Вы находитесь на странице: 1из 3

Date Activities

First day of OJT. OJT Orientation


November 22-24,2017 T-shirt printing
Cutting stickers
Folding t-shirts
Orientation for Air Liquide and Gas Mixer Control
Panel
November 27- December 1, Went to Amkor in Laguna. Observing on how to install
2017 instruments specifically control panel.
Safety Orientation in Air Liquide
Orientation in RTD and Controller
AutoCAD (Basic Circuit Making)
Cleaning Pressure Relief Valve
Cutting stickers
Temperature Indicator Controller (TIC) configuration
December 4-8, 2017 Reading the manual of TIC
AutoCAD
Panel assembly
Panel testing
Configuration of panel
Gift sorting
Paying of Bills
December 11-15, 2017 Sorting receipts
Configuration of a program
Programming
Panel wiring
Panel wiring
Gift sorting
December 18-22, 2017 Programming
Panel Wiring
Testing the Panel
Support in labelling
January 4-5, 2018 Searching pressure instrument.

Searching for our project study.


Cleaning the tools
Cutting stickers
January 8-12, 2018 Folding t-shirts
Wrapping t-shirts
AutoCAD
Programming traffic light in WindLGC
Programming
January 15-19, 2018 Cleaning
AutoCAD
Filling documents
AutoCAD
January 22-26, 2018 Programming
Researching
Paying the water bills
Research
Making of related literature and citations
AutoCAD
January 29- February 2, Completion report
2018 Calibration Certificate
Arranging the things they inquire
Calibration of Priming Temp and Vaporizer Temp in
LINDE Batangas
AutoCAD
February 5-9, 2018 Research
Cleaning the shelves
Sketch Up
Sketch Up
February 12-16, 2018 Research

AutoCAD
Research
February 19-23, 2018 Sketch Up
Programming Counter in WindLGC
Cleaning the Valves
Sketch Up
February 26- March 2, 2018 Cleaning the valves
AutoCAD
Wiring
Expenses sorting
Inventory sorting

March 8-9, 2018

March 12-16, 2018

March 19-23, 2018

March 26-30, 2018

April 2-6, 2018

April 9-13, 2018


April 16-20, 2018

Вам также может понравиться