STANDARD FIELD OPERATING PROCEDURE

2x800 MW Yermarus Thermal Power Station.


FIELD SOP FOR FORCED DRAFT FAN.
Document No.: Revision No:
Effective Date: Page 1
PMPL/RPCL/BLR/SOP/02 Revision Date:

STANDARD FIELD OPERATING


PROCEDURE
FOR

FORCED DRAFT FANS

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FIELD SOP FOR FORCED DRAFT FAN.
Document No.: Revision No:
Effective Date: Page 2
PMPL/RPCL/BLR/SOP/02 Revision Date:

INDEX
1) OBJECTIVE
2) SCOPE
3) INTRODUCTION
4) TECHNICAL DATA
5) RESPONSIBILITY
6) SAFETY PRECAUTIONS
7) SAFETY PPEs
8) SPECIAL TOOL EQUIPMENTS
9) PRE CONDITION TO START ID FAN
10) START UP PROCEDURE
11) TRIPPING CONDITION
12) SHUTDOWN
13) ABBREVIATIONS

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FIELD SOP FOR FORCED DRAFT FAN.
Document No.: Revision No:
Effective Date: Page 3
PMPL/RPCL/BLR/SOP/02 Revision Date:

1. Objective :
Smooth Operation of FD Fans- 2 Nos.

2. Scope :
This SOP is applicable for 2 Nos. of FD Fans.

3. Introduction:
The Secondary air is used for proper combustion of coal in the furnace. Its
suction is from atmosphere & discharge is going through APH (hot air goes to
Wind Box).

4. FD Fan’s Technical Data:


Fan Type FAF 26.6/12.5-1 ( Axial Reaction)

NO. OFF/ BOILER Two

MEDIUM ATMOSPHERIC AIR

LOCATION OUTDOOR

FAN DESIGN RATING

CAPACITY (m3/s) 280

TOTAL HEAD DEVELOPED (mmwc) 448

TEMP. OF MEDIUM (deg.c) 50

DENSITY (kg/ m3) 1.082

SPEED (rpm) 996

FAN RESERVE

FLOW (%) 30.6

PRESSURE (%) 43.5

FAN DRIVE COUPLING SPACER TYPE

DRIVE MOTOR

MAKE BHEL/BHOPAL

Frame 1LA7902-6

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FIELD SOP FOR FORCED DRAFT FAN.
Document No.: Revision No:
Effective Date: Page 4
PMPL/RPCL/BLR/SOP/02 Revision Date:

Rating (kw) 1775

Speed (rpm) 996

Volts (Volt) 11000

LUBRICATIN EQUIPMENT
FAN 15LPM/35 BAR FLOW (OIL-ISO VG68

MOTOR GREASE LUBRICATION (SERVOGEM3)

TYPE OF REGULATION BLADE PITCH CONTROL

BEARINGS

FIXED BEARINGS NU238M+6238 MC3

FREE BEARINGS NU232 M.C3

TIP DIAMETER IN DECIMETRE 26.6

HUB DIAMETER IN DECIMETRE 12.5

LUBRICANT & SUPPLIER SERVO PRIME 68 OF IOC


BHARAT TURBOL 68 OF BP
TURBINOL 68 OF HPC
TERESSO 68 (OTHERS)

FILLING LOCATION FAN BEARING HOUSING

FREQUENCY OF FILLING ONCE IN SIX MONTH OR


BASED ON OIL TEST RESULTS

FREQUENCY OF OBSERVATION DAILY

QUANTITIES PER FAN 325 LTRS / FAN

5. Responsibility:
Unit Control Engineer, Desk Engineer and Field Operator.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FIELD SOP FOR FORCED DRAFT FAN.
Document No.: Revision No:
Effective Date: Page 5
PMPL/RPCL/BLR/SOP/02 Revision Date:

6. Safety Precautions:
1. Field operator Ensure No Permit to Work is pending on regarding this system by
checking with CCR.
2. Proper function of interlock /protection.

7. Safety PPE’s: Ear Plugs, Safety Goggles, Hand Gloves, Etc.

8. Special Tools/ Equipments : Nil

9. Pre check to start FD fan A

1. No PTW is pending.

2. The Oil tank is adequately filled and ensure oil tank level is > 55%.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FIELD SOP FOR FORCED DRAFT FAN.
Document No.: Revision No:
Effective Date: Page 6
PMPL/RPCL/BLR/SOP/02 Revision Date:

3. Linearity of blades position w.r.t local / control room indication.

4. Ensure blade pitch at minimum position.

5. All manholes in Air path, Flue gas path, Furnace are in closed condition.
6. APH inlet SA dampers are open. Dampers power supply is ON.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FIELD SOP FOR FORCED DRAFT FAN.
Document No.: Revision No:
Effective Date: Page 7
PMPL/RPCL/BLR/SOP/02 Revision Date:

7. DMCW system is in service.


8. Lube oil skid power supply is ON.

9. Keep one lube oil cooler in service (i.e.) Open DMCW inlet, outlet valves.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FIELD SOP FOR FORCED DRAFT FAN.
Document No.: Revision No:
Effective Date: Page 8
PMPL/RPCL/BLR/SOP/02 Revision Date:

10. Fan Discharge gate are in close position. Gate power supply is ON.
11. ID fan in service.
12. APH is in service.

13. Check proper function of emergency switch.( Both fan & LOP’s)
14. Never run the Fan/Motor without protection /interlock.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FIELD SOP FOR FORCED DRAFT FAN.
Document No.: Revision No:
Effective Date: Page 9
PMPL/RPCL/BLR/SOP/02 Revision Date:

10. START UP PROCEDURE.

Taking first fan in service:-

1. Start one oil pump. Observe discharge pressure and flow. Ensure its healthiness &
keep second pump in interlock.
2. Start FD fan & monitor the starting current and note starting time.
3. Ensure that the discharge gate start open simultaneously with the start of fan motor.
4. Observe for abnormal sound, Vibration, Bearing temperature and Winding temp.
5. Increase blade pitch & keep watch on fan discharge pressure & secondary wind box
inlet pressure and record the blade opening position.

Taking second fan in service:-

6. Start one oil pump. Observe discharge pressure and flow. Ensure its healthiness &
keep second pump in interlock..
7. Give start command to second FD fan.
8. Open blade pitch of fan and decrease blade pitch of running fan.
9. Make blade pitch of both fan equal by parallel operation.
10. If there is any considerable deviation between loadings of both fans, Give biasing
between pitch controls of fans to keep the fan’s current almost equal.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FIELD SOP FOR FORCED DRAFT FAN.
Document No.: Revision No:
Effective Date: Page 10
PMPL/RPCL/BLR/SOP/02 Revision Date:

Note:
A. Deviation of parameters / Abnormalities from normal should be reported to
CCR & respective maintenance personnel.
B. Motor & Pump temp. has to be sensed by hand touch & if found abnormal
then, reported to concerned person & maintain record in log book.
C. Motor & Pump vibration to be sensed via hand touch & if found abnormal then,
reported to concerned person & maintain record in log book.
D. Oil level & greasing of the equipment to be monitor in regular interval.

Temp. Local Vibration Equipment Oil level &


To be Checked ( By Hand (By Hand Touch) Cleaning Greasing
Touch)
OK NOT
OK        

FD Fan

11. Tripping condition


1. Fan Bearing Temperature < 95°C alarms raised and at ≥ 105°C fans tripped.
2. Fan Bearing Vibration for Fans erected on Solid Concrete foundation ≥6.3 mm/s alarm
raised and at ≥ 9.9 mm/s fan trip.
3. Lube oil flow per fan bearing < 2.8 LPM.
4. Fan winding temperature ≥ 130°C.
5. Motor bearing vibration alarm >6.3 mm/sec,trip > 9.9 mm/sec.
6. Motor winding temp ≥125 deg C alarm raised and >130 Deg C fans tripped.
7. Motor Bearing temp ≥950 C alarms, trip >1050 C
8. Lube Oil Skid Failure.
9. Control oil pressure <4 kg/cm2.
10. Both ID fans off.
11. FDF EPB operated.

12. Shutdown

1. Take the Fan operation to manual from auto operation.


2. Reduce blade pitch to minimum gradually.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FIELD SOP FOR FORCED DRAFT FAN.
Document No.: Revision No:
Effective Date: Page 11
PMPL/RPCL/BLR/SOP/02 Revision Date:

3. Stop the Fan.


4. Close the discharge gate.
5. Note the deceleration time of the Fan.
6. Stop the lube oil system after about 2 hours.

13. Abbreviations
1. SOP: Standard Operating Procedure
2. UCE: Unit Control Engineer
3. DE: Desk Engineer
4. FE: Field Engineer
5. DCS: Distributed Control System
6. EE: Electrical Shift Engineer
7. MFT: Main Fuel Trip.
8. RB: Run Back.
9. CCR: Central Control Room

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head

Вам также может понравиться