Вы находитесь на странице: 1из 17

PROJECT TITLE

Zakum Oil Lines Replacement Project Phase 1

Engineering, Procurement, Construction & Commissioning (EPC) Works

CLIENT

ADMA-OPCO

CONTRACTOR

National Petroleum Construction Company


P.O. Box 2058
Abu Dhabi
UAE

NPCC Document Number: 2272-PP-OF-018

NPCC Project No. 2272

ROV- General Visual Inspection (GVI) Survey for


Report Title Crossings Locations and Proposed Risers
Locations

Date date

Revision: 0

Controlled Copy No. 1 (one)


QUALITY ASSURANCE

Document Control
2198-RADIALradial-RP-00-01-001
Action By Date Signature

Prepared K.H 24/12/2013 K.H

Reviewed A.O 24/12/2013 A.O

Approved

Table 1: Document Control

Document Issue
Revision No. Revision Details Date Embodied by
0 For Client Review and Approval

Table 2: Document Issue Register

Client Document Approval


Revision No. Approval for Date Signature Name
0 Client

Table 3: Document Approval

Document Issue List


Revision No. Copy No. Client Name Date of Issue
0 1

Table 4: Document Issue List

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.02 of 17 NPCC Survey


OVERVIEW OF PROJECT REPORTS

The following reports shall be submitted as part of the ‘The pre-engineering survey’.
NPCC Doc.
Report Title
Number
2272-PP-OF-018 Pre-Engineering Survey Report for Pipelines Radial 280
2272-PP-OF-018 Pre-Engineering Survey Report for Pipelines Radial 24
2272-PP-OF-018 Pre-Engineering Survey Report for Pipelines Radial 47 (Current Report)
2272-PP-OF-019 Pre-Engineering Survey Report for Pipelines Radial 38
2272-PP-OF-019 Pre-Engineering Survey Report for Pipelines Radial 237
2272-PP-OF-020 Pre-Engineering Survey Report for Pipelines Radial 304
2272-PP-OF-020 Pre-Engineering Survey Report for Pipelines Radial 22
2272-PP-OF-021 Pre-Engineering Survey Report for Pipelines Radial 329
2272-PP-OF-021 Pre-Engineering Survey Report for Pipelines Radial 88
2272-PP-OF-022 Pre-Engineering Survey Report for Pipelines Radial 153
Table 5: Overview of Project Reports

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.03 of 17 NPCC Survey


TABLE OF CONTENTS

1.0 INTRODUCTION ...................................................................................................................................... 10


2.0 SCOPE OF WORK ................................................................................................................................... 10
3.0 SURVEY METHODOLOGY ...................................................................................................................... 11
3.1 Crossing Survey........................................................................................................................................ 11
4.0 SCHEMATIC DIAGRAM OF PROPOSED ROUTES LOCATIONS ......................................................... 12
5.0 GEODETIC PARAMETERS ..................................................................................................................... 13
6.0 POSITIONING SYSTEM .......................................................................................................................... 13
7.0 VERTICAL DATUM................................................................................................................................... 13
8.0 PROPOSED PIPELINE ROUTE COORDINATES – RADIAL 47 ............................................................. 14
9.0 SURVEY RESULTS.................................................................................................................................. 15
9.1 General ..................................................................................................................................................... 15
9.2 8”Oil Proposed Pipeline from ZK167 to ZK290 PL (22)
Error! Bookmark not defined.
9.2.1 Summary ............................................................................................................................................... 15
9.2.2 Event List ............................................................................................................................................... 15
9.2.3 Existing Crossing Details ...................................................................................................................... 15
9.2.4 Images of Interest.................................................................................................................................. 16
9.3 8”Oil Proposed Pipeline from ZK290 to ZK47 PL (23)
Error! Bookmark not defined.
9.3.1 Summary
Error! Bookmark not defined.
9.3.2 Event List
Error! Bookmark not defined.
9.3.3 Existing Crossing Details
Error! Bookmark not defined.
9.3.4 Images of Interest
Error! Bookmark not defined.
10.0 EVENT CODES..................................................................................................................................... 16
11.0 CHARTS ................................................................................................................................................ 17
11.1 CHART INDEX ...................................................................................................................................... 17

LIST OF TABLES
Table 1: Document Control .................................................................................................................................... 2
Table 2: Document Issue Register ........................................................................................................................ 2
Table 3: Document Approval ................................................................................................................................. 2
Table 4: Document Issue List ................................................................................................................................ 2
Table 5: Overview of Project Reports .................................................................................................................... 3
Table 6: SOW Tasks List For The Subjected Proposed Pipelines. ..................................................................... 10
Table 7: Geodetic Parameters ............................................................................................................................. 13
Table 8: Vertical Datum and Depths .................................................................................................................... 13
Table 9: Pipeline route data from ZK-167 to ZK-290 (PL 22) .............................................................................. 14

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.04 of 17 NPCC Survey


Table10: Pipeline route data from ZK-290 to ZK-47 (PL 23) ............................................................................... 14
Table 11: Summary (PL22).................................................................................................................................. 15
Table 12: Event List (PL22) ................................................................................................................................. 15
Table 13: Existing Crossing Details (PL22) ......................................................................................................... 15
Table 11: Summary (PL23).................................................................................... Error! Bookmark not defined.
Table 12: Event List (PL23) ................................................................................... Error! Bookmark not defined.
Table 13: Existing Crossing Details (PL23) ........................................................... Error! Bookmark not defined.
Table 14: Event Codes ........................................................................................................................................ 17
Table 15: Chart Index .......................................................................................................................................... 17
LIST OF IMAGES
Image 1: Rock ........................................................................................................ Error! Bookmark not defined.
Image 2: Rock ........................................................................................................ Error! Bookmark not defined.

LIST OF FIGURES
Figure 1 : Zakum Field Proposed Pipelines Routes ............................................................................................ 12

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.05 of 17 NPCC Survey


REFERENCES

OPCO MARINE STANDARDS

OPCO /ASMV 2000, Rev 3 OPCO Acceptance Standards for Marine Vessels

OPCO /ASMC 2000, Rev 3 OPCO Acceptance Standards for Marine Contractors

OPCO /SIMO 2000, Rev 3 OPCO Acceptance Standards for Marine Operations

Project Documents and Drawings

Pipelines:

Document/ Drawing No. Document / Drawing Title


AD178-27/216-G-00020-05 Zakum Oil Lines Replacement Phase-1 FEED Services EPC
Scope of Work
AD178-27/216-G-00113-00 EPC SOW for Additional Oil Line from ZK162 to ZK153

SP-1046 (ADMA-OPCO) Specification for Submarine Pipeline System

STD-00 Part 2 Standard for site Conditions and Data


SP-1043 Offshore Survey of Subsea Pipeline

Pipeline Route Reports:

Document/ Drawing No. Document / Drawing Title


AD178-27/216-G-07000-03 Pipeline and Riser Design Basis
AD178-27/216-G-07200-02 Pipeline and Riser Design Basis
AD178-27/216-G-07201-02 Pipeline Route Selection Report
AD178-27/216-PL-71001 Pipelines Overall Field Layout Drawing
1281-PES-PL01 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL02 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL03 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL04 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL05 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL06 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL07 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.06 of 17 NPCC Survey


Document/ Drawing No. Document / Drawing Title
1281-PES-PL08 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL09 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL10 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL11 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL12 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL13 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL14 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL15 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL16 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL17 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL18 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL19 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281-PES-PL20 ROV-General Visual Inspection (GVI) Survey for Crossing
Locations and Proposed Riser Locations
1281P2-PES-GRPT-003 Vol 2 Pre-engineering Survey Report
1281-PES-GRPT-002.Vol 1 Adma-Opco -Zakum Pipelines Replacement- Phase 2-22
Additional Pipelines Route Survey
PA / 0074 / 12 / 01 – 9th May‘12 Soil Parameters Investigation – Replacement of 20 Critical
Zakum Oil Pipelines
Proj No: PA / 0074 / 12 / 01, Soil Parameters Investigation – Replacement of 8”, 12” & 16”
Report No: 261103 – 3rd July’12 Critical Zakum Oil Pipelines

NPCC Documents & Drawings

NPCC Engineering Document - Scope of work for Cable and Pipeline Route Survey
(Doc. No. 2272-N-SP-0101 & 2272-N-SP-0129)

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.07 of 17 NPCC Survey


Pipeline Route Drawings:

Drawing No Description
2272-N-SK-009-A Pipeline From ZK-162 to ZK-153 (additional PL)
AD-178-216-PL-70019; REV. 3 Pipeline From ZK-13 to ZK-304 (PL 12)
AD-178-216-PL-70018/70047; REV. 4 Pipeline From ZK-14 to ZK-13 (PL 11)
AD-178-216-PL-70029/70030; REV. 4 Pipeline From ZK-22 to ZK-CRP (PL 19)
AD-178-216-PL-71010; REV. 2 Pipeline From ZK-24 to ZK-158/76 (PL 41)
AD-178-216-PL-70010/70011/70012/70045;
Pipeline From ZK-38 to ZK-01 (PL 7)
REV. 4
AD-178-216-PL-70014/70015; REV. 3 Pipeline From ZK-39 to ZK-22 (PL 9)
AD-178-216-PL-71007; REV. 2 Pipeline From ZK-24 to ZK-38 (PL31)
AD-178-27PL-71002/71003/71004; REV. 3 Pipeline From ZK-88 to ZK-22 (PL 21)
AD-178-27-PL-70007/70008; REV. 4 Pipeline From ZK-110 to ZK-88 (PL 5)
AD-178-216-PL-70013; REV. 3 Pipeline From ZK-129 to ZK-39 (PL8)
AD-178-27-PL-70031/70032; REV. 3 Pipeline From ZK-153 to ZWSC-RP1 (PL 20)
AD-178-216-PL-71011/71012; REV. 2 Pipeline From ZK-110 to ZCSC-CRP (PL 42)
AD-178-27-PL-71005; REV. 2 Pipeline From ZK-167 to ZK-290 (PL 22)
AD-178-27-PL-71004; REV. 3 Pipeline From ZK-189 to ZK-293 (PL 2)
AD-178-216-PL-70023/70024; REV. 3 Pipeline From ZK-235 to ZK-237 (PL 14)
AD-178-216-PL-70025/70048; REV. 3 Pipeline From ZK-237 to ZCSC-BSTCN (PL 15)
AD-178-27-PL-70002/70003; REV. 4 Pipeline From ZK-277 to ZK-293 (PL 1)
AD-178-216-PL-71008/71009; REV. 3 Pipeline From ZK-280 to ZK-29 (PL 35)
AD-178-27-PL-70006; REV. 3 Pipeline From ZK-288 to ZK-110 (PL 4)
AD-178-27-PL-71006; REV. 2 Pipeline From ZK-290 to ZK-47 (PL 23)
AD-178-27-PL-70005; REV. 3 Pipeline From ZK-293 to ZK-153 (PL3)
AD-178-216-PL-70017/70046; REV. 3 Pipeline From ZK-300 to ZK-20 (PL 10)
AD-178-216-PL-70020/70021/70022; REV.3 Pipeline From ZK-304 to ZCSC-CRP (PL 13)
AD-178-27-PL-70009; REV. 3 Pipeline From ZK-329 to ZWSC-RP1 (PL 6)

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.08 of 17 NPCC Survey


GLOSSARY OF ABBREVIATIONS

BOSIET - Basic Offshore Safety Induction and Emergency Training


C-NAV - Geodetic Survey Grade DGPS Receiver
CD - Chart Datum
CM - Central Meridian
CLIENT - Larsen &Tourbo (Direct Client for NPCC)
COMPANY - ADMA-OPCO
CONTRACTOR - National Petroleum Construction Company (NPCC)
DGPS - Differentially Corrected Global Positioning System
DHSS - Dual Head Sector Scanning Sonar
DP - Dynamic Positioning (vessel)
DXF - Data Exchange Format
ES - Echo Sounder
EOL - End Of Line
GA - General Arrangement
GAPS - Global Acoustic Positioning System (USBL system)
GPS - Navstar Global Positioning System
GVI - General Visual Inspection
HDD - Hard Disc Drive
HSE - Health, Safety & Environment
INMARSAT - International Maritime Satellite Communication system
ITRF - International Terrestrial Reference Frame
KP - Kilometre Point
LARS - Launch and Recovery System (ROV)
OFO - Offshore Operations Department of NPCC
PC - Party Chief
PMT - Project Management Team
PPE - Personal Protective Equipment
QC - Quality Control
RMS - Root Mean Square
ROV - Remotely Operated Vehicle
RTCM - Radio Technical Commission for Maritime Services
SDLT - Super Digital Linear Tape
SM - Survey Manager
SOL - Start of Line
SOW - Scope Of Work
SUH - Start Up Head
TMS - Tether Management System
UKOOA - United Kingdom Offshore Operators Association
USBL - Ultra Short Base Line
UTM - Universal Transverse Mercator
WGS - World Geodetic System

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.09 of 17 NPCC Survey


1.0 INTRODUCTION

ADMA-OPCO has developed a Pipeline Replacement Strategy and Plan for progressive replacement of
aging subsea Pipelines network, which sets clear directions and expectations in order to create focus on
key priorities for sustainable production and expansion programs from the existing fields, whilst
maximizing economic life and value of our facilities with Zero Hydrocarbon Leak Policy. All future infield
lines replacement shall be based on quantitative more deterministic approach by full internal
inspection/selective validation, Fitness for Services (FFS), the deterministic Remnant Life Assessment
and business impacts. Based upon the above directives ADMA-OPCO intensified Intelligent Pigging
campaigns.

The pre-engineering survey shall cover pipeline crossings and platform approach surveys for all the
twenty six (26) pipelines.

2.0 SCOPE OF WORK

The scope of work under the present campaign was to carry out General Visual Inspection Survey (GVI)
using observation class ROV (Seaeye Panther or equivalent).

NPCC provided all vessels, equipment, apparatus, labour, transport, materials and tools to perform the
required scope of work as defined in this report. This include all clearances, permits and licences for
vessels, equipment and personnel with respect to customs, immigration, visas and other requirements of
the UAE government and other local authorities.

The survey activities were divided into the following areas:


 Mobilisation
 ROV Surveys as mentioned above using Observation Class ROV

All the proposed sail lines were produced by the On-line Surveyor and presented by the Party Chief prior
to the commencement of the survey works. The Party Chief along with other survey team members
ensured that adequate coverage was achieved.

Digital video recording system was integrated with the surface navigation positioning system and
provided complete coverage of the area of survey. Regular navigational fix positions, combined with the
USBL data were used to determine the position.

Hereunder table is the SOW tasks for the subjected Radial:

Pipeline Crossing / Plarform/ Existing line Task Comments

pipe pipe Crossing

Table 6: SOW Tasks List For The Subjected Proposed Pipelines.

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.010 of 17 NPCC Survey


3.0 SURVEY METHODOLOGY

All survey works have been carried out from a DP ROV survey vessel. An observation class ROV
(Seaeye panther or equivalent) along the proposed and existing routes.

3.1 Crossing Survey

Crossing surveys are aimed to determine the crossing details viz. crossing location, orientation,
existing pipeline condition (exposed or buried), height of the pipeline at the crossing location, damage,
if any, sleeper / mattress configuration / positions(if any)etc. of pipeline at the location.

Survey shall be carried out along the proposed pipeline route from the crossing location uptoa
minimum distance of 100mts on either side of the crossing location, in case of multiplecrossing 150m
on either side of the existing pipelines / cables at the extremities of thecrossing shall be surveyed.

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.011 of 17 NPCC Survey


4.0 SCHEMATIC DIAGRAM OF PROPOSED ROUTES LOCATIONS

Figure 1 : Zakum Field Proposed Pipelines Routes

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.012 of 17 NPCC Survey


5.0 GEODETIC PARAMETERS
Working spheroid Parameter
Spheriod Clarke 1880 (Modified)
Horizontal Datum Nahrwan
Semi-Major Axis 6378249.145 metres
Semi-Minor Axis 6356514.869 metres
Eccentricity2 0.006803511283
Inverse Flattening (1/f) 293.4650000
GPS reference Parameter
Spheriod WGS 1984
Horizontal Datum WGS 1984
Semi-Major Axis 6378137.0000 metres
Semi-Minor Axis 6356752.3142 metres
Eccentricity2 0.006694380067
Flattening 298.2572236
Projection Parameter
Grid Projection Universal Transverse Mercator (UTM)
Zone 39
Central Meridian 51O E
Latitude of Origin 000O N
False Easting 500,000 metres
False Northing 0.00 metres
Scale Factor 0.9996 on CM
Datum shift Parameter
WGS 84 to Nahrwan
Shift Rotation
∂x +233.40 m Rx 0.00
∂y +160.70 m Ry 0.00
∂z -381.50 m Rz -0.554
Scale Factor (ppm) -0.2263
Trial
DATUM Geographical Coordinates UTM Coordinates
point
Latitude Longitude Easting (m) Northing (m)
WGS 84 24O 51’ 27.61” 53O 36’ 48.85” 764 097.25 2751 721.19
Platform
Clarke
ZWSC
1880 24O 51’ 21.35” 53O 36’ 45.00” 764 000.00 2751 300.00
(mod.)
Source: ADMA-OPCO, UAE
Rotation Convention : Right (Clockwise +ve)
Table 7: Geodetic Parameters

6.0 POSITIONING SYSTEM


Primary Positioning System: C-NAV Diff. GPS System in High Precision Mode (SF2)
Secondary Positioning System: VERIPOS ULTRA

7.0 VERTICAL DATUM

Vertical Datum
All bathymetric data shall be reduced to Chart Datum (CD) using COMPANY supplied tidal
predictions for ZAKUM field.
Depths

All depths are in meters, unless otherwise stated.

Table 8: Vertical Datum and Depths

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.013 of 17 NPCC Survey


8.0 PROPOSED PIPELINE ROUTE COORDINATES – RADIAL Radial

Pipeline route data from ZK-167 to ZK-290 (PL 22)


Location Easting (m) Northing (m) Radius (m) Bearing KP (Km)
RISER BASE AT ZK-167 759 480.90 2 756 118.93 0.000
EXP-01 759 493.89 2 756 126.43 0.015
EXP-02 759 499.89 2 756 116.04 0.027
101.09°
TP-01 760 040.28 2 756 010.15 0.578
1000
TP-02 760 490.38 2 755 795.19 1.082
129.97°
EXP-03 761 732.65 2 754 753.88 2.703
EXP-04 761 736.51 2 754 758.48 2.709
RISER BASE AT ZK-290 761 744.17 2 754 752.06 2.719
DWG NO. AD-178-27-PL-71005; REV. 2
Table 9: Pipeline route data from ZK-167 to ZK-290 (PL 22)

Pipeline route data from ZK-167 to ZK-290 (PL 23)


Location Easting (m) Northing (m) Radius (m) Bearing KP (Km)
RISER BASE AT ZK-290 761 750.69 2754 745.71 0.000
EXP-01 761752.67 2754735.91 0.010
EXP-02 761764.44 2754738.29 146.30° 0.022
TP-01 761913.14 2754515.27 0.290
800
TP-02 761769.38 2753465.08 1.449
229.28°
EXP-03 761615.87 2753332.97 1.651
EXP-04 761608.98 2753338.76 1.660
RISER BASE AT ZK-47 761601.25 2753329.59 1.672
DWG NO. AD-178-27-PL-71006; REV. 2
Table10: Pipeline route data from ZK-290 to ZK-47 (PL 23)

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.014 of 17 NPCC Survey


9.0 SURVEYRESULTS
9.1 General

The pre-engineering survey shall cover pipeline crossings. The total survey scope has been
divided into fifeteen (15) radials. However, the following sections describe the survey results
obtained from the pre-engineering survey in Radial no.

9.1.1 Pipename EVENT LIST

9.1.2 Summary

Criteria Description
Approx. Length approx
Anomalies anom
Debris debris
Seabed Features SF
Supports supports
Stabilizations s
Other comments No other comments.
Crossing x
Table 11: Summary (PL22)

9.1.3 Event List

ID Code Easting Northing Description


value value value value value
Table 12: Event List (PL22)
 All coordinates are provided from the client database for buried crossings
 The survey was performed in the ascending KP direction.

9.1.4 Existing Crossing Details

Height
Crossing No Existing Pipeline/Cable Easting Northing KP Angle
(m)
no value value value value value
Table 13: Existing Crossing Details (PL22)
 All coordinates are provided from the client database for buried crossings

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.015 of 17 NPCC Survey


9.1.5 Images of Interest

Image 1: Comment
ID ID KP KP
Code EC
Comment Comment

No Anomalies were found during the survey

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.016 of 17 NPCC Survey


10.0 EVENT CODES

Event Codes Description Event Codes Description


SOS Start Of Survey FT Fish Trap
EOS End Of Survey TI Tire
SS Sleeper Support LA Ladder
GS Grout Bag Support CO Outcrop
MS Mattress Support DSR Soft Rope
MA Mechanical anchor DAD Area of Debris
ST Stabilizer DOH Hard Debris
DA Concrete Damage DOS Soft Debris
DM Metallic Debris DSC Scaffold
DN Non Metallic Debris DW Wire rope
PC Pipe Crossing CA Cable cut
CCR Cable Crossing PT Pipe Cut
Depth reading
SF Seabed Feature DRM
measurement
RO Rock
Table 14: Event Codes

11.0 CHARTS
11.1 CHART INDEX

DrawingNumber HorizontalScale Sheet

Table 15: Chart Index

Doc.No 2272-ROV-PES-RP-RADIAL radial - Rev.017 of 17 NPCC Survey