Inspection Test Plan (IT

Owner/Client : PT. Pertamina Hulu Energi WMO


Contractor : PT. Petronesia Benimel
Project Tittle : PROVISION OF ORF BUILDING INFRASTRUCTURE SERVICE

No. Job Item Method of Inspection Reference Docu

1 Survey

- Planning Drawing
Location, number, stability and protection
1.1 Visual Check and Dimensional - Existing Utility Drawing
of coordinate and Benchmark
- Location Map
- Job Safety Analisys (JS
1.2 Stake Out Dimensional
- Work Permit

2 Fence Fabrication and Installation

A Preparation

A1 Receiving material/component

Material (conformity to specification and


1 Visual Check and Dimensional
drawing)

Checking material/component according to SPB and


2 Ident. Material & Verification - SPB, Packing List
packing list

Visual inspection at material/component (Bend,


3 Visual Inspection - AWS D1.1
Dent, Scratch, Crack, Break, Corrosion, etc)

3 Storage material - Storage procedure Storage Procedure

A2 Set-out location - Dimensional Drawing

B Fabrication

1 Rebar Fabrication + Cutting & Bending

- Visual Inspection
Drawing, WPS/P
+ Fit-up & welding (if any)

- Visual Inspection

2 Steel Fabrication + Cutting & Drilling

- Visual Inspection
Drawing, WPS/P
+ Fit-up & welding (if any)

- Visual Inspection
Inspection Test Plan (IT

Owner/Client : PT. Pertamina Hulu Energi WMO


Contractor : PT. Petronesia Benimel
Project Tittle : PROVISION OF ORF BUILDING INFRASTRUCTURE SERVICE

No. Job Item Method of Inspection Reference Docu

3 Pipe Fabrication + Cutting

- Visual Inspection
Drawing, WPS/P
+ Fit-up & welding (if any)

- Visual Inspection

4 Hot dipped galvanizing + Hot dipped galvanizing for steel, rebar, and pipe.
Drawing

- Visual Inspection

C Fence Foundation & Sloof

1 Reinforcement material Visual & Dimensional

2 Formworak Visual & Dimensional

3 Pouring Concrete Visual Drawing

4 Finishing Visual

D Installation

Installation of Post (alignment, elevation,


1 + Fit-up, leveling & welding
location and stability)

- Visual Inspection Drawing, WPS/P


+ Tightening bolt & nuts

- Visual Inspection

2 Finishing + Finishing

- Visual Inspection

3 Road Access Preparation

3.a Works Preparation

3.a.1 Grubbing of all stump and roots Visual

3.a.2 Stripping of all turf and top soil Visual


Inspection Test Plan (IT

Owner/Client : PT. Pertamina Hulu Energi WMO


Contractor : PT. Petronesia Benimel
Project Tittle : PROVISION OF ORF BUILDING INFRASTRUCTURE SERVICE

No. Job Item Method of Inspection Reference Docu

3.a.3 Temporary drainage Visual

Geotextile

Geotextile Non Woven

Geotextile Woven

Installation

3.b Excavation

3.b.1 Preparation

Setout location, based on shop drawing


3.b.1.1 Dimensional
and endorsed benchmark

3.b.2 Excavation
3.b.2.1 Depth and width of excavation Dimensional Drawing
Line, slope and grades according to
3.b.2.2 Survey
approved drawing
3.b.2.3 Protection of slope, accepted Visual
3.b.2.4 Surface Visual
3.b.2.5 Cleaning Visual
Subgrade Compacted
Inspection Test Plan (IT

Owner/Client : PT. Pertamina Hulu Energi WMO


Contractor : PT. Petronesia Benimel
Project Tittle : PROVISION OF ORF BUILDING INFRASTRUCTURE SERVICE

No. Job Item Method of Inspection Reference Docu

3.c Backfill, limestone Quarry waste

3.c.1 Preparation

3.c.1.1 Quality of cleaning before backfill Visual

3.c.1.2 Quality of backfill material Limestone Refer to Material Approval Request

3.c.1.3 Compaction Sand Cone Test


3.c.2 Compaction Test :
"H" = HOLD POINT /
TAHAN / QC "SW" = SPOT WI
3.c.2.1 The Thickness of layers fill ≤HARUS
300 mm. HADIR "W" = WITNESS INSPECTIO
Test As per fill material requirement
MENYAK
MENYAKSIKAN INSP
"A" = APPROVAL DOCUMENT /
3.c.2.2 Subgrade PERSETUJUAN DOKUMEN Sandcone Test "D" AND
"R" = REVIEW = VERIFIC
COMM
VERIFIK
MEMERIKSA DAN KO
3.c.2.3 Final
"I" elevation
= INFORMATION / Dimensional
INFORMASI
3.d Base Course - A

Base material specification


Prepared by, Review CheckedReviewed
by, by,
PT. Petronesia Benimel PT. Petronesia Benimel
Exxonmobil Cepu Ltd.
Fill material in layer Dimensional

Compaction Test :

Base CBR ≥ 50 % Test


…………………………… ……………………………
…………………………….....
QA / QC Site Engineer
Project Engineer
Final level and profile Dimensional

3.e Access Road Works

3.e.1 Preparation

3.e.1.1 Construction method Review

3.e.1.2 Survey setout Dimensional

4 Concrete Road

4.a. Preparation

Cement type, quality, quantity and


4.a.1 Review
compliance with applicable standard
Inspection Test Plan (IT

Owner/Client : PT. Pertamina Hulu Energi WMO


Contractor : PT. Petronesia Benimel
Project Tittle : PROVISION OF ORF BUILDING INFRASTRUCTURE SERVICE

No. Job Item Method of Inspection Reference Docu

4.a.2 Quality and quantity of aggregate Test

4.a.3 Mix Design Review

4.a.4 Trial Mix Test

4.a.5 Preparation for concrete pouring Visual

4.a.6 Storing condition of cement and aggregate Visual

4.a.7 Location and surface condition of joints Visual & Dimensional

4.a.8 Cleaning prior to concrete placing Visual

4.b. Concrete Pouring

Workmanship of placing and consolidation


4.b.1. (drop height, layer thickness, proper Visual
vibration, etc.)

4.b.2. Concrete finishing and removal of laitance Visual

4.c. Post Pouring Concrete

Curing (period, method of preventing


4.c.1. Visual
moisture loss).
Appearance of surface after formwork
4.c.2. Visual
removal
Mortar finishing (level, chamber, crack,
4.c.3. Visual
etc.)
Dimensional inspection for completed
4.c.4. Dimensional
casting
4.d. Test

4.d.1. Concrete Slump Test Test, sampling

4.d.2. Concrete Compressive Test Test, sampling

4.e. REINFORCING BAR WORKS

4.e.1. Preparation

4.e.1.1 Material specification Visual, Dimensional, Review


Inspection Test Plan (IT

Owner/Client : PT. Pertamina Hulu Energi WMO


Contractor : PT. Petronesia Benimel
Project Tittle : PROVISION OF ORF BUILDING INFRASTRUCTURE SERVICE

No. Job Item Method of Inspection Reference Docu

4.e.1.2 Handling and storing Visual

4.e.1.3 Workmanship in cold bending operation Visual

4.e.1.4 Surface cleaning Visual

4.e.2. Installation
Location, shape, sizes, numbers, cleaning
4.e.2.1 Visual & Dimensional
and spacing of bars
4.e.2.2 Length and location of lap splice Visual & Dimensional
Rigidity of rebar assembly to withstand
4.e.2.3 Visual
concrete pouring
Strong condition (to prevent corrosion and
4.e.2.4 Visual
deformation)
4.e.2.5 Prohibiting item (ex: welding) Visual

4.f. FORM WORKS

4.f.1 Preparation

4.f.1.1 Quality and shape of material Visual & Dimensional

4.f.1.2 Formwork fabrication Visual & Dimensional

4.f.2. Installation

Location, dimension, alignment, plumb


4.f.2.1 Dimensional
and elevation

4.f.2.2 Chamfer Visual

Stability against concrete placing and


4.f.2.3 Visual
vibration

4.f.2.4 Surface treatment Visual

5 Documentation - Contract Document

LEGEND:
Inspection Test Plan (IT

Owner/Client : PT. Pertamina Hulu Energi WMO


Contractor : PT. Petronesia Benimel
Project Tittle : PROVISION OF ORF BUILDING INFRASTRUCTURE SERVICE

No. Job Item Method of Inspection Reference Docu


Test Plan (ITP)

Project Location : GRESIK


Date :
No. Contract :
Inspection Activity
Reference Document Accepted Criteria Verification Document
SC PB PHE

Planning Drawing Each Item - Survey Report W


Existing Utility Drawing QI-S.0.01 H
Location Map
Job Safety Analisys (JSA) Cross Check data survey - Survey Report

Material Approval Request MAR

SPB, Packing List W H /A

MRR

AWS D1.1 H W

Storage Procedure H W
Refer to Drawing & Cross
Drawing Survey report
check with Surveyor

H R
MTR
H R
Drawing, WPS/PQR AWS D1.1
H R
VWR
H R

H R
MTR
H R
Drawing, WPS/PQR AWS D1.1
H R
VWR
H R
Test Plan (ITP)

Project Location : GRESIK


Date :
No. Contract :
Inspection Activity
Reference Document Accepted Criteria Verification Document
SC PB PHE
H R
MTR
H R
Drawing, WPS/PQR AWS D1.1
H R
VWR
H R

H R
Drawing Painting report

H W

Material Approval Request Mill Certificate

Specification Standard
Drawing, Dimension, Alignment

Drawing Placing Duration (time), QI-C.2.02


Vibrator, Finnish as per
requerment

H R
AWS D1.1 MTR, VWR

Drawing, WPS/PQR H W

H R
Bolting Report
H R

H R
DIMENSIONAL REPORT
H W

Area Clean from grubbing and


roots

Clean from top soil


Test Plan (ITP)

Project Location : GRESIK


Date :
No. Contract :
Inspection Activity
Reference Document Accepted Criteria Verification Document
SC PB PHE
Control Water Both Surface
Runoff During The Work

Material Approval Request

Material Approval Request

Cross check with surveyor QI-S.0.01

Drawing QI-S.0.02

QI-S.0.02

QI-S.0.02
QI-S.0.02
QI-S.0.02
6%
Test Plan (ITP)

Project Location : GRESIK


Date :
No. Contract :
Inspection Activity
Reference Document Accepted Criteria Verification Document
SC PB PHE

Clean from all debris and water QI-S.0.03

QI-S.0.03

30% Procudure

"SW" = SPOT WITNESS


NESS INSPECTION / / To be comply with spec.
Procudure
NYAKSIKAN INSPEKSI PADA SAAT
MENYAKSIKAN TERTENTU
drawing

"D" AND
IEW = VERIFICATION
COMMENT/ BY REPORT/
per 1000 m3 Procudure
VERIFIKASI DARI
MERIKSA DAN KOMENTAR LAPORAN
Check Survey Elevation QI-S.0.03

ed by, Reviewed by,Data, Sieve


Laboratorium
Benimel Exxonmobil Cepu Ltd. Lab Result Sieve Analysis
mobil Cepu Ltd. Analysis

ASTM D2478, CBR ≥ 50 %


Procudure
(App. Drawing for Construction)
……………
……………………..... ……………………………...........
ngineerEngineer
Project QA/QC EMCL

Procudure
Correct Survey Data

- Material Approval Request :


-Mix
Design -ACI 301,
ACI 318, ACI
347
Test Plan (ITP)

Project Location : GRESIK


Date :
No. Contract :
- Material Approval Request :
-Mix Inspection Activity
Reference Document Accepted
Design Criteria
-ACI 301, Verification Document
SC PB PHE
ACI 318, ACI
347

QI-C.2.01

QI-C.2.01

QI-C.2.02

QI-C.2.02

QI-C.2.02

QI-C.2.02

QI-C.2.02
Placing Duration (time),
Vibrator, Finnish as per
requerment
QI-C.2.02

Punchlist
Each Post Concrete Pouring
Work
Punchlist

Punchlist

Each Truck Mixer Pouring QI-C.2.08


Concrete Works, sampel test 7,
14, 28 days QI-C.2.05

Mill Certificate

Material Approval Request,


Test Plan (ITP)

Project Location : GRESIK


Date :
No. Contract :
Inspection Activity
Reference Document Accepted Criteria Verification Document
SC PB PHE
Material Approval Request, QI-C.2.03
Specification Standard
QI-C.2.03

QI-C.2.03

QI-C.2.03

QI-C.2.03
Specification Standard
QI-C.2.03
Drawing, Alignment
QI-C.2.03

QI-C.2.03

Before Install Formwork QI-C.2.02

Before Install Formwork QI-C.2.02

QI-C.2.02

Specification Standard QI-C.2.02


Drawing, Dimension, Alignment
QI-C.2.02

QI-C.2.02

Contract Document - Contract Document - QA/QC Document R/D R/D


Dossier
Test Plan (ITP)

Project Location : GRESIK


Date :
No. Contract :
Inspection Activity
Reference Document Accepted Criteria Verification Document
SC PB PHE
: GRESIK
:
:
Inspection Activity
Remaks
: GRESIK
:
:
Inspection Activity
Remaks
: GRESIK
:
:
Inspection Activity
Remaks
: GRESIK
:
:
Inspection Activity
Remaks
: GRESIK
:
:
Inspection Activity
Remaks
: GRESIK
:
:
Inspection Activity
Remaks
: GRESIK
:
:
Inspection Activity
Remaks
Doc. No :
Date :

APPLICATION FOR INSPECTION

Attn :

Project Title :

Gentlemen,

We would like to have your presence for inspection according to the following schedules.

Date and time Place / Area Inspection Item Remarks

Result Accepted Rejected

Reinspection Required Yes No

Comments :

PT. PETRONESIA BENIMEL PT. Pertamina Hulu Energi WMO


Print Name

Signature

Date
QI - S.0.01
Doc. No

Project no :
Subject : SURVEY DATA REPORT
Project :
Location :
Ref. Drawing :
Description :

COORD. FINAL CUT & FILL (SUB GRADE) COORD. SUB BASE B DIFFERENT ELEVATION
NO POINT DIFF.
N E N E N E SUB GRADE BASE B
Note :

PT. PETRONESIA BENIMEL PT. Pertamina Hulu Ene

Print Name

Signature

Date
Date

Page
of

REMARKS
PT. Pertamina Hulu Energi WMO
Subject :

Project :

Location :

Ref. BM :

PT. PETRONESIA BENIMEL LINE TEAM - EMCL DIFF

NO POINT COORD. ELEVATION COORD. ELEVATION COORD.

N E Z N E Z N

10

11

12
13

14

15

16

17

18

19

20

PT. PETRONESIA BENIMEL

Print Name

Signature

Date
Date
QI - S.0.02-01
Doc. No Page
of

Project no :

DIFFERENT

COORD. ELEVATION REMARKS

E Z
PT. PETRONESIA BENIMEL PT. PHE WMO
QI
Doc. No

Project no
Subject : SURVEY DATA REPORT
Project :
Location :
Ref. Drawing :

COORD. ACTUAL ELEVATION ACTUAL


NO POINT
N E DESIGN / TOB ELEVATION 1 2 3 4 5 6 7
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

PT. PETRONESIA BENIMEL P


Print Name

Signature

Date
Date
QI - S.0.02
Doc. No Page
of

Project no :

ACTUAL
REMARKS
7 8

PT. PHE WMO


Date
QI - C.2.01
Doc.No page

of

Project No.
Subject : TRIAL MIX OF CONCRETE
Construction site
Construction section
Requirements
Impermeability to Water Class of concrete B 25
High frost resistance Required strength kg/cm2
High frost and de-icing salt resistance Consistency k
Resistance against chemical attacks Slump 5 to 10 cm
Cement content kg/m3
Fair faced concrete Water-cement ratio =
Pumpable concrete Max. size of aggregate mm
Early strength Air Content vol. - %
Concrete with low heat evolution Time for workability hours

Aggregate Type/Manufacturer/Quarry/Borrowpit
Cement manufacturing plant
Type / class of strength
Additive manufacturer
Type / Name

Grading curve No. k-value :

Govering water cement ratio W/Z Density kg/dm3 Volume dm3 / m3


Required water content, W
Required cement content, Z
Air Content
Aggregate total

Composition for 1 m3 Composition for m3

Materials weight of Weight of


weight of mpist
Percentage Volume Spec. gravity aggregate aggregate Surface moisture
aggregate
s.s.d. s.s.d.

aggregate % dm3 / m3 kg / dm3 kg / m3 kg % kg kg

Cement
Water
Weight of Fresh Concrete
Concrete admixtures
Ultra fine concrete = kg/m3 Cement = kg/m3 Aggregate < 0.25 mm kg/m
Concrete
3
additive = kg/m3

SUB KONTRAKTOR PT. PETRONESIA BENIMEL PT. Pertamina Hulu Energi WMO
Print Name

Signature

Date
Date
QI - C.2.02
Doc. No Page
of
Project no :
Subject : POURING CONCRETE

Test / Inspection Items

Placing Location Ref. Dwg.No.


Area

FORMWORK REBAR

Orientation Size
Location ( Coord. ) Spacing
size Clearance
Elevation Cleanliness
Clean & Oiled
Chamfer
Bracing

EMBEDMENTS MISCELLANEOUS

Anchor Bolts ( Diameter, Length & Type ) Blockouts


Anchor Bolts ( Location & Projection ) Type of Finish
Anchor Bolts Sleeves Curing Method
Thread Protection Const. Joints
Angle Iron HOT / COLD Weather Condition
Inserts Plate Sets/Test Specimen
pipes Truck Tickets
Conduit
Ground Wire

Remarks :

SUB KONTRAKTOR PT. PETRONESIA BENIMEL PT. Pertamina Hulu Energi WMO

Print Name

Signature

Date
Date
QI - C.2.03
Doc. No Page
of
Project no :
Subject : POURING CONCRETE SLAB

Project : Location :

Owner : Reference Drawing :

RESULT
NO ITEM TO CHECK DATE & SIGN REMARKS
YES N/A

1 Size/Length/Quality

2 Bending Radius / Shape

3 Spacing B/W Re-bars

4 Lap Splacing ( Length / Location )

5 Extra Length

6 Hook ( Extra Length / Shape )

7 Hoop / Stirrup ( Shape / Location / Pitch / Hook )

8 Starter Bar ( Shape / Length / Location )

9 Concrete Cover

10 Slab ( Direction / & Lower )

11 Reinforcing for Opening

12 Column / Beam ( Untorsionality )

13 Quality of Cleaning

Remarks :

SUB KONTRAKTOR PT. PETRONESIA BENIMEL PT. Pertamina Hulu Energi WMO

Print Name

Signature

Date
Subject : POURING CONCRETE RECORD

Project :

Location :

Cement Type :

Specified Strength of Concrete : ………………….……………Kg/cm2 ( …………psi )

Request No. / Delivery Time


Date Area / Block
Vol. Order Batch Plan On Site
Remarks :

SUB KONTRAKTOR PT. PETRONESIA BENIMEL

Print Name

Signature

Date
Date OF
O

QI - C.2.04
Doc. No. Page

of

Project No. :

Slump Poured Total


(inch) Vol. (m3) (m3)
PT. Pertamina Hulu Energi WMO
Date
QI - C.2.05
Doc.No page

of

Project No.
Subject : COMPRESSIVE STRENGTH TEST

1. General

Placing Date / Time :


Design Compressive Strength : ( Kg/cm2) (28 days)
Concrete Class : ( MPa )
Placing Location / Purpose :

2. Test Result of Concrete

1. Fresh Concrete Test


Slump : ( cm )
Air Content : (%)
Fresh Concrete Temperature : ( 0C )
Ambient Temperature : ( 0C )
Test Cylinder Number :

2. Compressive Strength Test

7 Day Strength 28 Day Strength


Specimen No. Test Strength Unit WT Test Strength Unit WT
Date (kg/cm2) (t/m3) Date (kg/cm2) (t/m3)

* Test Machine No. :

3. Test Result
Acceptable

Not Acceptable

SUB KONTRAKTOR PT. PETRONESIA BENIMEL PT. Pertamina Hulu Energi WMO
Print Name
Signature
Date
Date :
QI-C.2.08
Doc No. Page :

SUBJECT : TICKETING DOKET CONCRETE Project No. :


TRUCK TIME
NO WORK ITEM MIX DESIGN SLUMP ( cm ) TEMPERATURE OC VOLUME ( M3 ) REMARKS
NO START FINISH

TOTAL

WITNESSED BY REPORTED BY
PT. PETRONESIA BENIMEL PT.Pertamina Hulu Energi WMO SUB KONTRAKTOR

DATE : …………………… DATE : ……………………… DATE : ………………..


FILE : DATA QC-BBSP-ITP
FILE : DATA QC-BBSP-ITP
Date
QI - C.4.10
Doc. No Page
of
Project no :
Subject : FENCING

Project : Location :

Owner : Reference Drawing :

RESULT
NO ITEM TO CHECK DATE & SIGN REMARKS
YES N/A

1 Installation Pipe Line Post

Installation Strainer Post + Hexagonal Bolt, Double


2 Washer

3 Installation Chainlink Wire Mesh w/ Clips

4 Installation Tension Wire + Tension (Bottom) + Clips

5 Installation Tension Wire + Tension (Middle) + Clips

6 Installation Tension Wire + Tension (Upper) + Clips

7 Welding Bottom and Upper Tension Wire

8 Installation Wire Staples Embedded + Grouting

9 Installation Barbed Wire, 3 Strands w/ Clips

10 Installation Plastic Cap

11

12

13

14

15

Remarks :

SUB KONTRAKTOR PT. PETRONESIA BENIMEL PT. Pertamina Hulu Energi WMO

Print Name

Signature

Date
Date
QI - C.5.01
Doc. No Page
of
Project no :
Subject : ROAD & PAVEMENT

Project : Location :

Owner : Reference Drawing :

RESULT
NO ITEM TO CHECK DATE & SIGN REMARKS
YES N/A

I BASE COURSE B

Base Course Ready to spread of surface as per


1 Inspection sequence before

2 The surface of sub grade

3 The surface of base course

4 Check Composition density and thickness

5 Final survey

Remarks :

SUB KONTRAKTOR PT. PETRONESIA BENIMEL PT. Pertamina Hulu Energi WMO

Print Name

Signature

Date
Date
QI - C.7.01
Doc. No Page
of

Subject : FIELD CBR TEST (ASTM D 4429)

Project : Location :

Owner Reference Drawing :

1. Instrument Details : 3. PROVING RING : lbf


2. Layer : 4. Calibration Factor : lbf/div.
Time
PENT. Inch. DIAL READING LOAD
Min.

0 0

¼ 0,0125

½ 0,025

1 0,05

1½ 0,075

2 0,1

3 0,15

4 0,2

6 0,3

8 0,4

10 0,5

READING

READING 0.1'' 0.2 ''


LOAD

C B R VALUE

CBR 0.1'' 0.2 ''

Remarks :

SUB KONTRAKTOR PT. PETRONESIA BENIMEL PT. Pertamina Hulu Energi WMO

Print Name

Signature

Date
Subject : FIELD CBR TEST (SNI 1738-2011)

Project : Location :

Owner : 0.4535924 Reference Drawing :

1. Instrument Details : 3. PROVING RING : lbf


2. Layer : 4. Calibration Factor :

Time PENT. DIAL READING conv lbf to kg LOAD TEGANGAN

(min ) (mm) ( div ) (kg) (kg) (kg/mm²)

0 0 0.00 0.45 0.000 0

¼ (15') 0.32 1.00 0.45 22.808 4.499

½ (30') 0.64 1.00 0.45 22.808 4.499

1 (60') 1.27 1.00 0.45 22.808 4.499

1½ (90') 1.91 1.00 0.45 22.808 4.499

2 (120') 2.54 1.00 0.45 22.808 4.499

3 (180') 3.81 1.00 0.45 22.808 1.125

4 (240') 5.08 2.00 0.45 45.616 2.250

6 (360') 7.62 2.00 0.45 45.616 2.250

8 (480') 10.16 2.00 0.45 45.616 2.250

10 (600') 12.70 3.00 0.45 68.424 3.375

READING

READING 2.54 mm 5.08 mm


5.069 mm2 20.2765 mm2
LOAD

C B R VALUE

CBR 2.54 5.08


6.3 % 2.1 %

ss

Remarks :

SUB KONTRAKTOR PT. PETRONESIA BENIMEL

Print Name
Signature

Date
Date
QI - C.7.01
Doc. No Page
of

lbf
50.282 lbf/div.

PT. Pertamina Hulu Energi WMO


Date
QI - C.8.01
Doc. No Page
of
Subject :
Project : Location :
Owner Reference Drawing :

SKET

NORTH EAST ELEV. Remaks


NO. STA
(m) (m) (m)
1

Remarks :

SUB KONTRAKTOR PT. PETRONESIA BENIMEL PT. Pertamina Hulu Energi WMO
Print Name
Signature
Date
FORM DATA SURVEY-CROSS SECTION

Subject :
Project : Location :
Owner : Reference Drawing :
CROSS SECTION-SKETCH

NORTH EAST ELEV.


NO. STA
(m) (m) (m)
As STA.-
A-0
A-1
A-2
A-3
B-0
B-1
B-2
B-3
As STA.-
A-0
A-1
A-2
A-3
B-0
B-1
B-2
B-3
As STA.-
A-0
A-1
A-2
A-3
B-0
B-1
B-2
B-3
As STA.-
A-0
A-1
A-2
A-3
B-0
B-1
B-2
B-3
As STA.-
A-0
A-1
A-2
A-3
B-0
B-1
B-2
B-3
REMAKS

Вам также может понравиться