PROJECT: ARAR HOSPITAL

Hot Water storage calcualtions as per


ASHRAE Handbook - HVAC Applications - Service Water Heating

HOT WATER DEMAND PER FIXTURE


LIT/hr/FIXTIRE
CALCULATED AT 60C

ARAR HOSPITAL
4th Floor 3rd Floor 2nd Floor 1st Floor Ground Ancillary Bldg SUM
Lavatory (private) 128 128 48 17 48 10 379
Lavatory (Public) 4 4 15 23 12 6 64
Bath Tub 2 2 4
Shower 60 60 15 6 141
Service Sink 12 12 19 16 11 2 72
Pantry Sink 4 4 4 1 2 2 17
Kitchen Sink 10 10
Laundry 6 6

HOSPITAL
L/hr/Fixture No. Fixtures L/hr

Basin, Lavatory PRIVATE 7.6 379 2880.4


Basin, Lavatory PUBLIC 23 64 1472
Bathtubs 76 4 304
Dishwasher 380 0
Foot Basin 11 0
Kitchen Sink 76 10 760
Laundry, Stationary Tubs 106 6 636
Pantry Sink 38 17 646
Showers 284 141 40044
Service Sinks 76 72 5472
Hydrotherapeutic Showers 1520 0
Hubbard Baths 2270 0
Leg Baths 380 0
Arm Baths 130 0
Sitz Baths 114 0
Continuous Flow Baths 625 0
Circular Wash Sinks 76 0
Semicercular Wash Sinks 38 0

MAXIMUM DEMAND 52214.4

DEMAND FACTOR 0.25


STORAGE CAPACITY FACTOR 0.6

STORAGE CAPACITY (LIT) 7832.16

TOTAL STORAGE CAPACITY Taking 20%


9398.592 LIT
security=

SAY~ = 10000 LIT

HEATING NEEDED = 1892 Kg/hr Steam

o
Entering Water Temperature= 5 C
o
Leaving Water Temperature= 60 C
o
T = 60-5 =55 C
Required Steam pressure is 6BAR