Petron Refinery Master Plan 2

(RMP-2) Project

FIELD INSPECTION REPORT


Pre-Placement Inspection Report (Lean Concrete)
REPORT No. : RMP2-R-FIR-CI-FS-0789 DATE:

LINE or ITEM No: DRAWING No.: BR68-2-F6001 Rev. E,

AREA / LOCATION : Unit 6800m Piperack Foundation BR68-2-F6002 Rev. D, BR68-2-F6003 Rev. E,

REF. DOCUMENT :
INSPECTION DESCRIPTION: Checking final elevation & lay-out of excavation prior to lean concrete of footing & tie girder (68/005,006 & TG1)

SPG
No. Description FSPHIL DPI Remarks
ACCEPT REJECT

1 Check that all existing surfaces and works are completed.

2 Guide rails set and minimum Lean Concrete thickness.

3 Placement checked for cleanliness, access and availability of concreting


materials.
4 All settings out verified by the surveyor including dimensions, location and
level.
5 Others.

Remarks:

SIGNED : NAME : DATE:

FSPHIL

SIGNED: NAME: DATE:

DPI

SIGNED: NAME: DATE:

SPG