Вы находитесь на странице: 1из 5

DESIGN PRACTICES AND STANDARDS

† DIM XX GS
SUMMARY DATA SHEET

1.0 NEW/UPDATED STANDARD


TITLE: GS 00-06-00: Common Requirements for Offshore Installation
Contractors
REVISION DATE & NO.: December 2002 Rev. 1

2.0 SPEC(S) USED PRIOR TO NEW/UPDATED STANDARD


TITLE: GS 00-06-00: Common Requirements for Offshore Installation
Contractors
REVISION DATE & NO.: December 1997 Rev. 0

3.0 PRIMARY AUTHOR(S):


(Name / Dept) Rick Birdwell / DPD-CSD

4.0 REVIEWERS:
(Name / Dept) Nazri Ason / DPD-DED
Chee Weng Kong / DPD-CSD
Gary Orgill / DPD

GS 0-6-0 - Summary Datasheet Dec 2002


DESIGN PRACTICES AND STANDARDS
† DIM XX GS
SUMMARY DATA SHEET

5.0 SUMMARY OF CHANGES

CHANGE IMPACT
Blank = None, P=Positive, D=Detrimental

NATIONAL STANDARDS EXCEPTION

INTERNATIONAL STANDARDS
ENVIRONMENTAL

EMEP EXCEPTION
SAFETY/HEALTH

OPERABILITY
CORROSION

EXCEPTION
SCHEDULE

CONSIDER CHANGE DESCRIPTION


COST FOR (Indicate Para # from new/updated DIM/GS) REASON FOR CHANGE
IMPACT RETROACTIVE
RISK

APPLICATION
(USD K) (YES/NO)
No Revised company name and format Company name change and new formatting
standards.
No 2.2.7: Changed reference to API B31.8 to DnV Updated Reference to current practice
OS-F101: Submarine Pipeline Systems
No 2.2.10: Added reference to Petronas Procedures Updated reference
for Diving Operations
P No 6.6 change requirement of 5 davits to enough Number of davits is job specific no need to
davits. Added: Lift bags or tanks will not be require 5 if only two are required.
allowed as an alternative to davits unless prior
approved by EMEPMI
P No 9.2.5 Deleted EMEPMI discretionary stopping
mooring operations.

GS 0-6-0 - Summary Datasheet Dec 2002


DESIGN PRACTICES AND STANDARDS
† DIM XX GS
SUMMARY DATA SHEET

5.0 SUMMARY OF CHANGES

CHANGE IMPACT
Blank = None, P=Positive, D=Detrimental

NATIONAL STANDARDS EXCEPTION

INTERNATIONAL STANDARDS
ENVIRONMENTAL

EMEP EXCEPTION
SAFETY/HEALTH

OPERABILITY
CORROSION

EXCEPTION
SCHEDULE

CONSIDER CHANGE DESCRIPTION


COST FOR (Indicate Para # from new/updated DIM/GS) REASON FOR CHANGE
IMPACT RETROACTIVE
RISK

APPLICATION
(USD K) (YES/NO)
P P P No 9.2.9 added: Slings shall be certified by load Load testing to 2 times SWL is required by most
testing to two times the safe working load or the industry standards and clarifies our
maximum anticipated load. For slings with SWL requirements. Historically large slings have
of 250 metric tons or more the sling testing load been load tested to 1.1 time SWL when specific
may be reduced to 1.25 times the SWL if testing requirements are not provided.
CONTRACTOR can demonstrate a limitation in
regionally available sling testing facilities.
P No 9.2.12: added: CONTRACTOR shall identify all Clarify the any need for shut down should be
required platform shutdowns early in the planning identified in advance of work.
of the work and notify EMEPMI 60 days prior to
work start of any platform shutdowns required.

GS 0-6-0 - Summary Datasheet Dec 2002


DESIGN PRACTICES AND STANDARDS
† DIM XX GS
SUMMARY DATA SHEET

6.0 LIST OF UPDATED INTERNATIONAL & NATIONAL STANDARDS AND PRACTICES


REFERENCED IN THE DIM/GS.

The GS 0-6-0 sect 2 refers to ten international or national standards and practices. There are no
known conflicts and the GS requires that the latest revision of the standards and practices be used.
This GS also requires any conflicts to be resolved by EMEPMI.

GS 0-6-0 - Summary Datasheet Dec 2002


DESIGN PRACTICES AND STANDARDS
† DIM XX GS
SUMMARY DATA SHEET

7.0 CHECKLIST FOR NEW/UPDATED STANDARDS

Item No. Yes/No/NA Notes*


1. Does this DIM/GS require approval from Steering No
Committee or Deputy Production Manager?

2. Is this new/revised standard really necessary? Yes Meet the 5 year revision cycle
requirement
3. Conform to applicable International standards Yes International Standards incorporated
by reference
4. Conform to applicable National standards Yes Petronas Standards included by
reference
5. Conform to EMEP NA

6. Meet or exceed applicable regulatory requirements or Yes


PETRONAS guidelines

7. Embody responsible requirements where regulations Yes


do not exist

8. Reflect latest developments and lessons learned NA No applicable LL identified

9. Consider facilities abandonment requirements (Refer NA


to PETRONAS Guidelines for Platform
Decommissioning)

10. Consider Human Factor requirements (Refer to MOH NA


Industrial Hygiene Checklist)

11. Consider effects of new/updated industry standards Yes Refer to section 6 above.

12. Consider applicable Project Change Notice (PCN) NA


forms

13. Incorporate approved DIM/GS Permanent Change NA


Recommendation Forms

14. Consider relevant DIM/GS Bulletins NA

Notes* - Include PCN No., Safety Bulletin Ref. No., Lesson Learned Ref. No. and GS/DIM Bulletin Ref. No.

8.0 APPROVAL TO ISSUE THE NEW/UPDATED STANDARD


(Refer to Section 4.3 in DIM 0-1 / GS 0-0-1 for approval level required)

Approved by: _____________________________ Date: ____________________


(Name & Title)

GS 0-6-0 - Summary Datasheet Dec 2002