Вы находитесь на странице: 1из 32

1.

INTRODUCTION
1.1 POSCO at a Glance 02
CONTENTS 1.2 POSCO E&C at a Glance 03
1.3 Company Organization 04
1.4 Power Plant Business in POSCO E&C 05
1.5 Global network 06

2. EXECUTION CAPABILITIES OF POSCO E&C


2.1 Major Award and Achievement 08
2.2 Project Execution Capabilities 09

3. EXPERIENCES
3.1 EPC Track Record Table 14
3.2 Power Plant EPC : References 15
3.2 Power Plant EPC : On-going Projects 23

APPENDICES
26
27
1 Winning–competitiveness and sustainability
 named the world’s most competitive steel maker
for nine (9) consecutive years1)
 ranked 35th among the “Global 100 Most
Sustainable Corporations in the World in 2017”2)
1 Shareholders Constitution

 Foreigner 55.9 %
 Domestic Institution 29.5 %
 Treasury Stock 8.3 %
 Individual 6.3 %

2 Key Businesses of POSCO Group

1) by WSD, World Steel Dynamics / 2018


2) by WEF, World Economic Forum (Davos Forum) / 2017
1 Winning
 ranked 54th in “ENR2) Top Global Contractor 2018”
 ranked 7th in “Construction capability ranking and
assessed value” in Korea ('18)

1 Shareholders Constitution

 POSCO 52.8 %
 PIF 1) 38.0 %
 Others 7.1 %
 POSTECH 2.1 %

2 Business Lines

1) PIF : 2) ENR : Engineering News-Record


(The Saudi Asian Investment Company)
CEO

Strategic Global Marketing


Planning Center
 Business Strategy Group
 Business Planning & Development Group
Q-HSE Center • Energy Business Development (IPP / PPP)
 Plant Marketing Group
• Power Plant EPC Sales
• Chemical Plant EPC Sales
R&D Center  Infrastructure Marketing Group
 Architecture Marketing Group

Engineering & Project Execution + Domestic Marketing

Architecture Plant Infra


Division Division Division
 Urban Development  Conventional Power plant  Integrated Steel Works  Road
 Residential / Commercial (Coal-Fired & Gas-Fired)  Iron / Steel Making Plant  Railway
 Renewable energy  Continuous Casting  Port
 LNG / LPG Terminal  Hot Rolling  Water Treatment
 Oil & Gas  Cold Rolling  Desalination
 Petrochemical Plant  Smelter Plant (Nickel, etc.)
 Coal Gasification
Engineering
Jr. Engineer
(1~4yrs)
30
Sr. Engineer
143
(over 11yrs)

TOTAL 413
Engineers

Manager 240
(5~10yrs)
Procurement
over 20yrs
10

14 15~20yrs

1~5yrs

33 10~15yrs

TOTAL 107
Procurement Managers

Equipment
Construction
Material

1,913 639 902


Construction
HSE
Section On-going PJT (a) Completed PJT (b)
Products
(a)/(b) Overseas Domestic Sub-Total Overseas Domestic Sub-Total
Coal-Fired 2 1 3 5 1 6
Gas-Fired (CCPP) - 2 2 6 6 12
Off-Gas Power Plant - 1 1 2 4 6
Power
Plant Oil-Fired 1 - 1 - - -
(9/35)
SRF / Biomass - - - 1 4 5
Solar PV System - 1 1 - 5 5
Etc. - 1 1 - 1 1
Petrochemical 1 1 2 9 9 18
Chemical Oil & Gas - - - 1 - 1
Plant
(3/25) Special Chemical - 1 1 - 1 1
Oxygen Plant - - - - 5 5
Gas Processing 1 - 1 2 - 2
Gas
Plant LNG Terminal 1 3 4 2 5 7
(6/15)
LPG Terminal 1 0 1 3 3 6
TOTAL 7 12 18 31 43 75
Overseas
Overseas
Domestic
Coal-Fired Power Plant (6)

PJT Name Chile VENTANAS PJT Name Chile ANGAMOS PJT Name Chile CAMPICHE
Client AES Gener S.A. Client AES Gener S.A. Client AES Gener S.A.
Type CFPP / 268MWx1 Type CFPP / 259MWx2 Type CFPP / 268MWx1
Period Dec. 2006 ~ Dec. 2009 Period Apr. 2008 ~ Sep. 2011 Period May 2008 ~ Mar. 2013

PJT Name Indonesia MERAK PJT Name Chile COCHRANE PJT Name YEOSU #1
Client MEI (Merak Energi Indonesia) Client AES Gener S.A. Client KOENERGY
Type (CFBC) CFPP / 60MWx2 Type CFPP / 266MWx2 Type (CFBC) CFPP / 340MWx1
Period May 2010 ~ Oct. 2012 Period Apr. 2013 ~ Oct. 2016 Period May 2012 ~ Aug. 2016
Overseas
Domestic
Gas-Fired Power Plant (12)

PJT Name Peru KALLPA (add-on) PJT Name Peru CHILCA UNO (add-on) PJT Name Israel OPC ROTEM
Client Kallpa Energy Client Enersur Client IC Power
Type CCPP / 560MW 830MW Type CCPP / 530MW 810MW Type CCPP / 430MW
Period Nov. 2009 ~ Aug. 2012 Period June 2010 ~ Nov. 2012 Period Sep. 2010 ~ July 2013

PJT Name Peru PUERTO BRAVO PJT Name Thailand BANGCHAK 3E PJT Name Panama COLON
Client IC Power Client The Bangchak Petroleum Client AES (Gas Natural Atlantico)
Type Simple Cycle / 154MWx4 Type CCPP /15MWx1 Type CCPP / 391MWx1
Period Mar. 2014 ~ May 2016 Period Aug. 2015 ~ June 2017 Period May 2016 ~ July 2018
Overseas
Domestic
Gas-Fired Power Plant

PJT Name INCHEON #5,6 (Phase-1) PJT Name INCHEON #7,8,9 (Phase-2) PJT Name YANGJU
Client POSCO Energy Client POSCO Energy Client DAERYUN Power
Type CCPP / 626MWx2 Type CCPP / 420MWx3 Type CHP / 560MWx1
Period Oct.2008 ~ July 2011 Period Sep. 2010 ~ July 2015 Period July 2011 ~ Dec. 2013

PJT Name ANSAN PJT Name CHOONCHEON PJT Name YOUNG-NAM


Client S-Power Client CHOONCHEON Energy Client KOSPO YOUNGNAM Power
Type CCPP / 834MWx1 Type CHP / 470MWx1 Type CCPP / 470MWx1
Period Jan. 2012 ~ Dec. 2014 Period Mar. 2015 ~ June 2017 Period Aug. 2015 ~ Feb. 2018
Overseas
Domestic
Off-Gas Fired Power Plant (6)
현재 이 이미지를 표시할 수 없습니다. 현재 이 이미지를 표시할 수 없습니다. 현재 이 이미지를 표시할 수 없습니다.

PJT Name Indonesia Off-Gas Power Plant PJT Name Brazil CSP Off-Gas Power Plant PJT Name GWANGYANG Off-Gas Power Plant
Client PT.Krakatau POSCO Power Client CSP Client POSCO
Type Off-Gas(Simple) / 100MWx2 Type Off-Gas(Simple) / 100MWx2 Type Off-Gas(Simple) / 100MWx1
Period Aug. 2011 ~ Mar. 2014 Period Sep. 2012 ~ Oct. 2016 Period Nov. 2004 ~ Aug. 2006

현재 이 이미지를 표시할 수 없습니다. 현재 이 이미지를 표시할 수 없습니다.

PJT Name POHANG FINEX Off-Gas Power Plant PJT Name GWANGYANG Off-Gas CCPP PJT Name POHANG Off-Gas CCPP
Client POSCO Client POSCO energy Client POSCO energy
Type Off-Gas(Simple) / 146MWx1 Type Off-Gas CCPP / 142MWx2 Type Off-Gas CCPP / 145MWx2
Period June 2005 ~ July 2007 Period Feb. 2009 ~ May 2011 Period Feb. 2012 ~ May 2014
Overseas
Domestic
Solar PV(Photovoltaic) System (5)
현재 이 이미지를 표시할 수 없습니다. 현재 이 이미지를 표시할 수 없습니다. 현재 이 이미지를 표시할 수 없습니다.

PJT Name YEONGAM Solar PV PJT Name EDA Solar PV PJT Name JEONNAM Solar PV
Client Korea Solar Park Client EDA Solar Client JEONNAM Solar
Type Solar PV System /3MW Type Solar PV System / 1.2MW Type Solar PV System / 17.5MW
Period Aug. 2007 ~ May 2008 Period July 2008 ~ Sep. 2008 Period SEP. 2013 ~ June 2014

PJT Name GUNSAN Solar PV PJT Name JINYANG/HYUNGJIN Solar PV


Client GSELLS PV Power Plant Client JINYANG/HYUNGJIN Solar
Type Solar PV System / 4.22MW Type Solar PV System / 22.9MW
Period July 2014 ~ June 2016 Period Oct. 2015 ~ June. 2017
Overseas
Domestic
SRF / Biomass (4)

PJT Name KRAKOW Waste to Energy PJT Name BUSAN SRF PJT Name DONGHAE Biomass
Client K.H.K Client BUSAN E&E Client EWP
Type SRF / 16MWe+(Heat)35MWt Type SRF / 25MWx1 Type Biomass / 30MWx1
Period Feb. 2012 ~ June 2016 Period Oct. 2010 ~ Oct. 2013 Period Aug. 2011 ~ July 2013

Etc.

PJT Name SEOKMUN CHP PJT Name POHANG SRF PJT Name TAEGISAN Wind Energy
Client SEOKMUN Energy Client POHANG e&e Client TAEGISAN-Wind
Type Biomass/24MWe+52.2Gcal/h Type SRF / 12.1MWx1 Type 40MW
Period Dec. 2014 ~ Jan. 2017 Period June 2016 ~ Jan. 2019 Period Dec. 2006 ~ Dec. 2008
Overseas
Coal-Fired Power Plant (3) Domestic

PJT Name Philippines MASINLOC PJT Name Bangladesh MATARBARI PJT Name POSPOWER SAMCHEOK
Client Masinloc Power Partners Client CPGCBL Client POSPOWER
Type (SC) CFPP / 335MWx1 Type (USC) CFPP / 600MWx2 Type (USC) CFPP / 1,050MWx2
Period Mar. 2016 ~ Apr. 2019 Period Aug. 2017 ~ Jan./July 2024 Period Aug. 2018 ~ Apr. 2024

Gas-Fired Power Plant (2) Off-Gas Fired Power Plant (1)

PJT Name SIN-PYEONG-TAEK PJT Name NAM-JEJU PJT Name POHANG Off-Gas CCPP
Client SPPC Client KOSPO Client POSCO
Type CCPP / 943MWx1 Type CCPP / 173MWx1 Type Off-Gas CCPP / 150MWx1
Period Jan. 2017 ~ Nov. 2019 Period Feb. 2019 ~ Nov. 2020 Period Dec. 2019 ~ Dec. 2021
Overseas
Oil-Fired Power Plant (1) Solar PV System (1) Etc.(1) Domestic

PJT Name Iraq KHABAT PJT Name EUNSUNG/GWANGJIN Solar PV PJT Name SEOUL #1,2 Civil & Arch.
Client Ministry of Electricity Client EUNSUNG/GWANGJIN Solar Client KOMIPO
Type OFPP / 165MWx2 Type Solar PV System / 45MW Type CCPP / 400MWx2
Period Sep. 2013 ~ July. 2019 Period Oct. 2016 ~ Sep. 2019 Period Mar. 2013 ~ Aug. 2019
Global Marketing Center Center
Executive Vice President
Group
Hun-joo, Oh
+82-32-748-2020 Section
ohhj@poscoenc.com

Business Planning Group Plant Marketing Group Infra Marketing Group


Group Leader Group Leader Group Leader
Soo-hoon, Lee Ho-sung, Lee Seok-Jong, Lee
+82-32-748-2677 +82-32-748-2365 +82-32-748-3122
seanlee@poscoenc.com lhs@poscoenc.com enc154193@poscoenc.com

Business Development Group Power Plant Sales Architecture Marketing Group


Group Leader Section Leader Group Leader
Gi-joon, Byun Yang-rae, Kim Young-sup, Han
+82-32-748-1308 +82-32-748-2748 +82-32-748-3164
bgj1341@poscoenc.com coolman1@poscoenc.com han.ys@poscoenc.com

Oil&Gas, Petrochemical Sales


Section Leader
Joon-mo, Hong
+82-32-748-2276
jmhong@poscoenc.com
Coal-Fired Power Plant (completed)

COUNTRY PROJECT NAME TYPE BOILER STEAM TURBINE

1 VENTANAS CFPP / 268MWx1 Doosan (PC Type) Ansaldo Energia

2 ANGAMOS CFPP / 259MWx2 Doosan (PC Type) Ansaldo Energia


Chile
3 CAMPICHE CFPP / 268MWx1 Doosan (PC Type) Ansaldo Energia

4 COCHRANE CFPP / 266MWx2 IHI (PC Type) Ansaldo Energia

Foster Wheeler
5 Indonesia MERAK CFPP / 60MWx2 Fuji
(CFBC Type)
Doosan (CFBC
6 S.Korea YEOSU #1 CFPP / 340MWx1 Doosan
Type)

Coal-Fired Power Plant (on-going)

COUNTRY PROJECT NAME TYPE BOILER STEAM TURBINE

1 Philippines MASINLOC (SC) CFPP / 335MWx1 B&W (PC Type) GE

2 Bangladesh MATARBARI (USC) CFPP / 600MWx2 IHI (PC Type) TOSHIBA


Gas-Fired Power Plant (completed)
COUNTRY PROJECT NAME TYPE GAS TURBINE HRSG STEAM TURBINE
CCPP, 3x3x1
1 KALLPA SIEMENS BHI GE
560MW830MW
CCPP, 3x3x1
2 Peru CHILCA UNO SIEMENS BHI GE
530MW810MW
Simple Cycle, 4GTs GE
3 PUERTO BRAVO (N/A) (N/A)
154MWx4 (7FA)
CCPP, 3x3x1 GE
4 Panama COLON BHI SIEMENS
391MWx1 (6F.03)
CCPP, 3x3x1 MHPS
5 Israel OPC ROTEM BHI MHPS
430MWx1 (M701F4)
CCPP, 1x1x1 SIEMENS SC
6 Thailand BANGCHAK 3E ELLIOTT
15MWx1 (SGT-400) ENGINEERING
INCHEON #5,6 CCPP, 2x2x1 SIEMENS
7 BHI SIEMENS
(Phase-1) 626MWx2 (SGT6-5000F)
INCHEON #7,8,9 CCPP, 3x3x1 SIEMENS
8 SIEMENS SIEMENS
(Phase-2) 420MWx3 (SGT6-8000H)
CHP, 2x2x1 MHPS
9 YANGJU (N/A) MHPS
560MWx1 (M501F)
S.Korea CCPP, 2x2x1 SIEMENS
10 ANSAN BHI SIEMENS
834MWx1 (SGT6-8000H)
CHP, 1x1x1 MHPS
11 CHOONCHEON BHI MHPS
470MWx1 (M501J)
CCPP, 1x1x1 MHPS
12 YOUNG-NAM S&T MHPS
470MWx1 (M501J)
Gas-Fired Power Plant (on-going)
COUNTRY PROJECT NAME TYPE GAS TURBINE HRSG STEAM TURBINE
SIN-PYEONG- CCPP, 2x2x1 MHPS
1 S.Korea GE Power MHPS
TAEK 943MWx1 (M501J)

Renewable Energy Plant (completed)


COUNTRY PROJECT NAME TYPE BOILER STEAM TURBINE
1 Poland KRAKOW SRF / 16.1MWe+35MTt Doosan Lentjes SIEMENS

2 BUSAN SRF / 25MW Andritz E&E (CFBC) SIEMENS

DONGHAE Biomass / 30MW Andritz E&E (CFBC) SIEMENS


3
S.Korea
4 SEOKMUN Biomass / 24MWe+52.2 Gcal/h Hansol Seentec (CFBC) MHPS

5 POHANG SRF / 12.5MW Andritz E&E (CFBC) SIEMENS

Gas Engine Power Plant (completed)


COUNTRY PROJECT NAME TYPE ENGINE
1 Mexico POSCO-MEXICO Gas Engine / 3MWx3 GE

Вам также может понравиться