—— 1 SITE TEST REPORT FOR 400 KV -3 BAY EXTENTION OF EBOP ) ‘2 300 MW COAL BASED TPP ‘CHANDRAPUR ‘SUB CONTRACTOR:VEN |W COAL BASED TPP CHANDRAPUR _ (Contract No : LOWPLLIPJINOWVENUS CONTROLS/00L |" Date OF TESTING TEST REPORT FOR ich Yard 12 BAY | 2014 ‘REACTOR i Page Nor 1 4. Equipment Details Make BHEL Rated power 63 MVAR Rated voltage (V) 420 Rated current (A) 87 Impedance Ohm/phase 2800 Connection symbol YN SI. No. + 6007251 Type of Cooling : ONAN ‘Year of Manufacture 2 2013 2. Location 63 MVAR Reactor 5: LINE-4 3. Insulation Resistance Measurement: (Using Equipment Details) Make: CIE Range: 5000V SILNo. 60423 Calib due date: 25.06.2014 Main Winding HV—Earth Make :CIE Range :500V —S.No.66387 —Calib due date :25-06-2014 Megger used | Reference _ Measured value in (MO) [ec-cL [>500 — 500 CCG [5500 - _ ck — Checked by: wit Wis: VOLTECH Oo Rahul Chawa? Sig: Date: Phases — Fa | 11 (ta els SITE TEST REPORT FOR a 400 KV -3 BAY EXTENTION OF EBOP be ‘2x 300 MW COAL BASED TPP CHANDRAPUR SUB CONTRACTOR:VENUS CONTROLS AND SWITCHGEAR PVT LTD | Fioject:__2300 MW COAL BASED Location / Switch Yard Page No: 2 DATE OF TESTING 18-03-2014 REACTOR TRANSFORMER 4. Magnetizing Current Test: (Using Equipment Details) SI. No. 15592785 Calib due date: 11.04 2014 Make: FLUKE Range: 1000V Calib due date: 06.06.2014 ‘SI. No: W8082876 Make: Kyoritsu Range: 100A Applied Voltage in HV Side(V) HV Side (mA) qUIV aviw | Awiu Ww 407 | 405 400_ 86.6 | 5. Winding Resistance Test; Make: Scope Range:10000 ~—_— SI. No.2304.08Y633__Callib due date: 21-05-2014 i Measured Primary Winding Resistance in Ohms ie/t [i i 4ViN 2.482 i 2.487 veel | Trbecied caeah 4-498 4 Laeta L466 A | wa) L i 7 J 6. Remarks :The fearioy is ready for Commissioning __Checked by: Witnessed by = Mis: VOLTECH it Name: / j ON a obs Y i Draiteng Hace eae ig? 4 {Sig Tig: PSiguit Date: 1 Date: Dato: LIAli4

Вам также может понравиться