Вы находитесь на странице: 1из 6

5R-Lean Audit Checklist--Manufacturing

Area Audited / Shift


Area Supervisor Monthly Audit Overall Score
Employee Interviewed: Quarterly Audit
Audit Team Members
Team Self Audit XX Score
Date Performed: 0 1 2 3 4
Sort: Are there any un-needed items in the area?
1
Comments on # 1:
Straighten: Do the items that are needed have a conveniently located, visually designated
2 homes? When not in use, are they returned to their home?
Comments on # 2:
Shine: Are the machines, work stations, floors, walls and all items in the area clean, free from
3 clutter and properly maintained? Are checklists posted and up to date?
Comments on # 3:
Standardize: Team has established and documented standards on sort, straighten, and shine
4 (checklist). Are current standards being followed, reviewed and improved upon?
Comments on # 4:
Sustain: Have Sort-Straighten-Shine-Standardize been fully implemented and functioning well?
5 Are past audits posted and used for improvement?
Comments on # 5:
Visual Controls: Are visual aides in use, up to date and effective in telling how the area is
6 performing, what problems are occurring and what improvements are being made?
Comments on # 6:
Safety: Are safe work practices in place and being followed.
7
Comments on # 7:
Standard Work: Do Standard Work and Work Instructions exist for the area? Are they posted, in
8 use, followed, understood, and updated regularly.
Comments on # 8:
Continuous Flow: Has continuous flow been established where possible? Does the line move at
9 a steady pace based on Takt? Are standard WIP Levels established and followed?
Comments on # 9:
Cross training - Job Rotation: Are employees skilled at many different jobs in the area and out.
10 Are these skills documented on a skills matrix? Is there a regular job rotation schedule.
Comments on # 10:
Quality: Are quality control concepts in place? Is there evidence of defect tracking or other
11 process recording? Are metrics posted? Are defects addressed, not passed on?
Comments on #11:
Material Flow: Are parts replenished when they are needed, where they are needed in the
12 quantities needed, and presented to the operator as needed without disruption?
Comments on # 12:
Lean Leadership: Is a Lean Management system in place that utilizes: 1. Leader Standard
13 Work 2. Visual Controls 3. Daily Accountability 4. Discipline.
Comments on # 13:
Employee Engagement: Are employees actively participating in continuous improvement efforts
14 (5S team, idea boards, root cause for variation, DLS workshops, update SW, ect)?
Comments on # 14:
Other Lean Tools or General Comments? Are there other Lean Concepts, principles or tools
15 have been implemented in the area? How have these tools improved performance?
Comments on #15:
5
5R-Lean Audit Checklist--GUIDELINES
Scoring Key:
NA = Not applicable to this area (do not count in total possible score)
0 = No Evidence of implementation.
1 = Some Evidence but major gaps.
2 = Implemented and conforming in about 1/2 of the areas where applicable.
3 = Established and conforming in most areas with some gaps, little or no improvement activities.
4 = Only a Few Minor Gaps Remain and good improvement efforts & use of other Lean tools.
5 = Excellent 5S-Lean Conformance with Substantial Improvement Activities with Employee Involvement.
ask supervisors or lean coordinator. The audit is a too for improvement so include clear comments and conduct
employee interviews to understand what has been done and why.
Comments: Include specific gaps, exceptional and below standard examples as well as ideas for improvement.
Employee Interview (EI): Interview an employee or two from the area to better understand how Lean & 5S are
working in the area. (You do not need to ask all questions, just when you need to get a better understanding of where
they are.)
Audited Team: Corrective Action should be taken for scores of 0 or 1. Consider all suggestions and ideas.
1. Sort 2. Straighten 3. Shine

Do items in the area have a designated home? Are Is the entire area clean? Are machines and
Are there any un-needed items in the area they visually (labeled, color coded, shadow workstations clean, properly maintained, and have
(Tools, parts, drawings, paperwork, tables, boards, etc) and conveniently organized? Can all safety features in place? Do employees
fixtures, etc)? Pick any object in the area and you tell what goes where? EI: What part, tool or understand their role in 5S and TPM (autonomous
question a team member. Employee Interview paperwork do you spend the most time looking for maintenance)? EI: When is the last time you
(EI): What is it for? How often do you use it? or walking to while doing your job? Is there a way cleaned: (pick an item or area) ? How did you know it
Where is it's home? Need to be Red-tagged? to decrease that time? was time to clean it?

4. Standardize 5. Sustain 6. Visual Controls

Has the team established and documented


procedures for: 5S Checklists, Sort Criteria, Are team members continuously improving their Are visual aides in use, up to date and effective in
Straighten Criteria, Red Tag System, Team area or at least sustaining previous telling how the area is performing? Are their goals,
Meetings, and Peer audits? Are they following improvements? Were corrective actions taken on actual performance, reasons for variation, and
the documented procedures? Are the 5S low scores from previous audits? EI: Can you corrective actions visible, up to date and used as an
Checklists, Team Binder and visuals organized point out an improvement made by your team in operational tool? EI: Which visual controls in your
and up to date? EI: Where is your (name a the last month? How did it come about? How has area do you use? Why? How often? What do they
document) & how do you use it? it helped? Could it be improved? tell you?

7. Safety 8. Standard Work 9. Continuous Flow

Are aisle ways, exits, electrical panels fire


extinguishers, MSDS, First Aid, etc clearly Has continuous flow been established where
marked, free from obstructions and trip hazards. Do Standard Work and Work Instructions exist for possible? Does the line (all work stations) move at a
Are chemicals properly stored & labeled? PPE the area? Are they posted, in use, followed, steady pace based on Takt? Are standard WIP
& safe practices used? Emergency procedures understood, and updated regularly. EI: What are Levels established and followed? EI: What is your
known? EI: Emergency procedures known your responsibilities, and the best practices for Takt Time, # of operators and hours worked to reach
(Tornado Shelters, Fire Procedures, etc), completing the job safely with high quality and your goal? How does that change when customer
MSDS? efficiency? demand fluctuates?

10. Training-Rotation 11. Quality 12. Material Flow

Are quality control concepts in place? Is there


evidence of Six Sigma, defect tracking, error
proofing, root cause analysis or other problem Has a Plan For Every Part (PFEP) been established?
Is a cross training and job rotation program in solving? Are results (metrics) posted or Is it visually obvious how, how many, when, where
place within the department and other communicated back to employees? Is there an and by who the parts will be replenishing? Are parts
departments? Is the skills matrix utilized "Andon" system to respond to problems and presented to the operators where they are needed?
effectively to track training and skill levels of discipline to prevent passing on defects? EI. If Can parts be replenished by the materials group
employees within and outside the department? you discover a defect in your area, what do you without disrupting work? EI: How are your parts
EI: How often do you rotate to other jobs? Is do, then what happens? Do defects get passed replenished? When? By who? What is Kanban and
training effective-sufficient? on? your role in helping it to function properly?

13. Lean Leadership 14. Employee Engagement 15. Other Lean Tools

Are employees actively participating in 5S, daily Are there other Lean Concepts, principles or tools
Are employees actively participating in 5S, daily Are there other Lean Concepts, principles or tools
Do crew leaders and supervisors for the area Kaizen, problem solving, DLS Workshops, the Idea implemented. EI: Are there any examples in your
demonstrate good Lean Leadership? EI. Do your Board program or other ways to help their team area of using: Set Up Reduction, TPM, Six Sigma,
leaders conduct start up meetings, gemba continuously improve? Is there evidence of recent Root Cause Analysis, Value Stream or Process
walks, review visual controls, utilize leader improvements? EI: What is the most recent Mapping, Daily Accountability, DLS Workshops
standard work, communicate expectations, hold improvement made by your team? How has it (Kaizen), A-3 thinking, Teamwork, Error Proofing,
team accountable and have the discipline to worked? What remains to be done? Were you Discipline, Knowledge Share, Kanban, Pull
sustain efforts? involved? What is next? Systems?