DATA CONSTANTS:
Assume Pg = 0.02
Wall Partition (Hollow concrete masonry with 2 face plastered) = 2.98 kPa
BY TRIBUTARY METHOD
= 67.1125 kN
= 167.265 kN
= 30.45 kN
=7 m. x 7.5m. x 1.58
= 82.95 kN
= 103.392 kN
= 451.0867 kN
= 99.75 kN
Total Weight:
P = DL + LL
= 451.0867 kN + 99.75 kN
P = 550.8367 kN
𝑨𝒈 = 𝟖𝟑𝟖𝟑𝟒. 𝟖𝟏 𝒎𝒎²
𝑨𝒈 = 𝒕2
83834.81 𝑚m2 = 𝒕2
𝑡 = 289.54 𝑚𝑚
Say t = 300 mm
𝑨𝒈𝒏𝒆𝒘 = 𝒕2
𝑨𝒈 < 𝑨𝒈𝒏𝒆𝒘
𝟖𝟑𝟖𝟑𝟒. 𝟖𝟏 𝒎𝒎𝟐 < 𝟗𝟎𝟎𝟎𝟎 𝒎𝒎² ( ok )
𝑨𝒔 = 𝑷𝒈 𝑨𝒈𝒏𝒆𝒘
𝐴𝑠 = (0.02)(90000 𝑚𝑚2 )
𝑨𝒔 = 𝟏𝟖𝟎𝟎 𝒎𝒎𝟐
Use 25 mm ø
𝜋
𝐴𝑠 = (25 𝑚𝑚)²𝑁
4
𝜋
1800 𝑚𝑚2 = (28 𝑚𝑚)²𝑁
4
𝑁 = 3.66693 𝑏𝑎𝑟𝑠
Say 4 - 25 mm ø bars
Try 4 - 25 mm ø bars
𝜋
𝐴𝑠 = 4 (25 𝑚𝑚)²(4)
𝐴𝑠 = 1963.5 𝑚𝑚2
𝐴
𝑃𝑔 = 𝐴 𝑠
𝑔
1963.5 𝑚𝑚2
𝑃𝑔 =
83834.81 𝑚𝑚2
𝑃𝑔 = 0.02342105
𝑷𝒏𝒆𝒘 = 𝟔𝟐𝟑. 𝟖 𝒌𝑵
𝑷𝒏𝒆𝒘 > 𝑷
𝑆 = 16(25) = 400 𝑚𝑚
𝑆 = 48(10) = 480 𝑚𝑚
𝑆 = 300 𝑚𝑚
= 67.1125 kN
= 167.265 kN
= 30.45 kN
=7 m. x 7.5m. x 1.58
= 82.95 kN
= 206.6183 kN
Load from 5th floor plus column weight = P5 + Ag(new) x Height x Unit weight of Concrete
= 558.2707 kN
+ 558.2707 kN
= 1,112.6665 kN
= 99.75 kN
Total Weight:
P = DL + LL
= 1,112.6665 kN + 99.75 kN
P = 1,212.416 kN
𝐴𝑔 = 184524.2 𝑚𝑚2
𝑨𝒈 = 𝒕2
297665 𝑚m2 = 𝒕2
𝑡 = 429.5628 𝑚𝑚
Say t = 430 mm
𝑨𝒈𝒏𝒆𝒘 = 𝒕2
𝑨𝒈 < 𝑨𝒈𝒏𝒆𝒘
𝟏𝟖𝟒, 𝟓𝟐𝟒. 𝟐 𝒎𝒎𝟐 < 𝟏𝟖𝟒, 𝟗𝟎𝟎. 𝟎 𝒎𝒎² (Ok)
𝑨𝒔 = 𝑷𝒈 𝑨𝒈𝒏𝒆𝒘
𝐴𝑠 = (0.02)(184,900.0 𝑚𝑚2 )
𝑨𝒔 = 𝟑𝟔𝟗𝟖 𝒎𝒎𝟐
Use 28 mm ø
𝜋
𝐴𝑠 = (28 𝑚𝑚)²𝑁
4
𝜋
3698 𝑚𝑚2 = (28 𝑚𝑚)²𝑁
4
𝑁 = 6.005 𝑏𝑎𝑟𝑠
Say 6 - 28 mm ø bars
Try 6 - 28 mm ø bars
𝜋
𝐴𝑠 = 4 (28 𝑚𝑚)²(6)
𝐴𝑠 = 3,694.513 𝑚𝑚2
𝐴
𝑃𝑔 = 𝐴 𝑠
𝑔
3,694.513 𝑚𝑚2
𝑃𝑔 =
184,524.2 𝑚𝑚2
𝑃𝑔 = 0.020022
𝑷𝒏𝒆𝒘 > 𝑷
𝑆 = 16(25) = 400 𝑚𝑚
𝑆 = 48(10) = 480 𝑚𝑚
𝑆 = 430 𝑚𝑚
= 67.1125 kN
= 167.265 kN
= 30.45 kN
=7 m. x 7.5m. x 1.58
= 82.95 kN
= 206.6183 kN
Load from 4th floor plus column weight = P4 + Ag(new) x Height x Unit weight of Concrete
= 1,227.689 kN
= 1,782.0848 kN
= 99.75 kN
Total Weight:
P = DL + LL
= 1,782.0848 kN + 99.75 kN
P = 1,881.835 kN
𝑨𝒈 = 𝒕2
461970 𝑚m2 = 𝒕2
𝑡 = 535.1698 𝑚𝑚
Say t = 540 mm
𝑨𝒈𝒏𝒆𝒘 = 𝒕2
𝐴𝑔𝑛𝑒𝑤 = 540 𝑚𝑚 𝑥 540 𝑚𝑚
𝑨𝒈 < 𝑨𝒈𝒏𝒆𝒘
286,406.7 𝑚𝑚2 < 291,600 𝑚𝑚² (Ok)
𝑨𝒔 = 𝑷𝒈 𝑨𝒈𝒏𝒆𝒘
𝐴𝑠 = (0.02)(291,600 𝑚𝑚2 )
𝑨𝒔 = 𝟓, 𝟖𝟑𝟐 𝒎𝒎𝟐
Use 32 mm ø
𝜋
𝐴𝑠 = (32 𝑚𝑚)²𝑁
4
𝜋
5,832 𝑚𝑚2 = (32 𝑚𝑚)²𝑁
4
𝑁 = 7.25 𝑏𝑎𝑟𝑠
Say 8 - 32 mm ø bars
Try 8 - 32 mm ø bars
𝜋
𝐴𝑠 = 4 (32 𝑚𝑚)²(8)
𝐴𝑠 = 6,4333.982 𝑚𝑚2
𝐴𝑠
𝑃𝑔 = 𝐴
𝑔𝑛𝑒𝑤
6,4333.982 𝑚𝑚2
𝑃𝑔 =
286,406.7 𝑚𝑚2
𝑃𝑔 = 0.022464
𝑷𝒏𝒆𝒘 > 𝑷
𝑆 = 16(32) = 512 𝑚𝑚
𝑆 = 48(10) = 480 𝑚𝑚
𝑆 = 540 𝑚𝑚
= 67.1125 kN
= 167.265 kN
= 30.45 kN
=7 m. x 7.5m. x 1.58
= 82.95 kN
= 206.6183 kN
Load from 3rd floor plus column weight = P3 + Ag(new) x Height x Unit weight of Concrete
= 1,905.921 kN
= 2,460.3168 kN
= 99.75 kN
Total Weight:
P = DL + LL
= 2,460.3168 kN + 99.75 kN
P = 2,560.0668 kN
𝑨𝒈 = 𝒕2
389,630.5 𝑚m2 = 𝒕2
𝑡 = 624.2039 𝑚𝑚
Say t = 630 mm
𝑨𝒈𝒏𝒆𝒘 = 𝒕2
𝑨𝒈 < 𝑨𝒈𝒏𝒆𝒘
389,630.5 𝑚𝑚2 < 396,900 𝑚𝑚² (Ok)
𝑨𝒔 = 𝑷𝒈 𝑨𝒈𝒏𝒆𝒘
𝐴𝑠 = (0.02)(396,900 𝑚𝑚2 )
𝑨𝒔 = 𝟕, 𝟗𝟑𝟖 𝒎𝒎𝟐
Use 32 mm ø
𝜋
𝐴𝑠 = (32 𝑚𝑚)²𝑁
4
𝜋
7,938 𝑚𝑚2 = (32 𝑚𝑚)²𝑁
4
𝑁 = 9.87 𝑏𝑎𝑟𝑠
Try 10 - 32 mm ø bars
𝜋
𝐴𝑠 = 4 (32 𝑚𝑚)²(10)
𝐴𝑠 = 8,042.477 𝑚𝑚2
𝐴𝑠
𝑃𝑔 =
𝐴𝑔
8,042.477 𝑚𝑚2
𝑃𝑔 =
389,630.5 𝑚𝑚2
𝑃𝑔 = 0.020641
𝑷𝒏𝒆𝒘 > 𝑷
𝑆 = 16(32) = 512 𝑚𝑚
𝑆 = 48(10) = 480 𝑚𝑚
𝑆 = 630 𝑚𝑚
= 67.1125 kN
= 127.7261 kN
= 23.25208 kN
=40.0898 m2 x 1.58
= 63.34188 kN
= 55.875 kN
Load from 2nd floor plus column weight = P2 + Ag(new) x Height x Unit weight of Concrete
= 2,592.851 kN
= 2,930.15856 kN
= 76.17062 kN
Total Weight:
P = DL + LL
= 2,930.15856 kN + 76.17062 kN
P = 3,006.32918 kN
𝑨𝒈 = t 2
𝟕𝟔𝟑𝟐𝟎𝟐 𝑚m2 = 𝐭2
𝑡 = 676.4241 𝑚𝑚
Say t = 680 mm
𝑨𝒈𝒏𝒆𝒘 = 𝐭2
𝐴𝑔𝑛𝑒𝑤 = 680 𝑚𝑚 𝑥 680 𝑚𝑚
𝑨𝒈 < 𝑨𝒈𝒏𝒆𝒘
𝟒𝟓𝟕, 𝟓𝟒𝟗. 𝟓 𝒎𝒎𝟐 < 𝟒𝟔𝟐, 𝟒𝟎𝟎 𝒎𝒎² (Ok)
𝑨𝒔 = 𝑷𝒈 𝑨𝒈𝒏𝒆𝒘
𝐴𝑠 = (0.02)(462,400 𝑚𝑚2 )
𝑨𝒔 = 𝟗, 𝟐𝟒𝟖 𝒎𝒎𝟐
Use 32 mm ø
𝜋
𝐴𝑠 = (32 𝑚𝑚)²𝑁
4
𝜋
9,248 𝑚𝑚2 = 4 (32 𝑚𝑚)²𝑁
𝑁 = 11.49 𝑏𝑎𝑟𝑠
Try 12 - 32 mm ø bars
𝜋
𝐴𝑠 = 4 (32𝑚𝑚)²(12)
𝐴𝑠 = 9,650.97 𝑚𝑚2
𝐴
𝑃𝑔 = 𝐴 𝑠
𝑔
9,650.97 𝑚𝑚2
𝑃𝑔 = 457,549.5 𝑚𝑚2
𝑃𝑔 = 0.021093
𝑷𝒏𝒆𝒘 > 𝑷
𝑆 = 16(32) = 512 𝑚𝑚
𝑆 = 48(10) = 480 𝑚𝑚
𝑆 = 680 𝑚𝑚