Ceiling Vent:
Concreting Works
Concrete
Steel Bars
1|Page
#16 G.I. Tie Wire kg 16.00
Formworks
2|Page
REBAR, Gr 60, 25mm dia x 10.5m pc 1,428.97
ELECTRICAL WORKS
Wires
4|Page
2.0mm2 THHN m 23.33
Wiring Devices
Lighting Fixtures
Branches
2-15AT/50AF,1PCB,240V,10KAIC,,BOLT-ON PC 315.70
3-20AT/50AF,1PCB,240V,10KAIC,,BOLT-ON PC 315.70
C. Premium for Insurance and Bonds (including Renewal Cost up to Project Completion)
Total 952,315.00
6|Page
CWT Assembly 1 lot 21,878.75
Total 875,150.00
Rock 602.56
7|Page
Filler Materials 401.00
Lime Stabilized Mixed Soil Aggregate Base Course Crushed Grading A 693.75
Lime Stabilized Mixed Soil Aggregate Base Course Crushed Grading B 662.78
Lime Stabilized Mixed Soil Aggregate Base Course Uncrushed Grading A 670.00
Lime Stabilized Mixed Soil Aggregate Base Course Uncrushed Grading B 641.11
8|Page
Side Wall 12mm dia pc 518.00
Fire Extinguisher, 10 lbs Capacity, Wall Mounted, HCFC 123 set 6,825.00
9|Page
Miscellaneous and Consumables l.s. 5,000.00
Light Blue Light Reflective Tempered Glass Curtain Wall sq.m. 7,400.00
Railing with 12mm thk Clear Tempered Glass x 0.8m H l.m. 1,008.50
Handy guide on factors to multiply per cubic on different concrete class mixtures. Just multiply
each factor to the total volume (in cubic meter) and you’ll get the needed amount of cement
(40Kg/bag), sand (cu.m.) and gravel (cu.m.).
10 | P a g e
Sand 0.486 cu.m. Gravel 0.856 cu.m.
Gravel 0.8856 cu.m. Class AA (4,000 psi)
Class A (3,500 psi) Cement 11.729 Bags
Cement 8.799 Bags Sand 0.475 cu.m.
Sand 0.5724 cu.m. Gravel 0.8344 cu.m.
The following factors were already added an average wastage add-ons of around 5% to 8%. This
numbers should help average Filipinos to know draft amount of materials needed for minor
concreting works.
11 | P a g e
Supply, Delivery and Installation of
Homogeneous Tiles (600mm x 600mm) 1 SQ.M. 1,515.00 350.00
Lighting Accessories
These construction heavy equipment prices should help you do your own estimate. Everything is
in Philippine Peso currency. These prices are taken from “Association of Carriers and Equipment
Lessors, (ACEL) Inc.” presently 2014 ACEL Rates as used in most projects of the government.
HOURLY RATE
DESCRIPTION (PHP)
Earthmoving Equipment
Bulldozer 3,379.00
Payloader 1,733.00
Compaction Equipment
Lifting Equipment
12 | P a g e
Truck Mounted Crane 1,631.00
Excavating Equipment
Backhoe 1,537.00
Foundation Equipment
Concreting Equipment
Hauling Equipment
Air Equipment
13 | P a g e
Air Compressor 502.00
Jackhammer 150.00
Pumping Equipment
Pumpcrete 2,076.00
Shop Equipment
Chainsaw 75.36
Miscellaneous Equipment
Others
14 | P a g e
Pile Integrity Testing & accessories
(includes professional fee of Strcutural Engineer and reports) 37,000.00
1.STRUCTURAL EXCAVATION
Common excavation
15 | P a g e
Hand 6.00 MH/M3
2.STRUCTURAL BACKFILL
3.TRENCHING
EXCAVATION- MANUAL
EXCAVATION- MECHANICAL
BACKFILLING
16 | P a g e
Escombro backfilling 0.21 MH/M3
Roofing
Siding
CONCRETE WORKS
4.CONCRETE WORKS
Grade members
Suspended members
17 | P a g e
Rebar 0.08 MH/kg
PLACING CONCRETE
REBAR WORKS
Suspended slab
18 | P a g e
Suspended slab 0 – 18″ 1.67 MH/M2
STRIPPING OF FORMS
Suspended slab
19 | P a g e
Plates Installation 0.13 MH/B.F.
ARCHITECTURAL SPECIALTIES
DOORS
WINDOWS
PARTITIONS
PAINTING ( 3 coats )
7. STRUCTURAL STEEL
Fabrication
20 | P a g e
Light 110-130 MH/MT
Errection
Fabrication
Errection
H. CHB
4” CHB
Tooling 11 – 14 m2/day
6” CHB
Tooling 11 – 14 m2/day
21 | P a g e
Plastering 8.0 – 10 m2/day
8” CHB
Tooling 11 – 14 m2/day
Masonry Works
Stone Masonry
22 | P a g e
Pre-painted Flashing, GA 24 (0.701 mm) x 2.44m LN.M 316.00
Painting Works
23 | P a g e
Paint Enamel gal 666.82
24 | P a g e
RCP 910mm x 1m pc 2,860.00
25 | P a g e
Centralizer pc 230.00
Truss Works
6mm thk.x 65mm x 65mm x 6.0 Angle bar(T & B Chord) pc 2,248.70
255mm x 90mm x 25mm x 5mm thk. LC- Channel beam pcs. 4,057.57
26 | P a g e
Welding Rod (Fuji) box 2,330.00
27 | P a g e
Wheel Loader, 110 Hp, 1.7 cu.m Unit 2,500,000.00
28 | P a g e
20mmØ Coupling pc. 95.00
Supply and
install
valves,
pipings,
fittings and
other items
as
necessary Lot 1.00 103,700.00 31,110.00 37,746.80 172,556.80
Centrifugal
pump/motor
2HP, 230v Item 1.00 41,480.00 3,050.00 12,468.40 56,998.40
Sand Filter
360T2 w/
Multiport
Valve Item 1.00 73,200.00 3,050.00 21,350.00 97,600.00
Maindrain
Cover Item 1.00 1,830.00 366.00 614.88 2,810.88
Vacum
Fittings Item 2.00 732.00 1,830.00 717.36 6,558.72
Return
Fittings Item 4.00 732.00 152.50 247.66 4,528.64
Vacuum
cleaning set Item 2.00 18,300.00 1,830.00 5,636.40 51,532.80
Hydrostatic
relief valve Item 1.00 1,708.00 366.00 580.72 2,654.72
395,240.96
29 | P a g e
Underwater
Light 12v Item 8.00 17,080.00 1,464.00 5,192.32 189,890.56
Mounting
Ring Item 8.00 1,708.00 512.40 621.71 22,736.90
Transformer
300w / 12-
16 v Item 4.00 3,660.00 610.00 1,195.60 21,862.40
Conduits
3/4″
diameter lot 1.00 18,300.00 5,490.00 6,661.20 30,451.20
Magnetic
Switch Item 1.00 3,904.00 610.00 1,263.92 5,777.92
Push Botton
Switches Item 4.00 610.00 146.40 211.79 3,872.77
371,567.10
OTHER WORKS
Construction of
balancing tank Item 1.00 140,300.00 42,090.00 51,069.20 233,459.20
Construction of
filtration room Item 1.00 140,300.00 42,090.00 51,069.20 233,459.20
Supply of
water line from
sourec to pump
room using
PVC pipes item 1.00 21,960.00 6,588.00 7,993.44 36,541.44
Supply of
power from
source to pump
room. Tapping
not included item 1.00 30,500.00 – – 30,500.00
Testing &
Commissioning item 1.00 18,300.00 5,490.00 6,661.20 30,451.20
30 | P a g e
One month
maintenance item 1.00 12,200.00 6,100.00 5,124.00 23,424.00
587,835.04