Вы находитесь на странице: 1из 13

ESTIMATION OF A TWO-STOREY RESIDENTIAL BUILDING

CONCRETE
GROUND FLOOR
DESCRIPTION QUANTITY (nos.) DIMENSION (cu.m) VOLUME (cu.m.)
Footing 1 8 0.5915 4.732
Footing 2 2 0.455 0.91
Column 1 8 0.27 2.16
Column 2 2 0.18 0.36
Tie Beam 1 4 0.192 0.768
Tie Beam 2 5 0.222 1.11
Tie Beam 3 1 0.231 0.231
Tie Beam 4 2 0.141 0.282
Tie Beam 5 1 0.096 0.096
Wall Footing 1-1 1 0.084 0.084
Wall Footing 1-2 1 0.256 0.256
Wall Footing 1-3 2 0.188 0.376
Wall Footing 1-4 2 0.068 0.136
Wall Footing 1-5 1 0.128 0.128
Wall Footing 1-6 2 0.108 0.216
Slab 1 2 4.2 8.4
Slab 2 1 0.585 0.585
Slab 3 1 0.27 0.27
TOTAL 21.1
SECOND FLOOR
DESCRIPTION QUANTITY (nos.) DIMENSION (cu.m) VOLUME (cu.m.)
Column 1 8 0.27 2.16
Column 2 2 0.18 0.36
Beam 1 4 0.28 1.12
Beam 2 6 0.32375 1.9425
Beam 3 2 0.205625 0.41125
Beam 4 1 0.14 0.14
Beam 5-2 1 0.09 0.09
Beam 6 2 0.2625 0.525
Beam 7 1 0.135 0.135
Beam 8 1 0.195 0.195
Beam 9 2 0.10125 0.2025
Slab 1 2 4.2 8.4
Slab 2 1 0.585 0.585
Slab 3 1 0.27 0.27
TOTAL 16.53625
ROOF
DESCRIPTION QUANTITY (nos.) DIMENSION (cu.m) VOLUME (cu.m.)
Roof Beam 1 4 0.24 0.96
Roof Beam 2 6 0.2775 1.665
Roof Beam 3 2 0.17625 0.3525
Roof Beam 4-2 1 0.108 0.108
Roof Beam 5 2 0.009 0.018
Beam 6 1 0.2625 0.2625
TOTAL 3.366
TOTAL VOLUME = 41.00225
MASONRY
GROUND FLOOR
DESCRIPTION QUANTITY (nos.) DIMENSION (sq.m) AREA (sq.m.)
Wall 1 1 5.55 5.55
Wall 2 1 3 3
Wall 3 1 3.8 3.8
Wall 4 1 6.4 6.4
Wall 5 1 4.41 4.41
Wall 6 1 6.75 6.75
Wall 7 1 9.39 9.39
Wall 8 1 8.82 8.82
Wall 9 1 9.69 9.69
Wall 10 1 9.75 9.75
Wall 11 1 10.11 10.11
Wall 12 1 10.5 10.5
Wall 13 1 6.72 6.72
Wall 14 1 2.52 2.52
Wall 15 1 10.5 10.5
Wall 16 1 5.425 5.425
Wall 17 1 0.636 0.636
Wall 18 1 1.296 1.296
TOTAL 115.267
SECOND FLOOR
DESCRIPTION QUANTITY (nos.) DIMENSION (sq.m) AREA (sq.m.)
Wall 1 1 5.55 5.55
Wall 2 1 3 3
Wall 3 1 3.8 3.8
Wall 4 1 3.43 3.43
Wall 5 1 0.636 0.636
Wall 6 1 8.25 8.25
Wall 7 1 3.12 3.12
Wall 8 1 3 3
Wall 9 1 9 9
Wall 10 1 9.39 9.39
Wall 11 1 10.5 10.5
Wall 12 1 9 9
Wall 13 1 8.85 8.85
Wall 14 1 12 12
Wall 15 1 7.32 7.32
Wall 16 1 8.64 8.64
Wall 17 1 10.5 10.5
Wall 18 1 2.52 2.52
TOTAL 118.506
ROOF
DESCRIPTION QUANTITY (nos.) DIMENSION (sq.m) AREA (sq.m.)
Wall 1 1 0.585 0.585
Wall 2 1 6.195 6.195
Wall 3 1 7.7 7.7
TOTAL 14.48
TOTAL AREA 248.253
NAME: LOPEZ, JAIVIE S.
MADRIA, MIRENTZ IVAN A.

Project Name: Proposed Two-Story Residential House

COST ESTIMATE
ITEM MATERIAL DESCRIPTION QUANTITY UNIT UNIT COST

I MATERIALS
40 kg Portland Cement 651.00 bags 250.00
Fine Aggregates 149.42 cu.m. 550.00
Coarse Aggregates 32.42 cu.m. 650.00
CHB 3,604.00 pcs. 12.00
Reinforcing Steel Bars 181.00 pcs. 255.00
#16 GI Tie Wire 13.84 kgs. 85.00

TOTAL DIRECT COST


AMOUNT

162,750.00
82,181.00
21,073.00
43,248.00
46,155.00
1,176.40

356,583.40
PROGRAM OF WORKS
ITEM NO.: DESCRIPTION
EXCAVATION FOR FOOTING AND WALL FOOTING
BACKFILLING OF EXCAVATED MATERIALS
GRAVEL BEDDING @ SOF, CF, WF, TB
EMBANKMENT
SOIL POISONING
R.S.B. GRADE 40 FOR FOOTING AND FOUNDATION
R.S.B. GRADE 40 FOR COLUMNS, PC, DC, BEAMS AND STIFFENER
R.S.B. SLAB OF FILL, CORRIDOR AND RAMPS
R.S.B. FOR SLABS, STAIRS, AND SUN BREAKER
REINFORCED CONCRETE FOR FOOTING AND FOUNDATION
REINFORCED CONCRETE FOR COLUMNS, PC, DC, BEAMS, STIFFENER
REINFORCES CONCRETE FOR SOF, CORRIDOR AND RAMPS
REINFORCED CONCRETE FOR SLABS, STAIRS, AND SUNBREAKER
MASONRY UNITS (150mm WALL)
MASONRY UNITS (100mm WALL)
CARPENTRY AND JOINERY WORKS (BLACKBOARD)
CARPRNTRY FOR CEILING
METAL STRUCTURES (RAIL GUARD AND FIRE ESCAPE STAIRS)
STEEL WINDOWS WITH GRILLES
STEEL DOORS AND FRAMES
WOODEN DOORS
METAL STRUCTURES (ROOF FRAMING)
PRE-PAINTED METAL SHEETS (0.5mm TOTAL COAT THICKNESS)
PLAIN CEMENT FINISH WITH FLOOR HARDENER NON-SKID
NON-SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINE
PLAIN CEMENT PLASTER FINISH
CERAMIC TILES
MASONRY PAINTING
METAL PAINTING
WOODEN PAINTING
SEWER LINE WORKS
PLUMBING WORKS
SEPTIC TANK VAULT
CATCH BASIN
CONDUITS, BOXES, AND FITTINGS
WIRES AND WIRING DIVICES
POWER LOAD CENTER, SWITCHGEAR AND PANEL BOARDS
CONSTRUCTION SAFETY AND HEALTH
PROJECT BILLBOARD AND WARNING SIGNS
MOBILIZATION
DEMOBILIZATION
BUILDING PERMIT
TOTAL DAYS
START DATE END DATE DURATION
8/1/2018 8/17/2018 16
8/29/2018 9/4/2018 6
9/18/2018 9/20/2018 2
11/20/2018 11/22/2018 2
9/4/2018 9/18/2018 14
8/17/2018 8/27/2018 10
9/7/2018 10/24/2018 47
11/26/2018 12/26/2018 30
9/16/2018 10/21/2018 35
8/20/2018 9/10/2018 21

10/26/2018 10/30/2018 4
9/21/2018 11/4/2018 44
9/15/2018 11/7/2018 53
9/15/2018 10/25/2018 40
12/7/2018 12/11/2018 4
12/11/2018 12/25/2018 14
11/7/2018 11/13/2018 6
12/2/2018 12/12/2018 10
12/5/2018 12/13/2018 8
12/11/2018 12/17/2018 6
11/5/2018 11/19/2018 14
11/19/2018 11/23/2018 4
11/7/2018 11/23/2018 16
12/5/2018 12/6/2018 1
11/27/2018 12/1/2018 4
12/30/2018 1/6/2019 7
1/6/2019 1/30/2019 24
1/26/2019 1/30/2019 4
1/26/2019 1/30/2019 4
12/16/2018 12/20/2018 4
12/12/2018 12/16/2018 4
12/13/2018 12/19/2018 6
1/7/2019 1/11/2019 4
12/8/2018 12/24/2018 16
12/12/2018 1/2/2019 21
1/2/2019 1/6/2019 4
8/1/2018 1/30/2019 182
8/1/2018 1/30/2019 182
8/1/2018 8/2/2018 1
1/29/2019 1/30/2019 1

875
POWER
PROJECT
CONSTRU
LOAD
DEMOBILIZATION
BILLBOARD
MOBILIZATION
CENTER,
CONDUITS,
WIRES
CTIONAND
SWITCHGEAR
AND
SAFETY
NON-SKID
SEPTIC
CATCH
BOXES,
WIRING
PRE-PAINTED
PLAIN
PLUMBING
WARNING
SEWER
AND
WOODEN
TANK
BASIN
CEMENT
AND
PLAIN
METAL
DIVICES
CEMENT
MASONRY
HEALTH
AND
LINE
SIGNS
VAU
WORKS
FITTINGS
METAL
CERAMIC
METAL
METAL
CEMENT
PAINTING
PANEL
WORKS
PAINTING
LT
FINISH
FLOOR
PAINTING
STRU
STRU
SHEETS
REINFORCED
CARPENTRY
BOARDS
TILES
STEEL
WITH
PLASTER
REINFORCED
FINISH
CTU
WOODEN
CTU
REINFORCES
RES
FLOOR
DOORS
WINDOWS
(0.5m
CARPRNTRY
RES
REINFORCED
MASONRY
WITH
FINISH
(RAIL
MASONRY
AND
R.S.B.
(ROOF
CONCRETE
DOORS
mHARDENER
AND
6mm
CONCRETE
TOTAL
R.S.B.
GU
JOINERY
CONCRETE
WITH
GRADE
R.S.B.
FRAMING)
U
ARD
FRAMES
FOR
R.S.B.
NITS
GROOVE
UCONCRETE
FOR
COAT
NITS
FOR
GRILLES
AND
CEILING
SLAB
WORKS
NON-SKID
40
(100mm
SLABS,
FOR
GRADE
(150mm
THICKNESS)
SLABS,
FOR
FOR
FIRE
LINE
OF
COLU
EXCAVATION
GRAVEL
FOR
SOF,
(BLACKBOARD)
BACKFILLING
COLUMNS,
STAIRS,
FILL,
ESCAPE
40
WALL)
STAIRS,
MNS,
WALL)
SOIL
FOR
FOOTING
CORRIDOR
CORRIDOR
EMBANKMENT
BEDDING
FOOTING
AND
PC,
POISONING
STAIRS)
AND
PC,
FOR
DC,
OF
SUN
AND
DC,
SUNBREAKER
AND
FOOTING
EXCAVATED
BEAMS,
AND
@
AND
BREAKER
BEAMS
FOUNDATION
SOF,
RAMPS
RAMPS
FOU
STIFFENER
CF,
AND
AND
NDATION
MATERIALS
WF,
WALL
STIFFENER
TB FOOTING
DURATION
START DATE