DETAILED ESTIMATE
MATERIALS
ITEM DESCRIPTION QTY. UNIT UNIT TOTAL
COST COST
I SITEWORKS cu.m
Excavation cu.m
Backfill cu.m
Gravel Bedding cu.m. -
Selected Borrow cu.m. -
Subtotal -
II REINFORCING STEEL BAR kgs.
16mmØ RSB kgs -
12mmØ RSB kgs -
10mmØ RSB kgs -
Tie wire # 16 kgs -
Subtotal 0.00
III SCAFFOLDINGS AND FORMWORKS sq.m.
1/4" thk Ord Plywood pcs. -
2" x 2" Good Lumber bd.ft. -
2" x 3" Good Lumber bd.ft. -
CWN assted kg -
Subtotal 0.00
IV CONCRETE WORKS cu.m.
Portland cement bags -
Washed Gravel cu.m. -
Washed Sand cu.m. -
Subtotal 0.00
V MASONRY WORKS sq.m.
5" CHB pcs. -
Portland cement bags -
Washed Sand cu.m. -
Washed Gravel cu.m. -
RSB 10mmØ kgs. -
Tie wire # 16 kgs. -
Subtotal 0.00
VI TILE WORKS
60x60 Floor Tiles pcs. -
30x30 Unglazed Vitrified Ceramic Tiles pcs. -
30x30 Glazed Vitrified Ceramic Tiles pcs. -
Tile trim 10' pcs. -
Portland cement bags -
Washed Sand cu.m -
Tile grout bags -
Tile adhesive bags -
Subtotal 0.00
VII STEEL WORKS
ROOF FRAMING
2X2X1/4" @ 6.0m Long angle bar pcs. -
1.5X1.5X1/4" @ 6.0m Long angle bar pcs. -
2"x4"x1.5mm C purlins pcs. -
10mmØ Sag rod pcs. -
Welding Rod kgs -
Subtotal 0.00
MATERIALS
ITEM DESCRIPTION QTY. UNIT UNIT TOTAL
COST COST
VIII CARPENTRY WORKS sq.m.
A. Ceiling
0.5mm Spandrel (Pre-painted) w/ comp. access. sq.m -
1/4" thk. Gypsum Board pcs -
Blind rivets box -
Self drilling screw pcs -
Concrete Nail kgs -
Wall Angle 10ft pcs -
Double furring 5mx0.6 pcs -
Carrying Channel 5mx0.8 pcs -
Suspension rod pcs -
Suspension clip pcs -
Subtotal
IX PAINTING WORKS sq.m
Semi Gloss Latex Paint gals -
Flat Latex Paint gals -
Concrete Neutralizer gals -
Tinting Color qrt -
Flatwall Enamel gals -
Quick Dry Enamel gals -
Red Oxide gals -
Paint Thinner gals -
Masonry Putty gals -
Glazing Putty gals -
Roller Brush with tray set -
Paint Brush 4" set -
Paint Brush 2" pcs -
Sand Paper pcs -
Subtotal 0.00
X ROOFING WORKS sq.m
Roof Insulation pcs -
0.60mm thk. Rib Type Color Roof lm -
#24 GI Sheet S-Type Gutter (Pre-painted) pcs -
#24 GI Sheet Ridgeroll (Pre-painted) pcs -
#24 GI Sheet Valley roll (Pre-painted) pcs -
Rivet pcs -
Tecscrew pcs -
Roof Sealant ltrs -
Subtotal -
XI DOORS AND WINDOWS 1.00 lot.
All Doors with complete accessories: Lockset & all required
Door Closer & Door Stopper
D-1 3.00mW Anodized Double Swing Glass Door w/ 6mm thk set -
Clear Fixed Glass
D-2 1.60mW Anodized Double Swing Glass Door w/ 6mm thk set -
Clear Fixed Glass
D-3 1.20mW Double Swing Flush Door w/ 6mm thk. View sets -
Glass & Kick Plate
D-4 1.00mW Anodized Single Swing Glass Door w/ 6mm thk sets -
Clear Fixed Glass
D-5 0.80mW Single Swing Flush Door w/ 6mm thk. View sets -
Glass & Kick Plate
D-6 0.80mW Single Swing Flush Door sets -
D-7 0.90mW Single Swing Flush Door w/ Louver sets -
D-8 0.70mW Single Swing Flush Door w/ Louver sets -
TAILED ESTIMATE
LABOR
TOTAL TOTAL
COST
30% of the
total material
cost
₱ -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
LABOR
TOTAL TOTAL
COST
0.00 -
- -
- -
LABOR
TOTAL TOTAL
COST
- -
- -
I. TOTAL DIRECT COST
II. Contractor's Profit (10% of I)
III. V.A.T. (12% of I+II)
IV. TOTAL INDIRECT COST( II+III)
TOTAL PROJECT COST (I+IV)