Вы находитесь на странице: 1из 17

1 HYUNDAI E&C at a Glance

2 BUSINESS PORTFOLIO

3 STRUCTURE

4 GLOBAL PRESENCES

5 FINANCIAL HIGHLIGHTS

6 SUSTAINABILITY

7 GROUP NETWORK
• 1st Korean Contractor to advance to overseas market in 1965
- Achieved US$ 100 billion in cumulative overseas orders in 2013
*Currently over US$ 120 billion

Key Achievements

60% Tallest 6% 40,000,000

16th largest international contractor


- Top 5 Contractor in Middle East - Top 8 Contractor in Asia

- Top 2 Contractor in Maritime - Top 10 Contractor in Bridge


Discovering new areas with Strengthening 4 business lines

Civil
Plant
Marine (Dredging&Reclamation,Terminal,etc.)
Transportation (Road,Bridge,Railway,etc.)
Tunnel (Metro,Cavern,etc.) Gas Processing
Water Resources (HEPP, etc.) Refinery
Environmental (WWTP,etc.) Petrochemicals
Industrial Plants
Nuclear Plants
Building

Hospital & Medical Power & Energy


Sports& Cultural
Residential Buildings
High Rise & Intelligence
Power Plants
Buildings
Cogen / Geo Thermal
Mixed Use Development
T&D
Renewable Energy
Maritime Works

Under-
Bridge ground
Building
Civil Plant Power & Energy
Civil Works Civil Works
Works Civil Works Civil Works
Works Works Works
(Incl. Housing Works)

957 (457) 1,508 (638) 847 (287) 298 (91)


(Experienced Engineers over 15 years)

Supporting Units

Procure Strategic
Marketing -ment Business R&D Financing Admin. Auditing
Planning

Total 7,168 Employees


(including contract employees)
28 Branches Completed : 775 Projects On-going : 62 Projects
59 Nations
(+ 5 subsidiaries) USD 93 Bil USD 33 Bil
Asia : 9 (3) Asia : 24 Asia : 346 (32 Bil) Asia : 18 (4 Bil)
MENA : 11 (2) MENA : 19 MENA : 402 (52 Bil) MENA : 34 (20 Bil)
America : 5 America : 7 America : 15 (2 Bil) America : 7 (7 Bil)
CIS/Europe : 3 CIS/Europe : 9 CIS/Europe : 12 (6 Bil) CIS/Europe : 3 (2 Bil)
Financial Highlights (2018) Status in Construction Industry
(By Engineering News Records 2018)
New Order Sales Subsidiaries
Subsidiaries (5,713 Mil)
(8,551 Mil)

Etc.
Etc.
(FY2018) USD (FY2018) USD (389 Mil)
(433 Mil) Plant
17.3Bil Civil
(2,333 Mil) 15.2 Bil
(1,251 Mil) Civil
Plant
(2,092 Mil)
(1,704 Mil)
Building
Building (4,678 Mil)
(5,366 Mil)
Back Log (FY2018) USD 50.7 billion

Civil Building Plant Subsidiaries


(5,408 Mil) (19,495 Mil) (4,157 Mil) (21,405 Mil)

Credit Rating
(Agency : Korea Ratings Corporation)
Sustainability

 Member of Dow Jones Sustainability Indices - 6 consecutive years


 ISO 9001 (Quality Assurance Management System)
 ISO 14001 (Environmental Management Systems)
 ISO 50001 (Energy Management System)
 OHSAS 18001 (Safety & Health Management System)
 ASME NA (Nuclear Construction)
 KEPIC MN, SN, EN, MH (Nuclear Construction-Domestic)

Sustainability

Code of Conduct Improve


Methodologies
Build
Ethics Infrastructure

ComplianceCheckOrganization Clean Company Promotional Win-Win


Training Initiatives Cooperation System

Consensus through Ethic Education


Transparency
AUTOMOBILE CONSTRUCTION STEEL

PARTS

FINANCE & Others


1 PRESENCES

2 MAJOR PROJECT
Presences in Indonesia

 HDEC advanced to Indonesia in 1973 Peusangan 1&2 Hydro Power Plant

 Projects in Indonesia : 27 projects , USD 3,849 million


- On-Going Projects : 2 projects, USD 707 million
Cirebon II 1,000MW CFPP

- Completed Projects : 25 projects, USD 3,142 million Jakarta Branch Office

Major Projects in Indonesia

▪ PT. PLN ▪ PT Griyaceria Nusamekar ▪ ConocoPhilips Indonesia ▪ Sarulla Operation Ltd.


▪ Peusangan1&2 HEPP –Main Civil Works ▪ GCNM Apartments ▪ Suban Gas Development Ph.2 ▪ Sarulla 330MW Geothermal Plant
▪ U$ 167 Mil ▪ U$ 84 Mil ▪ U$ 96 Mil ▪ U$ 711 Mil
▪ ‘11.05 ~ ’19.03 ▪ ’14.03 ~ ’18.09 ▪ ‘04.07~’07.02 ▪ ‘12.12~’18.05
Peusangan 1&2 86MW HEPP – Main Civil Works (On-going)

CLIENT PT. PLN

CONSULTANT NipponKoei

CONTRACT US$167,000,000
VALUE
CONSTRUCTION May ‘11– Mar ’19 (95Months)
PERIOD
DESCRIPTION - '3 Concrete Dams
(10~15m height x 100m long)
- 2 Power Stations (43MW x 2)
- Tunnel Works
- Metal Works
- Installation of Turbine &
Generator
- 150kV Transmission Line(100km)
Casa Domaine Apartments

CLIENT PT .Griyaceria Nusamekar


(Salim + Lyman + Kuok)

CONSULTANT NorthcroftLimPte.Ltd.

CONTRACT US$84,000,000
VALUE
CONSTRUCTION Mar ‘14– Sep’18 (54Months)
PERIOD
DESCRIPTION - GFA: 91,520 m2
- 2 Buildings of Apartment
(53F / 57F / 3B)
Suban Gas Development Ph.2 in Indonesia

CLIENT ConocoPhilips Indonesia

CONSULTANT KBR

CONTRACT US$96,000,000
VALUE
CONSTRUCTION Jul‘04– Feb’07 (31 Months)
PERIOD

DESCRIPTION - 200 mmscfdx 2Processing Trains


- 43 km CarbonSteel Pipeline
Sarulla Geothermal Power Plant in Indonesia

CLIENT Sarulla Operation Ltd.


(Medco + Itochu + Kyushu +
Inpex + Ormat)

CONSULTANT WEST-JEC

CONTRACT US$711,000,000
VALUE
CONSTRUCTION Dec‘12– May ’18 (64Months)
PERIOD
DESCRIPTION - 110x3MWGeothermalPowerPlants
- 150kV Transmission Line
- Auxiliary Facilities

Вам также может понравиться