Checklist
for Commissioning and for Wilo Inspection and Repair Contract
Company / customer:
BASIC
Performance data
Unit type Art. no. / mod. year
Pump 1 type Art. no. / mod. year
Pump 2 type Art. no. / mod. year
Switchgear type Art. no. / mod. year
Condition inspection
Voltage Volt
Check motor protection setting IN P1: A IN P2: A
Check condition and impermeability of unit
Check smooth operation of pumps
Check condition of installation area
Diaphragm hand pump present
Faecal sewage
Greasy sewage
Rainwater
Check valves present
COMFORT
Condition inspection
Pump 1: Current measured I A
Pump 2: Current measured I A
CHECKLIST sewage lifting units / sump units Version 1.0/ 12.2016
Check alarm
Check fault-actuated switchover
Check function of non-return valve
Check function of check valve
Check unit pipe connections
Check unit fixations
Check switching points
Check floater / pilot tube / sensor
Checklist
for Commissioning and for Wilo Inspection and Repair Contract
PREMIUM
Wear parts replaced as part of Comfort contract? Yes, see service report
No, see remarks
Remarks:
CHECKLIST sewage lifting units / sump units Version 1.0/ 12.2016