Вы находитесь на странице: 1из 6

CURRICULUM VITAE

ENGR. MAJID HUSSAIN


House No. 424, Block No. 20, F.B Area, Karachi, Pakistan
Cell No: +92-300-3942150
Home Phone No: +92-21-36364016
Email: emh424@gmail.com
Skype:emh424

OBJECTIVES:
I want to utilize my knowledge of Civil Engineering for personal growth as well as for achieving goals of the
organization. I want to work on projects for the development of better future of the humanity.

DATE OF BIRTH : 09-10-1965

NATIONALITY: Pakistani (Passport Number: FF6895592 Validity: 11 OCT 2018)

EDUCATION
Degree Institute Date
ME Env. Engineering NED University of Engineering and Technology, Karachi 2001
BE Civil Engineering NED University of Engineering and Technology, Karachi 1989

OTHER SKILLS (Training, Computer proficiency) :


 MS Word;
 MS Excel;
 MS Power Point;
 MS Project
 Attended training course on PRIMAVERA;
 AutoCAD;
 ISO 14001Lead Auditor Course

LANGUAGE & DEGREE OF PROFICIENCY


Language Read Spoken Written
English Excellent Good Good
Urdu Excellent Excellent Excellent
Punjabi Fair Excellent Fair

MEMBERSHIP IN PROFESSIONAL ORGANIZATIONS:


 Member – Pakistan Engineering Council (Civil/11973);
 Member – Institution of Engineers Pakistan (M–16617/Civil);
 Member – Institution of Doctors, Engineers and Scientists, Netherlands (1474)

COUNTRIES OF WORK EXPERIENCE: Pakistan

EMPLOYMENT RECORD : Experience of Twenty Six Years

August 20, 2019 Page 1 of 6


CURRICULUM VITAE MAJID HUSSAIN

FROM : Feb 2016 - Present

EMPLOYER : K.M. Sharif & Co.

POSITION HELD : PROJECT ENGINEER

DESCRIPTION OF WORK :
Construction Management
FROM : Nov 2014 – to Present

EMPLOYER : PIMSAT Institute of Higher Education, Karachi

POSITION HELD : Assistant Head of Civil Engineering Department


Responsibilities included:
 Management of Civil Engineering Department
 Project Management
 Teaching of Civil Engineering subjects

FROM : Jan 2003 – to Oct 2014


EMPLOYER : NEC Consultants (Private) Limited, Karachi, Pakistan
POSITION HELD : Senior Civil Engineer
DESCRIPTION OF WORK :
 Feasibility Phase, Design Phase, Procurement Phase, Construction Phase, Commissioning
Phase and Operation Phase of Combined Effluent Treatment Plant (capacity: 43000 Cu.M/day),
Korangi Industrial Area, Karachi, Pakistan
 Grit Chamber
 Equalization Tanks
 Lifting Pumping Station
 Sludge Pumping Station
 Final Effluent Pumping Station
 Primary Sedimentation Tanks
 UASB Reactors
 Aeration Tanks
 Gas Holders
 Control Panel Room
 Sludge Drying Beds
 Secondary Sedimentation Tanks
 Office Building
 Vehicle Yard
 Boundary Wall
 Wastewater Conveyance System (12 KM Length) of Combined Effluent Treatment Plant,
Korangi Industrial Area, Karachi, Pakistan
 Dilution Line (3.5 KM) for Combined Effluent Treatment Plant, Korangi Industrial Area, Karachi
 Wastewater Pumping Station for Combined Effluent Treatment Plant, Korangi Industrial Area,
Karachi, Pakistan
 Prepared Contractual Procedures of Management of Combined Effluent Treatment Plant, PTA
(S.Z) Environmental Society, Korangi Industrial Area, Karachi, Pakistan
 Combined Effluent Treatment Plant, National Industrial Park, Korangi Creek, Karachi, Pakistan
 Combined Effluent Treatment Plant, Sunder Industrial Estate, Lahore, Pakistan
 Combined Effluent Treatment Plant, Pakistan Textile City, Karachi, Pakistan
 Combined Effluent Treatment Plant, Faisalabad Industrial City, Pakistan
 Performance Audit of Combined Effluent Treatment Plants of Karachi Water & Sewerage
Board (150 MDG)
 Combined Effluent Treatment Plants under the project of Greater Karachi Sewerage Plan (500
MGD)
 Industrial Wastewater Treatment Plant of M/s Muhammad Shafi Tanneries, Sind Industrial
Trading Estate, Karachi, Pakistan
 Industrial Wastewater Treatment Plant of M/s Din Leather, Sind Industrial Trading Estate,
Karachi, Pakistan
 Industrial Wastewater Treatment Plant of M/s Feroze Textile, Sind Industrial Trading Estate,
Karachi, Pakistan
 Industrial Wastewater Treatment Plant of M/s Al-Karam Textile, Landhi Industrial Area,
Karachi, Pakistan
 Wastewater Treatment Plant of M/s Philip Morris Industries-Kotri Industrial Area, Pakistan
 Wastewater Treatment Plant of M/s Philip Morris Industries-Sahiwal, Pakistan
 Water Treatment Plant of Jacobabad City, Pakistan
August 20, 2019 Page 2 of 6
CURRICULUM VITAE MAJID HUSSAIN

 Wastewater Flow Monitoring at:


 M/s Mehran Sugar Mills for Wastewater Treatment Plant
 M/s Tando Allahyar Sugar Mills for Wastewater Treatment Plant
 M/s Mirpurkhas Sugar Mills for Wastewater Treatment Plant
 M/s Army Sugar Mills, Badin for Wastewater Treatment Plant
 M/s Mirza Sugar Mills, Badin for Wastewater Treatment Plant
 M/s Colgate Pamolive at Kotri Industrial Area
 M/s National Food, Sindh Industrial Trading Estate
 Environmental Audits at 85 Industrial Units, Korangi Industrial Area, Karachi, Pakistan
 Development and Implementation of Environmental Management System (ISO 14001) at 65
Industrial Units, Korangi Industrial Area, Karachi, Pakistan
 Environmental Management System for Combined Effluent Treatment Plant – Korangi
Industrial Area, Karachi, Pakistan
 Prepared Newsletters of Combined Effluent Treatment Plant, Korangi Industrial Area, Karachi,
Pakistan
 Environmental Management System for Combined Effluent Treatment Plant of Textile City, Bin
Qasim Industrial Area, Karachi, Pakistan
 Implementation of Solid Waste Management Plan at Korangi Tanneries, Korangi Industrial Area,
Karachi, Pakistan
 Studied Textile Audit Reports and prepared database
 Prepared Solid Waste Management Plan of Textile City, Karachi, Pakistan
 Prepared Risk Management Plan of Textile City, Karachi, Pakistan
 Surveyed Landfills and dumping sites of Karachi
 Surveyed following Industrial Estates of Karachi to see practices of solid waste management:
 Korangi Industrial Area
 Landhi Industrial Area
 F.B Industrial Area
 North Karachi Industrial Area
 Sindh Industrial Trading Estate
 Solid Waste Generation & Disposal Survey of Jacobabad City under USAID Project
 Solid Waste Sampling in the wastewater of Malir River, Lyari River, Kalri Nallah and Pitcher
Nallah of Karachi
 Study of Water Quality of Indus River and conducted sampling at Hyderabad Bypass Bridge,
Thatta - Sajawal Bridge and Dadu - Moro Bridge
 Prepared Laboratory HSE Manual for M/s Pak Oasis Industries
 Prepared Solid Waste Management Plan for Jacobabad City
DESCRIPTION OF DUTIES:
 Coordination Meetings with Client, Consultants, Contractors, Government Departments and
Industries
 Coordination for Bidding Process
 Preparation of Bidding Documents
 Preparation of Drawings
 Preparation of Condition of Contract
 Preparation of BOQ
 Preparation of Specifications
 Preparation of Engineering Estimate
 Prequalification of Contractors
 Invitation of Tender
 Pre-Bid Meeting with Contractors
 Opening of Tenders
 Evaluation of Tenders
 Selection of Contractor
 Award of Work to Selected Contractor
 Contract Management
 Project Estimation;
 Preparation of BOQ;
 Preparation of Tenders;
 Tender Evaluation;
 Contract Management;
 Preparation of Bar Bending Schedules;
 Coordination Meetings with Client, Contractors and industries;
 Checking the quality and quantity of construction work
 Checking, evaluation and scrutinizing all Interim Payment Certificates
 Checking all the shop drawings
August 20, 2019 Page 3 of 6
CURRICULUM VITAE MAJID HUSSAIN

 Maintaining a filing system of all correspondence


 Keeping current set of record drawings and specifications
 Keeping valid all bonds/policies/guarantees construction period
 Maintaining monthly log, giving brief description of construction progress, meetings held,
decisions taken, minutes of meetings and other important events related to construction
works.
 Checking the quality and quantity of personnel assigned
 Preparation of monthly progress reports
 Checking the layout
 Re-adjusting the layouts and/or designs
 Check that the work is being carried out in accordance with final approved shop drawings,
specifications and Contract documents.
 See that selection and use of building materials is in accordance with the approved
specifications. Testing of structural and other materials
 See that the work has been completed in accordance with the requirements of the contract
and to the satisfaction of the Client.
 Checking and approval of ‘As Built Drawings’.
 Checking & giving report after the defect liability period.
 Closing of Contract.
 Suggest substitute materials
 Review change orders
 Maintain a record of work progress as per items of the Bill of Quantities
 Proper implementation of time schedule for construction agreed upon as per
contract.
 Checking of Health, Safety & Environmental arrangements at works
FROM : April 1995 - Dec 2002
EMPLOYER : National Management Consultants (Pvt.) Ltd., Karachi, Pakistan
POSITION HELD : Project Engineer
DESCRIPTION OF WORK
 Worked on Combined Effluent Treatment Plant for Korangi Tanneries, Korangi Industrial Area,
Karachi, Pakistan which included: Office Building; Environmental Laboratory; Equalization Tanks;
Pumping Stations; Primary Sedimentation Tanks; Secondary Sedimentation Tanks; Up-flow
Anaerobic Sludge Reactors; Aeration Tanks; Control Panel Room; Sludge Drying Beds
 Construction Management of National Institute of Leather Technology – Korangi Industrial Area,
Karachi, Pakistan which included: College Building; Laboratories; Tannery; Hostel Building; Canteen;
Sports Hall
DESCRIPTION OF DUTIES
 Coordination Meetings with Client, Contractors and industries;
 Checking the quality and quantity of construction work
 Checking, evaluation and scrutinizing all Interim Payment Certificates
 Checking all the shop drawings
 Maintaining a filing system of all correspondence
 Keeping current set of record drawings and specifications
 Keeping valid all bonds/policies/guarantees construction period
 Maintaining monthly log, giving brief description of construction progress, meetings held, decisions
taken, minutes of meetings and other important events related to construction works.
 Checking the quality and quantity of personnel assigned
 Preparation of monthly progress reports
 Checking the layout
 Re-adjusting the layouts and/or designs
 Check that the work is being carried out in accordance with final approved shop drawings,
specifications and Contract documents.
 See that selection and use of building materials is in accordance with the approved specifications.
Testing of structural and other materials
August 20, 2019 Page 4 of 6
CURRICULUM VITAE MAJID HUSSAIN

 See that the work has been completed in accordance with the requirements of the contract and to
the satisfaction of the Client.
 Checking and approval of ‘As Built Drawings’.
 Checking & giving report after the defect liability period.
 Closing of Contract.
 Suggest substitute materials
 Review change orders
 Maintain a record of work progress as per items of the Bill of Quantities
 Proper implementation of time schedule for construction agreed upon as per contract.
 Checking of Health, Safety & Environmental arrangements at works

FROM : Jan 1992 - April 1995


EMPLOYER : Naqvi & Siddique Associates
POSITION HELD : Site Engineer/Resident Engineer
DESCRIPTION OF WORK: Construction Management of hospital building (covered area 540,000 sft)
and Hostel buildings for Bolan Medical Complex Quetta, Pakistan
DESCRIPTION OF DUTIES
 Coordination Meetings with Client, Contractors and industries;
 Checking the quality and quantity of construction work
 Checking, evaluation and scrutinizing all Interim Payment Certificates
 Checking all the shop drawings
 Maintaining a filing system of all correspondence
 Keeping current set of record drawings and specifications
 Keeping valid all bonds/policies/guarantees construction period
 Maintaining monthly log, giving brief description of construction progress, meetings held, decisions
taken, minutes of meetings and other important events related to construction works.
 Checking the quality and quantity of personnel assigned
 Preparation of monthly progress reports
 Checking the layout
 Re-adjusting the layouts and/or designs
 Check that the work is being carried out in accordance with final approved shop drawings,
specifications and Contract documents.
 See that selection and use of building materials is in accordance with the approved specifications.
Testing of structural and other materials
 See that the work has been completed in accordance with the requirements of the contract and to
the satisfaction of the Client.
 Checking and approval of ‘As Built Drawings’.
 Checking & giving report after the defect liability period.
 Closing of Contract.
 Suggest substitute materials
 Review change orders
 Maintain a record of work progress as per items of the Bill of Quantities
 Proper implementation of time schedule for construction agreed upon as per contract.
 Checking of Health, Safety & Environmental arrangements at works
FROM : Feb 1991 – Dec 1991
EMPLOYER : Aquater (Pakistan) (Pvt.) Ltd.
POSITION HELD : Field Assistant
DESCRIPTION OF WORK: Construction supervision of Cooling Tower and Priling Tower for Extension
of Fertilizer Plant – District Rahim Yar Khan, Pakistan
DESCRIPTION OF DUTIES:
 Construction Management;
 QA/QC of Construction Activities;
 Coordination with Contractors;
 Bills Verification;

August 20, 2019 Page 5 of 6


CURRICULUM VITAE MAJID HUSSAIN

 Health, Safety & Environmental Management


FROM : Oct 1989 – Jan 1991
EMPLOYER : SAITA (Pakistan) Private Ltd. Karachi, Pakistan
POSITION HELD : Site Engineer
DESCRIPTION OF WORK
 Construction of Thermal Power Station (1100 MW) – Muzaffargarh, Pakistan which included: cooling
towers; Turbo generator foundation; Switch gear station; Water intake channel

DESCRIPTION OF DUTIES
 Construction Management;
 Coordination with Client;
 Health, Safety & Environmental management

August 20, 2019 Page 6 of 6

Вам также может понравиться