(yes/no) Requirement to
FINAL RISK
RISK RATING
RATING
Legal
PERSON Existing control measures with mechanism from hierarchy of
Sl. (S) AT control for each identified hazard additional control
No measure(s) required with
LIKELI HOOD
LIKELI HOOD
RISK
HAZARD
SEVERITY
SEVERITY
NUMBER
NUMBER
HAZARD(S) mechanism from hierarchy
EFFECT
RISK
RISK
of control for each
be complied
identified hazard
1 Physical illness due to heat stress and Site DM Code of Electrolytes or salt added fluid are provided at regular 2 5 1 10 2 5 1 10
working in direct under the heat stroke Engineer, Construction
intervals
sun light Health effects Foreman’s Safety
heat stress, Operators, Practice, Cool drinking water provided at work spot.
heat exhaustion, Helpers DEWA SP - Trained first aider is made available at site
heat cramps) and 06
visitors Safety Posters / signs regarding heat Stress shall be
fatigue displayed
Adequate cool rest rooms are made available.
Dark goggles/ full sleeve coveralls provided & encouraged to
wear.
Job rotation policy shall be followed to avoid continuous work
under direct sunlight.
Close supervision shall be in place.
Air conditioned rest area will be available during working time.
New employees shall be made exposed in a phased manner
to heat for acclimatization.
M/S IASLC will Comply MID DAY break regulation, June 15 to
September 15, Work shall not be executed during 12.30 to
3pm as instructed by Labor ministry
Water Tremors will provide on work areas with cold water to
avoid long distance travelling to water cooler
Ensure heat stress awareness training to conducted
DUBAI ELECTRICITY AND WATER AUTHORITY
HEALTH AND SAFETY RISK ASSESSMENT FORM
CONTRACT NO : 0172
CLIENT : MERAAS DEVELOPMENT L.L.C
PROJECT : 132/11KV GARDEN TOWER (GRDNTOWR) S/S
MAIN CONTRACTOR : SIEMENS
Activity : RA 013 – WORKING UNDER DIRECT SUN LIGHT Assessment Date : 27/05/2017
Assessor(s) : HSE Officer/ Site Engineer Review Date : 27/05/2017
Reviewed By : Project Manager Next Review Date. : 27/11/2017
2 Potential of skin diseases heat cramps, Site DM Code of M/S IASLC will Comply MID DAY break regulation, June 15 to
due to sun rays (Ultraviolet Allergically Engineer, Construction
September 15, Work shall not be executed during 12.30 to
Radiation) diseases, Skin Foreman’s Safety
3pm as instructed by Labor ministry
Cancer Operators, Practice,
Helpers DEWA SP - Safety Posters / signs regarding heat Stress shall be
and 06 displayed
visitors Ensure the proper compliance of summer working (EPE
2 5 1 10 2 5 1 10
Approved) Plan
Close supervision shall be in place
Dark goggles/ full sleeve coveralls provided & encouraged to
wear
Sun Protection cream to be use while standing extreme sun
light
3 Potential of heat related heat stress and Site DM Code of M/S IASLC will Comply MID DAY break regulation, June 15 to
illness due to lack of heat stroke Engineer, Construction
September 15, Work shall not be executed during 12.30 to
knowledge /or Training Health effects Foreman’s Safety
3pm as instructed by Labor ministry
(Dehydration, Operators, Practice,
heat stress, Helpers DEWA SP - M/S IASLC will provide conduct adequate safety trainings with
2 5 1 10 2 5 1 10
heat exhaustion, and 06 the help of visual display units
heat cramps) visitors Continues safety training will be provided regarding heat
stress
fatigue
Safety posters with different language will fix everywhere
4 Dehydration due to working heat stress and Site DM Code of Provide adequate drinking water points at site
at extreme sunlight heat stroke Engineer, Construction M/s IAS Lootah will ensure the availability of cooled drinking
Health effects Foreman’s Safety water at site
(Dehydration, Operators, Practice, Orel Re Hydration Salts (ORS) will be provided
heat stress, Helpers DEWA SP - Temporary rest areas will be provided with Industrial
heat exhaustion, and 06 Pedestrian fans
heat cramps) visitors M/s IAS Lootah HSE officer will monitor all activates
Water distribution team will provide cold drinking water in
fatigue
DUBAI ELECTRICITY AND WATER AUTHORITY
HEALTH AND SAFETY RISK ASSESSMENT FORM
CONTRACT NO : 0172
CLIENT : MERAAS DEVELOPMENT L.L.C
PROJECT : 132/11KV GARDEN TOWER (GRDNTOWR) S/S
MAIN CONTRACTOR : SIEMENS
Activity : RA 013 – WORKING UNDER DIRECT SUN LIGHT Assessment Date : 27/05/2017
Assessor(s) : HSE Officer/ Site Engineer Review Date : 27/05/2017
Reviewed By : Project Manager Next Review Date. : 27/11/2017
tremors at site.
Cold rest area will be available during working hours
Trained first aider with all first aid facilities (As per Mention in
DM CoCSP and DEWA SP – 06) to be provided