Minutes of Meeting

Tempat : Lt 12 Meeting Room


Tanggal : 11/04/19
Peserta : - Agus Faizin
- Cecep
- Eki Maradani
- Idham Andi T
- Andry Setiawan
- Roy Setiadi
- Tian Taufik
- Vina

No Description PIC Status Remark


1 Terminal point piping: 1 m outside from boiler building Piping To be confirmed
during project
(esp. location)
2 Tie in list to be developed Piping
3 Limestone and Bedmaterial Handling System : Piping – I&c Info
- Instrument air piping for control valve (by WIKA)
- Service air distribution piping, tie in 1 m outside building (by WIKA)
- Control valve & piping insulation (by Vendor)
4 Fuel Oil Firing System : Piping Info
- Fuel oil piping 1 m from boiler building (by WIKA)
- Return line fuel oil piping 1 m from boiler building (by WIKA)
- Service air piping 1 m from boiler building (by WIKA)
- Instrument air piping 1 m from boiler building (by WIKA)
5 IBD & CBD Tank : Piping – I&c Info
- Venting CBD Tank (by WIKA)
- All Manual Valve Blow Down Tank (By WIKA)
- All Drain Valve (By WIKA)
- Overflow Piping (by WIKA)
- Field Instrument & acc which connect to tank (by WIKA)
6 Electrostatic Precipitator: Mechanical Info
- Any pipe required for ESP System such as venting, etc (by Vendor)
- All Instrument (by Vendor)
- Any utility piping routed from main header such as service air,
service water, instrument air (by WIKA)
- Deliverable document reviewed (by WIKA) – All discipline
7 Steam Turbine : Mechanical Info
- Grey Color on P&ID (by WIKA)
- Instrument air piping (by WIKA)
- Nozzle from Vendor as per ASME B16.5
8 LP & HP Heater : Piping Info
- Drain Valve (by WIKA)
- Venting (by WIKA)
- Blind Flange (by WIKA)
- Goose Neck, if any, such as for tank (By Vendor)
9 Compressed Air System : Piping Info
All piping inside compressor building (by WIKA)
10 Coal Handling System: Piping To be confirmed
Service water piping to transfer tower for dust suppression during project
(containment pond under transfer tower) (by WIKA)
11 Plant Water System ; Piping Info
- Seawater intake GRE piping to MMF Nozzle (by WIKA)
- Piping from WTP to tank farm, tie in 1 m outside building (by WIKA)
- Piping from compressor to WTP, tie in 1 m outside building (by
WIKA)
- P&ID battery limit to be updated
12 Waste Water System : Piping Info
- Piping from sump pit to WWTP (pond) (by WIKA)
- Discharge piping from WWTP Discharge Pump Nozzle (by WIKA)
- Piping from Filter Press Nozzle (by WIKA)
- P&ID battery limit to be updated
13 Fire Protection System : Process To be confirmed
- Fire pump : Only pump not package Piping during project
- All piping by WIKA
14 Chemical Feed & Sampling System : Piping Info
- Chemical feed connection until pump discharge nozzle (by WIKA)
- Sampling pipe until sampling rack including insulation (By WIKA)
- Study building to be relocated to center area between boiler
15 Chlorination : Piping
- Connection to pump Nozzle (by WIKA)
- Diffuser (by Vendor)
- Chlorination Building follow up to Civil to be updated into 1 building
- Chlorination Building optimize to Circulating water pump
16 Garage House & Coal handling control room subject to review for Piping
relocation