------------------------------
2
Hydraulic Power Tong Operation Manual
SLD SAFETY INSTRUCTION AND LEGEND
Safety Instruction
1. Operator must read and know this manual well.
2. Tie the back guy according to the instruction. Don’t tie it in the wrong direction.
3. The safety door must be closed as making-up or breaking-out.
4. Don’t touch the running parts by hands when the tong is running.
5. Any sundries mustn’t be placed in the working area.
6. The pump should be off or the hydraulic tong power shut down as maintaining or changing the
jaw plates, dies seats or tong ties.
7. Over-pressure and over-torque are forbidden.
8. Don’t add or dismount any parts to the tong.
9. The parts should be used which are made by SLD.
Legend
Warning Seriously
Warning
Recommendation or Suggestion
SAFETY FIRST
SOME PROBLEMS WILL BE CREATED
IF ANY STOPPAGE CANNOT BE RESOLED
------------------------------------------------------------------------------------------------------------------------
3
Hydraulic Power Tong Operation Manual
SLD TABLE OF CONTENTS
TABLE OF CONTENTS
1. Summary ----------------------------------------------------------------------------------------------1
2. Structure Characteristics And Working Principle------------------------------------------------5
2.1 Transmission System---------------------------------------------------------------------------------5
2.2 Tong Head Assembly---------------------------------------------------------------------------------8
2.2.1 Clamping Mechanism--------------------------------------------------------------------------------8
2.2.2 Braking Mechanism----------------------------------------------------------------------------------8
2.2.3 Resetting Mechanism--------------------------------------------------------------------------------8
2.2.4 Centralizing Mechanism-----------------------------------------------------------------------------9
2.3 Hydraulic System------------------------------------------------------------------------------------10
2.3.1 Hydraulic Source-------------------------------------------------------------------------------------11
2.3.2 Bucket Valve------------------------------------------------------------------------------------------11
2.3.3 Hydraulic Bucket-------------------------------------------------------------------------------------11
2.3.4 Hand Control Valve-------------------------------------------------------------------------------11
2.3.5 Hydraulic Motor--------------------------------------------------------------------------------------11
2.3.6 Hydraulic Cylinder-----------------------------------------------------------------------------------14
2.3.7 Hydraulic Oil------------------------------------------------------------------------------------------14
3. Main Technical Parameters--------------------------------------------------------------------------16
4. Installing, Testing and Requirement----------------------------------------------------------------17
4.1 Inspection Before Installation-----------------------------------------------------------------------17
4.2 Lifting--------------------------------------------------------------------------------------------------17
4.3 Installing Hydraulic Pipelines-----------------------------------------------------------------------19
4.4 Installing Torque Control System-------------------------------------------------------------------20
4.5 Leveling------------------------------------------------------------------------------------------------20
4.6 The Back Guy------------------------------------------------------------------------------------------20
4.7 Preliminary Operation---------------------------------------------------------------------------------21
4.8 Making-up and Breaking-out------------------------------------------------------------------------ 22
4.9 Treatment After Using---------------------------------------------------------------------------------22
5. Actual Usage And Operation Methods--------------------------------------------------------------23
5.1 Jaw Plate, Die Seats, Tong Dies Selection And Mounting And Dismounting-----------------23
5.1.1 Jaw Plate Selection---------------------------------------------------------------------------------23
5.1.1.1 Size And Parts Numbers of Jaw Plate-----------------------------------------------------------23
5.1.1.2 Jaw Plate Assembly And Mounting And Dismounting---------------------------------------23
5.1.2 Die Seats And Tong Dies Selection And Mounting And Dismounting---------------------24
5.1.2.1 Specification And Parts Numbers For Die Seats And Tong Dies----------------------------24
5.1.2.2 Recommendation Table For Selection Die Seats And Tong Dies----------------------------24
5.1.2.3 Die Seats Assembly And Mounting And Dismounting ---------------------------------------24
5.1.2.4 Tong Dies Mounting And Dismounting ---------------------------------------------------------24
------------------------------------------------------------------------------------------------------------------------
4
Hydraulic Power Tong Operation Manual
SLD TABLE OF CONTENTS
5.2 Adjusting the Braking Torque---------------------------------------------------------------------26
5.3 Adjusting The Space Between Master Tong And Backup Tong----------------------------------27
5.4 Making-Up Operation---------------------------------------------------------------------------------27
5.5 Breaking-Out Operation-------------------------------------------------------------------------------28
5.6 Filling Oil Into Sensing Cylinder---------------------------------------------------------------------29
5.7 Installing Rack Plunger--------------------------------------------------------------------------------30
5.8 Adjusting Mechanism of Engagement Gear--------------------------------------------------------30
5.9 Shafting Operation-------------------------------------------------------------------------------------30
5.10 Testing Torque------------------------------------------------------------------------------------------30
6. Maintenance ---------------------------------------------------------------------- ---------------------31
7. Ordinary Troubles And Troubles Shooting --------------------------------------------------------32
8. Trucking, Storage And After Service----------------------------------------------------------------33
8.1 Trucking-------------------------------------------------------------------------------------------------33
8.2 Storage---------------------------------------------------------------------------------------------------33
8.3 Box Opening--------------------------------------------------------------------------------------------33
8.4 Unpacking ----------------------------------------------------------------------------------------------33
9. Attachment And Consumable Parts------------------------------------------------------------------34
9.1 Option Parts---------------------------------------------------------------------------------------------34
9.2 Consumable Parts--------------------------------------------------------------------------------------34
10 Accompanying Figure And Parts List---------------------------------------------------------------35
------------------------------------------------------------------------------------------------------------------------
5
Hydraulic Power Tong Operation Manual
SLD SUMMARY, STRUCTURE CHARACTERISTICS AND WORKING PRINCIPLE
1 Summary
Model XYQ12A hydraulic power tong is a mouth opening power tong which can soon make-up or
break-out joints of pipe strings in well service. It is used in making-up or breaking-out tubing,
small drilling pipe and small casing, their diameter are from 27/8 ″-51/2 ″(73mm to 140mm). It
has follow advantages matching with the same kind of tongs, which is simple structure,
convenient operation, reliable performance, long life and large torque. It is widely used on shore
or off shore oilfields. It can reduce workload, enhance working efficiency and improve the well
service.
Hydraulic power tong consists of two main parts--master tong and backup tong. The backup tong
clips coupling or joints, (It can also clips the pipe body by extending the front and back guide
arms as required.) and the master tong clips pipe string with turning in clockwise or
counter-clockwise, by this way, it completes making-up or breaking-out.
2.1 Transmission System
Hydraulic power tong has four shifts to reduce speed, as figure 1.
Low Gears: Z2, Z1, Z3, Z5, Z6, Z7, Z11, Z12, Z13
Second Low Gears: Z2, Z1, Z3, Z5, Z10, Z11, Z12, Z13
Second High Gears: Z2, Z4, Z6, Z7, Z11, Z12, Z13
High Gears: Z2, Z4, Z8, Z9, Z10, Z11, Z12, Z13
------------------------------------------------------------------------------------------------------------------------
6
Hydraulic Power Tong Operation Manual
SLD STRUCTURE CHARACTERISTICS AND WORKING PRINCIPLE
HYDRAULIC MOTOR HAND CONTROL VALVE
Fig1. Transmission Diagram
------------------------------------------------------------------------------------------------------------------------
7
Hydraulic Power Tong Operation Manual
SLD STRUCTURE CHARACTERISTICS AND WORKING PRINCIPLE
2.2 Tong Head Assembly (Fig.2, Fig.3, Fig.4)
2.2.1 Clamping Mechanism (Fig.2, Fig.3)
The clamping mechanism is double direction clipping by an inner curved roller for climbing. It
consists of ramp, roller, roller axle, jaw plate, die seats, tong dies and jaw plate frame assembly.
The jaw plate frame assembly is fixed in the inner of open gear. The spline on the board is
matched with another spline on connection plate of braking mechanism. When the transmission
system starts to drive the open gear turning, the jaw plate frame assembly doesn’t turn first at all
under the braking force from the braking mechanism, the curved ramp turns together with the
open gear, the roller on the jaw plate climbs along the curve surface of the ramp, it makes jaw
plate assembly towards the center, then it clips the pipe string at the first step. As the torque
extends and over the braking moment, the open gear drives all the ramp parts in the braking
mechanism turning together with the pipe string which are connection plate, braking disc, jaw
plate frame assembly and the jaw plate. The backup tong clamping mechanism is the same as the
master tong. Hydraulic oil pushes rack plunger reciprocating action and also drives the duplex
gear and the jaw plate frame turning inside the main body of the back tong, then drives the roller
climbing, finally clips or looses the pipe string.
------------------------------------------------------------------------------------------------------------------------
8
Hydraulic Power Tong Operation Manual
SLD STRUCTURE CHARACTERISTICS AND WORKING PRINCIPLE
1.Stopper 2. Reset Knob Axle 3.Cylindrical Pin 4.Reset Knob 5.Spline Connection Plate
6.Braking Disc 7.Slotted countersunk Head Screw 8.Countersunk Screw 9.Friction Plate
10.Spring 11.Braking Plate 12. Lock Nut 13. Hexagon Socket Cylindrical Head Screw
14.Steel Ball 15.Spring 16.Roller Support Frame 17.Centrolizing Roller 18.Centrolizing
Roller Axle 19.Open Gear 20.Jaw Plate Frame 21.Open Gear Cover 22.Spline Plate
------------------------------------------------------------------------------------------------------------------------
9
Hydraulic Power Tong Operation Manual
SLD STRUCTURE CHARACTERISTICS AND WORKING PRINCIPLE
2.2.3 Reset Mechanism (Fig.2)
It is the initial state of hydraulic power tong that the master tong jaw plate frame, the open gear
and the opening of the shell body align with the back-up tong jaw plate frame and the opening of
backup tong main body. After once making-up and breaking-out ends, the hand control valve
makes hydraulic power tong back to initial state, then the pipe string goes in or out through
hydraulic power tong easily. As making-up and breaking-out, the directions of the reset konb on
the master and backup tongs should be same.
1.Jaw Plate Frame 2.Die Seat 3.Dies 4.Ramp Plate 5.Jaw Plate 6.Roller Axle 7.Roller
8.Cone Point Setting Screw 9.Cylindrical Pin 10.Screw Stopper 11.Hex Socket Cylindrical
Head Screw 12. Setting Screw
------------------------------------------------------------------------------------------------------------------------
10
Hydraulic Power Tong Operation Manual
SLD STRUCTURE CHARACTERISTICS AND WORKING PRINCIPLE
------------------------------------------------------------------------------------------------------------------------
11
Hydraulic Power Tong Operation Manual
SLD STRUCTURE CHARACTERISTICS AND WORKING PRINCIPLE
------------------------------------------------------------------------------------------------------------------------
12
Hydraulic Power Tong Operation Manual
1.Hydraulic Station (1.1 Oil Pump; 1.2 Filter; 1.3 Anti-shock Pressure Gauge; 1.4 Overflow Valve)
2.Anti-shock Pressure Gauge 3.Bucket Valve 4.Hydraulic Bucket 5.hand control valve
6.hydraulic motor 7.Backup Tong Oil cylinder 8.Snap Joint
Corresponding relationship between input pressure and output torque from tong head. (Fig.6)
A: Low Gear
B: Second Low Gear
D: Second High Gear
C: Higher Gear
------------------------------------------------------------------------------------------------------------------------
14
Hydraulic Power Tong Operation Manual
1. Retaining Ring Using for Axle 2. O-Ring 3.Valve Core (2) 4.Valve Main Body
5.Handle 6.O-Ring 7. Flat Washer 8. Spring Washer 9. Nut 10. Valve Core(1) 11.
O-Ring 12. O-Ring 13. Valve Cap 14. Spring Washer 15.Nut
16. Plain Washer 17.Handle.
1.Hydraulic Bucket (1.1 Bolt 1.2 Nut 1.3 Hanging Head 1.4 Cotter Pin 1.5 Nipple
1.6 O-Ring 1.7 Choke Valve Core 1.8 Spring 1.9 Cylinder End Adapter
1.10 Bucket Body 1.11 Spring 1.12 Cylinder Body 1.13 Piston Rod 1.14 O-Ring
1.15 Cylinder End Adapter 1.16 O-Ring 1.17 Piston 1.18 Retaining Ring Using for Hole
1.19 Bucket End Joint 2. Copper Shim 3. High Pressure Hose 4. Bucket Valve
5. Snap Joint 6. Copper Shim
------------------------------------------------------------------------------------------------------------------------
15
Hydraulic Power Tong Operation Manual
SLD STRUCTURE CHARACTERISTICS AND WORKING PRINCIPLE
1. Valve Body 2. Hex Socket Cylindrical Head Screw 3. Combination Valve Core
4. O-Ring 5. Valve Tail Seat 6. Spring Seat(1) 7. Spring
8. Spring Seat(2) 9. Locked Plate 10. Support Seat 11. Hex Socket Cylindrical Head
Screw 12. Pin Axle 13. Fork 14. Pin Axle 15. Spring Washer 16. Hex Nut
17. Handle Lever 18. Ball Shape Handle
------------------------------------------------------------------------------------------------------------------------
16
Hydraulic Power Tong Operation Manual
2.3.6 Hydraulic Oil Cylinder (Fig.10)
It consists of cylinder liner, rack plunger, cover plate, Yx-sealing ring, cylinder cover etc. High
pressure oil drives rack plunger through cylinder cover into cylinder liner, then pushes the rack
plunger and drives the duplex gear and the backup tong jaw plate frame turning.
(1) YC-N46 low temperature solidification hydraulic oil, the suitable environmental temperature is
–20 oC +-40 oC;
(2) YB-N46 abrasion resistance hydraulic oil, the suitable environmental temperature is -10 oC
+-40 oC ;
(3) YA-N46 hydraulic oil, the suitable environmental temperature is 0 oC +-40 oC .
1. Backup Tong Main Body Tail Part 2. Duplex Gear 3. Turning Axle 4. Hex Socket
------------------------------------------------------------------------------------------------------------------------
17
Hydraulic Power Tong Operation Manual
Cylindrical Head Screw 5. O-ring 6. Cylinder Liner 7. Type-Yx Sealing Ring Using for
Hole 8. Cylinder Cover 9. Cover Plate 10.Hex Socket Cylindrical Head Screw
11.Rack Plunger 12. Hose Adapter 13. Oil Passage Bolt 14. Joint 15. O-Ring
16. Snap Joint 17. Joint
------------------------------------------------------------------------------------------------------------------------
18
Hydraulic Power Tong Operation Manual
SLD INSTALLING, TESTING AND REQUIREMENT
4. Installing, Testing and Requirement
Installing procedures are following when hydraulic power tong is used in well site.
4.1 Checking before installation
Checking power tong was broken or not during trucking. If it was broken, it should be
repaired.
Checking the fasten parts are loosen or not, fixed any loosed parts.
Checking jaw plate, die seats and dies are visible or not. (Fig.5.1)
4.2 Lifting
Lifting at the drilling rig or work-over rig is showing as Fig.11.
------------------------------------------------------------------------------------------------------------------------
19
Hydraulic Power Tong Operation Manual
Fig. 11 Lifting Showing
4.2.1 Connecting hydraulic bucket with the hanging rod of master tong together by bolts.
4.2.2 Installing a pulley on the mast, which can load 2 tones or more.
4.2.3 Lifting hydraulic power tong by a soft steel wire ø12mm or bigger, putting this wire through
the pulley on the mast, one end connecting hydraulic bucket and another end fixing at the mast.
4.2.4 Making dies of backup tong towards the pipe string coupling or the drilling pipe tool joint by
hydraulic bucket.
4.2.5 Adjusting methods of lifting height of hydraulic power tong.
4.2.5.1 Lifting power tong
Closing the chock valve in the bucket valve firstly, then opening it’s plug valve, power tong
SLD INSTALLING, TSETING AND REQUIREMENT
should be lifted slowly.(See Fig.17)
4.2.5.2 Putting down power tong
------------------------------------------------------------------------------------------------------------------------
20
Hydraulic Power Tong Operation Manual
Opening the chock valve in the bucket valve firstly, then opening it’s plug valve, power tong will
be put down slowly.(See Fig. 18)
------------------------------------------------------------------------------------------------------------------------
21
Hydraulic Power Tong Operation Manual
The support point of the pulley must be installed above the well head 15 meters.
Central line of the power tong head is located at 0.6 m far away the vertical line of the well head
in free hanging state.
The hose may be wrapped to be broken during operation.
The direction of the piston rod should be down, when installing the bucket.
When the backup tong is towards the pipe string coupling or the drilling pipe tool joint, the piston
The piston rod should be contracted back to inner bucket, to avoid to be crashed.
4.3 Installing hydraulic pipeline
4.3.1 The connection of oil inlet and outlet of high pressure hoses shows as Fig.20
4.3.2 Connecting the hoses between master tong and backup tong (See Fig. 21)
------------------------------------------------------------------------------------------------------------------------
22
Hydraulic Power Tong Operation Manual
SLD INSTALLING, TESTING AND REQUIREMENT
It is very important that adjusting hydraulic power tong parallel if it is not parallel, the
tong head clamping will not effect. Four screws should be adjusted.
------------------------------------------------------------------------------------------------------------------------
23
Hydraulic Power Tong Operation Manual
SLD INSTALLING, DEBUGGING AND DEMANDING
the pin at the tail of the tong; another end should be tied to the mast.
The height of one end of back guy ting up to the mast should be same as tong. The back guy
should be vertical with the center line of tong and also be pulled tightly.
Break-out Direction
Make-up Direction
Paying attention to the direction of the guy, the back guy should be tied to the right side of
the tong as making-up operation, but it should be in left as breaking-out operation when you
watch standing in front of the tong head. Don’t tie it in wrong direction.
Back guy must load over 3 tons, it is usually soft wire line.
4.7 Preliminary Operation
Provide oil to hydraulic power tong.
Control the lifting bucket; adjust the height of power tong.
Keep free-load running at low gear for 1 or 2 minutes; pressure should be 2Mpa lower.
Adjusting braking torque smaller if the pressure is over 2Mpa, the adjusting procedure shows
at 5.5.
Keep free-load running at high gear for 1 or 2 minutes; pressure should be 4Mpa lower.
Adjust braking torque smaller if the pressure is over 4Mpa. The adjusting procedure shows at
5.5.
Test tong head running in clockwise and counter clockwise direction and check
direction-changing mechanism, watch master tong and backup tong being synchronous
whether or not. Adjust the direction of reset knob if they are not synchronous. The procedure
shows at 5.4 and 5.5.
Open the safety door, put tong to the well head, watch the space between master tong and
backup tong is suitable whether or not. Adjust the space between them if the space is not
suitable. See 5.3.
Try to clamp the pipe string at high gear, adjust system providing oil pressure by adjusting
the overflow valve in the hydraulic system according to the making-up torque parameter,
shifts, torque, pressure parameter table (See Fig. 6) from API recommendation.
------------------------------------------------------------------------------------------------------------------------
24
Hydraulic Power Tong Operation Manual
SLD INSTALLING, TESTING AND REQUIREMENT
Don’t disassemble hydraulic pipe at high pressure, otherwise someone will be hurt or died and the
equipment will be broken.
Don’t approach the running part of hydraulic power tong by your body or clothes.
Don’t approach hydraulic tong who is not operators to avoid handing the operating lever to make
any trouble
One hand operates one handle only, don’t operate one more handles at the same time.
The temperature of the system hydraulic oil should not be over 65 oC. Over heating can make
hydraulic system seal failure and the running speed of tong slowly.
Proper treatment is useful for extending the life of power tong after it is used.
------------------------------------------------------------------------------------------------------------------------
25
Hydraulic Power Tong Operation Manual
SLD ACTUAL OPERATION METHODS
5. Actual Operation Methods
5.1 Dismounting
5.1.1 Jaw plate selection
5.1.1.1 Jaw plate specification and parts numbers show in table 1.
Table 1 Jaw Plate Specification Table
Serial No. Parts No. Part Names Notes
1 Jaw Plate Used For Master Tong, Suitable to all specify pipes
diameters
2 Jaw Plate 1 Used For Backup Tong, Suitable to the diameter
pipe within 140mm (51/2〃)
3 Jaw Plate 2 Used For Backup Tong, Suitable to the casing
coupling Ø 140mm only
------------------------------------------------------------------------------------------------------------------------
26
Hydraulic Power Tong Operation Manual
------------------------------------------------------------------------------------------------------------------------
27
Hydraulic Power Tong Operation Manual
SLD ACTUAL OPERATION METHODS
5.1.2 Die Seats And Dies Selection And Its Mounting Or Dismounting
5.1.2.1 Die Seats And Dies Specification And Parts Numbers
Clamp different pipe strings by selecting different specification die seats and dies to this power
tong. The die seats and dies of the master and backup tongs are common useful to clamp the same
diameter pipe string. Select die seat and dies following the stamp marks and part numbers on their
back .
Die seats specification and part numbers show in table 2.
Dies specification and part numbers show in table 3.
5.1.2.2 Die Seats and Dies Recommendation Selection Table (See Table 4)
5.1.2.3 Die Seats Assembly And Mounting Or Dismounting.
Die seats assembly consists of die seats, dies and screw stopper. (See Fig.15)
Hydraulic tong will be broken when different die seats and dies are used together.
Dismounting Die Seat Assembly: Pull one die seat assembly to the center of tong head, remove it
out of tong head, take out another one by the same way. Mounting operation is on the contrary.
(See Fig.16)
Must cut off the power source when you change jaw plate, die seat and dies.
------------------------------------------------------------------------------------------------------------------------
29
Hydraulic Power Tong Operation Manual
SLD ACTUAL OPERATION METHODS
Table 2 Die Seat Specification
Serial Part Number Part Name Mark Note
NO. (Stamp Mark)
1 Die Seat 1 143-138
2 Die Seat 2 132.5-128
3 Die Seat 3 127-122
4 Die Seat 4 121-116
5 Die Seat 5 114-109
6 Die Seat 6 107-102
7 Die Seat 7 93-86
8 Die Seat 8 73-70
9 Die Seat 9 78
10 Die Seat 10 60
11 Die Seat 156-151 For Backup tong Only
turn 3600 counterclockwise, finally tighten the lock nut. (See Fig.26)
It is in direct proportion between braking torque and racing pressure. Braking torque is more big
and the racing pressure of hydraulic power tong more high.
The preliminary clamping from backup tong to the pipe string depends on racing pressure. Backup
tong cannot expose dies if racing pressure is too low.
Too big braking torque is not suitable, it is very good that master tong and backup tong can
------------------------------------------------------------------------------------------------------------------------
30
Hydraulic Power Tong Operation Manual
SLD ACTUAL OPERATION METHODS
expose dies properly. Don’t press the braking spring to the bottom.
5.3 Adjusting The Space Between Master Tong And Backup Tong
Master tong clamps pipe string body, backup tong clamps the coupling (Both master tong and
backup tong clamp drilling pipe tool joints) by using common pole (Standard Disposition).
The method of adjusting the space between master tong and backup tong is to adjust the
screws on the front and back guide poles. (See Fig. 27)
Adopt long guide pole (Requirement is needed in order.) when master tong and backup tong
clamp pipe body. The method of adjusting the space between master tong and backup tong is
to insert the pin to proper hole on the guide pole, and use cotter pin locking them.(See Fig.28
The space between the guide pole under the support base and the guide bucket mustn’t be smaller
than the biggest length for screw engagement.
5.4 Making-up Operation (This manual is suitable for making-up or breaking-out direction with
right hand thread, but the left hand thread is on the contrary.)
Hydraulic power tong does racing, make it back to preliminary working state. Select proper
gear according to actual requirement.
Put the reset knob of the master tong and backup tong to making-up direction, be sure the
direction is in the same with indicating sign. (Fig.29)
------------------------------------------------------------------------------------------------------------------------
31
Hydraulic Power Tong Operation Manual
SLD ACTUAL OPERATION METHODS
Open the safety door, push hydraulic power tong towards the pipe string, and be sure the clamping
location by master tong and backup tong is right.
Close the safety door.
Push the tong end to make tong turning around the center and to tighten the guy.
Push hand control valve lever beginning to make-up operation.
Continue making-up operation until power tong stops and releases the lever.
Pull the hand control valve lever to make tong back to the initial state.
Open the safety door, push tong back to the start location. This is one time making-up
operation.
5.5 Breaking-out Operation (Basis On Right Hand Thread, Left Hand Thread Is on The Contrary.)
Hydraulic power tong does racing, make it back to preliminary working state. Select proper
gear according to actual requirement.
Put the reset knob of the master tong and backup tong to breaking-out direction, be sure the
direction is in the same as indicating sign. (Fig.30)
Open the safety door, push hydraulic power tong towards the pipe string, and be sure the
clamping location of master tong and backup tong is right.
Close the safety door.
Pull the tong end to make tong turning around the center and to tighten the guy.
Pull the hand control valve operating lever to start breaking-out operation.
Continue breaking-out operation till all screw thread out, then release operating lever.
------------------------------------------------------------------------------------------------------------------------
32
Hydraulic Power Tong Operation Manual
SLD ACTUAL OPERATION METHODS
Push hand control valve operating lever to make tong back to the preliminary working state.
Open the safety door, push tong back to the start location. This is one time breaking-out
operation
Keep power tong operating area clean and no any sundries inside. Tidy the hydraulic line, power
line and signal line to avoid them twisting and cut off.
5.6.1 There are two meters on hydraulic power tong, one is pressure meter which indicates system
pressure, another one is torque meter which indicates output torque from tong head. (Fig. 31)
------------------------------------------------------------------------------------------------------------------------
33
Hydraulic Power Tong Operation Manual
SLD ACTUAL OPERATION METHODS
5.7 Installing Rack Plunger
Remove the upper cover of the backup tong (BQ-1), duplex gear (BQ-9) and cylinder cover
(BQ-9), push out the rack plunger, install Yx seals at two ends of the cylinder liner, then push rack
plunger to the center of cylinder liner, finally Install duplex gear and other parts when the jaw
plate opening to match the backup tong. (Fig. 34)
The maximum
14 24 42 72
speed
Handle
position
Shifting Gear at low speed for the power tong, to avoid break the gear.
------------------------------------------------------------------------------------------------------------------------
34
Hydraulic Power Tong Operation Manual
Maintenance and Lubrication
5.11Daily Maintenance And Lubrication
Fill grease to grease nipple of the master axle, idle gear-axle, and duplex gear axle.
(Grease nipple shows in Fig. 36 and Fig 37.)
Don’t clean bearing by steam, if not can make bearing oil lost to rust.
Don’t clean pressure sensor by steam, if not can damage it.
------------------------------------------------------------------------------------------------------------------------
35
Hydraulic Power Tong Operation Manual
SLD ORDINARY TROUBLES AND SHOOTING GUIDE
7. Ordinary Troubles And Troubles Shooting Guide
Ordinary Reason Treatment
Troubles
1. Die Seat Selection Not Right Change One Pair Of Die Seats
2. Hard Goods Full In The Dies Groove Clean Them
Master 3. Dies Selection Not Right Change Dies
Tong And 4. Dies Too Worn Change New Dies
Backup 5. Power Tong Body Not In Level Adjusting As 4. 5. 3. And 4.5.4
Tong 6. Jaw Plate Roller Or Roller Bearing Damaged Or Chucked Clean, Grind Or Change
Slippage 7. Ramp Plate Worn Or Damaged Change Ramp Plate
8.Pipe String Hardness is ≥340 HB Purchasing Special Dies
Master Tong Braking Force From Tong Head Is Small. Change Worn Friction Plate Or Parts
Is OK But Adjust Or Change Braking Spring
Backup Tong Hose Between Master And Backup Tongs Connected Re-connect As 5. 3. 2.
Slippage Wrong
Oil Passage Of Master and Backup Tongs Blocked. Clean Oil Channel and Filling Core
8 Reasons for Master and Backup Tongs slippage Shooting as Above Method
Opening of Direction of reset knob is wrong. Turn the Knob 1800 Then Reset
Master and
Backup Tong Jaw Plate Frame Deform or Damaged Change or Repair It
Cannot align Reset Lock Pin was Broken Change The Reset Lock Pin
Speed is Displacement of Hydraulic Pump Is Low. Adjust Providing Oil Quantity to
slow. 120L/min
Check Valve of Snap Joints Opens Partly or the Change the Snap Joints or Clean
Pipe Is Blocked. the Pipe.
Master Tone Hydraulic Pump Suction Inefficacy, Air Is Clean the filter core or Fill
Turns
Sometime Inside the circuit. Enough Oil.
Quick
Sometime
Slow.
Motor turns but Trans axle or gear was broken. Change the broken parts.
tong head
doesn’t work
Backup tong The rack plunger is not in the central position Dismount backup tong then
clamps in
single direction when the opening of jaw plate frame matches install it as 5.10.
only. the main body of backup tong.
Shifting is not The press from ZQ-32 spring to the ZQ-38 Add a shim under the spring or
fixed, easy to
loose position seat is not enough. change the spring.
The output System pressure is low. Adjust system pressure as Fig. 6
torque is small.
Oil leaks 1. System pressure is bigger than 12Mpa. Adjust the pressure
from the 2. Back pressure is bigger than 4Mpa. Check the return oil line, make the
sealing part pipe unblocked
of hydraulic 3. Oil temperature is higher than 65 0c. Cooling and make temperature lower
system. 4. Sealing part is broken. Change the sealing part
Torque meter Oil is shortage in the sensor cylinder. Add oil into the sensor cylinder.
doesn’t Torque meter is damaged. Change the torque meter.
work.
Torque The signal line connecting with hydraulic tong is broken.
Change the signal line
system See the torque control system manual to resolve other problems.
doesn’t work
Please contact our company as 8.4, if you cannot resolve other problems.
------------------------------------------------------------------------------------------------------------------------
36
Hydraulic Power Tong Operation Manual
SLD TRUCKING, STORAGE AND CUSTOMER SERVICE
8. Trucking, Storage and After Service
8.1 Trucking:
When you move hydraulic power tong, you should move it smoothly and keep it from wet, and
don’t put it upside to downside and also keep it from damage. When it is lifted, use steel wire rope
with the diameter 12mm or bigger, and to keep it in balance. Don’t incline and swing it too much,
to keep it from attacking other things avoiding damaged.
8.2 Storage:
XYQ12A hydraulic power tong should be placed in where is no sunshine, prevent rain, wet proof,
good airing and the environment temperature below 45 0c. Don’t storage it in a muddy place or
outdoors. Protect oil inlet and outlet well to prevent some sundries in. The storage period is
general one year for new hydraulic power tong. It can be used after one-year storage but all the
sealing parts and hoses must be changed.
8.3 Unpacking
Check the appearance of hydraulic power tong and check and accept it as packing list.
------------------------------------------------------------------------------------------------------------------------
37
Hydraulic Power Tong Operation Manual
SLD ATTACHMENT AND CONSUMABLE ACCESSORY
9. Attachment And Consumable Accessory
9.1 Selecting Accessory
9.1.1 High Pressure Hose
9.1.2 Snap Joints
9.1.3 Torque Control System (Fig.25)
9.1.4 Hydraulic Source
9.2 Consumable Accessory (Advising one set consumable accessory for one tong)
------------------------------------------------------------------------------------------------------------------------
38
Hydraulic Power Tong Operation Manual
SLD FIGURES AND PARTS LIST
10. Figures And Parts List
------------------------------------------------------------------------------------------------------------------------
39
Hydraulic Power Tong Operation Manual
Fig Tong shell
Shell component parts Schedule
N
O.
Purchase code Code Name and specifications Amount
Hexagon socket head screw
1 12AZ-76 GB70-85 4
M12 × 15
2 12AZ-79 GB93-87 Spring washer M12 6
3 12AZ-98 XYQ12.Z-59 Front support seat 2
4 12AZ-1 XYQ12-02A Shell 1
5 12AZ-91 GB70-85 Hexagon socket head screw M10×20 4
6 12AZ-92 XYQ3B.Z-34 Rear handle 2
7 12AZ-85 XYQ12.Z-46 baffle (2) 2
8 12AZ-82 GB68-85 Slotted cylinder head Screw M6 × 10 12
XYQ12.Z-61
9 12AZ-267 Torque Indicating Plate 1
A
XYQ12.Z-56
10 12AZ-268 Products Mark plate 1
A
11 12AZ-38 XYQ12.Z-21 Positioning block 1
12 12AZ-32 XYQ12.Z-6 Brake spring 1
13 12AZ-30 XYQ12.Z-62 Guy pin 1
14 12AZ-31 GB91-86 Cotter Pin 5 × 35 1
15 12AZ-29 XYQ12.Z-54 Tail seat 1
16 12AZ-28 GB70-85 Hexagon socket head screw M12×40 4
17 12AZ-34 XYQ12.Z-58 flat key 2
Slotted countersunk screw M5 ×
18 12AZ-26 GB68-85 2
16
19 12AZ-24 XYQ12.Z-20 Bottom cover 1
20 12AZ-25 GB70-85 Hexagon socket head screw M8×20 6
21 12AZ-20 XYQ12.Z-17 End Plate 1
22 12AZ-23 GB70-85 Hexagon socket head screw M6×15 4
------------------------------------------------------------------------------------------------------------------------
40
Hydraulic Power Tong Operation Manual
Fig 13 Main clamp clamp head
The main component parts clamp clamp the first schedule
Amoun
No. Purchase code Code Name and specifications
t
Hexagon socket head screw
1 12AZ-105 GB70-85
M10×45
17
XYQ12.Z-01.01
2 12AZ-103
A
Open gear cover 1
3 12AZ-115 XYQ12.B-10 Positioning Screw 2
XYQ12.Z-01.04
4 12AZ-104
A
Jaw plate Frame 1
XYQ12.Z-01.05
5 12AZ-106
A
Open Gear 1
XYQ12.Z-01.02
6 12AZ-101
A
Stopper Pin 1
12AZ-110.1 dies(1) 4
XYQ12.Z-01.12
7 12AZ-110.2
A
dies (2) 4
12AZ-110.3 dies (3) 4
8 12AZ-107.1 XYQ12.Z-01.10 Die seat (1) 2
------------------------------------------------------------------------------------------------------------------------
41
Hydraulic Power Tong Operation Manual
12AZ-107.2 Die seat (2) 2
12AZ-107.3 Die seat (3) 2
12AZ-107.4 Die seat (4) 2
Amoun
No. Purchase code Code Name and specifications
t
12AZ-107.5 Die seat (5) 2
12AZ-107.6 Die seat (6) 2
12AZ-107.7 Die seat (7) 2
8 XYQ12.Z-01.10
12AZ-107.8 Die seat (8) 2
12AZ-107.9 Die seat (9) 2
12AZ-107.10 Die seat (10) 2
9 12AZ-109 XYQ12.Z-01.11 Screw Bumper Pin 8
10 12AZ-112 XYQ12.Z-01.08 Roller axle 2
Slotted cone point fastening Screw
11 12AZ-113 GB71-85
M8 × 12
4
12 12AZ-114 XYQ12.Z-01.06 Roller 2
13 12AZ-111 XYQ12.Z-01.09 Jaw plate 2
14 12AZ-108 GB119-86 Cylindrical pin M6 × 18 4
XYQ12.Z-01.07
15 12AZ-116
B
Ramp plate 4
Hexagon socket head screw
16 12AZ-91 GB70-85
M10×20
12
------------------------------------------------------------------------------------------------------------------------
42
Hydraulic Power Tong Operation Manual
Fig 14 Fuzheng agencies
Amoun
NO. Purchase code Code Name and specifications
t
1 12AZ-63 XYQ12.Z-05 Centralizing roller axle 20
------------------------------------------------------------------------------------------------------------------------
43
Hydraulic Power Tong Operation Manual
5 12AZ-121 GB91-86 Cotter pin M3 × 20 18
------------------------------------------------------------------------------------------------------------------------
44
Hydraulic Power Tong Operation Manual
Fig 15 Brake、reset agencies
------------------------------------------------------------------------------------------------------------------------
45
Hydraulic Power Tong Operation Manual
Brake、 reset body parts Parts Schedule
Amoun
NO. Purchase code Code Name and specifications
t
1 12AZ-58 GB119-86 Cylindrical pin 5 × 20 1
------------------------------------------------------------------------------------------------------------------------
46
Hydraulic Power Tong Operation Manual
Fig 16 Idle gear axle
Purchase Amou
NO. Code Name and specifications
code nt
1 12AZ-84 XYQ12.Z-45 Positioning plate 2
2 12AZ-122 XYQ12.Z-53 Idle gear Axle 2
3 12AZ-123 XYQ12.Z-42 sleeve 2
4 12AZ-125 XYQ12-41 Water proof cover 2
5 12AZ-124 GB1235-76 o- ring¢ 50×3.5 2
6 12AZ-127 GB893.1-86 Circlip for hole 100 4
7 12AZ-129 XYQ12.Z-43 Idle gear 2
------------------------------------------------------------------------------------------------------------------------
47
Hydraulic Power Tong Operation Manual
8 12AZ-126 GB283-87 Cylindrical roller bearings 42309 4
9 12AZ-128 XYQ12.Z-52 Supporting plate 2
Purchase Amoun
NO. Code Name and specifications
code t
1 12AZ-51 XYQ12.Z-32.00 Suspension bar 1
2 12AZ-89 XYQ12.Z-65 Top screw 4
3 12AZ-90 GB70-85 Hexagon socket head screw M10×25 8
------------------------------------------------------------------------------------------------------------------------
48
Hydraulic Power Tong Operation Manual
4 12AZ-86 XYQ12.Z-47 Suspension seat 2
5 12AZ-99 GB1152-89 Grease Nipple M6×1 2
6 12AZ-87 GB91-86 Cotter pin M4 × 30 2
7 12AZ-88 XYQ12.Z-63 Suspension pin axle 2
Purchase Amou
NO. Code Name and specifications
code nt
1 12AZ-8 GB1152-89 Grease NippleM10×1 1
------------------------------------------------------------------------------------------------------------------------
49
Hydraulic Power Tong Operation Manual
2 12AZ-48 XYQ12.Z-27 Support ring (2) 2
3 12AZ-5 GB308-89 Ball S6 58
4 12AZ-16 Roller Φ10 × 24.8 28
5 12AZ-47 XYQ12.Z-29 Spacer ring 1
6 12AZ-49 XYQ12.Z-30 Duplex Gear (upper) 1
7 12AZ-46 XYQ12.Z-47 stem 1
------------------------------------------------------------------------------------------------------------------------
50
Hydraulic Power Tong Operation Manual
NO. Purchase code Code Name and specifications Amount
------------------------------------------------------------------------------------------------------------------------
51
Hydraulic Power Tong Operation Manual
Hydraulic motors components schedule
Amoun
NO. Purchase code Code Name and specifications
t
1 12AZ-73 Hydraulic motors 1
Amoun
NO. Purchase code Code Name and specifications
t
1 12AZ-200 XYQ3B.Z-5-1 Valve body 1
2 12AZ-201 GB1235-76 o-seal ring 36×3.5 2
------------------------------------------------------------------------------------------------------------------------
52
Hydraulic Power Tong Operation Manual
3 12AZ-202 XYQ12.Z-5.1 Combination Valve Core 1
4 12AZ-203 XYQ12.Z.5-7 Support seat 1
5 12AZ-204 GB70-85 Hexagon socket head screw M6×16 4
6 12AZ-205 XYQ12.Z.5-8 Fork 1
7 12AZ-206 GB91-86 Cotter Pin3.2 × 20 2
8 12AZ-207 GB882-86 Pin Axle B10 × 40 1
9 12AZ-208 GB882-86 Pin Axle B12×45 1
10 12AZ-27 GB93-87 Spring washers 12 1
11 12AZ-210 GB6170-86 Hexagon head nut M12 1
12 12AZ-211 XYQ12.Z.5-9 Control lever 1
13 12AZ-212 XYQ12.Z.5-10 Ball knob 1
14 12AZ-213 XQ12.Z.5-12 Plug 1
15 12AZ-214 Copper gasket 14 × 2 1
16 12AZ-215 GB70-85 Hexagon socket head screw M12×35 4
17 12AZ-216 GB1235-76 o-seal ring O 26×2.4 2
12AZ-217.1 XQ12Y.Z-24 Tail connector (1) R 3 / 4
18
12AZ-217.2 Tail connector(2)M36×2 2
19 12AZ-218 XQ12Y.Z.5-2 Valve Tail seat 1
20 12AZ-219 XQ12Y.Z.5-6 Retaining ring 1
21 12AZ-220 XQ12Y.Z.5-5 Spring seat (2) 1
Hand control valve(without pressuring
22 12AZ-221 XQ12Y.Z.5-4 1
adjusting valve)
Hand control valve(with pressuring
23 12AZ-222 XQ12Y.Z.5-3 1
adjusting valve)
------------------------------------------------------------------------------------------------------------------------
53
Hydraulic Power Tong Operation Manual
Fig 22 Tong body
------------------------------------------------------------------------------------------------------------------------
54
Hydraulic Power Tong Operation Manual
------------------------------------------------------------------------------------------------------------------------
55
Hydraulic Power Tong Operation Manual
Fig 23 Spindle
Spindle components schedule
Amoun
NO. Purchase code Code Name and specifications
t
1 12AZ-42 XYQ12.Z-23A washer 1
16 12AZ-16 RollerΦ10×24.8 16
------------------------------------------------------------------------------------------------------------------------
56
Hydraulic Power Tong Operation Manual
Fig 24 Gear shifting Mechanism Ass (upper)
------------------------------------------------------------------------------------------------------------------------
58
Hydraulic Power Tong Operation Manual
10 12AZ-133 XYQ12.Z.6-4 Roller-axis 1
------------------------------------------------------------------------------------------------------------------------
59
Hydraulic Power Tong Operation Manual
Fig 26 Backup tong head
------------------------------------------------------------------------------------------------------------------------
60
Hydraulic Power Tong Operation Manual
Back clamp clamp head components schedule
Amoun
NO. Purchase code Code Name and specifications
t
------------------------------------------------------------------------------------------------------------------------
61
Hydraulic Power Tong Operation Manual
26 12AB-28.1 XQ12.B-11 Jaw plant (1) 2
12AB-28.2 Jaw plant (2) 2
27 12AZ-108 GB119-86 Cylindrical pin 6 × 18 4
28 12AB-23 XQ20.B-09A Ramp plate 4
------------------------------------------------------------------------------------------------------------------------
62
Hydraulic Power Tong Operation Manual
9 12AB-264 XYQ3B.B-9 Oil passage bolt 2
10 12AZB-265 GB1235-76 o-seal ring O 22×2.4 4
11 12AB-46 XYQ12.B-17 Joints 1 each
12 12AZB-44 JB/ZQ4427-86 Hose connector 10 Ⅱ -900/1000 1 each
13 12AB-266 XYQ12.B-12 Prolonged joints 1
14 12AB-43 XYQ12.B-16 Rack plunger 1
15 12AB-32 XYQ12.B-08.2 Tail part of backup tong main body 1
------------------------------------------------------------------------------------------------------------------------
63
Hydraulic Power Tong Operation Manual
Fig 30 Spring hanging tube assembly
Spring hanging tube assemblycomponents schedule
Amoun
NO. Purchase code Code Name and specifications
t
1 12AZT-01 XYQ12.QT-01 Nut M20 2
------------------------------------------------------------------------------------------------------------------------
64
Hydraulic Power Tong Operation Manual
9 12AZT-09 XYQ12.QT-09 Bolt M20 × 70 2
------------------------------------------------------------------------------------------------------------------------
65
Hydraulic Power Tong Operation Manual