COLUMN R/F DETAILS

LEGEND 9. CONTRACTOR SHALL ENSURE THAT THE STEEL BEING USED IN THE CONSTRUCTION IS STRAIGHT, FREE FROM TWISTS, REINFORCEMENT STEEL 5.0 temporary propping requirements Stud to be placed in the
CRACKS,SURFACES, FLAWS, LAMINATIONS, IMPERFECT EDGES AND OTHER DEFECTS. 1.0 general notes 5.1 Temporary propping/supports are required where indicated on plan thus:- TP 6.13 centre of each trough
1. 100 INDICATES THICKNESS OF SOLID SLAB/RAFT IN MM. 10. ALL FABRICATION PART SHALL BE NUMBERED AS INDIVIDUAL MEMBERS AND ALSO PART OF AN ASSEMBLY, TO FACILITATE cont.. Side lap where two
1.1 Supply SYMBOLS:

(57mm for standard 19mm O studs


1. ALL REINFORCEMENT USED IN THIS WORK SHALL CONFORM TO IS : 1786 WITH Fe 500 AND SHALL BE IN THE FORM OF sheets fix together
11. DETAIL 'A' IDENTIFICATION OF EACH PART UNIQUELY.
2.
+XXX
INDICATES FLOOR LEVEL. A WELDING LEGEND: DEFORMED BARS. 1.2 Where electronic format drawings are supplied by the steel fabricator or 3.7 The recommended method of fixing edge trim at perimeter columns are:- 5.2 Where temporary propping is required and spans between permanent supports
300/333 300/333 300/333

3 O min. single staggered


UPPER LVL.
-XXXX INDICATES THE LEVEL OF STRUCTURAL ELEMENT SLAB IDENTIFICATION NUMBER 11. TEMPLATES FABRICATED IN STEEL SHALL BE USED WHEREVER POSSIBLE FOR THE FABRICATION OF SIMILAR PARTS, engineer and dimensions are not shown on plan, JSWSMD may take scaled Note: Where columns are not framed by incoming beams, angle cleats supplied exceed 5.0m for TR60+ and + (or at unsupported slab edges with temporary
3. COLUMN
IN SECTION OR ELEVATION IN MM. TEMPLATES SHALL ALSO BE USED FOR PLACING THE FOUNDATION BOLTS OF THE COLUMNS BEFORE CONCRETING. 2. Fe 500 SHALL HAVE ELONGATION MORE THAN 14.5% AND COMPLY WITH OTHER REQUIREMENTS OF INDIAN STANDARDS dimensions from electronic drawings where required. It is the responsibility of and fixed by others may be required to the column face to support the free deck propping shown), the propping arrangement is to be in position, leveled and INDICATES MOMENT CONNECTION
4. 12. S2 FIRST FLOOR LVL. the steel fabricator/engineer to ensure these extracted dimensions are correct.
B INDICATES THAT A SECTION HAS BEEN DRAWN TYPICAL FILLET SHOP WELD 12. ERECTION CLEARANCES SHALL NOT BE MORE THAN 2MM. FIRST FLOOR LVL. FIRST FLOOR LVL. ADD NEW BARS edge. adequately braced prior to erection of the decking.
ALONG THE HORIZONTAL LINE LOOKING TOWARDS 3. REINFORCING BARS SHALL CONFORM ACCURATELY TO THE DIMENSIONS SHOWN ON RELEVANT DRAWINGS AND BAR BENDING SHALL HIGHER DIA BARS 1.3 It is the responsibility of the main contractor to ensure that any conflicts of INDICATES SHEAR CONNECTION
THE ARROW HEAD. SLAB 13. ALL MEMBERS SHALL PREFERABLY BE MACHINE-CUT, IF FLAME CUTTING REQUIRED,THE EDGES SHALL BE MACHINED TO 3MM MINIMUM. Edge trim to terminate at web of column. 5.3 The design and supply of the propping system is the responsibility of others and
CONFORM TO IS : 2502. SOFFIT OF BEAM tolerance do not affect following cladding fixing.

ZONE A
TYPICAL FILLET SHOP WELD ALROUND SOFFIT OF BEAM

30mm min.
5. THE BUTTING SURFACES AT ALL JOINTS SHALL BE PLAINED SO AS TO BUTT IN CLOSE CONTACT THROUGHOUT SOFFIT OF BEAM
LVL WHEREVER CHANGING
LOWER DIA. BARS (standard detail, unless specified otherwise) should be of adequate strength and construction to sustain the dead weight of
INDICATES AN OPENING IN THE STRUCTURAL ELEMENT 13. T12-125 1.4 These notes and associated JSWSMD drawings are to be read in conjunction the concrete plus any construction live loads. Decking is to be leveled by INDICATES SHEAR CONNECTION WITH RCC MEMBER
14. HOLES FOR THE BOLTS SHALL BE DRILLED. NO FLAME SHALL BE ALLOWED. 4. CONTRACTOR SHALL SUBMIT BAR BENDING SCHEDULES FOR THE RECORD OF CONSULTANTS AND FOR OBTAINING THEIR APPROVAL. OF BAR DIA HAPPENING

Hi /4
SPACING TYPICAL FILLET SITE WELD with all relevant Clients, Architects, Engineers and Services drawings and adjustment of the temporary props before pouring concrete. Spreader beams

Hi /4
IN PLAN AT A PARTICULAR LEVEL REPRESENTS THE NO LAP ZONE

L0
6. Ø OF BAR 15. CONTRACTOR SHALL PREPARE FABRICATION DRAWINGS AND CUTTING PLANS FOR APPROVAL OF CONSULTANT BEFORE
TERMINATION OF VERTICAL R.C.C MEMBER BELOW HOWEVER APPROVAL FROM THE CONSULTANT SHALL NOT ABSOLVE THE CONTRACTOR OF HIS RESPONSIBILITY AND LIABILITY ARISING details. extending the full width of the decking are to be used in all cases, no isolated
PLAN TOR R/F
TYPICAL FILLET SITE WELD ALROUND SLOPE NOT MORE THAN (1:6) CL
THAT LEVEL. PROCEEDING WITH THE FABRICATION OF PARTS HOWEVER APPROVAL FROM CONSULTANT, OF THE FABRICATION DRAWINGS OUT OF NON ACCURACY IN THE BAR BENDING SCHEDULE AS REGARDS THE DIAMETER, DIMENSION, SHAPES, NUMBER OF BARS, ETC. 2.0 design notes Edge trim to terminate at flanges of column. props are permitted. Temporary props should be installed to ensure zero 9. BLOCK WORK JUNCTION DETAIL
SLAB
TYPICAL `V' GROOVE BUTT WELD DOES NOT ABSOLVE THE CONTRACTOR RESPONSIBILITY OF LIABILITY ARISING OUT OF NON ACCURACY OF THE FABRICATION TO BE LAPPED NOT MORE (standard detail, unless specified otherwise) deflection of the decking at propped points prior to placement of concrete.

MIN.600
2.1 All decking to be TR60+ x1mm x S350 UNO

ZONE B
5. ALL REINFORCEMENT SHALL BE THROUGHLY CLEANED OF ALL GREASE, MILL SCALE, LOOSE RUST OR ANYTHING LIKELY TO DESTROY THAN 50% AT ONE SECTION
14. 2T16
T DRAWINGS AS REGARDING DIMENSIONS, NUMBERS, SHAPES, SECTIONS MENTIONED ETC. THE BASIS FOR PREPARING THE The props are to remain in position until concrete has reached at least 75% of

Hi
300 MM OR 0.3L d 2.2 The decking acts as permanent formwork only to carry the depth of slab

Hi
TYPICAL CJP WELD

Hi
VERTICAL ADHESION OF THE STEEL WITH CONCRETE. (WITCHEVER IS MORE) its design strength (typically achieved within 7-8 days), the structural engineer
R.C.C MEMBER DIAMETER OF BAR FABRICATION DRAWINGS SHALL BE THE DESIGN DRAWING ISSUED BY STRUCTURAL CONSULTANT. noted.The formwork design includes for a temporary construction load of 1.5 should be consulted prior to removal. Staggered Studs (1 per trough) Middle of beam
TERMINATION TOR R/F. OR TMT TYPICAL TACK WELD 16. ALL WELDING SHALL BE CARRIED OUT USING METAL ARC PROCESS AND SHALL BE IN ACCORDANCE WITH IS:816 AND IS:817. kN/m² in addition to the self weight of the slab. All slab reinforcement is to be Edge trim to box-out around to isolate column.
6. GOOD QUALITY DUCTILE BINDING WIRE OF 18 GAUGE DIA SHALL BE USED AT ALL BAR INTERSECTIONS. The following is for guidance only.

Ld +10D
ELEVATION NO. OF BARS designed and supplied by others. (only provided where specifically requested on client drawings) Restraint Strap
17. WELDING ELECTRODES SHALL CONFORM TO IS : 814.

Hi /4
Span

200
Stud to be placed in the

Hi /4
NO LAP ZONE
L L

L0
7. IN PLAN AT A PARTICULAR LEVEL REPRESENTS THE 7. NO CONCRETING SHALL COMMENCE, UNTIL THE BARS HAVE BEEN PROPERLY PLACED, TIED AND HAVE BEEN INSPECTED AND APPROVED GROUND FLOOR LVL. GROUND FLOOR LVL. 2.3 The decking acts as a permanent formwork and tensile reinforcement (sagging) centre of each trough

NO LAP ZONE
GROUND FLOOR LVL.

NO LAP ZONE
CONTINUATION OF A VERTICAL R.C.C MEMBER. BELOW 15. 4L 4 LEGGED STIRRUPS 18. ALL SURFACES TO BE WELDED HAVING THICKNESS EQUAL TO OR MORE THAN 20MM SHALL BE PREHEATED TO A TEMPERATURE Side lap where two

ZONE A
BY ENGINEER - IN - CHARGE. in the bottom of the slab only - basis of design in accordance with BS 5950-4 3.8 At Butt Joints or notches for column locations, gaps in excess of 3-5mm should be sheets fix together

(76mm for standard 19mm O studs


AND ABOVE THAT LEVEL.

Slab depth
4050/FLOOR HT.AS PER ARCH.DWG.
OF AT LEAST 60 DEGREE CELSIUS. SOFFIT OF DROP/SLAB SOFFIT OF DROP/SLAB SOFFIT OF DROP/SLAB
and 6 or BS EN 1994-1-1 and BS EN 1993-1-3. sealed using either tape or expanding foam. Where gaps are less than 3-5mm no 300/333 300/333 300/333
16. C1

4050/FLOOR HT.AS PER ARCH.DWG.


VERTICAL 8. LAYERS OF BARS SHALL BE SEPARATED BY SPACER BARS SUCH THAT SPACER BARS SHALL BE PLACED NOT MORE THAN 1 M APART 2.4 The decking will not act as a tensile reinforcement (hogging) for cantilever or special provision is required as minimal leakage is experienced. Continuous support
SLAB R.C.C MEMBER INDICATES COLUMN TYPE 19. AT LEAST 5% OF THE WELD SHALL BE TESTED BY DYE- PENETRATOIN TESTS IN THE PRESENCE OF REPRESENTATIVE OF JSWSMD Deck Profile
other situations where tensile stresses are induced in the upper surface of the

Hi /4
CLIENT/CONSULTANT. AND DIAMETER OF SPACER BAR SHALL BE MINIMUM 25 MM. OR DIA OF MAIN BAR WHICHEVER IS MORE. NO LAP ZONE
edge trim/flashing notes

L0

Hi /4
COLUMN (COL.) slab. 4.0 Temporary props to be

4 O min. studs in pairs


20. CONTRACTOR SHALL ENSURE DURING THE ERECTION OF STRUCTURAL MEMBERS OR WHILE USING THE STRUCTURAL MEMBERS FOR placed @ max. 1m centres
9. CHAIRS USED TO SEPARATE THE TWO LAYERS (TOP & BOTTOM) OF REINFORCEMENT OF RAFT SLABS, WALLS, ETC SHALL BE PLACED COLUMN SLOPE NOT MORE THAN (1:6) UPPER LVL. 2.5 Unless specifically instructed by the steel designer it is to be assumed that the 4.1 Edge trim is typically indicated on plan thus:- 'A' = trim type (recommended, to be designed EXPANDED METAL SHEET
SUPPORTING OTHER STAGING ETC THAT NO MEMBER IS OVER STRESSED. DURING THE ERECTION OF THE STRUCTU.,THE STEEL WORK by temporary works engineer)

200
17. SLEEVE IN BEAM / COLUMN / SHEARWALL NOT MORE THAN THE MAXIMUM HORIZONTAL DISTANCE BETWEEN THE LEGS OF THE CHAIRS. THE DIAMETER OF THE BARS USED IN decking is not required to provide lateral restraint to the beams nor to contribute 165 = the edge dimensions indicated are distance from CL beam to slab edge

flange width
LONGITUDINAL R/F OF COLUMN/ TO BE LAPPED NOT MORE LONGITUDINAL R/F OF COLUMN/

30mm min.
ELEVATION SHALL BE SECURELY BOLTED OR OTHERWISE FASTENED, AND IF NECESSARY OR IF DIRECTED BY CONSULTANTS BE TEMPORARILY BRACED. PREPARING CHAIRS SHALL BE MINIMUM 12MM OR ONE DIA HIGHER THAN THE TOP R/F BAR WHICHEVER IS MORE. BOUNDRY ELEMENTS BOUNDRY ELEMENTS to the stability of the framework.
THAN 50% AT ONE SECTION (back of trim), unless noted otherwise on plan - refer note 4.4 'Typical Edge

MIN.600

136 min
ZONE B
300 MM OR 0.3L d LAPS SHALL ALWAYS STAGGERED
8. PLAN AT A PARTICULAR LEVEL REPRESENTS THE 2T16 INDICATES CURTAILMENT OF BAR 21. ALL THE ANCHOR BOLTS SHALL HAVE A MINIMUM LENGTH OF 100MM. (WITCHEVER IS MORE)
2.6 Unless specifically instructed by the structural engineer it is assumed that the Details'. For guidance on timber runner size, refer JSWSMD Technical
IN STARTING LEVEL OF A VERTICAL R.C.C MEMBER. deck does not contribute as transverse reinforcement for the transfer of EOB = slab edge / edge trim to be flush with edge (toe) of beam flange. Manual or use JSWSMD Deck software to check prop width. 5-7MM

Hi

HI
10. ALL DOWELS PROVIDED FOR LAPPING SHALL BE WASHED WITH CEMENT IF LEFT EXPOSED FOR A PERIOD EXCEEDING 10 DAYS.

Hi

Hi
PLAN 4T16

HI
(STUB COLUMN) OR FLOTING COL. CONNECTION COB = slab edge / edge trim to be located on CL of beam.
~

18. LONGITUDINAL R/F OF COLUMN/ longitudinal shear in the design of composite beams. 5.4 For information on spans that require temporary propping, refer to JSWSMD CL
BOUNDRY ELEMENTS LOWER LVL. The trim type 'letter' refers to a project specific legend on the drawing showing
R/F. BAR 2T16 FLOOR FINISH 2.7
VERTICAL 22. ALL CONNECTIONS SHALL BE BOLTED UNO. 11. REINFORCEMENT BARS SHALL BE TESTED WHENEVER A NEW LOT OF STEEL ARRIVES AT SITE. SUCH TESTS SHALL BE CONDUCTED FLOOR FINISH Composite slabs require crack control and distribution reinforcement in the top load/span tables or JSWSMD Deck design software developed by The Steel
FLOOR FINISH of the slab in accordance with BS 5950 Part 4 or BS EN 1994-1-1. It can edge trim dimensions and gauge.
R.C.C MEMBER BASEMENT LVL. Construction Institute. Spans shown unpropped are based on the slab depth 200MM/100MM THK. BLOCK WORK

H /4
FOR EACH DIAMETER OF REINFORCING BARS IN ACCORDANCE WITH INDIAN STANDARDS IN DESIGNATED LABORATORIES. BASEMENT LVL. e.g. PLASTER

Hi /4
23. ALL WELDING SHALL CONFORM TO THE REQUIREMENTS OF THE STRUCTURAL WELDING CODE IS:816 AND IS:817 NO LAP ZONE BASEMENT LVL.
generally be steel fabric mesh which should be in accordance with BS 4449. 4.2 Where RSC's are located, the edge poured to a constant thickness rather than level tolerance (ie. no ponding

L0
19. DECK SLAB SPANNING DIRECTION

ZONE A
LATEST EDITION, ALL WELD SIZES SHALL BE THE LARGER OF THE SIZE REQUIRED BY CONNECTION FORCES, Edge dimension as
2.8 Supplementary reinforcement is necessary in the bottom of the slab where dimension indicates distance from web of UB indicated on resulting from steel frame deflection is incorporated). Studs in Pairs (2 per trough) Middle of beam

NO LAP ZONE
SLAB THE MINIMUM SIZE SHALL BE 6mm MINIMUM FILLET WELD UNO. ANY WELD SIZES SHOWN ON to slab edge (back of trim), unless noted Web of UB
holes not trimmed by structural steelwork exceed 250mm transverse to deck decking layout

VARIES
300

NO LAP ZONE
PLAN ELEVATION 20. BREAK LINE

VARIES
THE DESIGN DRAWING ARE CONSIDERED EFFECTIVE WELD SIZES AND SHALL BE INCREASED IN ACCORDANCE

VARIES
span. The design and supply of this reinforcement is the responsibility of otherwise on plan. drawing.
contractors notes

D
D

D
BRICK/BLOCK WORK WITH AWS AS REQUIRED BY GAPS OR SKEWS BETWEEN COMPONENTS,
9. 250 250 others. Where voids exceed 700mm x 700mm transverse to deck span, 6.0 stud welding notes

d
CL CENTRE LINE 250 250

d
21. 250 250 4.3 We bring to the attention of all parties that the edge trim is, for practical 7.1 IMPORTANT - Check drawings/span tables for temporary propping requirements.

d
SEC. additional trimming beams are to be provided by others -refer note 3.6 and
reasons, set out from steelwork and not theoretical grid lines. TOP FLANGES TO BE STUDWELDED MUST NOT BE PRIMED OR PAINTED!
75mm THK.P.C.C(1:5:10) WATER PROOFING JSWSMD Technical Manual for further information. 7.2 Decking continuous over more than two supports is not to be cut down to form

L d+10D
22. 75mm THK.P.C.C(1:5:10) AS PER SPECIFICATION 75mm THK.P.C.C(1:5:10) WATER PROOFING LVL WHEREVER CHANGING The following data is for guidance only. Final design requirements and single span sheets without prior consultation with JSWSMD Technical
10. STONE WORK REVISION MARK T10-300 (OUTER RING ONLY) AS PER SPECIFICATION LOWER DIA. BARS OF BAR DIA HAPPENING 2.9 The edge trim acts as permanent formwork only.
WATER PROOFING (L1XB1) 4.4 All edge trim is formed from galvanized mild steel in standard 3m lengths, specification are the responsibility of the project Design/Structural Engineer. Department.
SEC. AS PER SPECIFICATION (L1XB1) Stud welding to follow recommended practices, refer BCSA Publication No:
LxB 2.10 Decking around columns is cut into the web with trim offcuts, tape and foam cut to suit on site.
(L1XB1) 37/04 Code of Practice for Metal Decking and Stud Welding. 7.3 Concrete must always be poured evenly on a beam over which the deck is
LxB used to minimise grout loss. Where there are no incoming beams/supports or
CONCRETE WORK DIMENSION AND ABBREVIATIONS: GENERALLY, FOLLOWING ABBREVIATIONS EARTHWORK & EXCAVATION LxB
TYP. COLUMN REINF. SPLICING DETAIL moment connections/bracing obstructing deck support, additional support is to
4.5 Edge trim is indicated around the edge of the perimeter slab and around all
Welding Procedure Specifications( WPS), Quality Assurance Plan(QAP) and
continuous and spread towards butt joints in the sheet to ensure multiple spans
internal openings with an alphabetical/numerical reference, refer note 1.3. For 6.1 are uniformly loaded without adjacent spans being left unloaded. FIRE COATING
1. ALL CEMENT USED FOR STRUCTURAL WORK SHALL BE 43/53 GRADE ORDINARY PORTLAND CEMENT OR AS/ DESIGN MIX. SHALL BE USED IN THE DRAWINGS: TYP. COLUMN/BOUNDARY ELEMENT TIES SPACING TYP. COLUMN REINF. SPLICING DETAIL be provided by the steel fabricator. If temporary props are used, local
exact trim/flashing details (dimensions & gauge) specific to this project, refer to Procedure Qualification Report(PQR) shall be as per consultant' s specifications. Heaping of concrete and impact loading caused by pouring at height must be
1. ALL DIMENSIONS ARE EXPRESSED IN MILLIMETERS (U.N.O.) TYPICAL 1. FOUNDING LEVEL FOR ALL TRENCHES AND PITS SHALL BE MAINTAINED AT ONE UNIFORM LEVEL IN A PARTICULAR WITH COUPLERS reinforcement is to be designed, supplied and fixed by others to provide trim legend on each layout drawing. Where composite beams are specified by the project structural engineer, all avoided in all cases.
2. FINE AGGREGATE SHALL CONFORM TO IS: 383 OR 515. TYP effective permanent end support for the decking.
2. DIMENSIONS SHALL NOT BE OBTAINED BY MEASURING THEM BUILDING AS MINIMUM SPECIFIED DEPTH IN THE DRAWING. studs are to be through deck welded where possible.
3. COARSE AGGREGATE SHALL CONFORM TO IS: 383 OR 515. MAX MAXIMUM, AT THE MOST 2.11 The overall depth of the slab is 150 U.N.O. 4.6 Edge trim is to be fixed with a minimum bearing of 50mm on steelwork and 7.4 Daywork joints if required are to be formed over adjacent beams where parallel
AT THE SCALE. 6.2 Before starting any studwelding, such as at changes of shift or moving of
4. WATER USED FOR PRODUCTION OF CONCRETE SHALL CONFORM TO IS: 456. MIN MINIMUM, AT THE LEAST 2. ANTITERMITE TREATMENT TO FOUNDATIONS AND PLINTH FILLING SHALL CONFORM TO IS : 6313. 70mm on concrete or masonry. Edge trim is to be fixed using shot-fired fixings with deck span and where required perpendicular to deck span, only at beams EXPANDED METAL SHEET
3. NUMBER OF BARS SHALL NOT BE COUNTED ONLY WRITTEN HIGHER DIA BARS 2.12 In addition to its self weight for CON gradeGRADE N / mm2 equipment, a minimum of two test studs should be welded to pass a 30 degree where decking butt joints are located. All concrete/reinforcement is to be EXPANDED METAL SHEET
5. ADMIXTURES AND OTHER CONSTRUCTION CHEMICALS SHALL BE APPROVED BY THE CONSULTANTS BEFORE THEIR USE IN THE CONC. CENTRE TO CENTRE SPACING IN CASE OF UPPER COL DIA BAR ARE OF LARGER COLUMNS THAN LOWER COL., at 750mm centres with restraint straps provided to the top edge at 750mm bend test.
DIRECTION ARE TO BE FOLLOWED. C/C BAR TERMINATE detailed and supplied by main contractor to Engineer's specification.
3. MATERIAL FOR PLINTH AND GRADE FILLING SHALL BE NON SWELLING / NON EXPANSIVE TYPE OF EARTH/MURRUM centres maximum or 500mm centres for slab depths 200mm or greater. Two
6. ALL STRUCTURAL CONCRETE SHALL BE DESIGN MIX CONCRETE (CONTROLLED CONCRETE) OF MINIMUM GRADE M20 OR U.N.O. 4. ONLY WRITTEN DIMENSION SHALL BE FOLLOWED IN CASE B/F BOTH FACES LAPPING SHOULD BE DONE AT MID HEIGHT OF LOWER LVL. COLUMN The Design Loads of the Composite Slab are:- 6.3 DO NOT weld in inclement weather when water cannot be kept from laying on
OR STABILIZED MATERIAL OR COARSE GRAIN SAND AS APPROVED BY ENGINEER IN CHARGE PRIOR TO PLINTH / sets of restraint straps may be necessary (at top and mid-height of trim) for POLY URETHYNE /
7. ALL CONCRETE WORK SHALL BE MACHINE MIXED AND MACHINE VIBRATED. SIX CUBES SHALL BE TAKEN FROM EACH OF MISSING INFORMATION DIMENSIONS SHALL BE SOUGHT BOTH WAYS Load Name the deck or beams, nor when the temperature is below freezing.
B/W LOWER LVL. excessive height edge trims. Where applicable, the fixing details will be COMPRESSIBLE FILLER
SPECIFIED POUR, THREE FOR TESTING AFTER 7 DAYS AND THREE AFTER 28 DAYS. COMPLYING QA/QC CONCRETE, FROM THE AUTHORISED REPRESENTATIVE OF CDPL GRADE FILLING. TOP SOIL UP TO NECESSARY DEPTH SHALL BE CLEARED OFF OF ALL VEGETATION. PLINTH / GRADE Live Load kN/m² indicated on the decking layout drawing or note 9.0. 6.4 A minimum of 5% and no less than 2 studs per beam (one towards each end of MATERIAL
T&B TOP AND BOTTOM 4
CONSULTANTS. FILLING SHALL BE DONE IN LAYERS OF 300MM THICKNESS AND WELL COMPACTED UP TO 95% PROCTOR DENSITY. Restraint straps are provided in 25mm wide, standard 3m lengths - cut to suit on the beam) are to be 15 degree bend tested. Bending is to be by slow
PRODUCTION, TRANSPORTATION, PLACING, COMPACTION AND CURING AS MENTIONED IN IS: 456-2000 LVL LEVEL Partitions 1 kN/m²
5. FOR LAYOUT DIMENSIONS AND FLOOR LEVELS, THOSE CASE-I site. application of load using a pipe and bending towards the nearest end of the
8. APPROVAL OF DESIGN MIX SHALL BE OBTAINED FROM STRUCTURAL CONSULTANT. SHOWN ON THE ARCHITECTURAL DRAWINGS SHALL BE @ ABOUT, AT, AT THE RATE OF, AT THE SPACING OF 4. WHEREVER THE FINISHED GRADE LEVELS ARE BELOW NATURAL GROUND LEVELS, FOUNDING DEPTHS SHALL BE FROM
CASE-II Services / Ceiling Finishes .5 kN/m² beam.
8.0 loading out notes
(BAR DIA AT UPPER LVL. HIGHER THAN LOWER LVL.) (BAR DIA AT UPPER LVL. LESSER THAN LOWER LVL.) Floor Finishes 1.875 kN/m² DO NOT impact bend or strike with hammer.
9. IN CASE OF READYMIX CONCRETE USAGE, RECOMMENDATIONS OF CONCRETE MANUFACTURERS SHALL BE STRICTLY FOLLOWED. CONSIDERED AS THE CORRECT ONES. HOWEVER,CLARIFILATION
R/F REINFORCEMENT FINISHED GRADE LEVELS OR AS/DESIGN DRAWINGS. 4.7 typical edge details 8.1 Deck Pack Reference Symbol Trim and Flashing Bundle Reference Symbols
10. ALL CONCRETE ELEMENTS SUCH AS BASEMENT RAFT, RETAINING WALLS, SLABS BEAMS AND WALLS OF WATER TANKS MUST BE OBTAINED IN CASE OF ANY DISCREPANCY BETWEEN TYP. SECTION SHOWING CHANGE IN DIAMETER OF COLUMN LONGITUDINAL BAR AT ANY LEVEL 2.13 The composite slab has only been designed to carry those partitions considered 6.5 All welds are to be visually inspected to ensure a 360 degree weld fillet and Pack No
STPS STIRRUPS Typical edge detail.
INFORMATION SHOWN ON STRUCTURAL DRAWINGS AND 5. WHEREVER FINISH GROUND LEVEL ARE ABOVE NGL, FOUNDING DEPTH SHALL BE FROM NGL OR AS/ DESIGN DRAWINGS. in JSWSMD design calculations - where requested. 'ring' tested, by tapping lightly with a hammer. Studs with acceptable welds Floor / Phase No TRIM FLASHING
SHALL BE ABSOLUTELY WATER TIGHT AND CONTRACTOR SHALL ENSURE FOR THE SAME. 7. CASTING OF COLUMN SUPPORTING STAIRCASES, RAMP, BUNDLE BUNDLE
RELEVENT ARCHITECTURAL DRAWINGS. THK THICK, THICKNESS LOFT OR MEZZANINE FLOOR SHALL BE AS PER LVL should give a clear 'ring' sound. All studs that have incomplete fillets and/or
11. ALL CEMENT LOTS SHALL BE TESTED IN ACCORDANCE WITH IS: 4031 FOR CEMENT AND IN ACCORDANCE WITH IS: 516 6. EXCAVATION SHALL BE MAINTAINED DRY AND PROTECTED AGAINST ANY ACCIDENTAL FLOODING UNTILL FOUNDATION
Edge Dimension 1/02 1/T1 1/F1
6. FOR THE SIZES OF STRUCTURAL MEMBERES, THOSE SHOWN TOC TOP OF CONCRETE NOTES GIVEN IN RELEVANT STRUCTURAL AND ARCHITECTURAL 2.14 Fire rating for composite slab is 2 hour/s. 30 min* (refer note 4.1) give a dull sound when 'ring' tested are to be subjected to a bend test (as note
0.56t 36 Floor / Phase No
FOR CONCRETE, FOR INITIAL AND FINAL SETTING TIME, FOR PREPARING MORTAR CUBES AND CONCRETE CUBES ONLY ON THE STRUCTURAL DRAWINGS PREPARED BY CDPL LAYING IS COMPLETED. DRAWINGS. The top cover should be between 15 - 45mm. Advice on the design of 30 min. 6 x stud O min. 6.3). Failed studs are to be replaced and the studs on either side bend tested.
TOS TOP OF STEEL 1. FOR SPACING AND DIAMETER OF TIES REFER COLUMN/SHEAR WALL R/F. SCHEDULE. Ld+10d. 1. ALL DIMENSIONS ARE IN MM (U.N.O.). 8. FOR LINTEL RESTING ON COLUMNS, PROVIDE DOWELS Mesh or TAB-deck system Pack weight JSWSMD Site Pack No
UPON CONFIRMATION THAT CEMENT IS OF SATISFACTORY QUALITY, THEN THE SAME SHALL BE USED FOR STRUCTURAL CONC. WORK. CONSULTANTS SHALL BE READ. IN CASE OF ANY composite slabs and fire resistance design may be obtained by consultation (114 min.) 5-7MM

AS/DWG.
2. IN LAP PORTION STIRRUPS SPACING SHALL BE 150mmc/c (MIN.) 2. DO NOT SCALE ANY DIMENSION. ALWAYS FOLLOW Restraint strap Edge trim Managers Reference
DISCREPANCY BETWEEN INFORMATION SHOWN ON VARIOUS 7. IT IS MANDATORY TO REMOVE ALL LOOSE SOIL TILL THE FIRM SOIL IS REACHED. IF LOOSE POCKETS ARE ENCOUNTERED FOR LINTELS AS GIVEN IN LINTEL SCHEDULE. with JSWSMD Technical Department. 6.6 Studs should always be alternately staggered either side of butt joints in the
BOTTOM OF STEEL

Ld+10d.
12. AGGREGATES SHALL BE SPECIAL QUALITY BLACK HARD, STRONG, DURABLE, CLEAN AND FREE FROM ADHERENT COATINGS BOS WRITTEN DIMNESIONS.

AS/DWG.

Slab depth
STRUCTURAL DRAWINGS, SAME SHALL BE SOUGHT FROM THE IN EXCAVATION PIT, SAME SHALL BE FILLED WITH 1:4:8 PCC USING 40MM. DOWN COARSE AGGREGATE. IF THE POCKETS 3. MIN. TIES DIA SHALL BE ONE FOURTH OF COLUMN LONGITUDINAL BAR DIA OR AS/COLUMN OR SHEAR WALL SCHEDULE 9. CASTING OF COLUMN FOR ABOVE FLOOR SHALL BE DONE decking. Studs should be welded to patterns as shown on the drawings thus. Decking packs are to be loaded out in accordance with JSWSMD decking
FLAKY AND ELONGATED PIECES SHALL BE AVOIDED. BOB BOTTOM OF BASE PLATE 3. GENERAL NOTES SHALL BE REFERED IN CONJUCTION
AUTHORISED REPRESENTATIVE OF CDPL CONSULTANTS. WITH THIS DRAWING. ONLY WHEN ABOVE LEVEL COLUMN SCHEDULE AND 20 - 150 20 No. at 150mm centres layout drawings. Packs are to be located in areas shown hatched on JSWSMD
13. MAXIMUM NOMINAL SIZE OF AGGREGATES SHALL BE 20MM ARE BIG, HIGHER SIZE COURSE AGGREGTE MAY BE USED OR PLUMB CONCRETE SHALL BE ADOPTED AS PER SPECIFICATIONS. 4. L0 = Hi/6 FRAMING PLAN IS AVAILABLE AT SITE. 40 - 150 - P 40 No. at 150mm centres in pairs
FFL FINISHED FLOOR LEVEL decking GA (see below), unless advised otherwise by JSWSMD Site Manager

} MAXIMUM SHALL BE 4. FOR REINFORCEMENT FE 500 SHALL BE USED Maximum overhang varies 30 - 300 - S 30 No. at 300mm centres staggered
14. THE RESPONSIBILTY OF SUPPLYING DURABLE AND ADEQUATELY STRONG CONCRETE LIES PRIMARILY WITH THE CONTRACTOR = 450MM dependant on slab depth prior to delivery. PLASTER LAYER
UNO UNLESS NOTED OTHERWISE 8. FOR FILLING, IT IS ADVISABLE TO ALLOW STANDING WATER FOR 24 HOURS, WHEN THE SURFACE ARE SEMI DRY. CONFORMING TO IS : 1786 (2012) 10. CHANGE IN BAR DIAMETER ALONG FLOOR HEIGHT 50 - 300 - R Studs to be placed at 300mm centres, with the PAINT MARK (INDICATIVE ONLY) Point 'arrow'
SHALL BE DONE IN MID HEIGHT OF COLUMN IN LAP JSWSMD Deck Profile 60mm* and trim gauge (1.2mm, 1.6mm
IRRESPECTIVE OF THE METHOD (PRODUCED AT SITE OR OBTAINED THE SAME FROM RMC PLANT). WP WATERPROOFING HAND RAMMING SHALL BE CARRIED OUT WITH ATLEAST 6 TO 8 PASSES. CONSIDERED AS L0 remainder divided equally and placed from each Hatching indicates represents direction of
= LONGER DIMENSION OF COLUMN RAFT SIZE REDUSE JUNCTION DETAIL ZONE. * See Note 6.9 and 2.0mm available)
end of beam giving 2 no. per trough where necessary, pack 1/02 loading paint mark on pack.
5. FOR RCC WORKS USE CONCRETE MIX CONFORMING
15. CONTRACTOR SHALL ENSURE THAT ALL FIXTURES SUCH AS INSERTS, PIPE SLEEVES, ETC ARE IN PLACE IN ACCORDANCE
PCC PLAIN CEMENT CONCRETE
9. ALL FOUNDATION SHALL BE FOUNDED ON VIRGIN SOILS AT DEPTH INDICATED ON DRAWINGS. OR BOUNDARY ELEMENT JUNCTION DETAIL AS PER RAFT OF VARYING THICKNESS TO IS : 456 (LATEST REVISION) AS GIVEN IN COLUMN 11. ALL COLUMN REINFORCEMENT SHALL BE EMBEDDED
3.0 deck fixing notes until required 50 No. is achieved. out position.
1/02
WITH DRAWINGS BEFORE CONCRETING. CONCRETE GRADE R/F. SCHEDULE. 3.1 Sheets of decking are supplied in standard widths with square cut ends and NS = No Studs
M
5. Hi = HEIGHT OF i th FLOOR MEASURED FROM SOFIT OF BEAM/DROP PANEL/SLAB TO TOP OF SLAB OR FOOTING / LOWER FLOOR. MINIMUM Ld FROM FLOOR LEVEL.
6.7 Minimum stud spacings in accordance with BS 5950 Part 3: Section 3.1 and BS 0.56t 36
16. CONSTRUCTION AND TESTING OF LIQUID RETAINING STRUCTURES SHALL CONFORM TO THE PROVISIONS OF IS: 3370 10. WATER PROOFING SHALL BE CARRIED OUT FOR THE UNDERGROUND STRUCTURES AS PER SPECIFICATION. 12. ALL LONGITUDINAL COLUMN BARS SHALL BE PLACED may require cutting to suit on site. The preferred method of cutting is by petrol Typical detail where deck cantilevers in strong axis to form large slab edge.
L.V. LENGTH VARIES 6. SIZES OF COLUMN GIVEN IN COLUMN LAYOUT SHALL EN 1994-1-1 are:-
(PART 1 AND PART2.) MATCH WITH COLUMN SCHEDULE. ANY DISCREPANCY AT EQUAL SPACING (U.N.O.) driven disc.
STRUCTURAL SLAB LEVEL Edge Dimension (refer note 4.1) 8.2 Each pack has a paint mark located on the overlap edge of the sheet, the
SSL 11. LEVELING CONCRETE SHALL BE (MIN) 1:5:10 OR EQUIVALENT AND MINIMIUM 75 THICK(UNO). SHALL BE BROUGHT IN NOTICE TO STRUCTURAL 3.2 5 x diameter for studs spaced longitudinally along the beam.
17. JOINTS IN WATER RETAINING STRUCTURES SHALL BE PROVIDED AS PER DRAWINGS; PVC WATER STOPS OF SPECIFIED The minimum bearing requirements for metal decking is 50mm on steelwork 4 x diameter transverse spacing between rows of studs forming pairs. 'arrow' on the pack label indicates the way this paint mark should be facing (see
CONSULTANT. 450
WIDTH AND THICKNESS SHALL BE THERMOSTATICALLY SEALED AND NOT LAPPED. and 70mm on masonry or concrete. Restraint strap 3 x diameter transverse spacing between rows forming a staggered pattern.
INDICATES TOP BARS above).
18. LIQUID RETAINING STRUCTURES SHALL BE HYDROTESTED BY FILLING THEM WITH WATER, BEFORE BACKFILLING. LEAKS COLUMN SIZE REDUCTION DETAILS NOTES 3.3 Where beams are to receive shear studs, decking is fixed to steel using Hilti Mesh or TAB-deck system Max Edge trim Where beams are designed compositely, the longitudinal spacing of shear studs
8.3 The colour of the paint mark on each pack represents the gauge of the decking:

Slab depth
INDICATES BOTTOM BARS X-U 15 (DAK) or Spit SDK9 nails (or similar approved). Where no studs are should not exceed the limits outlined in BS 5950 Part 3: Section 3.1 or BS EN
FOUND DURING HYDROTESTING SHALL BE RECTIFIED BY THE CONTRACTOR AT HIS OWN COST BY INJECTION GROUTING COLUMN SIZE AS PER COLUMN SIZE AS PER 1. ALL DIMENSIONS ARE IN MM (U.N.O.). specified, Hilti X-ENP-19 or Spit SBR14 nails (or similar approved) should be Green 0.9mm gauge
COLUMN SCHEDULE 1994-1-1.
OR BY ANY OTHER METHOD AS SPECIFIED BY THE ENGINEER. COLUMN SCHEDULE 2. DO NOT SCALE ANY DIMENSION. ALWAYS FOLLOW Blue 1.0mm gauge
used. Decking must be fixed to steelwork at centres to suit the decking profile, 6.8 The flange thickness of beams requiring shear studs should be a minimum of 7.6mm.
WRITTEN DIMNESIONS. Red 1.2mm gauge
as follows: 6.9 Where edge beams are composite, the distance from CL stud to edge of slab is
STRUCTURAL STEEL MASONRY WORK COL. R/F AS/DET.
3. GENERAL NOTES SHALL BE REFERED IN CONJUCTION
WITH THIS DRAWING.
TR60+ 333mm centres at each sheet end and 666mm centres at intermediate JSWSMD Deck Profile
75 to be a minimum of 6 x diameter of the stud (114mm typical for standard 19mm Due to the possibility of varying gauges on any one project, for health and
supports. diameter studs). safety reasons it is essential that all packs are loaded out in the positions
MATERIAL 2 4. FOR REINFORCEMENT FE 500 SHALL BE USED TR80+ 300mm centres at each sheet end and 600mm centres at intermediate indicated on JSWSMD decking layout drawings, unless advised otherwise.
CONFORMING TO IS : 1786 (LATEST REVISION)

L d+10D

L d+10D
1. STEEL MATERIALS SHALL CONFORM TO THE FOLLOWING MINIMUM REQUIREMENTS UNLESS OTHERWISE 1 supports. 6.10 The dimension from CL of stud to toe of steel beam flange is to be a minimum of 30mm. 8.4 Each decking pack on a project has a unique reference; on arrival at site all
NOTED ON THE CONTRACT DOCUMENTS; 5. FOR RCC WORKS USE CONCRETE MIX CONFORMING At side locations, where beam runs parallel to deck span - 750mm maximum At sheet ends a dimension of 30mm from stud to the end of deckshould be maintained as packs will have a label indicating the relevant pack number, material type &
1. MASONRY SHALL BE CONSTRUCTED IN ENGLISH BOND COFORMING TO IS : 2212 CODE OF PRACTICE FOR BRICK WORK AND PLAN TO IS : 456 (LATEST REVISION) AS GIVEN IN COLUMN 4.8 At perimeter beams and intermediate beams parallel to deck span (where studs as shown in detail 4.7
(TIES ARRANGEMENT) R/F. SCHEDULE. centres (all profiles). Fixings are to be located a minimum of 20mm from the contents.
IS : 1905 CODE OF PRACTICE FOR STRUCTURAL SAFETY OF BUILDING. EARTHQUAKE RESISTANT DESIGN AND CONSTRUCTION PLAN are required) where the deck falls such that a rib is located over the beam 6.11 Shear studs are to have a minimum 15mm (BS 5950) or 20mm (BS EN 8.5
ROLLED SHAPES AND CHANNELS; IS:2062 Grade E450 MIN YIELD STRENGTH (250MPA) EQ EQ EQ EQ EQ TYP. DETAIL OF COLUMN REDUCING IN SIZE <MIN. 75mm <MIN.75mm 6. SIZES OF COLUMN GIVEN IN COLUMN LAYOUT SHALL edge of the decking sheet and where more than one fixing per trough is
1994-1-1) concrete cover over the stud. Should the cover be required to protect
Packs are to be loaded out to ensure equal bearing is achieved at both ends of
MISCELLANEOUS ANGLES; IS:2062 Grade E250B. OF BUILDING SHALL CONFIRM TO IS : 4326. TYP. DETAIL OF COLUMN REDUCING IN SIZE MATCH WITH COLUMN SCHEDULE. ANY DISCREPANCY required, at centres not less than 20mm within a single trough. Decking on flange, galvanized mild steel flashings are provided to form a closure to the pack.
HOLLOW STRUCTURAL SECTIONS; IS:4923 Grade YST310 (REDUCTION IN SIZE LESS THAN 75mm) SHALL BE BROUGHT IN NOTICE OF STRUCTURAL concrete/masonry is fixed using HILTI anchor fashoner (or similar profile - refer flashing details below. Flashings are provided in standard 3m the shear stud against corrosion, the BS 5950 minimum cover should be In all instances packs must have a minimum bearing of 50mm onto supports at
(REDUCTION IN SIZE MORE THAN 75mm) CONSULTANT. increased to 20mm.

EQ
FOR RECTANGULAR RHS,SHS 2. CONVENTIONAL BRICK/BLOCK UNITS SHALL BE STRONG ENOUGH WITH SHARP EDGES, DURABLE AND OF UNIFORM SIZE, CASE-II approved). lengths in gauges of 1.2mm, 1.6mm or 2.0mm. For geometry of all flashings both ends.
SEAMLESS PIPE FABRICATED AS PER IS:3589 FROM PLATES E310 Grade AS PER IS:2062 CASE-I 7. CASTING OF COLUMN SUPPORTING STAIRCASES, RAMP, refer to trim legend on the relevant decking layout drawing. 6.12 After welding, the shear stud should extend at least 35mm above the top of the 8.6 Where decking/edge trim is required to form a curve or radius, the setting out to
CONFORMING TO IS : 1077. LOFT OR MEZZANINE FLOOR SHALL BE AS PER LVL 3.4 Side stitching is to be provided to all JSWSMD decking profiles at 1.0m centres

EQ
PLATES FOR BUILT UP SECTIONS E 450 GRADE AS PER IS 2062 TR+ Edge Detail with 'V' flashing closure. decking profile (taken as shoulder height for TR+ trapezoidal profiles). enable cutting of deck and placing of edge trim is to be provided by the site
GIVEN IN RELEVANT STRUCTURAL AND ARCHITECTURAL from mid-span using self tapping screws. e.g.
DRAWINGS. engineer, with a physical line or template supplied for the JSWSMD installation

Ld +10D

L d+10D
2. CONNECTION MATERIAL SHALL CONFORM TO FOLLOWING MINIMUM REQUIREMENTS OR AS NEEDED FOR 3. MINIMUM THREE BRICKS SHALL BE SELECTED AT RANDOM FROM EACH LOT AND SHALL BE TESTED FOR CRUSHING STRENGTH CL Span
Restraint strap 6.13 Where shear studs are required in restricted areas, the following clearance dimensions apply:
8. FOR LINTEL RESTING ON COLUMNS, PROVIDE DOWELS Extent of profile trough removed
AND WATER ABSORPTION AND TEST RESULTS SHALL BE IN CONFORMITY WITH RELEVANT STANDARDS FOR TESTING. COL. R/F AS/DET. = side stitch locations. to enable stud to be fixed to beam
Edge trim - 450mm clear vertical dimension from TOS to obstruction. team to work to.
ANGLES/UB/UC; IS:2062 GARDE E 250
TYP. COLUMN SECTION SHOWING 2T12EXTERNAL (TIES BUNDLED) FOR LINTELS AS GIVEN IN LINTEL SCHEDULE. 1000 1000
- 50mm clear horizontal dimension to adjacent obstruction.
<75
PLACEMENT OF LONGITUDINAL BAR 9. CASTING OF COLUMN FOR ABOVE FLOOR SHALL BE DONE

CL Beam

CL Beam
PLATES; IS 2602 GARDE E 450/E350 FLOOR LVL.
4. MASONARY SHALL BE CONSTRUCTED IN CEMENT MORTAR 1 : 6 (TYPE M2 AS/BRICK MASONARY CODE) UNLESS SPECIFIED OTHERWISE. ONLY WHEN ABOVE LEVEL COLUMN SCHEDULE AND
BOLTS; IS:1367 GRADE 8.8S (ALL BOLTS THAT ARE EXPOSED TO WEATHERING SHALL BE FINISHE >75mm ALL BARS SHALL BE PLACED EQUALLY SPACED (UNO) FRAMING PLAN IS AVAILABLE AT SITE. mid-span
6.13 typical stud configurations
BLACK BOLT 5. MORTAR FOR MASONARY SHALL CONFORM TO IS : 2250. 2T12 EXTERNAL (TIES BUNDLED) Span TR+ Profiles (60 or 80):
COLUMN LONGITUDINALER
SLOPE NOT MORE THAN 1:6 SLOPE NOT MORE THAN 1:6 10. CHANGE IN BAR DIAMETER ALONG FLOOR HEIGHT
NUTS; IS:6623 FLOOR LVL. COVER SHALL BE DONE IN MID HEIGHT OF COLUMN IN LAP ZONE. Stud to be placed in the
WASHERS; IS:6649 6. ALL MASONARY JOINTS SHALL BE RAKED TO A DEPTH OF 6MM TO ENSURE EFFECTIVE BOND WITH PLASTER. RCC COLUMN COL. R/F AS/DET. 3.5 Slots cut in the decking for beam encasement (where required) are by the main JSWSMD TR+ Deck Profile centre of each trough
11. ALL COLUMN REINFORCEMENT SHALL BE EMBEDDED

COVER
contractor unless noted otherwise. The maximum size is to be 100mm wide Side lap where two
ANCHOR RODS/BOLTS IS:2062/IS:432 MINIMUM L d FROM FLOOR LEVEL.

Ø
sheets fix together
HEADED STUDS ASTM 108, GRADE 1010 THROUGH 1020 HEADED STUD TYPE, COLD-FINISHED 7. ALL PARTITION (HALF BRICK THICK) WALLS LENGTH SHALL BE PROVIDED WITH REINFORCEMENT AT EVERY THIRD COURSE without removal of any part of of the decking ribs. JSWSMD flashing
300/333 300/333 300/333
SECTION 2-2 12. ALL LONGITUDINAL COLUMN BARS SHALL BE PLACED

Ld +10D
Ld
CARBON STEEL TYPE B. 19MM/22MM/25MM DIAMETER UNO. WITH 2. NOS OF MIN. 6MM DIA BARS, HALF THE MORTAR SHALL BE LAID FIRST AND OTHER HALF LAID AFTER THE SOFFIT OF BEAM/ 3.6 The recommended sequence for forming an opening not trimmed by steelwork is:-
AT EQUAL SPACING (U.N.O.)

10
WELD ELECTRODES; IS:814 DROP PANEL OPTION-2 SLOPE OF 1:6 IS NOT AVAILABLE a) Fix decking.

Ø
2T12 EXTERNAL (TIES BUNDLED)
REINFORCEMENT IS PLACED INTO THE POSITION WITH MORTAR JOINT. THICKNESS NOT LESS THAN 12MM 0R TWICE THE 45° IN BEAM OR DROP PANEL / SLAB DEPTH b) Box out opening on decking by others. TR+ Edge Detail with 'Z' flashing closure.
3. ALL BOLTS & NUTS SHALL BE FINISHE BLACK BOLT BEAM/DROP PANEL c) Cast concrete and allow to cure (to achieve design strength).
SANDWCHED BARS DIA (WHICHEVER GREATER) AND BEND 300MM IN CROSS WALLS OR COLUMN. IN ELEVATION * AT BEAM/DROP PANEL COLUMN JUNCTION CONCRETE Restraint Strap
SOFFIT OF BEAM/ d) Decking cut out as required (by others) to form opening.

135
4. BOLTS AND NUTS SHALL HAVE ISO METRIC COARSE THREAD. 2T12EXTERNAL (TIES BUNDLED) COL. R/F AS/DET. GRADE OF COLUMN SHALL BE USED AT AN OFFSET OF Edge trim

10 d
DROP PANEL
8. IN CASE OF NON LOAD BEARING WALL, COMING UNDER THE SLAB OR BEAMS, LAST COURSE SHALL BE BUILT AFTER THE 600MM ALL ROUND THE COLUMN FACE.

flange width
10
DETAIL -W d
5. BOLTS, NUTS AND WASHERS IN BEARING TYPE CONNECTIONS SHALL COMPLY

db
Ø STIRRUP/TIE

(>
FORMWORK OF THE SLAB OR BEAM IS REMOVED.

102 min
WITH THE REQUIREMENTS OF IS:1367 AND IS:4000 OR EQUIVALENT APPROVED

75
BEAM/DROP PANEL CROSS TIE MUST ENGAGE

mm
BY THE ENGINEER IN ELEVATION PERIPHERAL TIE
SECTION 2-2 ALONGWITH

)
COL. R/F AS/DET. TYP. DETAIL (B) VERTICAL BAR. TO BE BENT AT 135°
6. ALL SHOP WELDS SHALL BE CONFORM TO IS:816. (UNO.) IN CASE DOWEL TO BE PROVIDED FOR COLUMN CL
OPTION-1 SLOPE OF 1:6 IS AVAILABLE
7. PIPE TO PIPE JOINT SHALL BE FULL PENETRATION GROOVE WELD. IN BEAM OR DROP PANEL DEPTH LONGITUDINAL BAR THEN LENGTH OF DOWELS BAR JSWSMD TR+ Deck Profile
DETAIL -W DETAILS OF 135° HOOK SHALL BE AS / GUIDELINES FOR LAPPING OF JSWSMD flashing utilised when
8. GENERAL CONSTRUCTION OF STEEL SHALL CONFORM TO IS:800. (2007)
SECTION 1-1 TO BE PROVIDED TO ALL RINGS deck sheet falls short of
TYPICAL DETAIL OF LINK COLUMN LONGITUDINAL BARS. side bearing beam
Single Studs (1 per trough) Middle of beam

PILE WORK DEVELOPMENT LENGTH (L d) FOR Fe500 SHRINKAGE /COMPENSATORY STRIPS(IN RW)
1- (a) PILES, INSTALLATION, CONCRETING, ALIGING, RECORDING DATA SHALL COMPLY IS : 2911
AT SPLICING OF BARS STIRRUPS SPACING NOT GREATER THAN 150MM SHALL BE USED.
(b) LOAD TEST ON PILES SHALL COMPLY IS : 2911 (PART-4).
LAP SPLICING SHALL BE CONSIDERED AS STAGGERED IF CLEAR DISTANCE BETWEEN SPLICE 1. LOCATION AND ARRANGEMENT OF SHRINKAGE /COMPENSATORY STRIPS
(c) REFER IS : 456-2000 FOR CONCRETE MATERIALS, CONCRETE MIX AND THEIR QUALITY.
IS NOT LESS THAN 0.3 TIMES THE DEVELOPMENT LENGTH OR 300MM (WHICHEVER IS MORE). SHALL BE FOLLOWED AS MARKED ON DESIGN
2- UNLESS STATED OTHERWISE CONCRETE GRADE SHALL BE M30 RESPECTIVELY FOR PILES & IT SHALL BE CONTROLLED DRAWINGS OR OTHERWISE CONSTRUCTION TEAM SHALL SUBMIT A
CONCRETE MIX & HIGHER CONCRETE GRADE SHALL BE RECOMMENDED IN AGGRESSIVE ENVIRONMENT WHERE SUB-SOIL, OR IN CASE MECHANICAL COUPLER ARE USED FOR SPLICING, CLEAR GAP BETWEEN FACE OF COUPLER PROPOSAL TO STRUCTURAL CONSULTANT FOR APPROVAL
WATER CONTAINING SULPHATE & CHLORIDE IN BEYOND PERMISSIBLE LIMITS 40 1440 1600 1840 1960 2280 SHALL BE 600MM (MINIMUM). BEFORE PROCEEDING TO EXECUTE THE WORK. IF ANY CASTING IS MORE
36 1300 1440 1660 1770 2060 PREFERRED LOCATION OF SPLICING IN VARIOUS STRUCTURAL MEMBERS :- THAN 20M LENGTH (IN ANY DIRECTION)
3- CONCRETE SHALL HAVE SLUMP AND WORKABILITY CONSISTENT WITH THE METHOD OF CONCRETING AS WELL AS THE METHOD
OF PILE INSTALLATION. MINIMUM SLUMP OF CONCRETE SHALL BE 100MM FOR UNDER WATER CONCRETING 150MM TO 180MM. (a) COLUMNS REFER COLUMN R/F. DETAILS WITHIN 7 DAYS, THEN CONSULT WITH CONSULTANT TO GET SHRINKAGE
32 1150 1280 1480 1570 1830
/COMPENSATORY STRIP LOCATIONAND DETAIL.
4- MINIMUM CEMENT CONTENT SHALL BE 400 KG/M3IN LEAR PILES ! (b) BEAMS AND SLAB TOP R/F - AT MID SPAN
28 1010 1120 1290 1380 1600 2. CONCRETING IN SHRINKAGE /COMPENSATORY STRIPS SHALL BE CARRIED
5- UNDER WATER CONCRETING SHALL BE DONE BY TREMIE METHOD COMPLYING CI.14.2.4 (a) OF IS : 456-2000. BOTTOM R/F - ONE THIRD OF SPAN
6- PILE SHALL BE INSTALLED AS ACCURATELY AS POSSIBLE ACCORDING TO THE DESIGNS AND DRAWINGS EITHER VERTICALLY OR 25 900 1000 1150 1225 1425 OUT ATLEAST 21 DAYS AFTER CASTING OF THE
MOST RECENT POUR.
(c) STAIRCASE WAIST SLAB ONE THIRD OF SPAN - 3. WHILE CASTING THE SHRINKAGE /COMPENSATORY STRIP AFTER THE
TO THE SPECIFIED BATTER. PILES SHOULD NOT DEVIATE MORE THAN 75MM FROM THEIR DESIGNED POSITIONS AT THE WORKING 20 720 800 920 980 1140
LEVEL OF PILING RIG. (d RETAINING WALL/WATER TANK WALL ALTERNATE BARS CAN BE LAPPED ABOVE MENTIONED DURATION, GUIDELINES FOR THE
CONSTRUCTION JOINTS
16 580 640 740 790 920
7- WHERE STIFF CLAY OR COMPACT SAND LAYERS HAVE TO BE PENETRATED, THE DRIVING SHALL BE FOLLOWED FROM THE CENTRE SHALL BE FOLLOWED.
12 440 480 560 590 690 (e) FOUNDATION 4. FIGURES IN RELEVANT STRUCTURAL DRAWINGS SHOWS DETAILS OF
OUT WARDS & INCASE OF SOFT SOILS THE DRIVING MAY HAVE TO PROCEED FROM OUTSIDE AREA WARDS CENTERS.INSTALLATION OF
CAGING SHALL BE DONE ONLY AFTER CONCRETE OF ADJACENT PILES HAVE SET PROPERLY. 10 360 400 460 490 570 (i) ISOLATED NO LAPPING - SHRINKAGE /COMPENSATORY STRIP FOR VARIOUS STRUCTURAL MEMBERS.
8- THE TOP CONCRETE IN A PILE SHALL BE BROUGHT 600MM OR MORE TO COUNTERACT STATIC HEAD OF SUBSOIL WATER ABOVE THE REINFORCEMENT ACROSS THE SHRINKAGE/COMPENSATORY STRIP
8 290 320 370 400 460 (ii) RAFT/COMBINED FOOTING/FOOTING BEAMS TOP - ONE THIRD OF SPAN SHALL BE AS PER SHOWN DETAILS
THE CUT-OFF LEVEL TO PERMIT REMOVAL OF ALL LAITANCE & WEAK CONCRETE BEFORE CAPPING AND TO ENSURE GOOD
7 260 280 330 350 400 BOTTOM - MID SPAN
CONCRETE AT THE CUT-OFF LEVEL.
9- REINFORCEMENT CAGE SHALL PROJECT 50 TIMES BAR DIA ABOVE THE CUT-OFF LEVEL FOR R/F BARS EMBEDMENT INTO THE 6 220 240 280 300 345 (iii) STITCH SLAB/GRADE SLAB ALTERNATE BARS CAN BE LAPPED
PILE CAP, THE DEPTH OF PILE SHALL MATCH WITH THIS EMBEDMENT.
ABOVE SPECIFIED LENGTH ARE IN MILLIMETERS.
10- MIN COVER TO PILES SHALL BE 40 MM (UNO) & ENSURED BY CONCRETE COVER BLOCKS.
11- THE MINIMUM DIA OF THE LATERAL TIES SHALL BE 8MM & SPACING SHALL NOT BE LESS THAN 150 MM TO ALLOW FREE FLOW ABOVE LENGTH SHALL BE USED AS ANCHORAGEMENT LENGTH OR LAP LENGTH FOR SPLICING.
OF CONCRETE INTO THE BODY OF PILES TO BE CAST.
12- PILE REINFORCEMENT CAGE TO BE MAINTAINED INTACT IN ITS POSITION 12 MM DIA SPACER RING TIED & TACK WELDED WHEN BARS OF TWO DIFFERENT DIAMETERS ARE BE TO SPLICED, LAP LENGTH SHALL BE
CALCULATED ON BASIS OF DIAMETERS OF SMALLER BAR.
@ 1000MM C/C THROUGHOUT THE LENGTH OF THE PILE.
13- PILE SHOULD BE EMBEDDED BY ATLEAST 75MM IN THE PILE CAP. FOR SPLICING OF HORIZONTAL R/F IN FOUNDATION, BEAM, SLAB, ETC, NOT MORE THAN 50%
14- PILE CAP SHOULD EXTEND BY ATLEAST D/2 BEYOND THE OUTER FACE EXTERIOR PILES BAR SHALL BE SPLICED AT ONE SECTION.
15- PILE CAP SHALL BE DEEP ENOUGH TO ALLOW FOR NECESSARY ANCHORAGE OF THE COLUMN AND PILE REINFORCEMENT AND
RIGID ENOUGH TO DISTRIBUTE THE IMPOSED LOAD EQUALLY ON THE PILES IN A GROUP.

CONSTRUCTION JOINTS SHUTTERING/ FORM WORK

1. CONSTRUCTION TEAM SHALL PLAN AND MARK ALL PROPOSED CONSTRUCTION JOINTS ON PLAN AND SUBMIT PROPOSAL TO STRUCTURAL 1. SHALL BE DESIGNED AND CONSTRUCTED SO AS TO REMAIN SUFFICIENTLY RIGID DURING PLACING AND COMPACTION OF CONCRETE STRUCTURAL MEMBER DESCRIPTION CLEAR COVER
CONSULTANT FOR APPROVAL/SUGGESTIONS BEFORE PROCEEDING FOR EXECUTION OF WORKS.
BOTTOM 50MM
2. PROPER KEYS SHALL BE PROVIDED TO FORM HORIZONTAL / VERTICAL CONSTRUCTION JOINT. RAFT FOUNDATION
2. FORMWORK SHALL BE SUCH AS TO PREVENT LOSS OF SLURRY FROM THE CONCRETE. SIDES 50MM
3. NOZZLES FOR INJECTION GROUTING SHALL BE PLACED AT ALL CONSTRUCTION JOINTS IN RAFT, RETAINING WALLS, JOINTS BETWEEN TWO TOP 50MM
VERTICALWALLS. ALL SUCH NOZZLES SHALL BE INJECTION GROUTED TO MAKE CONSTRUCTION JOINTS WATER TIGHT. GROUTING SHALL 3. SHUTTERING SHALL BE OF FRAMED PHENOL-FORMALDEHYDE RESIN BONDED PLYWOOD PANELS OR METAL PANELS OR EQUIVALENT TO
FORM A PART OF DESCRIPTION OF CONCRETING ITEM. PRODUCE SURFACE IN ONE PLANE, FREE FROM LIPS, FINS ETC. ISOLATED/STRIP FOOTING/RETANING WALL BOTTOM 50MM
FOOTING/U.G. FOOTING/STP FOOTING. TOP 50MM
4. NO VERTICAL CONSTRUCTION JOINTS SHALL BE GIVEN IN CONCRETING EXCEPT IN VERTICAL STRUCTURAL MEMBERS LIKE RETAINING WALLS 4. THE INTERIOR SURFACE OF THE SHUTTERING SHALL BE COATED WITH APPROVED MOULD OIL AND USE SHALL BE SUCH THAT IT WILL SIDES 50MM
OR LIQUID STORAGE WALLS.
NOT CAUSE STAINS TO APPEAR ON THE CONCRETE.
5. TREATMENT OF CONSTRUCTION JOINT DURING NEXT STAGE CONCRETING. PLINTH BEAM /TIE BEAMS ALL SIDE 30MM-MODERATE EXPOSURE
a. NEXT STAGE CONCRETE WITHIN 12 HOURS (WHEN CONCRETE IS GREEN)-------BEFORE STARTING WORK AT ANY CONSTRUCTION 5. CONTRACTOR SHALL ENSURE SHAPES, LINES AND DIMENSION TOLERANCES AS PER DESIGN DRAWINGS.
JOINT ALL LAITANCE SHALL BE REMOVED THOROUGLY. EARTH SIDE 30MM-MODERATE EXPOSURE
6. FORM WORK SHALL BE SUPPORTED BY STRONG AND PROPERLY BRACED SCAFFOLDIND BOTHWAYS VERTICALLY AND HORIZONTALLY (I) RETAINING WALL
b. NEXT STAGE CONCRETE WITHIN 3 DAYS (BEYOND 12 HOURS OF CASTING WHEN CONCRETE IS SEMI HARDENED)----WHEN WORK HAS INSIDE FACE 25MM
ENSURING UNYIELDING STRONG WOODEN OR STEEL BASE PLATES.
TO BE RESUMED ON HARDENED SURFACE THE SAME SHALL BE HACKED, CLEANED , WETTED AND COVERED WITH A LAYER OF NEAT
CEMENT GROUT. THE SAME SHALL BE FOLLOWED BY A 15MM THICK OF MORTAR MIXED IN THE SAME PROPORTION AS THE CONCRETE 7. STRIPPING TIME OF FORMS SHALL BE APPROPRIATE TO THE STRENGTH GAIN AS RECOMMENDED IN IS: 456-2000 COMPLYING AMBIENT (II) WATER TANK WALL WATER FACE 30MM
AND CONCRETING RESUMED IMMEDIATELY THEREAFTER. TEMPERATURE CONDITION OF 15 DEGREE CELSIUS. OUTER FACE 30MM
c. NEXT STAGE CONCRETE AFTER 3 DAYS (WHEN CONCRETE IS FULLY HARDENED)--- WHEN WORK HAS TO BE RESUMED ON FULLY 8. IN NORMAL CIRCUMSTANCES AFTER ADEQUATE CURING IS DONE FORMS MAY GENERALLY BE REMOVED AFTER THE EXPIRY (III) STP WALL LIQUID FACE 40MM
HARDENED SURFACE THE SAME SHALL BE HACKED, CLEANED , WETTED AND COVERED WITH A LAYER EPOXY/RESIN ON OLD CONCRETE OUTER FACE 30MM
OF THE FOLLOWING MINIMUM PERIOD.
AND CONCRETING RESUMED IMMEDIATELY THERAFTER. FOR GAP OF MORE THAN 7 DAYS SHEAR CONNECTORS SHALL BE PROVIDED IN
FIRST STAGE AS PER RECOMMENDATIONS FORM STRUCTURAL CONSULTANT. COLUMNS 300 WIDE OR MORE ------- 40MM FROM FACE OF TIES
FOR OPC CEMENT FOR PPC OR OPC + FLY ASH /GGBS
6. THE CONSTRUCTION JOINT SHALL BE IN ACCORDANCE WITH FOLLOWING GUIDELINES:
a. IN A BEAM AND SLAB, IT SHOULD BE PERPENDICULAR TO LONGITUDINAL R/F AND AT ONE THIRD OF SPAN. A. WALLS, COLUMN AND VERTICAL FACES
24 HOURS 36 HOURS ------- 30MM FROM FACE OF TIES*
OF ALL STRUCTURAL MEMBERS

B. SLABS (PROPS LEFT UNDER)


5 DAYS 7 DAYS BEAMS BOTTOM 30MM
(SPANNING UPTO 4.5mt.)
9 DAYS 11 DAYS (I) FLOOR BEAMS (FROM STIRRUP FACE) TOP 25MM
(SPANNING OVER 4.5mt.) SIDES 30MM
C. BEAMS SOFFITS (PROPS LEFT UNDER) 7 DAYS 9 DAYS (II) FLOOR BEAMS ON ROOF OF WATER TOP 40MM
(SPANNING UPTO 6.0mt.) TANK HAVING LIQUID OF CORROSIVE BOTTOM 45MM
TYP. RETANING WALL CORNER CHARACTER SIDES 25MM
REMOVAL OF PROPS UNDER SLABS 7 DAYS 9 DAYS
AS PER PLAN TOP
D. SPANNING UP TO 4.5M (III) FLOOR BEAM OVER WHICH FILLING IS
14 DAYS 17 DAYS BOTTOM
SPANNING OVER 4.5M PROPOSED.
SI
REMOVAL OF PROPS UNDER BEAMS
AND ARCHES. 14 DAYS 17 DAYS
E SPANNING UP TO 6M.
SPANNING OVER 6M. 21 DAYS 25 DAYS

REINF. AS PER DETAILS


9. THE SHUTTERING SUPPORTING THE OVERHANGS (CHAJJAS,CANOPY ETC) SHALL NOT BE REMOVED UNTIL SUFFICIENT BALANCING LOAD
OVER THE BEARING HAS BEEN ATTAINED BY BUILDING MASONRY OR OTHERWISE.

10. THE SHUTTERING OF CANTILEVER BEAMS & SLABS SHALL BE REMOVED STARTING FROM OVERHANGING EDGE.
AS PER PLAN

REINF. AS PER DETAILS 11. IT IS REQUIRED TO SUBMIT SHUTTERING DESGIN FOR VARYING FLOOR FOR APPROVAL TO STRUCTURAL CONSULTANT.

12. UNLESS OTHERWISE SPECIFIED ON DRAWINGS, ALL FORMWORK SHALL BE PROVIDED WITH UPWARD CAMBER TO COMPENSATE
ld.
FOR ANTICIPATED DEFLECTIONS. IT IS RESPONSIBILITY OF CONTRACTOR TO PROVIDE CAMBER IN LARGE SPAN SLAB AND BEAMS AS
PER CODAL RECOMMENDATIONOR GUIDE LINES GIVEN IN CPWD SPECIFICATIONS. AS GENERAL GUIDELINES, PROVIDE CAMBER
ld.
BEAM AND SLAB OR FOLLOW STRUCTURAL DRAWING FOR ANY SPECIFIC REQUIREMENTS.

Ld 13. FLOOR SLAB SYSTEM ARE DESIGNED FOR LIVE LOAD (AS MENTIONED IN IS CODE), FLOORING LOAD, WALL LOAD AND ACTUAL SELF
TYPICAL RET. WALL CORNER DETAILS (IN PLAN) WEIGHT OF SLAB. CASTING LOAD OF ABOVE LEVEL FLOOR SLAB AND SHUTTERING NOT CONSIDERD IN LOWER FLOOR SLAB (UNLESS
RETANING WALL T PLAN SPECIFIED IN DESIGN DRAWINGS). IT IS CONTRACTOR RESPONSIBILITY TO CALCULATE CASTING LOAD FROM TOP AND CHECK FEASIBILITY
OF SUPPORTING ON LOWER FLOOR AND SAME SHALL BE DULY APPROVED BY STRUCTURAL CONSULTANT.
AS PER PLAN

REINF. AS PER DETAILS

ld.

RETANING WALL
REINF. AS PER DETAILS

TYPICAL RET. WALL T DETAILS (IN PLAN)