DIM XX GS
SUMMARY DATA SHEET
4.0 REVIEWERS:
(Name / Dept) Nazri Ason / DPD-DED
Chee Weng Kong / DPD-CSD
Gary Orgill / DPD
CHANGE IMPACT
Blank = None, P=Positive, D=Detrimental
INTERNATIONAL STANDARDS
ENVIRONMENTAL
EMEP EXCEPTION
SAFETY/HEALTH
OPERABILITY
CORROSION
EXCEPTION
SCHEDULE
APPLICATION
(USD K) (YES/NO)
No Revised company name and format Company name change and new formatting
standards.
No 2.2.7: Changed reference to API B31.8 to DnV Updated Reference to current practice
OS-F101: Submarine Pipeline Systems
No 2.2.10: Added reference to Petronas Procedures Updated reference
for Diving Operations
P No 6.6 change requirement of 5 davits to enough Number of davits is job specific no need to
davits. Added: Lift bags or tanks will not be require 5 if only two are required.
allowed as an alternative to davits unless prior
approved by EMEPMI
P No 9.2.5 Deleted EMEPMI discretionary stopping
mooring operations.
CHANGE IMPACT
Blank = None, P=Positive, D=Detrimental
INTERNATIONAL STANDARDS
ENVIRONMENTAL
EMEP EXCEPTION
SAFETY/HEALTH
OPERABILITY
CORROSION
EXCEPTION
SCHEDULE
APPLICATION
(USD K) (YES/NO)
P P P No 9.2.9 added: Slings shall be certified by load Load testing to 2 times SWL is required by most
testing to two times the safe working load or the industry standards and clarifies our
maximum anticipated load. For slings with SWL requirements. Historically large slings have
of 250 metric tons or more the sling testing load been load tested to 1.1 time SWL when specific
may be reduced to 1.25 times the SWL if testing requirements are not provided.
CONTRACTOR can demonstrate a limitation in
regionally available sling testing facilities.
P No 9.2.12: added: CONTRACTOR shall identify all Clarify the any need for shut down should be
required platform shutdowns early in the planning identified in advance of work.
of the work and notify EMEPMI 60 days prior to
work start of any platform shutdowns required.
The GS 0-6-0 sect 2 refers to ten international or national standards and practices. There are no
known conflicts and the GS requires that the latest revision of the standards and practices be used.
This GS also requires any conflicts to be resolved by EMEPMI.
2. Is this new/revised standard really necessary? Yes Meet the 5 year revision cycle
requirement
3. Conform to applicable International standards Yes International Standards incorporated
by reference
4. Conform to applicable National standards Yes Petronas Standards included by
reference
5. Conform to EMEP NA
11. Consider effects of new/updated industry standards Yes Refer to section 6 above.
Notes* - Include PCN No., Safety Bulletin Ref. No., Lesson Learned Ref. No. and GS/DIM Bulletin Ref. No.