Solved by
Anam Aslam
Question # 1 of 15 ( Start time: 01:13:37 AM ) Total Marks: 1
The cost of a particular plan for a given period can be computed by using which one of
the following expressions?
Select correct option:
Output cost + hire/layoff cost + inventory cost – backorder cost
Output cost + hire/layoff cost + inventory cost + backorder cost
Output cost - hire/layoff cost + inventory cost + backorder cost
Output cost + hire/layoff cost - inventory cost + backorder cost
PG#137
Cost for a ( current) period equals Output Cost ( Regular +OT+ Subcontract) +
Hire/Layoff Cost+Inventory Cost + Backorder Cost
Frozen designs
Interchangeable parts
Reduced variety (mid Question)
Customized parts
Process Variation
All processes exhibit variation. For example, a machine that fills cereal boxes will not
put exactly the same amount in each box.
Single
Double
Multiple
Random
Where inspection costs are higher than costs of obtaining the sample, multiple samples
are carried to ensure that a good or bad result can help terminate the sample testing thus
ensuring savings in inspection cost.
http://wps.prenhall.com/bp_heizer_opsmgmt_9/77/19791/5066501.cw/-
/5066511/index.html
Q#2
Liability cost
Interest cost
Rework cost
Loss of future business cost
Failure costs include internal failure costs such as rework, scrap and external failure
costs such as recalls, warranty, litigation,
http://www.wfu.edu/~akinc/bus241/download/cost_of_quality.htm
Question # 11 of 15 ( Start time: 01:23:39 AM ) Total Marks: 1
Patterns of time series that repeat themselves after a period of days or weeks are called:
Select correct option:
Seasonality
Random variation
Cycles
Trends
http://wps.prenhall.com/bp_heizer_opsmgmt_9/77/19791/5066649.cw/content/index.html
Q#15
Simulation model
Master schedule
Aggregate plan
Critical path model
PG#138
Master schedule: The result of disaggregating an aggregate plan; shows quantity and
timing of specific end items for a scheduled horizon.
Reliability
Durability
Safety
Aesthetics
PG#49
Reliability: The ability of a product, part, or system to perform its intended function
under a prescribed set of conditions
PG#102
Reliability - consistency of performance
Question # 14 of 15 ( Start time: 01:26:54 AM ) Total Marks: 1
Technology has impacted the work place by:
Select correct option:
Linear trends
Non linear Trends
Forecast accuracy
None of the above
PG#41
Normal
Exponential
Beta
Pareto
http://highered.mcgraw-
hill.com/sites/0073041912/student_view0/chapter3/interactive_quiz.html
Q#10
Trend
Seasonality
Cycle
Irregular Variations
PG#37
Trend - long-term upward or downward movement in data often relates to population
shifts, changing incomes, and cultural changes.
Question # 7 of 15 ( Start time: 01:52:59 AM ) Total Marks: 1
Which one of the following mathematical expressions can be used to compute output
capacity?
Select correct option:
OT/CT
CT/OT
CT+OT
CT-OT
PG#85
OC Output capacity = OT/ CT
Job shop
Assembly line (mid)
Batch
Automation
More turnover
More difficult to teach the job
More absenteeism
Minimum responsibility
http://highered.mcgraw-
hill.com/sites/0072402857/student_view0/chapter10/multiple_choice_quiz.html
Q#6
Facilities layout
Demand forecast
Projected inventory
Overtime cost
http://www.google.com.pk/#sclient=psy&hl=en&source=hp&q=Which+of+the+followin
g+is+an+example+of+an+output+of+aggregate+planning%3F+++Select+correct+option:
++++++Facilities+layout+++Demand+forecast+++Projected+inventory+++Overtime+co
st+++&aq=f&aqi=&aql=&oq=&pbx=1&fp=2cb48911598117af&biw=800&bih=456
SEE (PPT)
Management involvement
Employee involvement
Organization’s operations
Problem solving
It is important to note that employee involvement is central to the philosophy of
continuous improvement.
http://totalqualitymanagement.wordpress.com/2009/09/01/continuous-improvement-the-
essence-of-kaizen/
Quality of design
Quality of conformance
Quality of use
Quality of service after delivery
Page #112
Quality of conformance: The degree to which goods or services conform to the intent of
the designers
Product
Process (mid paper)
Fixed-position
Storage
Quality in design
Quality in system
Quality in equipment
Quality in training
Page # 108
Quality in design ensures the safe as well as reliable operations of
the service.
Exponential smoothing
Weighted moving average
Multiple regressions
Moving average
http://www.slideshare.net/birubiru/lecture-07-forecasting-causal-forecasting-models-
regression-analysis
http://wps.prenhall.com/bp_heizer_opsmgmt_8/34/8940/2288737.cw/-
/2288740/index.html
Q#4
Question # 7 of 15 ( Start time: 03:32:55 AM ) Total Marks: 1
Which of the following depicts the overall production rate and size of the workforce
required to meet the demand?
Select correct option:
Aggregate plan
Master production schedule
Master requirements plan
Capacity requirements plan
Once the aggregate plan has been developed to give an overall production rate for the
planning period, it is handed to production personnel.
http://www.ehow.com/about_5070710_advantages-aggregate-production-plan.html
Developing the Aggregate Plan
Calculate period-by-period costs, then sum for total costs of the plan
Evaluate the plan’s impact on customer service and human resource issues
http://www.slideshare.net/ahmad1957/aggregate-planning-presentation-776636
Control charts
Scatter diagram
Histograms
Pareto charts
PG#120
Control Chart: A time ordered plot representative sample statistics obtained from an on
going process (e.g. sample means)
One more reference
a time-ordered diagram that is used to determine whether observed variations are
abnormal
control charts
http://www.proprofs.com/flashcards/tableview.php?title=costs-poor-process-
performance-quality
0
1
2
3
Question # 15 of 15 ( Start time: 03:40:31 AM ) Total Marks: 1
Robustness of a product is _____________ related with the probability of failure.
Select correct option:
Directly
Inversely
Linearly
Positively
Qualitative
Quantitative
Associative
Trend forecast
Page # 34
Question # 3 of 15 ( Start time: 03:56:25 AM ) Total Marks: 1
As a manager, you have defined the purpose of the forecasts. What should be the next
step in forecasting process?
Select correct option:
Time dimension
Reliability factor
Degree of accuracy
Measuring units
Pg#34
Accuracy. Forecasts should be accurate. In fact it should carry the degree of
accuracy, so the users are aware of the limitations of the forecast. This will also
help the end users to plan for possible errors and provide a basis for comparing
the forecast with other alternative forecasts.
Certainty
Uncertainty
Risk
Bounded rationality
Page # 25
Certainty: Means that the relevant parameter such as costs, capacity and demand have
known
values.
Question # 7 of 15 ( Start time: 03:57:44 AM ) Total Marks: 1
Services differ from manufacturing in all the following ways EXCEPT:
Select correct option:
Customers typically interact directly with the service delivery process
Consumption and production take place simultaneously.
Services are intangible.
Services can be stored.
Acceptance risk
Consumer risk
Producer’s risk
Rejection risk
Page # 131
Producer’s risk: the probability that a lot containing the acceptable quality level will be
rejected
Question # 10 of 15 ( Start time: 04:00:34 AM ) Total Marks: 1
Which one of the following is a disadvantage of a process layout?
Select correct option:
Production ratio
Productivity
Reliability
Operations ratio
Productivity is a measure of the effective use of resources, usually expressed as the
ratio of output to input
Customization
Mass Customization
Standardization
None of the above
Advantages of Standardization
1. Fewer parts to deal with in inventory & manufacturing
2. Reduced training costs and time
3. More routine purchasing, handling and inspection procedures
4. Orders fillable from inventory
5. Opportunities for long production runs and automation
6. Need for fewer parts justifies increased expenditures on perfecting designs and
improving quality control procedures
http://books.google.com.pk/books?id=-
ClR8ptaMZkC&pg=PA94&dq=Quality+function+deployment+++translating+customer+
requirements&hl=en&ei=s58YTsqgDIfvsga6nYnEDw&sa=X&oi=book_result&ct=result
&resnum=1&ved=0CCgQ6AEwAA#v=onepage&q=Quality%20function%20deploymen
t%20%20%20translating%20customer%20requirements&f=false
Failure
Appraisal
Operating
Opportunity
A preventive measures improve quality, appraisal costs decrease, because fewer
resources are needed for quality inspections and the subsequent search for the causes of
any problems that are detected
http://xisspm.files.wordpress.com/2011/07/chap-1-concept-of-quality-tqm.pdf
Subjective inputs
Qualitative technique
Quantitative technique
Delphi method
Question # 7 of 15 ( Start time: 04:33:58 AM ) Total Marks: 1
________ method of evaluation of quality allows the inspectors to make decisions about
whether a product / service meets the specifications?
Select correct option:
Measuring attributes
Measuring variables
Measuring dimensions
None of the above
http://books.google.com.pk/books?id=oMjLPc6LwbwC&pg=PA215&dq=The+method+
allows+inspectors+to+make+a+simple+yes-
no+decision+about+whether+a+product+or+service+meets+the+specifications&hl=en&e
i=pa8cTrfIOYrKrAeZ2dneCw&sa=X&oi=book_result&ct=result&resnum=1&ved=0CC
gQ6AEwAA#v=onepage&q=The%20method%20allows%20inspectors%20to%20make
%20a%20simple%20yes-
no%20decision%20about%20whether%20a%20product%20or%20service%20meets%20
the%20specifications&f=false
Question # 8 of 15 ( Start time: 04:35:24 AM ) Total Marks: 1
Which one of the following is a key benefit of process plant strategy?
Select correct option:
Organizational Strategy
Time and Quality Strategy
Operational Strategy
Manufacturing/Service Strategy
page # 15
Operational Strategy is
Narrower in scope and in more detail
Cycle
Trend
Seasonality
Random variation
Page # 37
Cycle – wavelike variations of more than one year’s duration these occurs because of
political, economic and even agricultural conditions
Bottleneck operations
Straight line flow patter (or adaption)
Work stations close together
Open plant floors (high visibility)
http://highered.mcgraw-
hill.com/sites/0072402857/student_view0/chapter8/multiple_choice_quiz.html
Q#5
Question # 15 of 15 ( Start time: 04:42:08 AM ) Total Marks: 1
Which one of the following refers to the volume of output at which total cost equals total
revenue?
Select correct option:
Simplicity of usage
Costly
Quick and easy to prepare
Easily understandable
page # 36
Naive Forecasts
·Simple to use
·Virtually no cost
·Quick and easy to prepare
·Data analysis is nonexistent
·Easily understandable
Question # 2 of 15 ( Start time: 05:23:43 AM ) Total Marks: 1
A technique that averages the number of recent actual values and forms a new value is
called:
Select correct option:
Exponential smoothing
Weighted moving average
Moving average
None of the above
Page # 37
· Moving average – A technique that averages a number of recent actual values, updated
as new values become available.
Question # 3 of 15 ( Start time: 05:25:12 AM ) Total Marks: 1
Which of the following influences on the sales of a product is the most difficult to
forecast?
Select correct option:
Seasonal
Trend
Nonlinear trend
Cyclical
http://highered.mcgraw-
hill.com/sites/0072402857/student_view0/chapter9/multiple_choice_quiz.html
Q#8
Question # 4 of 15 ( Start time: 05:26:34 AM ) Total Marks: 1
Who introduced the use of statistical control charts for monitoring production?
Select correct option:
G.S. Radford
W. Shewhart
F.W. Taylor
K.Ishikawa
Page # 101
W. Shewhart of Bell Technologies introduced the Statistical process control charts.
Question # 5 of 15 ( Start time: 05:27:46 AM ) Total Marks: 1
Ali dialed Customer Service Representative of WARID who very friendly and sociably
responded his queries. Which dimension of service quality is referred to in this example.
Select correct option:
Responsiveness
Courtesy
Reliability
Convenience
Page # 104
Question # 6 of 15 ( Start time: 05:29:04 AM ) Total Marks: 1
ABC organization, actively engaged in continuous improvements, trains its work teams
to use the PDCA for problem solving. The documentation of process by analyzing data,
setting of qualitative goals comes in which of the following stage of PDCA?
Select correct option:
Plan
Do
Check
Act
Page # 116
Question # 7 of 15 ( Start time: 05:30:23 AM ) Total Marks: 1
Which of the following management level is responsible for long-range capacity
planning?
Select correct option:
Lower management
Middle management
Top management (mid paper)
Rs. 102
Rs. 50
Rs. 98
Rs. 200
Back Order = Back Order Cost per Unit X Number of Backorder Units
= 2 * 100 = 200
Question # 9 of 15 ( Start time: 05:32:50 AM ) Total Marks: 1
Which one the following formula or function can be used to measure the performance?
Select correct option:
Product layout
Fixed position layout
Process layout
Hybrid layout
Page # 80
Fixed Position layout. A Layout in which the product or project remains stationary, and
workers, materials, and equipment are moved as needed
Question # 13 of 15 ( Start time: 05:35:59 AM ) Total Marks: 1
Collaborative Planning, Forecasting, and Replenishment (CPFR) a Web based tool used
to coordinate demand forecasting, ____________ and inventory replenishment between
supply chain trading partners.
Select correct option:
Four
Five
Six
Seven
http://books.google.com.pk/books?id=oMjLPc6LwbwC&pg=PA236&dq=ISO+9000+act
ually+consists+of+five+documents&hl=en&ei=FLEYTursGIntsga5jammDw&sa=X&oi
=book_result&ct=result&resnum=1&ved=0CC8Q6AEwAA#v=onepage&q=ISO%20900
0%20actually%20consists%20of%20five%20documents&f=false
Question # 2 of 15 ( Start time: 08:07:34 PM ) Total Marks: 1
Which one of the following mathematical expressions can be used to compute
availability?
Select correct option:
a+b-c
a+b+c
a-b+c
a-b-c
Page # 137
Number of workers in a period equals Number of Workers at the end of the previous
period PLUS Number of new Workers at the start of the current period - Number of laid
off Workers at the start of the current period
Certainty
Uncertainty (mid paper)
Risk
Bounded rationality
Rs. 200
Rs. 995
Rs. 5000
Rs. 1050
Carrying Cost per Unit X Average Inventory
=1000*5=5000
Remanufacturing
Robust design
Automation
Manufacturability
Page # 51
Question # 2 of 15 ( Start time: 08:37:52 PM ) Total Marks: 1
Which of the following provide guidance and directions for carrying out operations?
Select correct option:
Tactics
Strategies
Policies
Mission
Tactics are methods and actions used to accomplish strategies. They provide guidance
and direction for carrying out actual operations, which need the most specific and
detailed plans for decision making in an organization.
Question # 3 of 15 ( Start time: 08:38:53 PM ) Total Marks: 1
Completion of any operations depends upon the slowest process in the assembly line.
What operations managers need to do in order to be successful?
Select correct option:
Prevention costs
Appraisal costs
Inspection costs
Rework costs
Page#119
With increase in inspection activities the cost of inspection increases.
Question # 12 of 15 ( Start time: 08:44:31 PM ) Total Marks: 1
The operational strategy must be in line with the:
Select correct option:
Department goals
Organizational goals
Management goals
None of the above
Thus it can be said that planning the systems more of a job of a senior manager, birds
eye view and has ORGANIZATIONAL STRATEGY in it where as planning the use of
the system is an OPERATIONAL STRATEGY
Question # 13 of 15 ( Start time: 08:45:07 PM ) Total Marks: 1
Decision Tree is read from:
Select correct option:
Right to left
Left to right
Top to bottom
Bottom to top
Page#29
Decision Trees
The tree is read from left to right
Processing time
Changeover time
Response Time
Planning time
PG#18
Planning Time: The time required to react to a competitive threat, or to adopt new
technologies, or to approve changes to an existing facility
Question # 2 of 15 ( Start time: 08:56:56 PM ) Total Marks: 1
Organizations that produce something other than physical products are called:
Select correct option:
Cultural goods transformation
Data transfer groups
Transformation organizations
Service organizations
Question # 3 of 15 ( Start time: 08:57:20 PM ) Total Marks: 1
Which one of the following is not a step of decision process:
Select correct option:
Specify objectives
Determine the product of chance probabilities
Analyze and select alternative
Implement and monitor the result
PG#24
Question # 4 of 15 ( Start time: 08:57:41 PM ) Total Marks: 1
The type of processing structure that is used to produce gasoline, chemicals, and steel is
known as.
Select correct option:
Job Shop
Batch
Assembly Line
Continuous Flow
Question # 6 of 15 ( Start time: 08:59:48 PM ) Total Marks: 1
Which ONE of the following forms a bridge between two islands of Engineering and
Management?
Select correct option:
Production Engineering
Operations Management
Industrial Management
Operations Engineering
PG#2
Question # 8 of 15 ( Start time: 09:00:30 PM ) Total Marks: 1
Operations management of XYZ accepts and rejects the batches of items on the basis of
predetermined standards. This technique is known as____________
Select correct option:
Acceptance sampling
Rejection sampling
Multiple sampling
None of the above
PG#128
Acceptance sampling is an important form of inspection applied to lots or batches of
items before or after a process, to judge conformance with predetermined standards.
Similarly Sampling plans are the plans that specify lot size, sample size, number of
samples, and acceptance/rejection criteria
Question # 9 of 15 ( Start time: 09:01:47 PM ) Total Marks: 1
All of the following are dimensions of service quality Except:
Select correct option:
Assurance
Responsiveness
Intangibles
Reliability
PG#105
Question # 10 of 15 ( Start time: 09:02:32 PM ) Total Marks: 1
Releasing products with defects should be informed to the customers. This statement
comes under ______ frame work.
Select correct option:
Legal
Ethical
Environmental
None of the above
PG#46
Ethical: Operations Manager should understand that he is under Contractual agreement
not to exhibit unethical behavior. Releasing products with defects should be informed to
the customers.
Question # 11 of 15 ( Start time: 09:03:26 PM ) Total Marks: 1
Which one of the following is the first step in line balancing?
Select correct option:
Informations
Services (mid)
Facilities
Materials
http://wps.prenhall.com/bp_heizer_opsmgmt_9/77/19791/5066649.cw/content/index.html
Q#2
Question # 4 of 15 ( Start time: 09:42:20 PM ) Total Marks: 1
Which one of the following is an example of a short range plan?
Select correct option:
Machine loading
Back order
Facilities layout
Product design
PG#133
Short-range plans (Detailed plans)
1. Machine loading
2. Job assignments
Exponential smoothing
Moving averages
Naïve approach
Linear regression
Time-Series Forecasting
Decomposition of a Time Series
Naive Approach
Moving Averages
Exponential Smoothing
Exponential Smoothing with Trend Adjustment
Trend Projections
Seasonal Variations in Data
Cyclical Variations in Data
Capital
Energy
Labor
Machine
Operations strategy
Organizational strategy
Marketing strategy
Manufacturing units
PG#14
Organizational strategy is
An over all big picture for the whole organization.
Longer in time horizon
Less detailed and broader in scope.
Planning
Controlling
Forecasting
Organizing
PG#31
Forecasting allows the manager to anticipate the future so then can plan accordingly.
Question # 8 of 15 ( Start time: 12:17:02 AM ) Total Marks: 1
Which one of the following management functions is based on forecasting?
Select correct option:
Planning
Organizing
Leading
Controlling
Forecasting: Management function begins with forecasting. It is the scientific
process of looking forward which is based on past performance, current analysis
and future trends. Planning is based on forecasting.
Question # 10 of 15 ( Start time: 12:17:37 AM ) Total Marks: 1
To make operations strategy effective it should be:
Select correct option:
Machine loading
Backorders
Facilities layout
Work schedule
PG#133
Question # 15 of 15 ( Start time: 12:20:45 AM ) Total Marks: 1
Which of the following factors are important for choosing a strategy for aggregate
planning?
Select correct option:
Continuous Flow
Assembly Line
Batch
Job Shop
Question # 3 of 15 ( Start time: 12:37:10 AM ) Total Marks: 1
Which of the following time fences in a Master Production Schedule (MPS) allows many
variations in products with multiple changes?
Select correct option:
Fixed time fence
Moderately firm time fence
Frozen time fence
Flexible time fence
Types of Time Fences
Frozen
– No schedule changes allowed within this window.
Moderately Firm
– Specific changes allowed within product groups as long as parts are
available.
Flexible
– Significant variation allowed as long as overall capacity requirements
remain at the same levels.
Aggregate plan
Material requirements plan
Rough-cut capacity plan
Capacity requirements plan
Pg#137
Rough-cut capacity planning: Approximate balancing of capacity and
demand to test the feasibility of a master schedule.
Question # 8 of 15 ( Start time: 12:42:32 AM ) Total Marks: 1
The productivity measure output/ (labor + machine) will be named as:
Select correct option:
Partial measure
Multifactor measure
Total measure
None of the above
PG#19
Question # 2 of 15 ( Start time: 02:13:54 AM ) Total Marks: 1
Following are all examples of distinctive competencies EXCEPT;
Select correct option:
Price
Quality
Planning
Flexibility
PG#14
Question # 4 of 15 ( Start time: 02:15:11 AM ) Total Marks: 1
Maintaining quality is the responsibility of ______ in the organization.
Select correct option:
Top Management
Operations Department
Everyone
PG#112
Quality Control Department cannot be held responsible for Quality alone. Quality is the
responsibility of each and every individual working for the organization.
Question # 6 of 15 ( Start time: 02:16:56 AM ) Total Marks: 1
ABC Company practices Six Sigma approach in its manufacturing. The company might
have implemented this approach in how many stages?
Select correct option:
Ten
Seven
Five
Eleven
PG#115
Question # 11 of 15 ( Start time: 02:23:32 AM ) Total Marks: 1
The forecasting model that is based upon estimates of salesperson's expected sales is
likely to be called ________.
Select correct option:
Delphi method
Sales force combination
Consumer market survey
Panel of executive opinion
http://wps.prenhall.com/bp_heizer_opsmgmt_9/77/19791/5066649.cw/content/index.html
Q#5
Question # 13 of 15 ( Start time: 02:24:45 AM ) Total Marks: 1
Materials, land, energy and human and capital resources are the examples of:
Select correct option:
Inputs
Transformation
Outputs
Productivity
PG#2
Inputs include materials, inventory, services, land, and energy, human and capital
resources.
Corporate strategy
Needs of the customer
Operations Strategy
All of the above
PG#14
Question # 9 of 15 ( Start time: 03:05:43 AM ) Total Marks: 1
The forecasting time horizon that would typically be easiest to predict would
be:
Select correct option:
Medium-range
Long-range
Short-range
Intermediate range
http://wps.prenhall.com/bp_heizer_opsmgmt_8/34/8940/2288737.cw/-
/2288740/index.html
Q#1
Question # 10 of 15 ( Start time: 03:06:07 AM ) Total Marks: 1
A product ‘A’ is specified to work well up to 30 degree Celsius temperature and 30%
humidity. What would these specifications represent?
Select correct option:
Reliability factor
Standard conditions
Normal operating conditions
Standard operating procedure
ISO 9000
ISO 14000
ISO 9002
ISO 9004
PG#114
ISO 9000: Is a set of international standards on quality management and quality
assurance, critical to international business.
Edwards Deming
Joseph Juran
Kaoru Ishikawa
Philip Crosby
Ref:Pg#116:
The PDCA Cycle (shewhart Cycle/Deming Wheel) ( The concept of the PDCA Cycle
was first introduced by Walter Shewhart, the leading statistician, who also developed
statistical process control).It was taken up and promoted very effectively from the 1950s
on by the famous Quality Management authority, W. Edwards Deming, and is
consequently known by many as `the Deming Wheel'. It is a continuous process and
enables the operations manager to check the work at various stages.
http://en.wikipedia.org/wiki/W._Edwards_Deming
Question # 14 of 15 ( Start time: 03:10:55 AM ) Total Marks: 1
Sequence of data points that are measured typically at successive times at regular time
intervals is known as:
Select correct option:
Moving average
Weighted moving average
Time series
Forecasts
Time series data is a sequence of data points typically measured at successive times and
may be spaced at uniform time intervals.
http://www.dbta.com/Articles/Editorial/Trends-and-Applications/Managing-Time-Series-
Data-with-Informix-76454.aspx
Question # 15 of 15 ( Start time: 03:11:44 AM ) Total Marks: 1
In the “Check” stage, team analyzes the data collected during the ____ stage to find out
how closely the results correspond to the specifications of ____ stage.
Select correct option:
Do, Plan
Plan, Do
Do, Check
Plan, Check
PG#116
Question # 1 of 15 ( Start time: 04:06:21 AM ) Total Marks: 1
In six sigma process, ________ stage comes after the “Analyze” stage
Select correct option:
Control
Improve
Choose
Monitor
PG#115
1. Define
2. Measure
3. Analyze
4. Improve
5. Control
Reverse engineering
Concurrent engineering
Manufacturability
Serviceability
PG#153
Concurrent engineering is the bringing together of engineering design and manufacturing
personnel early in the design phase.
Growth
Maturity
Saturation
Decline
DECLINE: In this phase, most of the organizations adopt a defensive design R&D
Strategy in an attempt to prolong the life of the product by employing new packaging,
redesigning it, improving its reliability
Question # 15 of 15 ( Start time: 04:17:30 AM ) Total Marks: 1
What are the chances of the batch containing defect exceeding LTPD will be accepted is
known as?
Select correct option:
Acceptance risk
Consumer risk
Producer risk
http://www.google.com.pk/search?hl=en&source=hp&q=chances+of+the+batch+cont
aining+defect+exceeding+LTPD+will+be+accepted+is+known+as+Consumer+risk+
&oq=chances+of+the+batch+containing+defect+exceeding+LTPD+will+be+accepte
d+is+known+as+Consumer+risk+&aq=f&aqi=&aql=f&gs_sm=e&gs_upl=901131l92
0786l0l22l13l2l2l0l0l854l2266l0.2.3.1.6-
1l9&biw=800&bih=456&cad=cbv#sclient=psy&hl=en&source=hp&q=chances+of+t
he+batch+containing+defect+exceeding+LTPD+will+be+accepted+is+known+as+Pr
oducer+risk+&aq=f&aqi=&aql=&oq=&pbx=1&fp=2cb48911598117af&biw=800&b
ih=456
(PPT)
Production design
Service design
Product design
Transportation
Quality of life
Location of new markets
Location of raw materials
PG#96
Site Related Factors
•Land
•Transportation
•Environmental
•Legal
Question # 5 of 15 ( Start time: 02:45:25 PM ) Total Marks: 1
Which one of the following correctly represents a set of time series forecats?
Select correct option:
1
2
3
4
PG#106
Gap 2
Mismatch between manager’s expectations of service quality and service quality
specifications
Management science
Information sciences
Industrial engineering
Scientific management
http://www.google.com.pk/search?hl=en&source=hp&q=chances+of+the+batch+containi
ng+defect+exceeding+LTPD+will+be+accepted+is+known+as+Consumer+risk+&oq=ch
ances+of+the+batch+containing+defect+exceeding+LTPD+will+be+accepted+is+known
+as+Consumer+risk+&aq=f&aqi=&aql=f&gs_sm=e&gs_upl=901131l920786l0l22l13l2l
2l0l0l854l2266l0.2.3.1.6-
1l9&biw=800&bih=456&cad=cbv#hl=en&q=The+systematic+processing+of+data+to+y
ield+information+is+a+part+of++Information+sciences&um=1&ie=UTF-
8&tbo=u&tbm=bks&source=og&sa=N&tab=wp&fp=a7f45afe84adb93a&biw=800&bih
=456
Operations
Marketing
Accounting
Finance
Page#7
The Operations function consists of all activities that are directly related to
production of a good or service
Question # 9 of 15 ( Start time: 03:19:37 PM ) Total Marks: 1
In exponential smoothing model, a denotes:
Select correct option:
Smoothing constant
Previous forecast
Forecast error
Actual forecast
Establishing durability
Finding reliability
Scheduling services (mid)
Quality improvement
Poke – yoke
Kaizen
Robustness
Quality deployment Continuous improvement, based on Japanese concept called
KAIZEN, is the philosophy of continually seeking ways to improve operations.
http://totalqualitymanagement.wordpress.com/category/management-of-process-quality/
Product
Process
Fixed-position
Storage
In a Process layout, work stations are arranged according to the general function they
perform without regard to any particular product.
http://books.google.com.pk/books?id=dcLkiXWg2gcC&pg=PA1&dq=Quality+function+
deployment+++translating+customer+requirements+into+the+appropriate+technical+req
uirements+for+each+stage+of&hl=en&ei=pbkZTtUxksPxA96OoTI&sa=X&oi=book_res
ult&ct=result&resnum=1&ved=0CCgQ6AEwAA#v=onepage&q=Quality%20function%
20deployment%20%20%20translating%20customer%20requirements%20into%20the%2
0appropriate%20technical%20requirements%20for%20each%20stage%20of&f=false
Maximin
Maximax
Laplace
Non of the above
PG#26
Question # 8 of 15 ( Start time: 06:39:18 PM ) Total Marks: 1
Often the managers and employees have _________ centered appraoch towards their
business
Select correct option:
Process
Product / service
Customer
Management
PG#106
Managers and employees have a very internal process-oriented view of their business, it
is tough to break this view and to see things the way the customer does
Productivity Measures
Environmental scanning
Competitor’s distinctiveness
Ref:Pg#15
Service Organizations in Pakistan function with a very detailed and elaborative
Operations Strategy. It is important to identify the Strategy Design Process and able to
recognize the concepts associated with Strategy Formulation. Service Organizations are
no exceptions and work diligently to identify, nurture and protect their
distinctive competencies. Service Organizations are busy carrying out detailed
environmental scanning and also periodically carryout SWOT Analysis.
Stability of demand
Technological changes
Competitive forces
Cost factor
0.03 minutes
1.8 minutes (mid)
2700 minutes
291 minutes
Judgmental
Delphi Method
Consumer Survey
Naïve Forecasting
Naive forecasting is Quantitative forecasting
Energy Productivity
Machine Productivity
Labor Productivity
Capital Productivity
G.S. Radford
W. Shewhart
F.W. Taylor
W.E. Demig
Ref: Pg#101
Frederick Winslow Taylor the father of scientific management brought back the concept
of quality by incorporating product inspection as well as focusing on the importance of
manufacturing management.
If a firm subcontracts 600 units of a product ‘A’, with the subcontracting cost of Rs. 6 per
unit. What would be the total subcontracting cost?
Select correct option:
Rs. 100
Rs. 594
Rs. 3600
Rs. 606
Subcontract: Subcontract Cost per Unit X Subcontract Quantity
6*600=3600
Management of ABC service providing organization wants to improve the gap between
manager’s expectations of service quality and its specifications. For removing this
difference; what the managers are supposed to do first?
Select correct option:
Quality of service should be determined
Customer’s perception of service should be determined
Customer’s needs and wants should be determined
Marketability of service should be determined
Mismatch between manager’s expectations of service quality and service quality
specifications
To implement a system to improve this gap, management must first understand exactly
what the customer wants.
Question # 2 of 15 ( Start time: 08:54:55 PM ) Total Marks: 1
Identify the time span covered by aggregate planning.
Select correct option:
3-7 months
2-10 months
2-12 months
4-8 months
Pg#133
Aggregate planning: Intermediate-range capacity planning, usually covering 2 to 12
months.
Question # 4 of 15 ( Start time: 08:56:48 PM ) Total Marks: 1
Which one of the following is the goal of method analysis?
Select correct option:
Dividing and analyzing a job (mid)
Check individual human motions used to perform an operation
Determining the length of time it will take to undertake a particular task
Determining the amount of time a worker spends on various activities
http://wiki.answers.com/Q/What_would_you_distinguish_operation_management_from_
management_and_organizational_behavior_as_thought_at_your_university
Time series
Delphi
Naïve
Associative
PG#36
Naive Forecasts
·Simple to use
·Virtually no cost
·Quick and easy to prepare
Question # 10 of 15 ( Start time: 01:00:07 AM ) Total Marks: 1
Which of the following statements is TURE about production system?
Select correct option:
Decreases
Increases
Is not affected with time horizon
None of the above
PG#33
Forecast accuracy decreases as time horizon increases
Delphi Method
Time series Analysis
Associative Models
Naïve Forecasting
PG#35
Time series forecasting models try to predict the future based on past data
Failure
Success
Sometimes failure and sometimes success
Complex
Long term
Short term
Both long and short term
None of the above
http://books.google.com.pk/books?id=Q5tWH0II0HIC&pg=PT32&dq=In+forecasting,+p
lanning+the+use+of+system+related+to+the+long+term+plans&hl=en&ei=mfoZTtuLJM
eq-
gbQrpTYBw&sa=X&oi=book_result&ct=result&resnum=10&ved=0CFsQ6AEwCQ#v=
onepage&q=Forecasts%20have%20two%20primary%20uses%3A%20to%20help%20ma
nagers%20plan%20the%20system%20and%20also%20to%20help%20them%20plan%20
the%20use%20of%20the%20system.%20Planning%20the%20system%20itself%20is%2
0long-range%20planning%3A&f=false
http://en.wikipedia.org/wiki/Productivity
Flexibility
Quality
Quick Response
Profitability
Quick response aka Also known as Agility and an organization on this basis is often
known as Agile Organization)
Risk
Certainty
Uncertainty
None of above
PG#25
Certainty: Means that the relevant parameter such as costs, capacity and demand have
known values.
Satisfying customers
Financial analysis
Management decisions
None of the above
PG#19 ·Productivity ratios are used for
Planning workforce requirements
Scheduling equipment
financial analysis
Question # 8 of 15 ( Start time: 01:46:33 AM ) Total Marks: 1
A term strategy is referred to as
Select correct option:
Delphi method
Time series method
Exponential smoothing
Associative model
Pg#35
Delphi method: Managers and staff complete a series of questionnaires, each developed
from the previous one, to achieve a consensus forecast.
http://wps.prenhall.com/bp_heizer_opsmgmt_9/77/19791/5066511.cw/content/index.html
Inverse
Linear
Direct
Parallel
PG#33 Forecast accuracy decreases as time horizon increases
Question # 1 of 15 ( Start time: 03:31:04 AM ) Total Marks: 1
Characteristics like taste, feel, expertise, image or reputation relates to -----------.
Select correct option:
Subjective inputs
Objective inputs
Quantitative technique
None of the given options
REF qualitative Definition
Associated with the subjective quality of a thing or phenomenon, such as feel, taste,
expertise, image, leadership, reputation.
http://www.businessdictionary.com/definition/qualitative.html
1770
1920
1911
1815
http://www.theglasgowstory.com/storyc.php
Budgeting
Capacity planning
Inventory management
Quality control
Page#31 Forecasting in business forms the basis for budgeting and planning for capacity,
sales, production, inventory, manpower, purchasing and more.
Control decision
Non-operational decision
Strategic decision
Tactical decision
Sales force
Consumer surveys
Delphi method
Executive opinions
PG#35
Question # 2 of 15 ( Start time: 03:42:22 AM ) Total Marks: 1
Those significant characteristics that service customers perceive as minimum standards of
acceptability to be considered as a potential purchase is called:
Select correct option:
Order Winners
Order Qualifiers
Order Takers
None of the above
Pg#15
Order qualifiers are those significant characteristics that service customers perceive as
minimum standards of acceptability to be considered as a potential purchase
Question # 4 of 15 ( Start time: 03:43:26 AM ) Total Marks: 1
The method that uses explanatory variables to predict the future is known as:
Select correct option:
Delphi method
Naïve forecast
Associative model
Judgmental forecast
(Handout page 35) Associative models - uses explanatory variables to predict the future
for example demand for a small car may be dependant upon increase in price of petrol or
CNG
Question # 6 of 15 ( Start time: 03:45:29 AM ) Total Marks: 1
The ratio of the real value of output to the combined input of labor and capital is called:
Select correct option:
Labor Productivity
Capital Productivity
Energy Productivity
Multifactor Productivity
http://www.pc.gov.au/research/productivity/primer/measures
Multifactor productivity is the ratio of (the real value of ) output to the combined input of
labour and capital.
Delphi method
Naïve forecast
Associative model
Judgmental forecast
http://ids355.wikispaces.com/Ch.+3+Forecasting
Question # 8 of 15 ( Start time: 03:59:03 AM ) Total Marks: 1
Which of the following includes the quantitative methods of forecasting?
Select correct option:
Strategy
Tactics
Mission
Goals
Page#13
Question # 6 of 15 ( Start time: 04:25:27 AM ) Total Marks: 1
Productivity refers to the ratio of output to input, in your views what are the measures by
which productivity can be increased?
Select correct option:
http://wps.prenhall.com/bp_heizer_opsmgmt_9/77/19791/5066511.cw/content/index.
html
Productivity ratios
Productivity Growth
Multifactor productivity
Operations strategy
PG#19
Productivity ratios are used for
Planning workforce requirements
Scheduling equipment
Financial analysis
Mission Statement
Goals
Tactics
Strategies
PG#12 Mission Statement answers the question “What business are we in?”
Maximax
Mmaximin
Mminimax regret
EMV criterion
Judgmental
Time series
Associate models
Naïve
Pg#35 Judgmental - uses subjective inputs meaning that a judgmental forecast rely on
analysis of subjective inputs obtained from various sources, such as consumer surveys,
the sales staff, managers and executives, and panels of experts.
Tangibility
Perishability
Simultaneity
Degree of Customer Contact
Question # 4 of 15 ( Start time: 03:09:15 AM ) Total Marks: 1
Which one of the following is an implication of laplace approach of decision making?
Select correct option: