CLIENT
ADMA-OPCO
CONTRACTOR
Date date
Revision: 0
Document Control
2198-RADIALradial-RP-00-01-001
Action By Date Signature
Approved
Document Issue
Revision No. Revision Details Date Embodied by
0 For Client Review and Approval
The following reports shall be submitted as part of the ‘The pre-engineering survey’.
NPCC Doc.
Report Title
Number
2272-PP-OF-018 Pre-Engineering Survey Report for Pipelines Radial 280
2272-PP-OF-018 Pre-Engineering Survey Report for Pipelines Radial 24
2272-PP-OF-018 Pre-Engineering Survey Report for Pipelines Radial 47 (Current Report)
2272-PP-OF-019 Pre-Engineering Survey Report for Pipelines Radial 38
2272-PP-OF-019 Pre-Engineering Survey Report for Pipelines Radial 237
2272-PP-OF-020 Pre-Engineering Survey Report for Pipelines Radial 304
2272-PP-OF-020 Pre-Engineering Survey Report for Pipelines Radial 22
2272-PP-OF-021 Pre-Engineering Survey Report for Pipelines Radial 329
2272-PP-OF-021 Pre-Engineering Survey Report for Pipelines Radial 88
2272-PP-OF-022 Pre-Engineering Survey Report for Pipelines Radial 153
Table 5: Overview of Project Reports
LIST OF TABLES
Table 1: Document Control .................................................................................................................................... 2
Table 2: Document Issue Register ........................................................................................................................ 2
Table 3: Document Approval ................................................................................................................................. 2
Table 4: Document Issue List ................................................................................................................................ 2
Table 5: Overview of Project Reports .................................................................................................................... 3
Table 6: SOW Tasks List For The Subjected Proposed Pipelines. ..................................................................... 10
Table 7: Geodetic Parameters ............................................................................................................................. 13
Table 8: Vertical Datum and Depths .................................................................................................................... 13
Table 9: Pipeline route data from ZK-167 to ZK-290 (PL 22) .............................................................................. 14
LIST OF FIGURES
Figure 1 : Zakum Field Proposed Pipelines Routes ............................................................................................ 12
OPCO /ASMV 2000, Rev 3 OPCO Acceptance Standards for Marine Vessels
OPCO /ASMC 2000, Rev 3 OPCO Acceptance Standards for Marine Contractors
OPCO /SIMO 2000, Rev 3 OPCO Acceptance Standards for Marine Operations
Pipelines:
NPCC Engineering Document - Scope of work for Cable and Pipeline Route Survey
(Doc. No. 2272-N-SP-0101 & 2272-N-SP-0129)
Drawing No Description
2272-N-SK-009-A Pipeline From ZK-162 to ZK-153 (additional PL)
AD-178-216-PL-70019; REV. 3 Pipeline From ZK-13 to ZK-304 (PL 12)
AD-178-216-PL-70018/70047; REV. 4 Pipeline From ZK-14 to ZK-13 (PL 11)
AD-178-216-PL-70029/70030; REV. 4 Pipeline From ZK-22 to ZK-CRP (PL 19)
AD-178-216-PL-71010; REV. 2 Pipeline From ZK-24 to ZK-158/76 (PL 41)
AD-178-216-PL-70010/70011/70012/70045;
Pipeline From ZK-38 to ZK-01 (PL 7)
REV. 4
AD-178-216-PL-70014/70015; REV. 3 Pipeline From ZK-39 to ZK-22 (PL 9)
AD-178-216-PL-71007; REV. 2 Pipeline From ZK-24 to ZK-38 (PL31)
AD-178-27PL-71002/71003/71004; REV. 3 Pipeline From ZK-88 to ZK-22 (PL 21)
AD-178-27-PL-70007/70008; REV. 4 Pipeline From ZK-110 to ZK-88 (PL 5)
AD-178-216-PL-70013; REV. 3 Pipeline From ZK-129 to ZK-39 (PL8)
AD-178-27-PL-70031/70032; REV. 3 Pipeline From ZK-153 to ZWSC-RP1 (PL 20)
AD-178-216-PL-71011/71012; REV. 2 Pipeline From ZK-110 to ZCSC-CRP (PL 42)
AD-178-27-PL-71005; REV. 2 Pipeline From ZK-167 to ZK-290 (PL 22)
AD-178-27-PL-71004; REV. 3 Pipeline From ZK-189 to ZK-293 (PL 2)
AD-178-216-PL-70023/70024; REV. 3 Pipeline From ZK-235 to ZK-237 (PL 14)
AD-178-216-PL-70025/70048; REV. 3 Pipeline From ZK-237 to ZCSC-BSTCN (PL 15)
AD-178-27-PL-70002/70003; REV. 4 Pipeline From ZK-277 to ZK-293 (PL 1)
AD-178-216-PL-71008/71009; REV. 3 Pipeline From ZK-280 to ZK-29 (PL 35)
AD-178-27-PL-70006; REV. 3 Pipeline From ZK-288 to ZK-110 (PL 4)
AD-178-27-PL-71006; REV. 2 Pipeline From ZK-290 to ZK-47 (PL 23)
AD-178-27-PL-70005; REV. 3 Pipeline From ZK-293 to ZK-153 (PL3)
AD-178-216-PL-70017/70046; REV. 3 Pipeline From ZK-300 to ZK-20 (PL 10)
AD-178-216-PL-70020/70021/70022; REV.3 Pipeline From ZK-304 to ZCSC-CRP (PL 13)
AD-178-27-PL-70009; REV. 3 Pipeline From ZK-329 to ZWSC-RP1 (PL 6)
ADMA-OPCO has developed a Pipeline Replacement Strategy and Plan for progressive replacement of
aging subsea Pipelines network, which sets clear directions and expectations in order to create focus on
key priorities for sustainable production and expansion programs from the existing fields, whilst
maximizing economic life and value of our facilities with Zero Hydrocarbon Leak Policy. All future infield
lines replacement shall be based on quantitative more deterministic approach by full internal
inspection/selective validation, Fitness for Services (FFS), the deterministic Remnant Life Assessment
and business impacts. Based upon the above directives ADMA-OPCO intensified Intelligent Pigging
campaigns.
The pre-engineering survey shall cover pipeline crossings and platform approach surveys for all the
twenty six (26) pipelines.
The scope of work under the present campaign was to carry out General Visual Inspection Survey (GVI)
using observation class ROV (Seaeye Panther or equivalent).
NPCC provided all vessels, equipment, apparatus, labour, transport, materials and tools to perform the
required scope of work as defined in this report. This include all clearances, permits and licences for
vessels, equipment and personnel with respect to customs, immigration, visas and other requirements of
the UAE government and other local authorities.
All the proposed sail lines were produced by the On-line Surveyor and presented by the Party Chief prior
to the commencement of the survey works. The Party Chief along with other survey team members
ensured that adequate coverage was achieved.
Digital video recording system was integrated with the surface navigation positioning system and
provided complete coverage of the area of survey. Regular navigational fix positions, combined with the
USBL data were used to determine the position.
All survey works have been carried out from a DP ROV survey vessel. An observation class ROV
(Seaeye panther or equivalent) along the proposed and existing routes.
Crossing surveys are aimed to determine the crossing details viz. crossing location, orientation,
existing pipeline condition (exposed or buried), height of the pipeline at the crossing location, damage,
if any, sleeper / mattress configuration / positions(if any)etc. of pipeline at the location.
Survey shall be carried out along the proposed pipeline route from the crossing location uptoa
minimum distance of 100mts on either side of the crossing location, in case of multiplecrossing 150m
on either side of the existing pipelines / cables at the extremities of thecrossing shall be surveyed.
Vertical Datum
All bathymetric data shall be reduced to Chart Datum (CD) using COMPANY supplied tidal
predictions for ZAKUM field.
Depths
The pre-engineering survey shall cover pipeline crossings. The total survey scope has been
divided into fifeteen (15) radials. However, the following sections describe the survey results
obtained from the pre-engineering survey in Radial no.
9.1.2 Summary
Criteria Description
Approx. Length approx
Anomalies anom
Debris debris
Seabed Features SF
Supports supports
Stabilizations s
Other comments No other comments.
Crossing x
Table 11: Summary (PL22)
Height
Crossing No Existing Pipeline/Cable Easting Northing KP Angle
(m)
no value value value value value
Table 13: Existing Crossing Details (PL22)
All coordinates are provided from the client database for buried crossings
Image 1: Comment
ID ID KP KP
Code EC
Comment Comment
11.0 CHARTS
11.1 CHART INDEX