Академический Документы
Профессиональный Документы
Культура Документы
Office Address Casa Roma Subdivision, Brgy. Real Calamba City, Laguna, Philippines
Registrations
SPECS Member
Bank Reference
Banco De Oro
Crossing, Calamba Branch
Real, Calamba City, Laguna
SECTION I
Introduction
List of Tools & Equipments
List of Heavy Equipments
List of Vehicles
SECTION II
On-Going Projects
Completed Projects
List of Clients
Project Photos
SECTION III
Table of Organization
Location Map
SECTION IV
SEC Registration
BIR Registration
PCAB License
PhilGEPS Certificate
SSS Registration
Business Permit
Meralco Certificate
SECTION I
INTRODUCTION
The Company is located in Brgy. Real which is very close to the Industrial Parks in
Laguna. Our strategic locations enable us to respond immediately to urgent or
emergency needs of commercial and industrial companies around the vicinity. We
are also serving the construction needs of several industrial companies in Industrial
Parks of Cavite and Batangas.
The management and technical aspects of the Company are handled by former
NAPOCOR officers experienced in Lines and Substations; Power System Protection,
Metering, Control; Testing and Commissioning; Project Management.
JFA Electrical is also engaged in the sales of various transmission and distribution lines
hardware such as but is not limited to concrete poles, pole insulators, strain clamps,
aluminum conductors (ACSR), galvanized guy wires and bolts. We also offer
Maintenance Services for commercial and industrial power equipment and Full Project
Management from Design to Testing and Commissioning and being a General Services
Company we can also render civil and mechanical works such as painting, hauling,
piping and fabrication works.
The Company's thrust is to provide quality service with cost efficiency, safety and
schedule as project drivers. We always ensure that each work done by the Company is
in compliance with provisions ofthe Philippine Electrical Codes and Recommended
Practices of the Electrical Construction Industry.
The JFA Electrical Construction and General Services then look forward to rendering
services and fulfilling the electrical requirements of your company soon.
LIST OF TOOLS & EQUIPMENTS
JFA LIST OF VEHICLES
BULLDOZER
VIBRO ROLLER
Hino Motors Philippines PHP 285,000.00 Canlubang, Calamba, Laguna Preventive Maintenance of First Private Pole & Transmission Line Feb-19 2019
Miyoshi Technologies Phils., Inc. PHP 3,300,000.00 Silang Cavite Bldg 5 Power Supply for Plating Line Jan-19 2019
Miyoshi Technologies Phils., Inc. PHP 17,390,000.00 Silang Cavite Provision of 3MVA Power Supply at Bldg.4 Jun-18 2018
Colegio de San Juan de Letran PHP 162,960.00 Bucal, Calamba Laguna Senior High Building Gate Aug-18 2018
Calamba Medical Center PHP 25,000,000.00 CMC, Crossing, Calamba City, Laguna CMC Tent and Events Place Nov-18 2018
Calamba Eye Center, Inc. PHP 800,000.00 CMC, Crossing, Calamba City, Laguna CMC Renovation of 5th Floor Nov-18 2018
Calamba Medical Center PHP 25,000,000.00 CMC, Crossing, Calamba City, Laguna CMC Cancer Center Linac Bunker Oct-18 2018
Ayala Land, Inc. PHP 4,900,000.00 Bacolod Capitol Central Gatusalao st., Bacolod City Bacolod Capitol Central Chapel Aug-18 2018
Ayala Land, Inc. PHP 18,500,000.00 Bacolod Capitol Central Gatusalao st., Bacolod City Bacolod Capitol Central Food Choices Aug-18 2018
Philippine Science High School PHP 10,000,000.00 Odiongan, Romblon Const of Electrical Distribution System with Genset and 2 Tranformers Aug-18 2018
Alveo Land PHP 26,783,661.43 Brgy. Malamig, Biñan City, Laguna Construction of Aveia Clubhouse and Guardhouse Jul-18 2018
Carmelray Industrial Park 2 PHP 700,000.00 Calamba, Laguna CIP 2 Admin Jul-18 2018
Makati Development corp. PHP 33,000,000.00 Western Bicutan, Taguig City Arca Pie Parcel 1 & 3 Dec-17 2017
MDC Build Plus PHP 14,000,000.00 Mandurriao, Iloilo City, General Electrical Works Oct-17 2017
Makati Development corp. PHP 17,308,000.00 Pasong Buaya 1, Imus Cavite The Courtyards Phase 2 Auxiliary Power Syustem Jul-17 2017
Ayala Land, Inc. PHP 120,000,000.00 Imus Cavite Construction of Vermosa Courtyards Clubhouse Feb-17 2017
COMPLETED PROJECTS
Company Amount of Project Location Scope of Works Working Days
Pofessional Regulation Commission PHP 10,871,008.00 PRC, Manila Rehabilitation of PRC Central Office Building Electrical System 6 months
First Industrial Township Utilities, Inc. PHP 1,050,000.00 Brgy.Pagaspas, Tanauan, Batangas Extension of 34.5Kv Distribution Line at FIT New Roads 30 days
Ionics Properties, Inc. PHP 1,700,000.00 Continental Carmelray Park 2 Calamba Laguna Repair and Repainting Works of Continental Building 90 days
Ayala Land Inc. PHP 16,300,000.00 Liwasang Kalayaan, Marikina Heights Food Court Fit Out Works 6 months
Makati Development corp. PHP 4,409,322.25 Vermosa Sports Lab, Pasong Buaya 1, Imus, Cavite FDAS and Electrical Works 210 days
Hino Motors Philippines Corporation PHP 5,200,000.00 Canlubang, Calamba City Replacement/Upgrading of 1.5MVA to 2.5MVA Transformer 180 days
HKT Philippines Inc. PHP 6,000,000.00 Lot C2-1A, Brgy.Punta, CIP 2, Calamba City, Laguna 13.8KV Underground Primary Line 6 months
Makati Development corp. PHP 1,050,000.02 ALP K5 Soliento Nuvali, Canlubang, Cal. Laguna Lamp Post Pedestal for TR 1B 180 days
Sunly Properties Inc PHP 24,000,000.00 Silang, Cavite Blaine 2 Project - Land Development 210 days
Ayala Land Inc. PHP 11,400,650.95 ALP K2 Terelay Sta.Rosa, Laguna Terelay Perimeter Light 90 days
Alveo Land Corp PHP 14,658,131.92 Kasa Luntian, Cavite City COR: Emergency Supply & Inst EF 90 days
Ayala Land Inc. PHP 13,661,790.49 ALP K2 CECI Perimeter Light Energization 90 days
Ayala Land Inc. PHP 1,900,000.00 Ayala Southvale Phase 2 Daang Hari Road Repairs 90 days
Ayala Land Inc. PHP 5,935,772.58 Santierra Sta. Rosa, Laguna CECI Streetlight Energization 90 days
Makati Development corp. PHP 4,200,000.00 Pasong Buaya, Dasmarinas, Cavite Brgy. Road Construction Works 60 days
Ayala Land Inc. PHP 10,000,000.00 Silang, Cavite Phase 7 Slope Protection Works 90 days
Ayala Land Inc. PHP 9,000,000.00 Silang, Cavite Phase 11 Slope Protection Works 90 days
Ayala Land Inc. PHP 7,000,000.00 Silang, Cavite Phase 15 Slope Protection Works 90 days
Ayala Land Inc PHP 3,192,287.45 Cagayan De Oro Phase 2 Slope Protection Using Wrap Around Wall 90 days
Makati Development corp. PHP 2,500,000.00 Kasa Luntian, Cavite City Dry Utilities 90 days
Ayala Land Inc PHP 30,858,096.49 Sta. Rosa City, Laguna Terelay Terminus and Intersections 6 months
Makati Development corp. PHP 13,500,000.00 Elaro, Sta. Rosa, Laguna Dry Utilities 90 days
Makati Development corp. PHP 12,800,000.00 Terelay, Sta. Rosa, Lag. U/G Dry Utilities 90 days
Ayala Land Inc. PHP 7,500,000.00 Santierra Sta. Rosa, Laguna Phase 2 Streetlighting System 90 days
Ayala Land Inc. PHP 11,200,000.00 Terelay Sta. Rosa, Laguna Phase 1 Streetlighting System 90 days
Ayala Land Inc. PHP 5,450,000.00 Vermosa Ex-O D&B Barangay Hall & Basketball Court 180 days
A.G Araja PHP 2,500,000.00 Sta.Rosa, Laguna Monde Nissin Electrical Works 90 days
Makati Development corp. PHP 27,361,000.00 Pasong Buaya, Dasmarinas, Cavite The Courtyards 1 year
Calubad Residences PHP 7,784,000.00 Triveia, Nuvali, Sta.Rosa City, Laguna Construction of Residential House 1 year
Supply of Material, Erection, Installation, Commisioning of First Private Pole with
Cargill Philippines, Inc. PHP 936,700.91 Ph2 First Bulacan Industrial City Brgy.Santor Malolos, Bulacan 30 days
Power
ITO Seisakusho Phils. Corp. PHP 4,100,000.00 Continental Carmelray Park 2 Calamba Laguna Conversion of Service Line 60 days
Claymount Assemblies Philippines Inc. PHP 3,835,144.10 Batino, Calamba City Laguna Building Relayout for Bldg.9 and 10 60 days
Asian Hospital Inc. PHP 612,775.78 Filinvest Corporate City, Alabang Muntinlupa Alteration of the Pharmacy Compounding area at the Chemo Infusion Unit 60 days
COMPLETED PROJECTS
Company Amount of Project Location Scope of Works Working Days
Ionics Properties, Inc. PHP 11,509,145.00 TDK Carmelray Park 2 Calamba Laguna Conversion of Service line
Lampcor Industrial Resources Inc. PHP 3,030,000.00 Poblacion, Muntinlupa City Electrical Works for Amkor Technology 120 days
Ichikawa Philippines PHP 11,400,000.00 PEZA, Rosario, Cavite Ichikawa Retro Fit out Works 150 days
Mr. Jonathan Emmanuel S. Sison PHP 6,595,800.38 Venari, Nuvali, Canlubang, Calamba City, Laguna Construction of 2 Storey Residential Building 180 days
Mr.Pedro Fernandez PHP 6,900,000.00 Ayala Westgrove, Brgy. Inchican, Silang, Cavite Construction pf Residential Building 180 days
Makati Development Corporation PHP 2,500,000.00 Pasong Buaya, Dasmariñas Cavite Transmission Lines 30 days
3J Piggery Farm PHP 2,700,000.00 Brgy. San Isidro, San Pablo City, Laguna Provision of 34.5Kv Transmission Line 45 days
Ayala Land Inc. PHP 11,200,000.00 Santierra, Nuvali, Sta. Rosa, Laguna Phase 1 Streetlighting System (Santierra Terelay) 90 days
Laguna Metts Corporation PHP 775,200.00 Laguna Technopark, Binan, Laguna Generator No. 3 Synchronization Layout Installation 45 days
Pilipinas Hino Corporation PHP 3,686,797.20 Canlubang Industrial Estate, Calamba City, Laguna Additional Power Supply for New Building intended for new building 60 days
Claymount Assemblies Phils. Inc. PHP 450,469.63 CPIP, Brgy. Batino, Calamba City, Laguna SSMC Expansion of Additional 18 Casting Table 30 days
Miyoshi Technologies Phils Inc. PHP 4,500,000.00 CIP 2, Brgy. Milagrosa, Calamba City, Laguna Provision of 415 power / 1 mva power for Bldg. 3 60 days
Miyoshi Technologies Phils Inc. PHP 3,339,548.48 CIP 2, Brgy. Milagrosa, Calamba City, Laguna Provision of 3MVA Power Supply 60 days
Ayala Land Inc. PHP 39,400,000.00 Brgy. Buaya, Imus, Cavity Garbage Closure works 90 days
Belle Corporation PHP 45,074,823.72 City of Dreams, Parañaque City Pressure Relef System for Basement Slab 15 days
Advantek Inc. Phil Branch PHP 598,899.95 CIP 2, Brgy.Tulo, Calamba City Rotary air screw compressor 20 days
Laguna Metts Corporation PHP 1,541,176.00 Laguna Technopark, Binan, Laguna Installation of manual transfer switch 30 days
First Laguna Electric Cooperative Inc. PHP 210,980.00 Fleco Inc., Lumban, Laguna Clearing of Distribution Lines 30 days
Makati Development Corp. PHP 7,500,000.00 Alveo Mirala, Sta. Rosa City Construction of Tex Fence 30 days
Claymount Assemblies Phils Inc. PHP 6,500,000.00 CPIP, Brgy. Batino, Calamba City, Laguna Building relayout project for CAP 60 days
Makati Development Corp. PHP 1,050,000.00 Elaro Nuvali, Canlubang, Calamba City Supply & Install of main and Street Names 60 days
Ayala Land Inc. PHP 12,350,055.76 Santierra Sta.Rosa, Laguna Tapping Point of Cistern Tank 60 days
Ayala Land Inc. PHP 1,300,000.00 Santierra Sta.Rosa, Laguna Construction of Fence at Bridge 30 days
Ayala Land Inc. PHP 1,347,566.96 Santierra Sta.Rosa, Laguna S & I of Cobblestones 30 days
AG Araja Construction & Dev. Corp PHP 700,000.00 Analog Devices, Cavite Tower Crane Electrical Requirements 30 days
AG Araja Construction & Dev. Corp PHP 2,600,000.00 Analog Devices, Cavite ADGT Building 4: Lightning Ground Protection System 30 days
AG Araja Construction & Dev. Corp PHP 520,000.00 Analog Devices, Cavite Electrical works for N+1 Equipment from ADP 30 days
AG Araja Construction & Dev. Corp PHP 26,550,000.00 Analog Devices, Cavite Electrical Works at Analog Devices Gen.Trias, Cavite 90 days
Ayala Land Inc. PHP 7,824,410.18 Sta.Rosa City, Laguna Terelay Terminus and Intersections 120 days
Multiflex RNC Philippines. Inc. PHP 147,650.06 Cupang, Muntilupa City Electrical Works 15 days
Multiflex RNC Philippines. Inc. PHP 33,316.00 Alabang, Muntinlupa City Electrical Works For Cutting Dept. 15 days
Multiflex RNC Philippines. Inc. PHP 100,000.00 Alabang, Muntinlupa City Labor Cost Replacement of Damaged Wireds 15 days
Multiflex RNC Philippines. Inc. PHP 65,000.00 Alabang, Muntinlupa City Dismantling of Feeder Wires@Rebonded 15 days
COMPLETED PROJECTS
Company Amount of Project Location Scope of Works Working Days
PHPC Co., Ltd. Inc. PHP 2,000,000.00 SEPZ, Laguna Technopark Binan City, Laguna Testing of ten units of transformer & Supply of P.Fuse Refill & Assy 30 days
PHPC Co., Ltd. Inc. PHP 900,000.00 SEPZ, Laguna Technopark Binan City, Laguna Supply of labor and engineering supervision for 34.KV load break 30 days
Ayala Land Inc. PHP 12,350,055.76 Santierra Sta. Rosa, Laguna Tapping Point of Cistern Tank 90 days
Ayala Land Inc. PHP 1,300,000.00 Santierra Sta. Rosa, Laguna Construction of Fence at Bridge 20 days
AG Araja Develepment Corp PHP 3,350,000.00 SPML, Lti,Binan, Laguna Electrical works for Reliability lab @ Sunpower Fab 2 60 days
Uratex Philippines PHP 2,400,000.00 Alabang, Muntinlupa City Electrical works 60 days
Ayala Land Inc. PHP 6,366,140.90 Ayala Westgrove, Brgy. Inchican, Silang, Cavite Renovation of Sports Center 90 days
Ayala Land Inc. PHP 7,000,774.90 Abrio, Sta. Rosa, Laguna Creek Fence and Rear Exit Gate 60 days
Orient Semiconductor Electronics PHP 93,744.00 LISP I, Real, Calamba City, Laguna Supply and installation of ACU 3 days
Ayala Land Inc. PHP 239,988.93 Abrio, Sta. Rosa, Laguna Replacement of Tiles at Guard house 15 days
Ayala Land Inc. PHP 1,991,266.82 Abrio, Sta. Rosa, Laguna Supply and installation of tiles and porous pavers 30 days
Miyoshi Technologies Phils Inc. PHP 10,000,000.00 CIP II, Brgy. Tulo, Calamba City, Laguna Construction of FIPG AREA 90 days
F.Tech Philippines Mfg. Inc. PHP 37,000.00 LTI, Binan, Laguna Replacement of Steel Steps 4 days
F.Tech Philippines Mfg. Inc. PHP 390,000.00 LTI, Binan, Laguna Repainting of post @ production area 8 days
F.Tech Philippines Mfg. Inc. PHP 160,400.00 LTI, Binan, Laguna cobweb removal and repainting of wall @ pa 20 days
F.Tech Philippines Mfg. Inc. PHP 140,000.00 LTI, Binan, Laguna Repair of Flooring near smoking area 20 days
Miyoshi Technologies Phils Inc. PHP 133,354.22 CIP II, Brgy. Tulo, Calamba City, Laguna Trench and Drain Line 10 days
Ayala Greenfield Development Corp. PHP 344,205.87 AGE Brgy. Tulo, Calamba City Relocation of View Deck 10 days
Ayala Greenfield Development Corp. PHP 385,414.76 AGE Brgy. Tulo, Calamba City Construction of Steel pole with net 15 days
Ayala Land Inc. PHP 258,500.00 Santierra, Sta. Rosa Laguna Construction of Canopy @ Sales Office 10 days
Claymount Assemblies Philippines Inc. PHP 7,200,000.00 CPIP, Batino, Calamba, Lag. Renovation and Fit-out works in Bldg. 9 & 10 45 days
Ayala Greenfield Development Corp. PHP 344,205.87 AGE, Brgy. Tulo, Calamba City Relocation and Rehabilitation of View Deck for Phase 6 30 days
ayala Land, Inc.. PHP 8,000,000.00 Santierra, Sta. Rosa Laguna Sales Pavilion and View Deck 90 days
austriamicrosystems Phils. Inc. PHP 181,250.68 CIP II, Brgy. Tulo, Calamba City Factory Expansion - enclosure of awning windows 14 days
Ayala Land Inc. PHP 1,117,202.63 Abrio, Sta. Rosa, Laguna Porous Pavers Along Bike Path 30 days
Makati Development Corporation. PHP 2,848,771.55 Abrio, Sta. Rosa, Laguna Contruction of Porous Side Walk 30 days
Bunggo Barangay Hall PHP 1,000,000.00 Brgy. Bunggo, Calamba City Contruction of Barangay Hall 75 days
Nidec Precision Philippines Corp. PHP 155,000.00 LTI, Binan, Laguna Proposed Acrylic Board 5 days
Nidec Precision Philippines Corp. PHP 100,000.00 LTI, Binan, Laguna Installation of Tiles 10 days
Nidec Precision Philippines Corp. PHP 75,000.00 LTI, Binan, Laguna Proposed Fixe dWindow @ Washing Area 10 days
Nidec Precision Philippines Corp. PHP 155,000.00 LTI, Binan, Laguna Proposed Dry wall partition/renovation of locker 15 days
Nidec Precision Philippines Corp. PHP 100,000.00 LTI, Binan, Laguna Clinic Area Improvement 15 days
Nidec Precision Philippines Corp. PHP 88,000.00 LTI, Binan, Laguna Proposed Fixed Window @ QA Phase 1 5 days
COMPLETED PROJECTS
Company Amount of Project Location Scope of Works Working Days
Miyoshi Technologies Philks. Inc. PHP 3,725,000.00 CIP II, Brgy. Tulo, Calamba City Proposed Covered Staging Area 30 days
Miyoshi Technologies Philks. Inc. PHP 300,000.00 CIP II, Brgy. Tulo, Calamba City Proposed Mezzanine @ staging area 15 days
CPL TEch PHP 630,000.00 CIP II, Brgy. Tulo, Calamba City Electrical fit-out works 30 days
Seoul Metal Philippines Inc. PHP 1,683,403.61 CIP II, Brgy. Tulo, Calamba City Electrical Works 20 days
Ayala Land Inc. PHP 1,025,500.00 Santierra, Nuvali, Sta. Rosa View Deck
Ayala Greenfield Development Corp. PHP 662,772.74 AGE, Brgy. Tulo, Calamba City Restoration - Sales Pavilion 45 days
Ayala Greenfield Development Corp. PHP 1,787,229.70 AGE, Brgy. Tulo, Calamba City Restoration - Sales Pavilion 45 days
Makati Development Corp. PHP 550,536.04 AGE, Brgy. Tulo, Calamba City Supply and Installation of Concrete Poles 25 days
Ayala Land Inc. PHP 873,511.55 Abrio, Nuvali, Sta. Rosa, Laguna porous Pavers along bike path 30 days
Ayala Greenfield Development Corp. PHP 139,128.23 Brgy. Tulo, Calamba City Supply and Installtion of Safety film on Railing Glass Panel 15 days
Ayala Greenfield Development Corp. PHP 59,200.00 Brgy. Tulo, Calamba City Installation of lot markers 10 days
Austria Microsystems PHP 259,000.00 CIP II, Brgy. Tulo, Calamba City, Laguna S/I Bulk Station LN2 Tank & Supply Line 15 days
AustriaMicrosystems PHP 150,000.00 CIP II, Brgy. Tulo Calamba, City Laguna Scissor Lift Installation 15 days
Ayala Land PHP 1,200,000.00 Tower One & Exchange Plaza, Makati City Street Signage 30 days
Nidec Philippines Corporation PHP 55,000.00 LTI, Biñan Laguna Oil Storage 18 days
Nidec Philippines Corporation PHP 93,000.00 LTI, Biñan Laguna Repair of Leak 4 days
Ascendas Philippines PHP 483,243.00 CIP II, Brgy. Tulo Calamba, City Laguna Frontken Fit-Out Works 30 days
Ayala Land PHP 914,070.59 Calamba, City Laguna AGE - Phase 6 View Deck 15 days
Ayala Land PHP 215,000.00 Calamba, City Laguna AGE Tent 15 days
San Jose Hospital & Trauma Center PHP 2,400,000.00 Rosario, Cavite Upgrading of Electrical System 60 days
Makati Development Corporation PHP 1,200,000.00 Sta. Rosa Laguna Staff House 60 days
Makati Development Corporation PHP 1,059,000.00 Sta. Rosa Laguna Side Walk Finish 60 days
Makati Development Corporation PHP 2,000,000.00 Sta. Rosa Laguna Side Walk Finish additional works 60 days
Fast Services Corporation PHP 1,096,000.00 CPIP Batino, Calamba City Nestle - Batiino WH Repainting Works 25 days
Calamba Doctors Hospital PHP 100,000,000.00 Parian Calamba City, Laguna Construction of 11 Storey New Medical Arts Building 1 1/2 years
Fast Services Corporation PHP 100,000.00 CPIP Batino, Calamba City Provision of Water Meter 1 day
Makati Development Corporation PHP 2,104,000.00 Abrio Phase 1 Sta. Rosa, Laguna MDC - Abrio Pavers-Walkway 90 days
Fast Services Corporation PHP 2,434,000.00 CPIP Batino, Calamba City Nestle Batino Office WH Renovation Works 60 days
Fast Services Corporation PHP 2,422,476.11 CPIP Batino, Calamba City Main Office Renovation - Fit out works 36 days
Ayala Land PHP 650,000.00 Montecito Renovation of PM & Sales Office 28 days
Makati Development Corporation PHP 1,059,375.88 Abrio Phase 1 Sta. Rosa, Laguna Nuvali - Side walk Finish 90 days
Locators Association II PHP 269,581.03 LISP II. Calamba City Installation of Additonal Railings & Fence 15 days
World Trade Center - Metro Manila PHP 397,652.00 World Trade Center, Roxas Boulevard, Pasay City Installation of Floor tiles @ the Pre-function Area of WTCMM Tent 15 days
COMPLETED PROJECTS
Company Amount of Project Location Scope of Works Working Days
World Trade Center - Metro Manila PHP 100,000.00 World Trade Center, Roxas Boulevard, Pasay City Preventive Maintenance 1 day
Sunpower Phils. Mfg. Ltd. PHP 750,000.00 FPIP Sto. Tomas Batangas Preventive Maintenance / Oil Refilling 53days
F.Tech Mfg. Inc. PHP 1,700,000.00 LTI Biñan, Laguna Underground works for 34.5KV Transmission Line 20 days
Kawasaki Motors Phils. PHP 160,000.00 cupang, Muntinlupa Preventive Maintenance 2 days
ICCP Group PHP 1,920,000.00 RFM Science Park III Underground Electrical Power Lines Project 60 days
Ayala Land PHP 480,000.00 Tower one & Exchange Plaza, Makati City Board Up Fence 3 days
Calamba Allied Industrial Corporation PHP 480,000.00 San Cristobal Calamba City Construction of First Private Pole 15 days
World Trade Center - Metro Manila PHP 4,100,000.00 World Trade Center, Roxas Boulevard, Pasay City Construction of Electrical Room & Feeder Line 45 days
Sunpower Phils. Mfg. Ltd. PHP 200,000.00 FPIP Sto. Tomas Batangas Complete Oil Analysis and Dissolve Gas Analysis for 7 transformers 5 days
Miyoshi Technologies Inc. PHP 60,000.00 CIP 2 Brgy. Tulo Calamba City, Laguna Civil Works for Line 6 & Silver Line w/Epoxy Painting 15 dyas
Fast Services Corporation PHP 43,000.00 CPIP, Brgy. Batino, Calamba City Repair Works of Three Units Elctrical Manhole 15 days
Nidec Philippines Corp. PHP 260,000.00 Laguna Technopark, Biñan, Laguna Construction of IQA Room Extension @Bldg.A 30 days
Claymount Assemblies Phils. Inc. PHP 17,700,000.00 EZP Business Park, CPIP Batino Calamba, City Retro-Fit Out Works for Claymount Assemblies Phils. Inc. @ Bldg. 9&10 45 days
Ayala Land PHP 1,200,000.00 Nuvali - Abrio Side Walk Finish 30 days
AC Technical Corp. PHP 1,092,583.44 Brgy. Pinagkaisahan, Makati City Concrete Encasement @ St Lukes 30 days
Uratex Philippines PHP 28,000.00 San Pedro , Laguna Relocation of Production Plant 60 days
Tong Hsing Electronics Inc. PHP 880,000.00 Canlubang , Laguna Supply of Labor & Installation of Power transformer 750kva 45 days
F-Tech Mfg. Inc. PHP 100,000.00 Laguna Technopark, Biñan, Laguna Replacement of worn-out Gutter 10 days
Austria Microsystems (Phils.) Inc. PHP 5,100,000.00 CIP II, Brgy. Milagrosa, Calamba City, Laguna Electrical Installation for the main electrical feeder @ Tungaloy Building 45 days
Advantek Phils. Inc. PHP 2,605,117.53 CIP II, Brgy. Milagrosa, Calamba City, Laguna Electro-Mechanical Works 60 days
Magnifico Construction PHP 301,151.65 Silang Cavite Upgrading Works on electrical system 45 days
Ayala Land PHP 146,658.64 Montecito, Brgy. Canlubang, Calamba City, Laguna Proposed fishing Deck 7 days
Ayala Land PHP 400,000.00 Montecito, Brgy. Canlubang, Calamba City, Laguna Proposed Asphalt Pavement works & wooden Platform 10 days
University of the Philippines PHP 381,712.11 UPLB Los Banos, Laguna Replacement of Existing Defective Primary Pole including Accessories 30 days
LIST OF CLIENTS
FIRST INDUSTRIAL
TOWNSHIP UTILITIES
LAMPCOR
INC.
INDUSTRIAL
RESOURCES INC
PRICON
MICROELECTRONICS
, INC.
CALAMBA
SIIX EMS PHILIPPINES, INC. DOCTORS
HOSPITAL
CIVIL & MECHANICAL WORKS
PROJECT PHOTOS
Project : Construction of Westgrove Guardhouse & Signage
Location : Sta. Rosa, Laguna
Owner : Ayala Land Inc.
Project Cost : Php 16,000,000.00
BERNIE N. MALABANAN
LABORER / HELPERS
Warehouse In Charge
LOCATION MAP
SECTION IV
BIR REGISTRATION
PCAB LICENSE
Republic of the Philippines
Department of Budget and Management
PROCUREMENT SERVICE
This further certifies that JFA ELECTRICAL CONSTRUCTION AND GENERAL SERVICES INC.
has submitted the required eligibility documents in the PhilGEPS Supplier Registry as listed in Annex A,
which document is attached hereto and made an integral part hereof. The Procuring Entity reserves the
right to verify, validate and ascertain the authenticity, completeness and truthfulness of all the submitted
documents during the post-qualification process.
Page 1 of 3
REMINDERS 1
The PhilGEPS office shall not determine the eligibility of merchants. The PhilGEPS
office’s evaluation of the eligibility requirements shall be for the sole purpose of
determining the approval or disapproval of the merchant’s application for
registration.
The determination of the eligibility of merchants, whether registered with the GOP-
OMR or not, shall remain with the Bids and Awards Committee (BAC). The BAC’s
determination of validity of the eligibility requirements shall be conclusive to
enable the merchant to participate in the public bidding process.
Page 2 of 3
________________________
1 Refer to Section 4 of the Guidelines for the Use of the Government of the Philippines - Official Merchant's Registry
of
JFA ELECTRICAL CONSTRUCTION AND GENERAL SERVICES INC.
Casa Roma Subdivision, Brgy. Real,
Calamba City Laguna
Page 3 of 3
SSS REGISTRATION
MERALCO – ACCREDITED CONTRACTOR