SEQUENCE OF WORK - MASONRY WORKS TO PAINTING WORKS

8
WALL SETTING - OUT INSPECTION REQUEST
(WALL MAP)- PARAVISIBLE -
DISAPPROVE EELHI)
1 D

INSPECTION REQUEST DISAPPROVE


(PARAVISIBLE - EELHI) D

PLASTERING WORKS

FOR T&B:
-INSTALLATION OF ZOCALO
FORMWORK,DOWELS &
BENTONITE STRIP
-WALL DRAIN AND CONCRETE POURING OF
LAVATORY LINTEL BEAM
SETTING - OUT
7
DISAPPROVE
2 D
INSPECTION REQUEST
(PARAVISIBLE - EELHI)
INSPECTION REQUEST
(PARAVISIBLE - EELHI)
DISAPPROVE
D

SETTING-OUT AND REBARS


PARAVISIBLE- ZOCALO FOR LINTEL BEAM AND
CONCRETE DOOR OPENING
POURING (T&B)
DISAPPROVE 6
3 D

INSPECTION REQUEST INSPECTION REQUEST


(PARAVISIBLE - EELHI) (PARAVISIBLE - EELHI)

DISAPPROV
4 ED

NOTICE OF INSPECTION
(PARAVISIBLE - EELHI) PARAVISIBLE-PREPARATION
OF PLASTERING - BUTONES

PARAVISIBLE - CHB LAYING


PARAVISIBLE - CONCRETE
POURINGOF STIFFENER
COLUMN

DISAPPROV
PARAVISIBLE - INSTALLATION ED 5
OF REBARS FOR STRIPPING INSPECTION REQUEST
COLUMN (PARAVISIBLE - EELHI)
PARAVISIBLE - INSTALLATION
OF REBARS FOR STRIPPING INSPECTION REQUEST
COLUMN (PARAVISIBLE - EELHI)

SEQUENCE OF WORK - MASONRY WORKS CONT..

GROOVE WITH STYRO / HANDOVER


BACKER ROD

DISAPPROVED
DISAPPROVE 14
9 D
0
INSPECTION REQUEST
INSPECTION REQUEST (PARAVISIBLE - EELHI)
(PARAVISIBLE -EELHI)

10
0 FINAL COAT
SEALANT APPLICATION

DISAPPROVE 13
D 0
INSPECTION REQUEST
INSPECTION REQUEST (PARAVISIBLE - EELHI)
(PARAVISIBLE -EELHI)

DISAPPROVED

SKIMCOAT 1st COAT

11
0
NOTICE OF INSPECTION DISAPPROVED
(DATEM - EELHI) 12
0

INSPECTION REQUEST
(PARAVISIBLE - EELHI)
PRIMER APPLICATION
SEQUENCE OF WORK - PRECAST WALL TO PAINTING WORKS

HANDOVER
PRECAST GAP WITH
BACKER
ROD
7
INSPECTION REQUEST
DISAPPROVED (PARAVISIBLE - EELHI)
1
DISAPPROVED

INSPECTION REQUEST
(PARAVISIBLE - EELHI)
FINAL COAT

6
INSPECTION REQUEST
(PARAVISIBLE - EELHI)
SEALANT APPLICATION

DISAPPROVED

DISAPPROVED
1st COAT
2

INSPECTION REQUEST
(PARAVISIBLE - EELHI) 5
INSPECTION REQUEST
(PARAVISIBLE - EELHI)
3

DISAPPROVED
INSPECTION REQUEST
(PARAVISIBLE - EELHI)

DISAPPROVED
PRIMER

RECTIFICATION WORKS
(HASA)

DISAPPROVED
DISAPPROVED

4
SKIMCOAT NOTICE OF INSPECTION
(DATEM - EELHI)

SEQUENCE OF WORK - WATERPROOFING

PLASTERING AT T&B TO CONCRETE TOPPING


WATERPROOFING

DISAPPROVED

6
1 INSPECTION REQUEST
(PARAVISIBLE - EELHI)
NOTICE OF INSPECTION
(PARAVISIBLE - EELHI)
DISAPPROVED

INSTALLATION OF
WIREMESH AND BUTONES

WATERPLUG AND SURFACE


PREPARATION PRIOR TO 1st
COAT
5

INSPECTION REQUEST
(PARAVISIBLE - EELHI)
DISAPPROVED

2
DISAPPROVED

INSPECTION REQUEST
(PARAVISIBLE - EELHI)

APPLICATION OF 1st COAT


INSPECTION REQUEST
(PARAVISIBLE - EELHI)

DISAPPROVED
3

INSPECTION REQUEST
(PARAVISIBLE - EELHI)
INSPECTION REQUEST
(PARAVISIBLE - EELHI)
DISAPPROVED

INSPECTION REQUEST
(PARAVISIBLE - EELHI)
APPLICATION OF 2nd COAT

SEQUENCE OF WORK - WINDOW OPENING

PARAVISIBLE - INTERNAL
INSPECTION

1
NOTICE OF INSPECTION
PRIOR
TO RECTIFICATION

2
INSPECTION REQUEST
(PARAVISIBLE - EELHI)

RECTIFICATION WORKS

DISAPPROVED

3 INSPECTION
(PARAVISIBLE - WALL VISION)

DISAPPROVED
INSPECTION REQUEST
PRIOR TO APPLICATION OF
BASECOAT
(PARAVISIBLE- EELHI - WALL
VISION)

APPLICATION OF BASECOAT
APPLICATION OF BASECOAT

FINAL HANDOVER OF
WINDOW OPENING

SEQUENCE OF WORK - TOPPING AND TILE WORKS


GROOVE BETWEEN PRECAST
AND SLAB

DISAPPROVED

1 INSPECTION REQUEST
(PARAVISIBLE - EELHI)

SEALANT, WIREMESH AND


BUTONES

DISAPPROVED

2 INSPECTION REQUEST
(PARAVISIBLE - EELHI)

CONCRETE TOPPING

TILE SETTING - OUT

DISAPPROVED

3 INSPECTION REQUEST
(PARAVISIBLE - EELHI)
INSTALLATION OF TILES

DISAPPROVED

4 INSPECTION REQUEST
(PARAVISIBLE - EELHI)

HANDOVER

SEQUENCE OF WORK - CEILING WORKS


PRIOR TO INSTALLATION
OF: HANDOVER
- CEILING FRAME
- MEPFHS
- DUCT WORKS (ME)
- WIRES AND 6
DROPPINGS (EE&AU) INSPECTION REQUEST
- WATERLING AND (PARAVISIBLE - EELHI)
SANITARY LINE(PL)
- CROSSMAN BRANCHLINE
AND DROPPINGS(FP) DISAPPROVED

DISAPPROVE
D FINAL COAT

1 NOTICE OF INSPECTION
(PARAVISIBLE - EELHI
-SUBCON)

5
INSPECTION REQUEST
(PARAVISIBLE - EELHI)
- CEILING FRAME
- MEPF
- DUCT WORKS (ME)
- AIR FLOW / SMOKE TEST DISAPPROVED
(ME)
- WIRES AND DROPPING
(EE&AU)
- WATERLING AND SANITARY 1st COAT APPLICATION
LINE(PL)
- CROSSMAN BRANCHLINE
AND DROPPINGS(FP)
- HYDRO TEST (PL&FP)
- FIRE RATED SEALANT
(MEPF)
4
INSPECTION REQUEST
(PARAVISIBLE -EELHI)
AND DROPPINGS(FP)
- HYDRO TEST (PL&FP)
- FIRE RATED SEALANT
(MEPF)
4
INSPECTION REQUEST
(PARAVISIBLE -EELHI)

DISAPPROVED
2
INSPECTION REQUEST
(DATEM -EELHI - SUBCON) PRIMER APPLICATION

DISAPPROVED

3
CEILING ENCLOSURE INSPECTION REQUEST
(PARAVISIBLE - EELHI)

SEQUENCE OF WORK - DRYWALL

WALL SETTING - OUT

DISAPPROVED
HANDOVER
1 INSPECTION REQUEST
(PARAVISIBLE - EELHI)

INSPECTION REQUEST 7
(PARAVISIBLE - EELHI)
PRIOR TO INSTALLATION OF:
- DRYWALL FRAME
- MEPF DISAPPROVED
- BOX SETTING (EE&AU)
- AIRCON DRAIN AND
WATERLINE (PL) FINAL COAT

DISAPPROVED

2 INSPECTION REQUEST INSPECTION REQUEST 6


(PARAVISIBLE - EELHI) (PARAVISIBLE - EELHI)

DISAPPROVED

- DRYWALL FRAME 2nd COAT APPLICATION


- MEPF
- BOX-SETTING (EE&AU)
- CONDENSE DRAIN RISER
(PL-TESTING)
- FIRE RATED SEALANT
(MEPF)
INSPECTION REQUEST 5
(PARAVISIBLE - EELHI)
- BOX-SETTING (EE&AU)
- CONDENSE DRAIN RISER
(PL-TESTING)
- FIRE RATED SEALANT
(MEPF)
INSPECTION REQUEST 5
(PARAVISIBLE - EELHI)
DISAPPROVED

DISAPPROVED
3 INSPECTION REQUEST
(PARAVISIBLE - EELHI)
PRIMER APPLICATION

DISAPPROVED

DRYWALL ENCLOSURE INSPECTION REQUEST 4


(PARAVISIBLE - EELHI)

SEQUENCE OF WORK - ACCU LEDGE

SETTING - OUT

DISAPPROVED
HANDOVER
1 INSPECTION REQUEST
(PARAVISIBLE - EELHI)

INSPECTION REQUEST 5
(PARAVISIBLE - EELHI)
INSTALLATION OF REBARS:
- PIPING FOR AIRCON DRAIN,
- ELEVATION, SETTING OUT, DISAPPROVED
ALIGNMENT
- LEAK TEST / FLOW TEST
WATERPROOFING WORKS

DISAPPROVED

INSPECTION REQUEST
2 (PARAVISIBLE - EELHI) INSPECTION REQUEST 4
(PARAVISIBLE - EELHI)

DISAPPROVED

CONCRETE POURING
SEALANT APPLICATION

DISAPPROVE
D
DISAPPROVE
D

SLOPE TO DRAIN AND INSPECTION REQUEST


SEALANT GAP (PARAVISIBLE - EELHI) 3

SEQUENCE OF WORK - PIPE CHASE

INSTALLATION OF REBARS:
- PIPING FOR AIRCON DISAPPROVE
DRAIN, D
- ELEVATION, SETTING OUT,
ALIGNMENT HANDOVER
- LEAK TEST / FLOW TEST

INSPECTION REQUEST 5
(PARAVISIBLE - EELHI)

1 INSPECTION REQUEST DISAPPROVED


(PARAVISIBLE - EELHI)

DISAPPROVED INSTALLATION OF PIPE


CHASE

LEAK TEST AND HYDROTEST

NOICE OF INSPECTION 4
NOTICE OF INSPECTION (PARAVISIBLE - EELHI)
2 (PARAVISIBLE - EELHI)

DISAPPROVE
D
DISAPPROVE
D

TOOL JOINT / PIPE CHASE INSPECTION REQUEST