a
LIFE EXTENSION OF WELLL PLATFORM PROJECT
PHASE 02 (LEWPP ‐02), INDIA
CLIENT : OIL AND NATURAL GAS CORPORATION LTD.
CLIENT PROJECT CODE : LEWPP-02
PROJECT : LIFE EXTENSION OF WELL PLATFORM PROJECT
PHASE 02 (LEWPP-02), INDIA
PO No. : 5700000940
PO DATE. : 09-02-2017
MR REF. : 9651-000-04-MR-410- R0
Revision Date Purpose
0 28.02.2017 For Approval
GAYTRI INDUSTRIAL CORPORATION Document No: QPM/QC/03
302B, Nitco Biz Park Page No: 1 of 2
Wagle Industrial Estate
Revision No: 5
Thane (West), 400 604
Quality Procedure Manual Level II Revision Date: 04/04/2016
Prepared by: M.R.
Title: PMI Test
Approved by: C.E.O
Procedure :
1. Scope - This procedure describes the minimum requirements for use of PMI machine
to verify alloy of SS Material composition in condition by XRF Technique. Light
elements such as Al, Si and Mg are excluded.
2. Purpose - This procedure is to address the clause of process control to define the use
of PMI for alloy analysis.
5. Equipment - X-ray based. Ag anode, Excitation energy 10-40 Kv, .Software modes
- Analytical, Fast ID and Pass/ Fail. Normal time for test result display is 10 seconds.
Instrument used for PMI shall be NITON make, Model : XL2 OR XL3.
Insturment Sr. No may be any of these. (40921/ 69248/ 63182/ 46021/ 69248/ 32230
Chemical spot testing equipment shall not be used for testing.
TRIAL C
US
MUMBAI
OR
RI IND
PORAT IO
400 080
*
YT
GA N
GAYTRI INDUSTRIAL CORPORATION Document No: QPM/QC/03
302B, Nitco Biz Park Page No: 2 of 2
Wagle Industrial Estate
Revision No: 5
Thane (West), 400 604
Quality Procedure Manual Level II Revision Date: 04/04/2016
Prepared by: M.R.
Title: PMI Test
Approved by: C.E.O
9. Method – a).Switch on the machine and let machine do self test and come to
test mode automatically.
b) Select desired mode of testing
c) Calibrate the instrument using standard calibrating clip.
d) Select alloy library for verification of alloys by pass fail mode.
e) Wait for reading to stabilize after processing trigger.
f) Instrument will show spectrum of alloys.
g) If component is not meeting the requirement, then adjacent
locations shall be re-checked again.
12. Non Confirming Materials : If any piece from representative percentage sample is
found to be Unacceptable, then the remainder of material
shall be verified by performing 100% PMI test.
Non Confirming items shall be quarantined.
13. Report- Elements to be analyzed for SS316/316L -- Cr%, Ni% & Mo%
Elements to be analyzed for SS304/304L -- Cr% & Ni%
Alloy elements analysis is reported in a standard report format
TRIAL C
US
MUMBAI
OR
RI IND
PORAT IO
400 080
*
YT
GA N
MS
METALLURGICAL SERVICES
PROJECT:- CLIENT:-
DATE :
PMI REPORT NO:- Vendor/ Sub. Vendor:-
Testing Agency:-Metallurgical Services.
I.W.O. No :-
Mumbai
P.O.NO : PMI Location:
Client Approved PMI Procedure No:
ALLOY CONTENT%
SPECIFIED RANGE --
SPECIFIED RANGE --
Sr.
DISCRIPTION REMARK
No.
SR NO: