SUBTOTAL QUANTITY OF

Stair Case (1)


No. Item of Work Quantity

1 Filling m3
2 Excavation m3
3 Gravel Lay m3
4 Base Compaction m2
5 Plastic Sheet m2
6 Lean concrete m3
7 Forming m2 #DIV/0! m2 / m3
8 Chamfer m1 Re - Bar Ratio,
9 Wire Mesh m2 According Design Sec.
10 Re-bar kg #DIV/0! Kg / m3 225.00 Kg / m3
11 Concrete m3 0.00 Kg / m3
12 Trowel finish m2
13 Backfill & Compac m3
14 Disposal m3

Rebar ( Break Down ) Dia. 6 8 10 12 13 16 19 22 25 32


kg 0.00
kg 0.00
kg 0.00
SUB TOTAL Kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Over Lap Factor : 1.02 1.03 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.12

Net Quantity : 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Lost Factor 5% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Submit Quantity : 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
434028683.xls (Found Base & Pedestal)
PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
Total Bottom of Found. =GL. (m) -1.10 Base Pedestal RE - BAR CALCULATION
No TYPE Member Lean Conc. Thick (m) 0.05 Dimension C.Spacer 0.05 Dimension C.Spacer 0.04 DESCRIPTION BAR USING BAR FABRICATION BAR CONSUMPTION
Stair Case Foundation Place L. Conc. Each Space (m) 0.10 W L H/D Side Place W L/D H Side Place Code Cutting Position Total Total By Diameter (Kg.) Total By
( Base & Pedestal ) (Nos.) Gravel Thick (m) 0.15 (m) (m) (m) ( Nos. ) ( Nos. ) (m) (m) (m) ( Nos. ) ( Nos. ) Type Section Position D. Distance Length Pcs Layer Side Place Pcs Length Weight 6 8 10 12 13 16 19 22 25 32 Section
1 Section / Bar Shape 1 Excav. Or Filling Depth (m) 1.30 1.50 1.50 0.15 2 1 0.25 1.50 1.45 2 1 (mm) (@) (m) (Nos.) (Nos.) (Nos.) (Nos.) (Nos.) (m) (Kg) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (kg)
Item of Work Quantity Width Length Height Side Quantity Width Length Height Side Quantity
Excavation Space Base Lower Long Straight 10 200 1.52 8 1 1 8 12.16 0.62 7.54 7.54
Left Right Filling m3 0.00 2.10 2.10 0.00 0.00 Wide Straight 10 200 1.52 8 1 1 8 12.16 0.62 7.54 7.54
Top 0.60 0.60 Excavation m3 7.49 2.40 2.40 1.30 7.49 Middle Bar Spacer 10 900 0.70 3 1 1 3 1.94 0.62 1.21 1.21
Bottom 0.30 0.30 Gravel Lay m3 0.49 1.80 1.80 0.15 0.49 Upper Long Straight 10 200 1.52 8 1 1 8 12.16 0.62 7.54 7.54
Average 0.45 0.45 Base Compaction m2 3.06 1.80 1.70 3.06 Wide Straight 10 200 1.52 8 1 1 8 12.16 0.62 7.54 7.54
Plastic Sheet m2 0.00 1.70 1.70 Ring / Hor. Outside 200 1 1
Forming = 6.78 m2 / m3 Lean concrete m3 0.14 1.70 1.70 0.05 0.14 Pedestal Vertical Inside 16 200 1.81 16 1 1 1 16 28.96 1.58 45.76 45.76
Re - Bar = 124.43 Kg / m3 Forming m2 5.98 1.50 1.50 0.15 2 0.90 0.25 1.50 1.45 2 5.08
Concrete = 0.39 m3 / m2 Chamfer m1 0.00 1.50 1.50 0.15 4 6.60 0.25 1.50 2 3.50 Middle Bar Spacer 900 1 1
Wire Mesh m2 0.00 1.50 1.50 Horizontal
Re - Bar Ratio, According Design section Re-bar kg 109.66 31.36 78.29 Outside 10 200 3.28 16 1 1 1 16 52.48 0.62 32.54 32.54
Base = 50.63 Kg Concrete m3 0.88 1.50 1.50 0.15 0.34 0.25 1.50 1.45 0.54 Other Dowel
Pedestal = 190.31 Kg Trowel finish m2 0.00 1.50 1.50 2.25 0.25 1.50 0.00 Cross Bar
Total = 240.94 Kg Backfill & Compaction m3 6.52 6.52 Stek
= 273.40 Kg / m3 Disposal m3 1.40 1.50 1.50 0.15 0.97 0.25 1.50 1.15 0.43

Rebar ( Break Down ) Dia. 6 8 10 12 13 16 19 22 25 32


Base kg 31.36 0.00 0.00 31.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.90 0.00 0.00 0.00 109.66
Pedestal kg 78.29 0.00 0.00 32.54 0.00 0.00 45.76 0.00 0.00 0.00 0.00 0.00 0.00 45.76 0.00 0.00
Other kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL Kg 109.66 63.90 45.76

Page 2 of 3 Pages
434028683.xls (Ramp Slab & Trap)
PT. SMCC Utama Indonesia
Project : Nippon Shokubai Indonesia
Location : Cilegon, Banten, Indonesia.
Total Bottom of Found. =GL. (m) 0.00 Slab / Ramp Slab Trap / Step RE - BAR CALCULATION
No TYPE Member Lean Conc. Thick (m) 0.00 Dimension C.Spacer 0.03 Dimension C.Spacer 0.03 DESCRIPTION BAR USING BAR FABRICATION BAR CONSUMPTION
Ground Slab Place L. Conc. Each Space (m) 0.00 W L H/D Side Place W L/D H Side Place Code Cutting Position Total Total By Diameter (Kg.) Total By
( S - ?... ) (Nos.) Gravel Thick (m) 0.00 (m) (m) (m) ( Nos. ) ( Nos. ) (m) (m) (m) ( Nos. ) ( Nos. ) Type Section Position D. Distance Length Pcs Layer Side Place Pcs Length Weight 6 8 10 12 13 16 19 22 25 32 Section
1 Section / Bar Shape 1 Excav. Depth (m) 0.00 1.50 6.30 0.15 2 1 0.26 1.50 0.20 2 19 (mm) (@) (m) (Nos.) (Nos.) (Nos.) (Nos.) (Nos.) (m) (Kg) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (kg)
Item of Work Quantity Width Length Height Side Quantity Width Length Height Side Quantity
Slab / R Lower Long Straight 13 200 7.28 8 1 1 8 58.24 1.04 ### 60.57
Filling m3 0.00 Wide Straight 10 200 1.62 32 1 1 32 51.84 0.62 32.14 32.14
Excavation m3 0.00 Middle Bar Spacer 10 900 0.78 12 1 1 12 9.10 0.62 5.64 5.64
Gravel Lay m3 0.00 Upper Long Straight 13 200 7.28 8 1 1 8 58.24 1.04 ### 60.57
Base Compaction m2 0.00 Wide Straight 10 200 1.62 32 1 1 32 51.84 0.62 32.14 32.14
Plastic Sheet m2 0.00 Ring / Hor. Outside
Forming = 7.48 m2 / m3 Lean concrete m3 0.00 Trap / S Horizontal 10 300 1.62 21 1 1 19 399 646.38 0.62 400.76 400.76
Re - Bar = 406.91 Kg / m3 Forming m2 16.14 1.50 6.30 0.15 2 9.45 0.26 1.50 0.20 2 6.69 Trap 10 200 0.76 32 1 1 19 608 462.08 0.62 286.49 286.49
Concrete = 0.23 m3 / m2 Chamfer m1 0.00 0.26 1.50 0.20 4
Floor Area = m2 Wire Mesh m2 0.00 1.50 6.30
Re - Bar Ratio, According Design section Re-bar kg 878.31 191.06 687.25
Slab / Ramp S = 283.50 Kg Concrete m3 2.16 1.50 6.30 0.15 1.42 0.26 1.50 0.20 0.74 Other
Trap / Step = 148.20 Kg Trowel finish m2 9.45 1.50 6.30 9.45 0.26 1.50 0.00
Total = 431.70 Kg Backfill & Compaction m3 0.00
= 200.00 Kg / m3 Disposal m3 0.00

Rebar ( Break Down ) Dia. 6 8 10 12 13 16 19 22 25 32


Slab / Ramp Slab kg 191.06 0.00 0.00 69.92 0.00 121.14 0.00 0.00 0.00 0.00 0.00 0.00 757.17 ### 0.00 0.00 878.31
Trap / Step kg 687.25 0.00 0.00 687.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other kg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TOTAL Kg 878.31 757.17 121.14