Unit Rate
No Sub Job Description Quantity Amount (RM)
(RM)
4 Carried out ash blasting the side entry casing. (Item B) 5 nos.
9 Carried out ultrasonic cleaning the bearing housing T/E. (Item G) 5 nos.
10 Carried out ultrasonic cleaning the bearing housing C/E. (Item H) 5 nos.
11 Carried out ash blasting the compressor outlet casing. (Item J) 5 nos.
TOTAL, RM -
MMHE TE In-charge :
MMHE Project Planner In-charge :
MMHE Cost Controller In-charge :
Name Sign Date
P.S. …………………………………………………………..
Approved by (MMHE),
Unit Rate
No Sub Job Description Quantity Amount (RM)
(RM)
TOTAL, RM -
MMHE TE In-charge :
MMHE Project Planner In-charge :
MMHE Cost Controller In-charge :
Name Sign Date
P.S. …………………………………………………………..
Approved by (MMHE),