Week 1 1) Just-In-Time was successfully implemented by; 1 point

Week 2 Toyota

Honda
Week 3
Suzuki
Week 4 Volkswagen

Week 5 No, the answer is incorrect.


Score: 0
Week 6 Accepted Answers:
Toyota
Week 7
2) POK stands for; 1 point
Week 8
Product Ordering Kanban
Week 9
Process Ordering Kanban

Week 10 Production Ordering Kanban

Plan Ordering Kanban


Week 11
No, the answer is incorrect.
Week 12 Score: 0

Just In Time Accepted Answers:


(JIT) Production Ordering Kanban

Kanban 3) The following is (are) the prerequisite(s) for JIT; 1 point


System
Multi skilled workers
Materials
Requirement Vendor should produce defect free
Planning
(MRP)-I Worker should be empowered for his own decision

Materials All of the above


Requirement
Planning No, the answer
© 2014 NPTEL -isPrivacy
incorrect.
& Terms - Honor Code - FAQs -
(MRP)-II
A project of Score: 0 In association with
Enterprise Accepted Answers:
Resource All of the above
Planning (ERP)
Funded byon;
4) Just-In-Time technique has major emphasis 1 point
Quiz :

1 of 3 Thursday 17 May 2018 05:43 PM


Operations Management - - Unit 13 - Week 12 https://onlinecourses.nptel.ac.in/noc18_me26/un...

Assignment 12 Powered by
Zero inventories
Feed back
week-12 Reduced manpower

Solution for Over production


Assignment 12 All of the above

DOWNLOAD No, the answer is incorrect.


VIDEOS Score: 0
Accepted Answers:
Zero inventories

5) Which one of the following items is NOT a part of the fundamental JIT concept? 1 point

Right place

Right time

Right quantities

Right customer

No, the answer is incorrect.


Score: 0
Accepted Answers:
Right customer

6) Just-In-time (JIT) does NOT include which one of the following? 1 point

Lean manufacturing

High inventory production

Fast-throughput manufacturing

None of the above

No, the answer is incorrect.


Score: 0
Accepted Answers:
High inventory production

7) Kanban is a visual system for controlling production. 1 point

True

False

No, the answer is incorrect.


Score: 0
Accepted Answers:
True

8) Modular design and standard parts are two elements of product design in lean systems. 1 point

True

False

No, the answer is incorrect.


Score: 0
Accepted Answers:
True

9) Kaizen relates to continuous improvement. 1 point

True

2 of 3 Thursday 17 May 2018 05:43 PM


Operations Management - - Unit 13 - Week 12 https://onlinecourses.nptel.ac.in/noc18_me26/un...

False

No, the answer is incorrect.


Score: 0
Accepted Answers:
True

10)What does ERP stand for? 1 point

Enterprise resource planning

Expanse research project

Enterprise research planning

Expanse resource project

No, the answer is incorrect.


Score: 0
Accepted Answers:
Enterprise resource planning