OPOSED 2-STOREY RESIDENTIAL STRUCTURE

. AND MRS. RONALD RAY G. SARABOSING


HACIENDA SALINAS SUBDIVISION, LAHUG

ITEM DESCRIPTION QTY UNIT U/M COST MATERIAL COST QTY


1 EARTHWORKS
A. Excavation 0.00
B. Gravel Base
C. Backfill
D. Earthfill

2 CONCRETING WORKS
A. Reinforcements
10mmx6meters
12mm x 6 meters
16mm x 6 meters
Wire No. 16 for Tying
B. Forms and Scaffoldings
1/4" x 4' x 8' plywood
2" x 2" x 6' lumber
2" x 2" x 8' lumber
2" x 2" x 10' lumber
2" x 2" x 12' lumber
2" x 2" x 14' lumber
2" x 2" x 16' lumber
2" x 3" x 6' lumber
2" x 3" x 8' lumber
2" x 3" x 10' lumber
2" x 3" x 12' lumber
2" x 3" x 14' lumber
2" x 3" x 16' lumber
4" Common Wire Nails
1" Common Wire Nails
Used Oil
C. Footings,Columns,Beams,Slabs
40 kg Cement
Sand
3/4" Gravel
1 1/2" Gravel

3 MASONRY WORKS
A. Concrete Hollow Block
4" CHB
6" CHB
B. Reinforcement
10mm x 6 meters
C. Mortar and Plaster
Cement
Sand

4 STRUCTURAL STEEL ROOF FRAMING


A. Rafters
Angle Bar 1 1/2" x 1 1/2" x 3/16"
Angle Bar 2" x 2" x 1/4"
B. Purlins
2" x 4" x 1.2mm C-Purlins
C. Sag Rods
10mm x 6 meters Round Bars
D. Installment/Fabrication
Welding Rod
Grinding Stone
Oxygen
Acetylene
Red Lead Primer
Carbon Brush

5 ROOFING AND ACCESSORIES

6 PLUMBING
A. Pipes (Galvanized Iron)
1/2 Galvanized Iron (20ft)
B. Pipe Fittings (Galvanized Iron)
90° Elbow

C. Pipes (PVC)
2" Ø PVC
4" Ø PVC
6" Ø PVC
D. Pipes Fittings (PVC)
4"x2" Ø Reducing Tee Wye
4" Ø Cleanout Plug
4" Ø 45° Elbow
4" Ø Wye
4" Ø Tee Wye
4" Ø P-Trap
2" Ø P-trap
2" Ø 45° Elbow
6" Ø Tee

7 ARCHITECTURAL AND FINISHING


A. Ceiling
1/4" x 4' x 8' plywood
Ceiling Moulding
2" x 2" x 6 meters Lumber
B. Wall
Primer
Paint JD NGA NAAY COLOR
PAINT THINNER?
C. Floor
20 cm x 20 cm Unglazed Tiles
20 cm x 20 cm Glazed Tiles
30 cm x 30 cm Unglazed Tiles
White Cement Joint Filler
Cement Mortar
MARAMING CHUCHU INSERT HERE
D. Stairs
2 x 12 Wood Step
Decorative Iron Baluster
2" x 1/4" x 6' Lumber
2" x 1/4" Flat Bar
E. Doors and Windows
Doors (Wood)
Doors (Glass)
Windows (Glass)
2" x 6" Lumber for Door Jamb
4" Common Wire Nails
F. Others
Wood Varnish
Sandpaper
Paint Brush
UNIT U/L COST LABOR COST QTY UNIT M/E COST EQPT COST

0.00 0.00
DIRECT COST