Вы находитесь на странице: 1из 3

ATTENTION : S & L Enterprises

PROJECT : Go Kah Oh Building Office Renovation


LOCATION: : Go Kah Oh Building, Basak, Mandaue City, Cebu
SUBJECT: : Glass Installation, Flooring and Tile Works

Dear Sir,

We are pleased to submit below our best price for your requirement.

EQUALBID19-1Q025
MATERIAL LABOR
ITEM NO. QTY UOM ITEM DESCRIPTION
Unit Cost Unit Cost
GLASS WALLING/DOOR
Tempered Glass, 12 mm Thick with 2-side
0.9mX0.9m Door Openning with Stainless Steel
1 lot Handle & Lock, Aluminum Framing & Bracket. 263,819.83 79,145.95

FLOORING & TILE WORKS


320 600x600 Ceramic Tiles 320.00 96.00
2 bags Grout 121.68 36.50
5 cubic meter Fine Sand 2,340.00 702.00
34 bags PORTLAND CEMENT 358.80 107.64
40 bags Adhesive 702.00 210.60
Total
12% VAT
TOTAL COSTS

Special Discount, 7%
NET PROJECT COST
Scope of Works:
1.0 Supply labor and materials for installation of inspector test valve connector .
2.0 Supply tools and equipment.
3.0 Testing and Commissioning
4.0 Asbuilt Plan
PROJECT COST:
TERMS: 50% Down payment, balance by progress billing
Excluding relocation and existing items inside
DURATION: As per agreement
VALIDITY: 30 days
WARRANTY: N/A
OTHERS: Written Notice is required for any ADDITONAL or CHANGE OF ORDER

Thank You so Much for giving us the opportunity to submit this quotation.
Very Respecfully Yours;

Conforme :
ALLAN M. ALAGOS, PME
General Manager Client/Representative
D19-1Q025 8/31/2019
Total Unit Total Amount
Cost

342,965.78 342,965.78

416.00 133,120.00
158.18 316.37
3,042.00 15,210.00
466.44 15,858.96
912.60 36,504.00
543,975.11
65,277.01
609,252.12
42,647.65
566,604.47

onnector .