data will be provided in MGA coordinates to m AHD.

Proposed earthworks design will be supplied by Sterling & Wilson in


tins in 12da or CAD 3d format. This is to
include key features such as internal roads and hydraulic features.
The survey and acquisition of hydraulic structure data external to the
site will be provided by the client.
We have only allowed for two (2) options to reduce offsite impacts (if
any).
We have only allowed for one (1) iteration of the internal site layout.
Changes to the layout will require
additional hydraulic modelling and will be priced as a variation.
The proposed timeline relies on receipt of all survey data, site layout
and earthworks.
We have allowed for a single review of each technical report and
design drawings (if required) by Sterling &
Wilson. SMEC will only address a single consolidated set of review
comments.
No allowance has been made for hydrologic or hydraulic modelling of
the Macquarie River.
No allowance for climate change and modelling scenarios with
increased rainfall.
No allowance has been made for a site visit by the flooding team.
No allowance has been made for the survey of flood debris marks and
community consolation has not been
included.
No allowance has been made for the acquisition of additional
topographic datdata will be provided in MGA coordinates to m AHD.
Proposed earthworks design will be supplied by Sterling & Wilson in
tins in 12da or CAD 3d format. This is to
include key features such as internal roads and hydraulic features.
The survey and acquisition of hydraulic structure data external to the
site will be provided by the client.
We have only allowed for two (2) options to reduce offsite impacts (if
any).
We have only allowed for one (1) iteration of the internal site layout.
Changes to the layout will require
additional hydraulic modelling and will be priced as a variation.
The proposed timeline relies on receipt of all survey data, site layout
and earthworks.
We have allowed for a single review of each technical report and
design drawings (if required) by Sterling &
Wilson. SMEC will only address a single consolidated set of review
comments.
No allowance has been made for hydrologic or hydraulic modelling of
the Macquarie River.
No allowance for climate change and modelling scenarios with
increased rainfall.
No allowance has been made for a site visit by the flooding team.
No allowance has been made for the survey of flood debris marks and
community consolation has not been
included.
No allowance has been made for the acquisition of additional
topographic dat