Mannix Carney MSc
I use P6, Data Analytics and Facilitation Skills to Identify Risks, Plan
www.linkedin.com/in/mannixcarney and Communicate Project Schedules.
(LinkedIn) Calgary, Alberta, Canada
projectplanninghq.com (Other)

Top Skills
Summary
MS Project I am a project planner with over 15 years of experience in project
Primavera P6 control roles on industrial engineering projects in the oil and gas,
Construction pharmaceutical and infrastructure Industries.

Languages These projects were for the following global leaders:


German Imperial Oil (Oil & Gas), Chevron (Oil & Gas), Pfizer
(Pharmaceutical), Siemens(Electrical Infrastructure), CNRL (Oil &
Gas), Kinder Morgan (Infrastructure), Repsol (Oil & Gas), Nexen (Oil
& Gas), Novartis (Pharmaceutical), Transcanada (Infrastructure),
Cenovus (Oil & Gas), Suncor(Oil & Gas), Genzyme (Pharmaceutical)
and Teva (Pharmaceutical).

A little about me.

Originally from Ireland, I live in Calgary in Alberta Canada.

I am an advanced Primavera P6 and MS Project user and I have


experience in using SAP, Deltek Cobra and Ares Prism to plan and
control significant scopes of work.

Over the years, I have experienced several poorly planned, chaotic


and demoralizing projects.
These experiences really motivated me to find proven process and
techniques that allowed for the thoughtful, efficient and well executed
project delivery.

In my experience, the increase in project data and industry changes


means that project control professionals need to work extra hard at
defining project requirements, scope and work breakdown structure.

I have documented the data analysis tools and project planning


techniques that I have found useful on my website.

  Page 1 of 4
   

Experience
Wood
Project Planner
May 2012 - Present 
Calgary, Canada Area

Scheduler at SAGD engineering company in Calgary. Responsible for


developing and updating project schedules.
• Refinement of the cost estimate though using resource loading
• Leading interactive planning sessions with the project management team and
discipline leads.
• Updating schedules weekly and creating four week summaries.
• Preparing reports that highlight variances from the project baseline.
• Preparing earned value reports that include cost performance indicators and
schedule performance indicators.
• Managing changes in project scope though a change management process.
• Creating cash flow reports from the schedule for the cost control team.

Siemens
planner
2013 - 2014 (2 years)

Waterford Institute
Research Coordinator
July 2008 - July 2011 (3 years 1 month)
Waterford, Ireland

Worked as a researcher for one year, delivered and tested collaboration


workshops for a group of engineering students. Completed a MSc in
Construction Management based on the research work and course work.

• Designed and hosted online workshops in collaborative technology for MSc


in Project Management students in one of Ireland’s leading construction
engineering institutes.
• Instructed students from Universities in UK, France, Turkey and Cyprus on
using collaborative systems such as WebEx.
• Course work covered project management, construction economics, financial
management and construction law.

Published four conference papers.

  Page 2 of 4
   

Used a combination of an online project management system called Aconex


and a web conferencing
system called Webex to host a number of problem solving meetings.

DFL Construction
Project Scheduler / Coordinator
June 2006 - June 2008 (2 years 1 month)
Waterford, Ireland

DFL Construction - www.dfl.ie - Irish Building Contractor with 30 years


experience in commercial, pharmaceutical, industrial and residential
construction.

• Lead scheduler responsible for developing and maintaining Primavera P6


for a building contractor. Updated the schedule through regular field visits and
interaction with the cost control group.
• Worked with the cost estimating team to align the project baseline with the
cost estimate. The schedule was then used to support change orders
• Site based at Teva Pharmaceuticals, the project was a 20 million Euro
expansion of a product line. Involved during the design, construction and hand
over phase.
• Project took place in a functioning pharmaceutical plant, with the key link in
activities taking place during a two week shut down period.
• Assisted in preparing the project contract and selecting the list of
subcontractors for construction work.
• Responsible for recording project meetings, progress reports and site safety
records.
• Gained estimating experience though the pricing of additions to the project
scope.
• Liaised between site-based foremen and design teams, updating drawings
and requesting further information.
• Lead project schedule and safety meetings.

Pfizer
Validation Specialist
May 2004 - May 2006 (2 years 1 month)
Dublin, Ireland

Pfizer Pharmaceuticals – Worked as a validation specialist during the


final construction phase of a quality control laboratory on a 1 billion Euro
pharmaceutical project.

  Page 3 of 4
   

Education
Waterford Institute of Technology
Master's degree, Construction Management · (2008 - 2009)

Waterford Institute of Technology


Bachelor's degree, Construction Management · (2000 - 2004)

  Page 4 of 4