Вы находитесь на странице: 1из 2

Doc No

P117 Dedicated Car Park


Rev.
Site Progress Overview FOR 2.15 As Of 2-Jun-15
Floors
Sr # Activity Complete Complete Remarks
B5 B4 B3 B2 B1 GF MZ IF 2F 3F RF Riser A Riser B

MECHANICAL WORKS
HVAC
1 Installation of Sleeves/ Blockout in Slab &Wall 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% -NA- -NA-
2 Installation of Supports & Hangers 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% -NA- -NA-
3 Installation of Insulated Duct 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% -NA- -NA-
4 Installation of Insulated Riser Duct -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
5 Installation of Round Duct 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
6 Installation Dampers & Accessories 100% 100% 100% 100% 90% 100% 100% 100% 100% 100% 100% -NA- -NA-
7 Installation of Aluminium Cladding 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% -NA- -NA-

8 Installation of Louvers & Plenium Boxes 100% 100% 100% 100% 100% 100% -NA- -NA- -NA- -NA- -NA- -NA- -NA-

9 Installation of AHU -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- 95% -NA- -NA- -NA- -NA-
10 Installation of Jet Fans 100% 100% 100% 100% 100% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
11 Installation of Car Park Supply & Extract Fans -NA- -NA- -NA- -NA- 100% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
12 Installation of Staircase Pressurisation Fans -NA- -NA- 100% -NA- 100% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
13 Installation of Grills & Diffusers 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% -NA- -NA-
14 Installation of CO Cable 80% 80% 80% 80% 80% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
15 Installation of CO Devices 0% 0% 0% 0% 0% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
16 Installation of CO panel 0% 0% 0% 0% 0% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
Plumbing
1 Installation of Sleeves/ Blockout in Slab &Wall 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% -NA- -NA-
2 Installation of Supports & Hangers for Drainage & Water Supply
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% -NA- -NA-
3 Installation of Water Supply Piping 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% -NA-
5 Installation of Drainage Piping (Storm/Soil/Vent) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 100%
7 installtion of Valves & Accessories 100% 90% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% -NA-
8 installtion of Drainage Accessories 100% 100% 100% 100% 100% 100% 100% 100% 40% 100% 85% -NA- -NA-
9 Installation of Bibtap 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% -NA- -NA-
10 Installation of Electric Water Heater -NA- -NA- -NA- -NA- -NA- 100% -NA- -NA- -NA- -NA- 0% -NA- -NA-
11 Installation of Sanitary Fixtures -NA- -NA- -NA- -NA- -NA- 0% -NA- -NA- -NA- -NA- 0% -NA- -NA- Civil Clearence Needed.
12 Installation of Domestic Water Storage Tank -NA- 100% -NA- 100% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
13 Installation of Booster Pump -NA- 100% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
14 Installation of Submersible Pumps 0% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
15 Installation of Automatic Airvent -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- 0% -NA- -NA- -NA-
Doc No
P117 Dedicated Car Park
Rev.
Site Progress Overview FOR 2.15 As Of 2-Jun-15
Floors
Sr # Activity Complete Complete Remarks
B5 B4 B3 B2 B1 GF MZ IF 2F 3F RF Riser A Riser B

MECHANICAL WORKS
Fire Fighting
1 Installation of Sleeves/ Blockout in Slab &Wall 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
2 Installation of Supports & Hangers for Fire Fighting 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 Installation of Fire Fighting Piping 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

4 Installation of Riser Fire Fighting Piping 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

5 Installation of Fire Fighting Branch & Droppers Piping 100% 100% 100% 100% 100% 80% 80% 80% 80% 80% -NA- -NA- -NA-
6 Installation of Fire Hose Cabinets 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% -NA- -NA-
7 Installation of Landing Valve Cabinets 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% -NA- -NA-
8 Installation of Fire Water Storage Tank 100% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
9 installation of Sprinklers 100% 100% 100% 100% 100% 0% -NA- 0% -NA- -NA- 0% -NA- -NA-
10 installation of Flow Control Assembly with Valves 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% -NA- -NA-
11 installation of Fire Alarm Check Valve 100% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
12 Installation of Automatic Airvent -NA- -NA- -NA- -NA- -NA- 100% -NA- -NA- -NA- 100% -NA- -NA- -NA-
Chilled Water System
1 Installation of Sleeves/ Blockout in Slab &Wall 90% 90% 90% 90% 90% 90% 90% 90% 0% 0% 0% 0% 0%
Installation of Supports & Hangers for Chilled Water
2 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 0% 100%
System & Condensate Drain Piping
3 Installation of Chilled Water Piping 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 0% 0%
4 Installation of Condensate Drain Piping 30% 30% 30% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
5 Insulation for Chilled Water System 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
6 Insulation for Condensate Drain Piping 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
7 Aluminum Cladding for Chilled Water System 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
8 ETS Room Installation & its Assembly -NA- -NA- -NA- -NA- 0% -NA- -NA- -NA- -NA- -NA- -NA- -NA- -NA-
9 Installation of Valves in Chilled Water System 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%