P Action/Task Completion Date Variation Date Justification
Teacher allowed 17 Completion of Project Fri 16th Aug Fri 25th Aug extension for entire class 12 Complete Site Plan Sun 21st Jul - - Design of house led to 13 Complete Floor Plan Sun 4th Aug Wed 7th Aug mistakes that caused me to restart 14 Complete Elevations Wed 14th Aug - - Took time to learn 15 Complete Planometric Fri 9th Aug Mon 12th Aug AutoCAD and to complete drawing Took time to find best 6 Create Website Sun 30th Jun Sun 7th Jul website creator and to learn how to use it Extension allowed for 16 Finalise Website Fri 16th Aug Thu 24th Aug more time 1 Find a block in North QLD Sun 2nd Jun - - 7 Understand ‘open plan’ Sun 30th Jun - - Research council regulations for chosen 2 Sun 9th Jun - - block 3 Research about climate Sun 16th Jun - - Materials took longer 4 Research about materials Sun 23rd Jun Sun 30th Jun than expected to find, analyse and decide upon 4 Research about ‘features’ Sun 23rd Jun - - Research about water & energy Other research took 5 Sun 30th Jun Wed 3rd Jul consumption longer than expected 8 Start planning/designing Sun 30th Jun - - Look at other similar 8 Sun 30th Jun - - houses/designs/plans Had lots of trouble th th 9 Complete final design Sun 14 Jul Wed 17 Jul finding a design that I was happy/confident with Needed to complete my 10 Start drawing plans Sun 14th Jul Wed 17th Jul final design to start drawing Due to extension, wanted Type up all justifications and reasoning to get plans completed 11 Sun 28th Jul Mon 12th Aug for design ASAP as they are more important