Appendix C.

BOQ and Price Breakdown for Coal Unloading Jetty Work - Summary(for Reference Only)

PJT : Van Phong 1 BOT Thermal Power Plant Project Unit : VND(Excluding VAT), R0, 2019.02.28
Price Amount
S/N Description Remarks
Option 1 Option 2 Option 3 Option 4
1 DIRECT COST - - - -
1.1 Material
1.2 Labour
1.3 Equipment
2 INDIRECT COST - - - -
2.1 Indirect Labour of Direct Cost, Fixed Rate
2.2 Tool & Consumable of Direct Cost, Fixed Rate
2.3 Construction Power & Water of Direct Cost, Fixed Rate
2.4 Site Temporary Facility (including Camp, Temporary Warehouse and etc.) of Direct Cost, Fixed Rate
2.5 Insurance of Direct Cost, Fixed Rate
2.6 Taxation of Direct Cost, Fixed Rate
2.7 EHS (Environmental, Health & Safety) Control of Direct Cost, Fixed Rate
2.8 Any Others Field Expenses of Direct Cost, Fixed Rate
3 OVERHEAD & PROFIT of Direct Cost, Fixed Rate
Total (1 + 2 + 3) - - - -

Note
1. The condition is Fixed Lump-sum Price
2. Each option is described below.
1) Option 1
- Apply whole piles as Steel pipe pile
- After the completion of the dredging work of the jetty area, offshore piling & structure work carry out. (dredging will be carried out by another party)
2) Option 2
- Apply whole piles as Steel pipe pile
- After completion of the reclamation by installing cofferdam, onshore piling & structure work carry out.
3) Option 3
- Apply vertical pile for working platform and access bridge as PHC Pile. The rest apply the Steel pipe pile
- After the completion of the dredging work of the jetty area, offshore piling & structure work carry out. (dredging will be carried out by another party)
4) Option 4
- Apply vertical pile for working platform and access bridge as PHC Pile. The rest apply the Steel pipe pile
- After completion of the reclamation by installing cofferdam, onshore piling & structure work carry out.

1/5
Appendix C1. BOQ and Price Breakdown for Coal Unloading Jetty Work - Direct Cost(for Reference Only)

PJT : Van Phong 1 BOT Thermal Power Plant Project Unit : VND(Excluding VAT), R0, 2019.02.28
Material Labor Equipment Total
S/N Item Description Unit Q'ty Remark
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

1 Design Work

1.1 - - - - -

1.1.1 - - - - -

1.1.2 - - - - -

2 Survey and Soil Investigation - - - - -

2.1 - - - - -

2.2 - - - - -

2.3 - - - - -

- - - - -

3 Jetty - Steel Pipe Pile - - - - -

3.1 - - - - -

3.2 - - - - -

3.3 - - - - -

- - - - -

4 Earth works - - - - -

4.1 - - - - -

4.2 - - - - -

4.3 - - - - -

- - - - -

5 Concrete Works - - - - -

5.1 - - - - -

5.2 - - - - -

5.3 - - - - -

- - - - -

6 Steel Works - - - - -

6.1 - - - - -

6.2 - - - - -

6.3 - - - - -

- - - - -

7 Pipe Works - - - - -

7.1 - - - - -

7.2 - - - - -

7.3 - - - - -

- - - - -

8 Finish Works - - - - -

8.1 - - - - -

8.2 - - - - -

8.3 - - - - -

2/2
PJT : Van Phong 1 BOT Thermal Power Plant Project Unit : VND(Excluding VAT), R0, 2019.02.28
Material Labor Equipment Total
S/N Item Description Unit Q'ty Remark
Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

- - - - -

9 Slope Protection (about 400m) - - - - -

9.1 - - - - -

9.2 - - - - -

9.3

- - - - -

10 Other Works - - - - -

10.1 - - - - -

10.2 - - - - -

10.3 - - - - -

- - - - -

11 Permit - - - - -

11.1 - - - - -

- - - - -

TOTAL - - - -

Note.
1. Subcontractor is required to submit list and schudule for Item 10. Permit
2. Cathodic Protection Anode for Steel Pile : 40 years of Design life
3. Slope Protection length : about 400m
4. Pile test shall be included static load test (1%) & PDA test (1%)
5. Subcontractor is required to submit unit price for optional fender item according to "AE8 Optional fender item"

3/3
List of Permit

PJT : Van Phong 1 BOT Thermal Power Plant Project

S/N Permit Issued by

1
2
3
4
5
2019.02.28
Process Schedule
Details Remarks
Start End