Вы находитесь на странице: 1из 8

RESUME

TANVEER HUSSAIN

MECHANICAL & EQUIPMENT INSPECTOR STATIC & ROTATIC


Aramco Approved & Sabic Approved
Mobile: +966-59-7671869 tanveer9hataf000@gmail.com

Objective:
Seeking a challenging career in mechanical engineering environment in a dynamic organization
and be a part of highly motivated team of professionals involving modeling and implementation
of engineering applications with a built-in attitude of working with advance technology.
Educational Qualifications:
 Diploma in Mechanical Engineering
 Certificate of Intermediate and Secondary Education Gujranwala
 ASNT NDT Level 2 (UT, PT, MT, RT)
 NDT Level II Visual Testing (VT)
 Diploma in Piping Design
Technical Qualification:

 ASNT NDT Level II - Dye Penetrate Testing


 ASNT NDT Level II - Magnetic Particle Testing
 ASNT NDT Level II - Radiographic Testing
 ASNT NDT Level II - Ultrasonic Testing
 ASNT NDT Level II - Visual Test

Additional Knowledge
 ASME SEC. II C
 ASME SEC. V
 ASME SEC. VIII
 ASME SEC. IX
 API. 650
 ASME B 31.3
Computer skills
 MS Office (Word, Excel & Power Point, Corel Draw, Adobe Premiere, Auto Card)
Language(s)
 English, Urdu Proficient in Speaking, Reading & Writing, Arabic & Chinese Speaking.
Knowledge of Safety Activities

RESUME

Promote the health, safety and welfare of people at work


 Protect people against risks at work
 Promote a safe and health work environment
 Identify, Assess, Eliminate and control Hazards

RESUME
RESUME
TANVEER HUSSAIN
First AID:
 An Aide until Effective Medical care arrived
Types of Permit:
 Could work permit, Hot work permit, Gas Release permit, Excavation work permit.
Types of Confined Space:
 Manholes of Tanks, Exchangers, Pressure Vessel.
Professional Experience

 My areas of expertise are Preservation, Installation, and Inspection & Verification of


Rotating, Tanks, and Static Equipment & Welding Inspection.

 Experienced in preparation/verification of ITP, QCP, NCR

 Procedures , Statements for the Installation & Inspection of Equipment


EXPERIENCE: Holding over 10+Yrs of experience in construction of Petrochemicals and Oil &
gas industries with the implementation of ASME, ASTM, API, AWWA, AWS, and NACE
Standards. The Projects completed in K.S.A as follows.
WORK EXPERIENCE IN SAUDI ARABIA:
SINOPEC 5TH CONSTRUCTION CO. (Static & Rotatic Aramco Approved)

Main Contractor TECNICAS REUNDIDAS for Services & Contracting Co. LTD.
Company : TRS/SINOPEC 5TH CONSTRUCTION CO.
Project : JAZAN IGCC UTILITIES & COMMON AREA-PACKAGE 5 PROJECT

Position : Equipment / Mechanical QC Inspector


Period : 17-06-2016 to 01-01-2019

SINOPEC 5TH CONSTRUCTION CO. (Sadara Aramco Approved)

Main Contractor TECNICAS REUNDIDAS for Services & Contracting Co. LTD.
Company : SINOPEC 5TH CONSTRUCTION CO
Project : SADARA Chemical Company Project
Position : Equipment / Mechanical QC Inspector
Period : 22-02-2015 to 17-06-2016
RESUME

RESUME
RESUME
TANVEER HUSSAIN
THIRD CHEMICAL CONSTRUCTION COMPANY (Sadara Aramco Approved)

Main Contractor DAELIM Saudi Arabia Ltd.


Company : Third Chemical Construction Company (TCC)
Project : SADARA Chemical Company Project
Position : Equipment / Mechanical QC Inspector
Period : 18-08-2013 to 20-02-2015
GUSAT (Sadara Aramco Approved)
Main Contractor GUSAT Saudi Arabia Ltd.
Company : GUSAT Korean Company Ltd.
Project : SADARA Chemical Company Project
Position : Equipment / Mechanical QC Inspector
Period : 15-05-2013 to 14-08-2013
CHEMANOL (SHUTDOWN) (Sabic Approved)
Main Contractor AL YAMAMA.
Company : AL YAMAMA
Project : CHEMANOL Chemical Project.
Position : Equipment QC & Welding QC Inspector
Period : 06-05-2013 to 14-05-2013
Saudi Kayan Sabic (Sabic Approved)
Main Contractor Sinopec 5TH Saudi Arabia Ltd.
Company : SINOPEC 5TH CONSTRUCTION CO.
Project : NDA Project
Position : Equipment QC, Tank & Welding QC Inspector

Period : 30-09-2012 to 01-05-2013

YANBU STEEL Yanbu (Sabic Approved)

Main Contractor DAELIM Saudi Arabia Ltd.


Company : Yanbu Steel
Project : LDPE Project.
RESUME

Position : Mechanical / Equipment QC, Tank Inspector

Period : 07-07-12 to 25-09-2012

RESUME
RESUME
TANVEER HUSSAIN
TASNEE PATROCHECIAL (Sabic Jubail)
Main Contractor SAMMSUN Korean.
Company : Sendan International Company
Project : Sabic Live Project
Position : Equipment QC & Welding Inspector

Period : 05-05-2012 to 01-07-2012

ARABIAN ETIMAAD Industrial Satrop Project Jubail


Company : Arabian Etimaad Ltd.
Project : Satorp Project Jubail2
Position : Mechanical / Equipment QC , Tanks Inspector

Period : 04-07-2011 to 30-04-2012

DESCON ENGINEERING LTD PAKISTAN.


Company : DESCON ENGINEERING LTD PAKISTAN
Project : Oil & Gas Project Pakistan
Position : Equipment QC & Welding Inspector

Period : 20-12-2009 to 28-12-2011

IMRAN ENGINEERING PVT LTD PAKISTAN.


Main Contractor Imran Engineering Pvt Ltd Pakistan.
Company : IMRAN ENGINEERING PVT LTD PAKISTAN
Project : Project Pakistan
Position : Equipment QC & Welding Inspector

Period : 2008 to 2009

BILD CORE GUJRAT PAKISTAN


Company : BILD CORE GUJRAT
Project : Project Pakistan
Position : Before 6 month Fabricator & after 6 month Assistant QC
RESUME

Period : 2007 to 2008

RESUME
RESUME
TANVEER HUSSAIN

DUTIES AND RESPONSIBILITIES

 Monitoring the on‐going daily construction activities.


 Reviewing the construction method statements and making comments per
project specifications, procedures & ITPs.
 Regular site visits for foreseeing the potential deficiencies based on his physical
experience to share with construction crew.
 Inspector during any operations.
 Coordination with Clients inspectors for getting the feedback for open log book
entries and preparations of corrective actions to close those violations.
 Emphasizing on the control of documents and records by advising the
document controllers, QC Inspectors.
 Conducting routine internal meetings with QC inspectors for further vigilance to the
potential problems which must be tackled accordingly to avoid non‐conformities.

ROTATING EQUIPMENT INSPECTION:

 Foundation Pad elevation prior to installation of equipment


 Installation of equipment as Per API 686.
 Preservation record checking of equipment as per preservation schedule.
 Base Plate leveling & other mechanical equipment
 Prior to grouting leveling check & elevation of equipments
 Rotating equipment inspections of Pumps, Blowers, Compressors, chiller packages
Turbine, Agitators / Mixers, each phase of construction to start-up.
 Reviewing ITP’s for Equipment’s with respect to compiling it with standards / codes.
 Pre-Shaft alignment & final shaft alignments like Rim & Face ,Reversed, Laser Alignment
inspection , chipping , padding leveling, curing, skid leveling, pre alignment without pipe
, after with pipe alignment inspection ,Shim verification min /max ,DBSE, soft foot, Bolt
tightening of motor as per vendor, piping flange parallelism Inspection Suction &
Discharge Flange also Flange Face Verification, Gasket Verification, Final Bolt Tightening
for Suction & Discharge Flange of rotary equipment’s
 Witnessing rotary equipment’s driver and driven in and out shaft alignment and offset
conditions.
 Witnessing inspection for Motor solo run for inadequate noise, vibration and excessive
heating.
 Final Inspection for pump / motor gear box, pipe stress verification.
 Rotary equipment’s oil flushing with fine mesh screens where ever applicable and
conditional monitoring during commissioning.
 Check preservation status of equipments at site and storage area to ensure the requirements
of client and vendor are done such as rust prevention to equipment especially offshore area,
RESUME

monitor the nitrogen purging requirements for vessels and compressors, rotation of
shafting, oil filling and cleaning of equipments.
 Verify all materials which required for indoor and outdoor storage.

RESUME
RESUME
TANVEER HUSSAIN
 Ensure to have a preservation log for all the equipments checked and monitor daily / weekly
for easily tracking the status

STATIC EQUIPMENT INSPECTION:

 Static Equipment inspection for Columns /Towers, Drums, Exchangers, Filters, Reactors
each phase of construction to start-up.
 Check Static / Rotating arrive at site shall have each equipment tag number and name
plate. Visual inspection for any damage cause during transportation. Dimensional
inspections per design order.
 Verify the erection of equipments such as Columns /Towers, Drums, Exchangers, Filters,
Reactors and other equipment if they follow the Method of Statement.
 Prior to Grouting: anchor bolts, leveling, elevation checking, orientation of foundation,
orientation of equipment, plumpness of static equipment’s.
 Check the shimming requirements for static equipment as per project specification.
 Before Alignment of Vessel need to be check such as pre-watering of foundation, chipping,
Padding, Padding elevation, cleaning and works requirements.
 Columns/towers inspections like tray levelness, tray support ring levelness, bolt torque of
tray fixing clamps, Feeder/distributor pipe levelness and internal cleanliness. Down comers
and weir height checking.
 Checked external attachment such as platforms, ladders, support and instruments are
installed and inspected.
 Prior and ongoing Installation of filter cartridges and demisters inspection.
 Prior to final closure / Box-up of pressure vessels (columns, reactors, heat exchangers and
drums, filters) inspections.
 Final box up activities prior to closure of equipment.
 Flange faces, flange ratings and gaskets size and ratings for static equipment man ways.
 Internal screens checking of reactors prior to box-up and before filling catalyst.
 Bolt torque of static equipment man ways after final box up and bolt tightening of
Foundation anchor bolts and setting bolts.
 Final Visual checklists, update equipment status.
 Reviewed Method of Statement prepared by subcontractors regarding construction
activities that will guide them to Construction Activities.
 Ensure that inspection areas are safe for working with required level of safety.

PERSERVATION INSPECTION:
 Technical requirements for protection of equipment and Associated materials.
 Material and Equipment Protection and Preservation Plan.
 Equipment and Material Protection from the time the item is being prepared for shipping
at the source (by the manufacturer or at Vendor Shop), through shipping, site
delivery/storage, and installation and/or the Lay down Area
RESUME

 Oversee the implementation of the proper Material Receiving Plan. Ensure the proper
handling/receiving of all deliveries to the site Coordinate with the preservation engineer
for proper storage.

RESUME
RESUME
TANVEER HUSSAIN
 Implement quality requirements through its material receiving inspector. Ensure
conformance of approved materials by with existing standards and specs. Shall be received.

PIPING INSPECTION:

 Review of piping P&ID and isometric drawings, line check and completion of test packs.
 Confirm the piping system concurs with flow diagrams to verify completeness of system.
 Verify piping and equipment pressure test punch list. Ensure correction or completion of
punch list items.
 Prepare RFI according to the approve ITP and arrange for submission to the client for
inspection as per schedule.
 Ensure that all required NDE shall be performed prior to final system hydro/ pneumatic
testing unless otherwise specified by engineering.

TANKS & WELIDNG INSPECTION:

Responsibilities of Tanks and Welding.


 All installed equipment inspected the location, orientation, elevation.
 Prior to Erection Perform Inspection activities, (Inspection before and after installation)
prior to Grouting leveling, elevation and Location checking of Tanks.
 Monitor fabricated and erected products for conformance with applicable codes,
standards and Contract Requirements
 Visual and Dimensional inspection for layout carried out according to Tanks as per
API 650
 Inspecting Roundness, Plumpness and Levelness of the Tanks as per API 650
 Inspection of Peaking and Banding and also known to check the Templates used for
this inspection of the Tanks
 Ensure that NDT equipments are calibrated before using and during using also
 Ensuring the Levelness of the foundation before erection of the Tanks
 Inspection of Fabrication & Erection of Storage Tanks
 Work all these Tanks 75070,75074,75080,75062
 Monitoring the welding procedure to ensure the authenticity of the process
 Maintain all the documentation for the inspection and repair work carried
 Monitoring the welding inspection, before, during, after & also defect
 Welding defect, surface defect, internal defect, penetration defect also inspected
 Dye Penetrate , Magnetic Particle , Vacuum Box , Pad leak , Penetrating Oil Testing
RESUME

PERSONAL DETAILS:

RESUME
RESUME
TANVEER HUSSAIN
Name : Tanveer Hussain Malik s/o Muhammad Nazir
Nationality : Pakistan
Iqama status : Transferable / (Mobile) #: 059-7671869
Marital Status : Single / tanveer9hataf000@gmail.com , tanveer9hataf000@hotmail.com
E-mail : Email: mahvashtanveer@yahoo. com , tanveer9hataf000@yahoo.com,

RESUME

RESUME

Вам также может понравиться