Вы находитесь на странице: 1из 53

1.

0 DESIGN INFORMATION

1.1 Material Properties

Density of Concrete 24 kN/m3


Density of Water 9.81 kN/m3
Concrete Grade 30 N/mm2
Characteristic Strength of high yield Steel 460 N/mm2
Characteristic Strength of Mild Steel 250 N/mm2

1.2 Durability Requirement

Exposure Condition - Severe

Clear cover to r/f 50 mm

1.3 Foundation

Assumed bearing capacity 125 kN/mm2


Soil parameters c= 0 kN/mm2
(cohesionless soil) j= 30 0
g= 20 kN/m3
(Where c is cohesion, j is friction angle and g is the density.)

2.0 REFERENCES

BS 8110 Part 1 (1985)


British Standard Structural Use of Concrete

BS 8007 (1987)
Design of concrete structures for retaining aqueous liquids

BS 4466 (1981)
Specification for Bending Dimensions and Scheduling of Reinforcement for Concrete.

Reinforced Concrete Designer’s Hand Book


R.E.Renolds and James C. Steedman - 10 th Edition

Standard Method of Detailing Structural Concrete


By Institution of Structural Engineers UK
CONTENTS
Page No
1.0 Codes of Practice and References 1
2.0 Design Data and Parameters 2-3
3.0 Loadings 4-7
4.0 Stability check of the chamber in sea bed 8
5.0 Analysis of the chamber 9
6.0 Analysis results and Design
6.1 Analysis results of Wall 01 common for Wall 03 10-11
6.2 Design of Wall 01 common for Wall 03 12-16
6.3 Analysis results of Wall 02 17-18
6.4 Design of Wall 02 19-23
6.5 Analysis results of Top Slab 24-25
6.6 Design of Top Slab 26-31
6.7 Analysis results of Base Slab 32-33
6.8 Design of Base Slab 34-38
7.0 Conclusion 39

Annexure 1
Annexure 2
Annexure 3
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

DESIGN OF OFFSHORE JUNCTION CHAMBER


Note to the Revision 02
Considering the size and arrangment of the opening and dimensions of the
walls and slab where the opening provided, the original model was developed
assuming there is no openings to obtain the conservative results. However,
through the Revision 01 the model is revised by providing openings at respective
locations. No structural connection assumed between the pipes and walls,
hence no forces will transfer between each other.
As the SS manhole cover fix to the top slab by eight number of bolts, the total
force apply on the cover has assumed to be transferred to the top slab as
point loads at eight locations.

1.0 Codes of Practice and References


BS 8110 Part 1 (1997)
Structural Use of Concrete

BS 8007 (1987)
Design of concrete structures for retaining aqueous liquids

BS 6349-1:2000
Maritime Structures

BS 8666 (2000)
Specification for Bending Dimensions and Scheduling of Reinforcement for
Concrete.

Reinforced Concrete Designer’s Hand Book


R.E.Reynolds and James C. Steedman - 10 th Edition

Design of Water Retaining Structures


Ian Batty, Roger Westbrook

Principles of Geotechnical Engineering 5th Edition


Braja M Das

Foundation Analysis & Design


Joseph E Bowles

Standard Method of Detailing Structural Concrete


Institution of Structural Engineers UK

Supplementary data of Tender Document

Design and Numerical Modelling of Mutwal Sea Outfall


Lanka Hydraulic Institute August 2013

Geotechnical Investigation Report


(NBRO on 28th May 2013)

3 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

2.0 Design Data and Parameters


2.1 Material Properties
Density of Concrete (γcon) 24 kN/m3
Density of normal Water (γw) 10 kN/m3
Density of sea water (γsw) 10.25 kN/m3
geotechnical Bulk density of soil (γsat) 19.7 kN/m3
report, at CH 1447 Angle of internal friction (φ') 46 0

BS6349 Concrete grade 35 N/mm2


Table 22&24
BS8007
clause 6.3
Characteristic Strength of high yield Steel 460 N/mm2

2.2 Durability Requirements


Design Life of the structure 50 yrs
BS6349 Exposure Condition - Very Severe (XS2)
clause58.3.3.2 Clear cover to reinforcement 50 mm

BS 8007 Design surface crack width 0.1 mm


clause 2.7.3
clause 2.2.3.3

2.3 Bearing Capacity of sea bed at the selected location

Terzaghi's ultimate bearing capacity equation for shallow foundation assuming


local shear failure (conservative approach) with the effect of ground water table

For square shape footing


Eqn 15.17 qu = 1.3ċ'N'c+qN'q+0.4γBN'γ
Principles of cohesionless soil
Geotechnical ċ' = (2/3)c' = 0
Engineering with the effect of water table
q = γ(Df-D)+γ'D
where,

4 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

γ - Unit weight of unsaturated soil


Df - Distance to the soil fill above the base from bottom of the base ≤ B
B - Width of the base = 4.5 m
D - Distance to the water level above the base from the bottom of base ≤ Df
γ' - Effective unit weight of soil = γsat - γsw

Df = D = 0.8 m
γ' = 19.7-10.25
= 9.45 kN/m3
Therefore
q = 0+9.45*0.8
= 7.56 kN/m2

For φ=φ'=460
Table 15.2 of N'c = 55.73
Principles of N'q = 39.48
Geotechnical N'γ = 41.7
Engineering
Since the soil is in submerged condition γ need to be replaced by γ'

qu = 0+7.56*39.48+0.4*9.45*4.5*41.7
= 1007.79 kN/m2

Assuming factor of safety (FOS) of 3

Allowable bearing capacity qa = 1007.79/3


= 335.93 kN/m2

Bowles Book Modulus of subgrade reaction (ks) = 40*SF*qa


page 408 = 40*3*335.93
= 40311.43 kN/m3

5 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

3.0 Loadings
Following load cases and combinations have been considered
3.1 Load cases

LC1 - Critical load case for stability calculation of chamber

clause 38.2 FD = (CD ρV An)/2


2

BS6349
where,
FD - steady drag force (kN)
CD - time-averaged drag force coefficient
ρ - water density (t/m3)
V - incident current velocity (m/s)
An - area normal to flow (m2)

Table 7 CD = 2
BS6349
ρ = 10.25 kN/m3

6 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
= 1.03 t/m3
LHI Report V = 1.00 m/s (during monsoon season)
An = 2.45*4.5
= 11.03 m2
Therefore
FD = 11.30 kN

Assuming following dimensions for elements

Thickness of wall 01 = 350 mm having an opening of 2.4m


diameter
Thickness of wall 02 = 350 mm

Thickness of wall 03 = 350 mm having an opening of 1.6m


diameter
Thickness of base slab = 500 mm

Thickness of top slab = 350 mm having an opening of 1.2m


diameter

Submerged weights of
Wall 01 = {(24-10.25)*[2.4*4.5*0.35-(π*2.42*0.35/4)]}
= 30.20 kN
Wall 02 = (24-10.25)*2.4*2.8*0.35
= 32.34 kN
Wall 03 = {(24-10.25)*[2.4*4.5*0.35-(π*1.62*0.35/4)]}
= 42.30 kN

Base slab = (24-10.25)*4.5*4.5*0.5


= 139.22 kN
Top slab = {(24-10.25)*[3.5*4.5*0.35-(π*1.22*0.35/4)]}
= 70.35 kN

7 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

LC2 - Critical Load case for reinforcement design of structural elements

Assumptions
- Friction loss along the pipe has not been considered (conservative)
- Evethough the water densities are different between inside and outside
maximum density value (γsw) has been considered (conservative)
Application of inside and outside water pressures

Resultant pressure diagram

8 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

P1 = γsw*(6.7+h-2.4)
= γsw*(h+4.3)
P2 = γsw*(6.7+h-2.4+2.4)
= γsw*(h+6.7)
P3 = γsw*(h-2.4)
P4 = γsw*h
P5 = γsw*(h-2.75)
P6 = γsw*(h+0.5)
Therefore,
P1-P3 = γsw*6.7
= 68.68 kN/m2
P2-P4 γ
= sw *6.7
= 68.68 kN/m2
P1-P5 = γsw*7.05
= 72.26 kN/m2
P2-P6 = γsw*6.2
= 63.55 kN/m2
If the submerged density is assumed for concrete in the analysis,

P1-P3 = P2-P4 = P1-P5 = P2-P6 = 68.68 kN/m2

9 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

4.0 Stability check of the chamber in sea bed


- Load case LC1 is considered
- Beneficial effect from the two pipes connected at either side ignored (conservative)

70.35

Passive resistance (P) = [Kp*(γsat-γsw)*0.8*0.8/2]*4.5

Kp = (1+Sin φ)/(1-Sinφ)
= 6.13

P = 83.36 kN
Sliding resistance (F) = (70.35+42.3+64.68+30.2+139.22)*tanδ

Table 11-6 Assume δ=200


Bowles Book F = 126.21 kN

Taking moment about A

Overturning moment(Mo) = 11.3*2.025


= 22.88 kNm
Resistant moment (Mr) = 83.36*0.267+42.3*0.675+(70.35+64.68+139.22)*
2.25+30.2*3.825
= 783.39 kNm
Factor of safety against sliding = (83.36+140.01)/11.3
= 18.55 >> 2 OK

Factor of safety against = 868.73/22.34


overturning = 34.24 >> 3 OK

10 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
Bearing pressure (Max) = P/A + M/Z
= 384.68/4.5*4.5+22.34/(4.5*4.52/6)
= 20.47 kN/m2 << 335.93 kN/m2
No bearing failure OK

Bearing pressure (Min) = P/A-M/Z


= 17.53 kN/m2 >> 0 OK
Chamber not lifting

Check for floatation

It has been assumed that the both pipelines are prevented of floating by
their own arrangements.
60% air filled condition is assumed for floatation check

Total weight of the chamber = Wall 01+2*Wall 02+Wall 03+Base slab+ Top slab
including 40% of water inside = + 3.8*2.8*2.4*10*0.4
= 707.39 kN

Total up thrust force act on the = 10.25*4.5*3.5*3.25


chamber = 524.67 kN

F.O.S against floatation = 605.25/524.67


= 1.35 > 1.25 OK

11 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

5.0 Analysis of the chamber


PROKON (version 2.6) structural analysis and design software has been
used for the analysis. 3 dimensional finite element model has prepared
using 0.25mx0.25m shell elements.

Supports for the base slab are given as spring supports and the spring
constants have been calculated using the value of modulus of subgrade
reaction multiplying the effective area.

Pressure to the shell elements applied as area load perpendicular to the


surface

Value of the concrete density entered as the submerged density

0.25mx0.25m 0.35mthk
3D model of the chamber shell elements

0.25mx0.25m 0.5m thk spring supports


shell element

Applied pressure

12 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Top Slab

Wall
Please refer Annexure 1 for input data for the analysis
6.0 Analysis Results and Design

6.1 Analysis results of wall 01 common for wall 03:

Vertical Direction
Mx moments are considered in the design of the vertical reinforcement.

Maximum ultimate moment, Mx = 30.00 kNm/m


(see figure below)

Maximum ultimate shear Vy = 80.00 kN/m


(see figure below)

Maximum service moment, Mx = 20.00 kNm/m

13 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
(see figure below)

Horizontal Direction
My moments are considered in the design of the horizontal reinforcement.

Maximum ultimate moment, My = 38.00 kNm/m


(see figure below)

Maximum ultimate shear, Vx = 115.00 kN/m


(see figure below)

Maximum service moment, My = 27.00 kNm/m

14 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

### 6.2 Design of wall 01

Vertical Reinforcement

Design for ultimate condition

Assume that
Cover to r/f = 50 mm
Vertical r/f = 16 mm dia.
Horizontal r/f = 16 mm dia.
Vertical spacing = 125 mm
Horizontal spacing = 125 mm

Ian Batty & Assuming total direct tension is resisted by single face reinforcement
Roger West Brook Ultimate flexural moment (Mu) = 30 kNm/m
Page 58, 59 Ultimate Direct Tension (Fu) = 120 kN/m
Annexure 2
M1u = Mu-Fu(d-h/2)
= 17.88 kNm/m
Calculate As to carry M1u
Parameter Value
BS 8110 M 17.88
part-1 b 1000.00
Cl.3.4.4.4 t 350.00
d 276.00
fcu 35.00
fy 460.00
M/bd2fcu 0.01
k 0.01
k' 0.16
z 273.93
0.95d 262.20
Zcorrect 262.20
x 4.60

15 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
As(req) 170.40

As to carry Fu = Fu/0.87fy
= 299.85 mm2/m
Total As = 299.85+170.4 As(req)
= 470.25 mm2/m 470.25
mm2/m

Design for service condition

Ms = 20.00 kNm/m

Fs = 85 kN/m

M1s = Ms-Fs(d-h/2)
= 11.42 kNm/m

Estimate stress for 0.1mm crack (fs) = 200 N/mm2

z = 0.9*d
= 248.4 mm
As required = M/fs/z + Fs/fs
= 229.8 + 425
= 654.77 mm2/m
Actual As provided = 1609 mm2/m

Actual As resisting M = 229.8*1609/654.77


= 564.63 mm2/m

Actual As resisting F = 425*1609/1157.99


= 1044.37 mm2/m

BS 8007 w = (3*acr*εm) / {1+2*[(acr-cmin)/(h-x)]} --- {1}


Appendix B εm = ε1 -ε2 --- {2}
ε2 = 1.5*{bt (h-x)*(a'-x)} / {3*Es*As*(d-x)} --- {3}
ε1 = {fs*(h-x)} / {Es(d-x)} --- {4}
and
(x/d) = αe*r { SQRT [ 1+2/αe*r] -1} --- {5}
Es = 200 kN/mm 2

BS8110:2 Ec = 13.5 kN/mm2 assuming creep coefficient of 1


clause 3.6

Parameter Value
Vertical r/f 16
Horizontal r/f 16
Vertical Spacing 125
Horizontal Spacing 125
Cover 50
M 11.42
αe 15
t 350
b 1000

16 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
d 276
As(resisting M) 565
As(total) 1609
ρ 0.0020
(x/d) 0.2178
x 60
z 256
fs 79 < 0.8fy OK
fcb 1.5 < 0.45fcu OK
ε1 0.0005
ε2 0.0017
εm -0.001193
acr 88.86
cmin 66.00 w= 0.000
w -0.275 mm

Check crack width for direct tension

Assume
ε1 = 0.0005 (same as for flexure)
ε2 = bt x h = 0.001
Es x As w = 3acrx εm
εm = ε1 -ε2 = -0.15 OK
= -0.0006 = 0.00
Shrinkage and thermal movement in immature concrete
Cl.2.6.2.3
BS 8007 ρ crit = 0.0035

Refer Fig A- Minimum steel area As (min)


2 BS 8007 = 612.5 mm2/m = 613 mm2

Cl A-3 BS Wmax = Smax*R*α (T1+T2)


8007 Take R= 0.5
T1 = 34.0 0
C
350mm thick wall, 400kg/m3 cement content, plywood
Table 5.1 formwork
AppendixA T2 = 0 0
C
of BS8007 α= 10*10 -6
Wmax / Smax = 0.5*(10*10 -6)*( 34 + 0 )
= 0.00017
Table A-3 Smax = ( fct / fb )*(φ / 2ρ )
Table A-1 ( fct / fb ) = 0.67
Wmax / 0.00017 = 0.67*( φ / 2*ρ )
ρ = 0.000570 *φ
= 0.0091
Area of steel required = 1594.60 As
= 1595
Check for shear mm2
Shear force V = 80.00 kN
Shear stress v = 0.29 N/mm2
Table 3.8 BS Shear capacity vc = 0.59 N/mm2
8110 P-1
Shear is not critical

17 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
Note

As the effect of direct tension is not very significant and reducing of design forces due
to that effect is conservative at SLS as shown above, that check has not been performed
for latter calculations

Horizontal reinforcement

Design for ultimate condition

Assume that
Cover to r/f = 50 mm
Vertical r/f = 16 mm dia.
Horizontal r/f = 16 mm dia.
Vertical spacing = 125 mm
Horizontal spacing = 125 mm

Parameter Value
M 38.00
b 1000.00
t 350.00
d 292.00
fcu 35.00
fy 460.00
M/bd2fcu 0.01
k 0.01
k' 0.16
z 287.81 As(req)
BS 8110 0.95d 277.40 = 342
part-1 Zcorrect 277.40 mm2/m
Cl.3.4.4.4
x 9.31
As(req) 342.29

18 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Design for service condition

Service moment = 27.00


BS 8007 w = (3*acr*εm) / {1+2*[(acr-cmin)/(h-x)]} --- {1}
Appendix B εm = ε1 -ε2 --- {2}
ε2 = 1.5*{bt (h-x)*(a'-x)} / {3*Es*As*(d-x)} --- {3}
ε1 = {fs*(h-x)} / {Es(d-x)} --- {4}
and
(x/d) = αe*r { SQRT [ 1+2/αe*r] -1} --- {5}
Es = 200 kN/mm 2

Ec = 13.5 kN/mm2 assuming creep coefficient of 1

Parameter Value
Vertical r/f 16
Horizontal r/f 16
Vertical Spacing 125
Horizontal Spacing 125
Cover 50
M 27.00
αe 15
t 350
b 1000
d 292
As 1609
ρ 0.0055
(x/d) 0.3306
x 97
z 260
fs 65 < 0.8fy OK
fcb 2.2 < 0.45fcu OK
ε1 0.0004
ε2 0.0005
εm -0.000092 w= 0.000
acr 88.86 mm
cmin 66.00
w -0.021

Shrinkage and thermal movement in immature concrete


Cl.2.6.2.3 As (min)
BS 8007 ρ crit = 0.0035 = 613
mm2/m
Refer Fig A- Minimum steel area
2 BS 8007 = 612.5 mm2/m

Cl A-3 BS Wmax = Smax*R*α (T1+T2)


8007 Take R= 0.5
T1 = 34.0 0
C
350mm thick wall, 400kg/m3 cement content, plywood
Table 5.1 formwork
AppendixA T2 = 0 0
C

19 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
of BS8007 α = 10*10 -6

Wmax / Smax = 0.5*(10*10 -6)*( 34 + 0 )


= 0.00017
Table A-3 Smax = ( fct / fb )*( φ / 2ρ )
Table A-1 ( fct / fb ) = 0.67
Wmax / 0.00017 = 0.67*(φ / 2*ρ ) As
ρ = 0.000570 *φ = 1595
= 0.0091 mm2/m
Area of steel required = 1594.60

Check for shear

Shear force V = 115.00 kN


Shear stress v = 0.39 N/mm2
Table 3.8 Shear capacity vc = 0.58 N/mm2
BS 8110 P-1 Shear is not critical

Check for deflection

Clause 3.4.6.3
BS 8110 Part1 Maximum deflection = 1 mm
1997 Maximum allowable deflection = 3250/250 (Span/250)
Clause 2.2.3.4 = 13 mm Hence OK
BS8007

Summary for wall 01&03

Vertical Reinforcement = T16@125 (1609mm2/m) NF&FF


Horizontal Reinforcement = T16@125 (1609mm2/m) NF&FF

20 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

6.3 Analysis results of wall 02:

Vertical Direction
Mx moments are considered in the design of the vertical reinforcement.

Maximum ultimate moment, Mx = 59.00 kNm/m


(see figure below)

Maximum ultimate shear Vy = 136.00 kN/m


(see figure below)

21 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Maximum service moment, Mx = 42.00 kNm/m


(see figure below)

Horizontal Direction
My moments are considered in the design of the horizontal reinforcement.

Maximum ultimate moment, My = 38.00 kNm/m


(see figure below)

Maximum ultimate shear, Vx = 90.00 kN/m


(see figure below)

22 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Maximum service moment, My = 27.00 kNm/m

### 6.4 Design of wall 02

Vertical Reinforcement

Design for ultimate condition

Assume that
Cover to r/f = 50 mm
Vertical r/f = 16 mm dia.
Horizontal r/f = 16 mm dia.
Vertical spacing = 125 mm
Horizontal spacing = 125 mm

Parameter Value
BS 8110 M 59.00
part-1 b 1000.00
Cl.3.4.4.4 t 350.00
d 276.00
fcu 35.00
fy 460.00

23 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
M/bd2fcu 0.02
k 0.02
k' 0.16
z 269.04
0.95d 262.20
Zcorrect 262.20
x 15.47 As(req)
As(req) 562.27 = 562
mm2/m

Design for service condition

BS 8007 w = (3*acr*εm) / {1+2*[(acr-cmin)/(h-x)]} --- {1}


Appendix B εm = ε1 -ε2 --- {2}
ε2 = 1.5*{bt (h-x)*(a'-x)} / {3*Es*As*(d-x)} --- {3}
ε1 = {fs*(h-x)} / {Es(d-x)} --- {4}
and
(x/d) = αe*r { SQRT [ 1+2/αe*r] -1} --- {5}
Es = 200 kN/mm 2

BS8110:2 Ec = 13.5 kN/mm2 assuming creep coefficient of 1


clause 3.6

Parameter Value
Vertical r/f 16
Horizontal r/f 16
Vertical Spacing 125
Horizontal Spacing 125
Cover 50
M 42.00
αe 15
t 350
b 1000
d 276
As 1609
ρ 0.0058
(x/d) 0.3381
x 93
z 245
fs 107 < 0.8fy OK
fcb 3.7 < 0.45fcu OK
ε1 0.0007
ε2 0.0006
εm 0.000188
acr 88.86
cmin 66.00 w= 0.043
w 0.043 mm

Shrinkage and thermal movement in immature concrete


Cl.2.6.2.3
BS 8007 ρ crit = 0.0035

Refer Fig A- Minimum steel area As (min)


2 BS 8007 = 612.5 mm2/m = 613

24 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
mm2/m
Cl A-3 BS Wmax = Smax*R*α (T1+T2)
8007 Take R= 0.5
T1 = 34.0 0
C
350mm thick wall, 400kg/m3 cement content,plywood
Table 5.1 formwork
AppendixA T2 = 0 0
C
of BS8007 α= 10*10 -6

Wmax / Smax = 0.5*(10*10 -6)*( 34 + 0 )


= 0.00017
Table A-3 Smax = ( fct / fb )*(φ / 2ρ )
Table A-1 ( fct / fb ) = 0.67
Wmax / 0.00017 = 0.67*( φ / 2*ρ )
ρ = 0.000570 *φ
= 0.0091
Area of steel required = 1594.60 As
= 1595
Check for shear mm2/m
Shear force V = 136.00 kN
Shear stress v = 0.49 N/mm2
Table 3.8 Shear capacity vc = 0.59 N/mm2
BS 8110 P-1 Shear is not critical

Horizontal reinforcement

Design for ultimate condition

Assume that
Cover to r/f = 50 mm
Vertical r/f = 16 mm dia.
Horizontal r/f = 16 mm dia.
Vertical spacing = 125 mm
Horizontal spacing = 125 mm

Parameter Value
M 38.00
b 1000.00
t 350.00
d 292.00

25 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
fcu 35.00
fy 460.00
M/bd2fcu 0.01
k 0.01
k' 0.16
z 287.81 As(req)
BS 8110 0.95d 277.40 = 342
part-1 Zcorrect 277.40 mm2/m
Cl.3.4.4.4
x 9.31
As(req) 342.29

Design for service condition

Service moment = 27.00


BS 8007 w = (3*acr*εm) / {1+2*[(acr-cmin)/(h-x)]} --- {1}
Appendix B εm = ε1 -ε2 --- {2}
ε2 = 1.5*{bt (h-x)*(a'-x)} / {3*Es*As*(d-x)} --- {3}
ε1 = {fs*(h-x)} / {Es(d-x)} --- {4}
and
(x/d) = αe*r { SQRT [ 1+2/αe*r] -1} --- {5}
Es = 200 kN/mm 2

Ec = 13.5 kN/mm2 assuming creep coefficient of 1

Parameter Value
Vertical r/f 16
Horizontal r/f 16
Vertical Spacing 125
Horizontal Spacing 125
Cover 50
M 27.00
αe 15
t 350
b 1000
d 292
As 1609
ρ 0.0055
(x/d) 0.3306
x 97
z 260
fs 65 < 0.8fy OK
fcb 2.2 < 0.45fcu OK
ε1 0.0004
ε2 0.0005
εm -0.000092 w= 0.000
acr 88.86 mm
cmin 66.00
w -0.021

Shrinkage and thermal movement in immature concrete

26 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
Cl.2.6.2.3 As (min)
BS 8007 ρ crit = 0.0035 = 613
mm2/m
Refer Fig A- Minimum steel area
2 BS 8007 = 612.5 mm2/m

Cl A-3 BS Wmax = Smax*R*α (T1+T2)


8007 Take R= 0.5
T1 = 34.0 0
C
350mm thick wall, 400kg/m3 cement content,plywood
Table 5.1 formwork
AppendixA T2 = 0 0
C
of BS8007 α = 10*10 -6

Wmax / Smax = 0.5*(10*10 -6)*( 34 + 0 )


= 0.00017
Table A-3 Smax = ( fct / fb )*( φ / 2ρ )
Table A-1 ( fct / fb ) = 0.67
Wmax / 0.00017 = 0.67*(φ / 2*ρ ) As
ρ = 0.000570 *φ = 1595
= 0.0091 mm2/m
Area of steel required = 1594.60

Check for shear

Shear force V = 90.00 kN


Shear stress v = 0.31 N/mm2
Table 3.8 Shear capacity vc = 0.58 N/mm2
BS 8110 P-1 Shear is not critical

Check for deflection

27 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Clause 3.4.6.3
BS 8110 Part1 Maximum deflection = 0.17 mm
1997 Maximum allowable deflection = 3250/250 (Span/250)
Clause 2.2.3.4 = 13 mm Hence OK
BS8007

Summary for wall 02

Vertical Reinforcement = T16@125 (1609mm2/m) NF&FF


Horizontal Reinforcement = T16@125 (1609mm2/m) NF&FF

6.5 Analysis results of wall 03:

Vertical Direction
Mx moments are considered in the design of the vertical reinforcement.

Maximum ultimate moment, Mx = 60.30 kNm/m


(see figure below)

28 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Maximum ultimate shear Vy = 109.00 kN/m


(see figure below)

Maximum service moment, Mx = 43.00 kNm/m


(see figure below)

Horizontal Direction
My moments are considered in the design of the horizontal reinforcement.

Maximum ultimate moment, My = 45.00 kNm/m


(see figure below)

29 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Maximum ultimate shear, Vx = 84.00 kN/m


(see figure below)

Maximum service moment, My = 32.00 kNm/m

### 6.6Design of wall 03

Vertical Reinforcement

Design for ultimate condition

Assume that
Cover to r/f = 50 mm

30 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
Vertical r/f = 16 mm dia.
Horizontal r/f = 16 mm dia.
Vertical spacing = 125 mm
Horizontal spacing = 125 mm

Parameter Value
BS 8110 M 60.30
part-1 b 1000.00
Cl.3.4.4.4 t 350.00
d 276.00
fcu 35.00
fy 460.00
M/bd2fcu 0.02
k 0.02
k' 0.16
z 268.88
0.95d 262.20
Zcorrect 262.20
x 15.82 As(req)
As(req) 574.66 = 575
mm2/m

Design for service condition

BS 8007 w = (3*acr*εm) / {1+2*[(acr-cmin)/(h-x)]} --- {1}


Appendix B εm = ε1 -ε2 --- {2}
ε2 = 1.5*{bt (h-x)*(a'-x)} / {3*Es*As*(d-x)} --- {3}
ε1 = {fs*(h-x)} / {Es(d-x)} --- {4}
and
(x/d) = αe*r { SQRT [ 1+2/αe*r] -1} --- {5}
Es = 200 kN/mm2
BS8110:2 Ec = 13.5 kN/mm2 assuming creep coefficient of 1
clause 3.6

Parameter Value
Vertical r/f 16
Horizontal r/f 16
Vertical Spacing 125
Horizontal Spacing 125
Cover 50
M 43.00
αe 15
t 350
b 1000
d 276
As 1609
ρ 0.0058
(x/d) 0.3381
x 93
z 245
fs 109 < 0.8fy OK
fcb 3.8 < 0.45fcu OK

31 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
ε1 0.0008
ε2 0.0006
εm 0.000206
acr 88.86
cmin 66.00 w= 0.047
w 0.047 mm

Shrinkage and thermal movement in immature concrete


Cl.2.6.2.3
BS 8007 ρ crit = 0.0035

Refer Fig A- Minimum steel area As (min)


2 BS 8007 = 612.5 mm2/m = 613
mm2/m
Cl A-3 BS Wmax = Smax*R*α (T1+T2)
8007 Take R= 0.5
T1 = 34.0 0
C
350mm thick wall, 400kg/m3 cement content,plywood
Table 5.1 formwork
AppendixA T2 = 0 0
C
of BS8007 α= 10*10 -6

Wmax / Smax = 0.5*(10*10 -6)*( 34 + 0 )


= 0.00017
Table A-3 Smax = ( fct / fb )*(φ / 2ρ )
Table A-1 ( fct / fb ) = 0.67
Wmax / 0.00017 = 0.67*( φ / 2*ρ )
ρ = 0.000570 *φ
= 0.0091
Area of steel required = 1594.60 As
= 1595
Check for shear mm2/m
Shear force V = 109.00 kN
Shear stress v = 0.39 N/mm2
Table 3.8 Shear capacity vc = 0.59 N/mm2
BS 8110 P-1 Shear is not critical

Horizontal reinforcement

Design for ultimate condition

32 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
Assume that
Cover to r/f = 50 mm
Vertical r/f = 16 mm dia.
Horizontal r/f = 16 mm dia.
Vertical spacing = 125 mm
Horizontal spacing = 125 mm

Parameter Value
M 45.00
b 1000.00
t 350.00
d 292.00
fcu 35.00
fy 460.00
M/bd2fcu 0.02
k 0.02
k' 0.16
z 287.02 As(req)
BS 8110 0.95d 277.40 = 405
part-1 Zcorrect 277.40 mm2/m
Cl.3.4.4.4
x 11.06
As(req) 405.35

Design for service condition

Service moment = 32.00


BS 8007 w = (3*acr*εm) / {1+2*[(acr-cmin)/(h-x)]} --- {1}
Appendix B εm = ε1 -ε2 --- {2}
ε2 = 1.5*{bt (h-x)*(a'-x)} / {3*Es*As*(d-x)} --- {3}
ε1 = {fs*(h-x)} / {Es(d-x)} --- {4}
and
(x/d) = αe*r { SQRT [ 1+2/αe*r] -1} --- {5}
Es = 200 kN/mm2
Ec = 13.5 kN/mm2 assuming creep coefficient of 1

Parameter Value
Vertical r/f 16
Horizontal r/f 16
Vertical Spacing 125
Horizontal Spacing 125
Cover 50
M 32.00
αe 15
t 350
b 1000
d 292
As 1609
ρ 0.0055

33 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
(x/d) 0.3306
x 97
z 260
fs 77 < 0.8fy OK
fcb 2.6 < 0.45fcu OK
ε1 0.0005
ε2 0.0005
εm -0.000014 w= 0.000
acr 88.86 mm
cmin 66.00
w -0.003

Shrinkage and thermal movement in immature concrete


Cl.2.6.2.3 As (min)
BS 8007 ρ crit = 0.0035 = 613
mm2/m
Refer Fig A- Minimum steel area
2 BS 8007 = 612.5 mm2/m

Cl A-3 BS Wmax = Smax*R*α (T1+T2)


8007 Take R= 0.5
T1 = 34.0 0
C
350mm thick wall, 400kg/m3 cement content,plywood
Table 5.1 formwork
AppendixA T2 = 0 0
C
of BS8007 α = 10*10 -6

Wmax / Smax = 0.5*(10*10 -6)*( 34 + 0 )


= 0.00017
Table A-3 Smax = ( fct / fb )*( φ / 2ρ )
Table A-1 ( fct / fb ) = 0.67
Wmax / 0.00017 = 0.67*(φ / 2*ρ ) As
ρ = 0.000570 *φ = 1595
= 0.0091 mm2/m
Area of steel required = 1594.60

Check for shear

Shear force V = 84.00 kN


Shear stress v = 0.29 N/mm2
Table 3.8 Shear capacity vc = 0.58 N/mm2
BS 8110 P-1 Shear is not critical

Check for deflection

34 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Clause 3.4.6.3
BS 8110 Part1 Maximum deflection = 1.01 mm
1997 Maximum allowable deflection = 3250/250 (Span/250)
Clause 2.2.3.4 = 13 mm Hence OK
BS8007

Summary for wall 02

Vertical Reinforcement = T16@125 (1609mm2/m) NF&FF


Horizontal Reinforcement = T16@125 (1609mm2/m) NF&FF

35 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

6.7 Analysis results of Top Slab:

Longitudinal Direction
Mx moments are considered in the design of the vertical reinforcement.

Maximum ultimate moment, Mx = 41.00 kNm/m


(see figure below)

Maximum ultimate shear Vy = 136.20 kN/m


(see figure below)

Maximum service moment, Mx = 30.00 kNm/m


(see figure below)

36 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Shortl Direction
My moments are considered in the design of the horizontal reinforcement.

Maximum ultimate moment, My = 52.00 kNm/m


(see figure below)

Maximum ultimate shear, Vx = 111.00 kN/m


(see figure below)

Maximum service moment, My = 37.00 kNm/m

37 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

### 6.8 Design of Top Slab

Longitudinal Reinforcement (secondary)

Design for ultimate condition

Assume that
Cover to r/f = 50 mm
Secondary r/f = 16 mm dia.
Main r/f = 16 mm dia.
spacing of secondary r/f = 125 mm
spacing of main r/f = 125 mm

Parameter Value
BS 8110 M 41.00
part-1 b 1000.00
Cl.3.4.4.4 t 350.00
d 276.00
fcu 35.00
fy 460.00
M/bd2fcu 0.02
k 0.02
k' 0.16
z 271.20
0.95d 262.20
Zcorrect 262.20
x 10.67 As(req)
As(req) 390.73 = 391
mm2/m

Design for service condition

BS 8007 w = (3*acr*εm) / {1+2*[(acr-cmin)/(h-x)]} --- {1}


Appendix B εm = ε1 -ε2 --- {2}
ε2 = 1.5*{bt (h-x)*(a'-x)} / {3*Es*As*(d-x)} --- {3}
ε1 = {fs*(h-x)} / {Es(d-x)} --- {4}
and
(x/d) = αe*r { SQRT [ 1+2/αe*r] -1} --- {5}
Es = 200 kN/mm2
BS8110:2 Ec = 13.5 kN/mm2 assuming creep coefficient of 1
clause 3.6

Parameter Value
Vertical r/f 16
Horizontal r/f 16
Vertical Spacing 125

38 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
Horizontal Spacing 125
Cover 50
M 30.00
αe 15
t 350
b 1000
d 276
As 1609
ρ 0.0058
(x/d) 0.3381
x 93
z 245
fs 76 < 0.8fy OK
fcb 2.6 < 0.45fcu OK
ε1 0.0005
ε2 0.0006
εm -0.000025
acr 88.86
cmin 66.00 w= 0.00
w -0.006 mm

Shrinkage and thermal movement in immature concrete


Cl.2.6.2.3
BS 8007 ρ crit = 0.0035

Refer Fig A- Minimum steel area As (min)


2 BS 8007 = 612.5 mm2/m = 613
mm2/m
Cl A-3 BS Wmax = Smax*R*α (T1+T2)
8007 Take R= 0.5
T1 = 34.0 0
C
350mm thick wall, 400kg/m3 cement content, plywood
Table 5.1 formwork
AppendixA T2 = 0 0
C
of BS8007 α= 10*10 -6

Wmax / Smax = 0.5*(10*10 -6)*( 34 + 0 )


= 0.00017
Table A-3 Smax = ( fct / fb )*(φ / 2ρ )
Table A-1 ( fct / fb ) = 0.67
Wmax / 0.00017 = 0.67*( φ / 2*ρ )
ρ = 0.000570 *φ
= 0.0091
Area of steel required = 1594.60 As
= 1595
Check for shear mm2/m
Shear force V = 136.20 kN
Shear stress v = 0.49 N/mm2
Table 3.8 Shear capacity vc = 0.59 N/mm2
BS 8110 P-1 Shear is not critical

39 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Short direction reinforcement (main reinforcement)

Design for ultimate condition

Assume that
Cover to r/f = 50 mm
Secondary r/f = 16 mm dia.
Mainl r/f = 16 mm dia.
spacing of secondary = 125 mm
spacing of main r/f = 125 mm

Parameter Value
M 52.00
b 1000.00
t 350.00
d 292.00
fcu 35.00
fy 460.00
M/bd2fcu 0.02
k 0.02
k' 0.16
z 286.23 As(req)
BS 8110 0.95d 277.40 = 468
part-1 Zcorrect 277.40 mm2/m
Cl.3.4.4.4
x 12.82
As(req) 468.40

Design for service condition

Service moment = 37.00


BS 8007 w = (3*acr*εm) / {1+2*[(acr-cmin)/(h-x)]} --- {1}
Appendix B εm = ε1 -ε2 --- {2}
ε2 = 1.5*{bt (h-x)*(a'-x)} / {3*Es*As*(d-x)} --- {3}
ε1 = {fs*(h-x)} / {Es(d-x)} --- {4}
and
(x/d) = αe*r { SQRT [ 1+2/αe*r] -1} --- {5}
Es = 200 kN/mm 2

Ec = 13.5 kN/mm2 assuming creep coefficient of 1

40 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
Parameter Value
Vertical r/f 16
Horizontal r/f 16
Vertical Spacing 125
Horizontal Spacing 125
Cover 50
M 37.00
αe 15
t 350
b 1000
d 292
As 1609
ρ 0.0055
(x/d) 0.3306
x 97
z 260
fs 88 < 0.8fy OK
fcb 3.0 < 0.45fcu OK
ε1 0.0006
ε2 0.0005
εm 0.000063 w= 0.01
acr 88.86 mm
cmin 66.00
w 0.014

Shrinkage and thermal movement in immature concrete


Cl.2.6.2.3 As (min)
BS 8007 ρ crit = 0.0035 = 613
mm2/m
Refer Fig A- Minimum steel area
2 BS 8007 = 612.5 mm2/m

Cl A-3 BS Wmax = Smax*R*α (T1+T2)


8007 Take R= 0.5
T1 = 34.0 0
C
350mm thick wall, 400kg/m3 cement content, plywood
formwork
Table 5.1 T2 = 0 0
C
AppendixA α = 10*10 -6

of BS8007
Wmax / Smax = 0.5*(10*10 -6)*( 34 + 0 )
= 0.00017
Table A-3 Smax = ( fct / fb )*( φ / 2ρ )
Table A-1 ( fct / fb ) = 0.67
Wmax / 0.00017 = 0.67*(φ / 2*ρ ) As
ρ = 0.000570 *φ = 1595
= 0.0091 mm2/m
Area of steel required = 1594.60

Check for shear

Shear force V = 111.00 kN


Shear stress v = 0.38 N/mm2

41 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
Table 3.8 Shear capacity vc = 0.58 N/mm 2

BS 8110 P-1 Shear is not critical

Check for deflection

Clause 3.4.6.3
BS 8110 Part1 Maximum structural deflection = 0.33 mm (upward)
1997 Maximum allowable deflection = 3500/250 (Span/250)
Clause 2.2.3.4 = 14 mm Hence OK
BS8007

Summary for Top Slab

Longitudinal Reinforcement = T16@125 (1131mm2/m) T&B


Short direction Reinforcement = T16@125 (1131mm2/m) T&B

Checking the fixing strength of the 1400mm dia. SS cover on top slab

Cover - SS 316L 20mm thick Bolts - SS316L, 20mm diameter

Density of SS = 80 kN/m3

Maximum ultimate lifting force = [1.4*68.68-(80-10.25)*0.02]*π*1.42/4


applying on cover slab = 145.87 kN

Number of bolts use for fixing = 8

42 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
Force apply on one bolt = 145.87/8
= 18.23 kN (** Service load value of this
has been applied as point loads
Check for the bolt capacity to the top slab in the analysis)

Area of a bolt = π*202/4


= 314.16 mm2

ASPEN Tension strength of bolts (pt) = 290 N/mm2


(seeAnnexure 3)
clause6.3.4.3 Tension capacity of a bolt (Pt) = 314.16*290/1000
BS5950 = 91.11 kN
Part 1 2000
Shear strength of a bolt = 0.6pt
= 174 N/mm2
Assuming shear area of a bolt similar to tensile stress area
clause 6.3.1 Shear capacity of a bolt (P s) = 54.66 kN
BS5950
There is no significant shear force apply on bolts

Hence 91.11 >> 18.23 bolts are safe OK

Check for the bonding strength

Clause 3.12.8.4 Design ultimate anchorage bond = β*√fcu


BS 8110-1 stress (fbu)
1997
Table 3.26 Assume plain bar value for β (conservative)

fbu = 0.28*√35
= 1.66 N/mm2

Ultimate force on the bolt without = fbu*π*φe*l


anchorage failure (Fs)

where
φe = diameter of bolt = 20 mm
drawing for l = anchorage length = 250 mm
manhole cover
Therefore
Fs = 26.02 kN > 18.23 kN OK

Fixing details for the manhole cover is satisfactory

43 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

6.9 Analysis results of Base Slab:

Secondary direction
Mx moments are considered in the design of the vertical reinforcement.

Maximum ultimate moment, Mx = 60.00 kNm/m


(see figure below)

Maximum ultimate shear Vy = 118.00 kN/m


(see figure below)

Maximum service moment, Mx = 43.00 kNm/m


(see figure below)

44 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Primary Direction
My moments are considered in the design of the horizontal reinforcement.

Maximum ultimate moment, My = 37.00 kNm/m


(see figure below)

Maximum ultimate shear, Vx = 95.00 kN/m


(see figure below)

Maximum service moment, My = 26.00 kNm/m

45 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

### 6.10 Design of Base Slab

Longitudinal Reinforcement

Design for ultimate condition

Assume that
Cover to r/f = 50 mm
Secondaryl r/f = 16 mm dia.
Mainl r/f = 16 mm dia.
spacing of secondary r/f = 75 mm
spacing of main r/f = 75 mm

Parameter Value
BS 8110 M 60.00
part-1 b 1000.00
Cl.3.4.4.4 t 500.00
d 426.00
fcu 35.00
fy 460.00
M/bd2fcu 0.01
k 0.01
k' 0.16
z 421.48
0.95d 404.70
Zcorrect 404.70
x 10.04 As(req)
As(req) 370.46 = 370
mm2/m

Design for service condition

BS 8007 w = (3*acr*εm) / {1+2*[(acr-cmin)/(h-x)]} --- {1}


Appendix B εm = ε1 -ε2 --- {2}

46 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
ε2 = 1.5*{bt (h-x)*(a'-x)} / {3*Es*As*(d-x)} --- {3}
ε1 = {fs*(h-x)} / {Es(d-x)} --- {4}
and
(x/d) = αe*r { SQRT [ 1+2/αe*r] -1} --- {5}
Es = 200 kN/mm 2

BS8110:2 Ec = 13.5 kN/mm2 assuming creep coefficient of 1


clause 3.6

Parameter Value
Vertical r/f 16
Horizontal r/f 16
Vertical Spacing 75
Horizontal Spacing 75
Cover 50
M 43.00
αe 15
t 500
b 1000
d 426
As 2682
ρ 0.0063
(x/d) 0.3486
x 148
z 377
fs 43 < 0.8fy OK
fcb 1.5 < 0.45fcu OK
ε1 0.0003
ε2 0.0004
εm -0.000145
acr 74.96
cmin 66.00 w= 0.00
w -0.031 mm

Shrinkage and thermal movement in immature concrete


Cl.2.6.2.3
BS 8007 ρ crit = 0.0035

Refer Fig A- Minimum steel area As (min)


2 BS 8007 = 875 mm2/m = 875
mm2/m
Cl A-3 BS Wmax = Smax*R*α (T1+T2)
8007 Take R= 0.5
T1 = 34.0 0
C
500mm thick wall, 400kg/m3 cement content
Table 5.1
AppendixA T2 = 0 0
C
of BS8007 α= 10*10 -6

Wmax / Smax = 0.5*(10*10 -6)*( 34 + 0 )


= 0.00017
Table A-3 Smax = ( fct / fb )*(φ / 2ρ )
Table A-1 ( fct / fb ) = 0.67
Wmax / 0.00017 = 0.67*( φ / 2*ρ )
ρ = 0.000570 *φ

47 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
= 0.0091
Area of steel required = 2278.00 Top As,top
= 2278
= 911.20 Bottom mm2/m
(surface zone thickness is 100mm) As,bottom
= 911.2
mm2/m

Table 3.8 Check for shear


BS 8110 P-1 Shear force V = 118.00 kN
Shear stress v = 0.28 N/mm2
Shear capacity vc = 0.61 N/mm2
Shear is not critical

Short direction reinforcement

Design for ultimate condition

Assume that
Cover to r/f = 50 mm
Vertical r/f = 16 mm dia.
Horizontal r/f = 16 mm dia.
Vertical spacing = 75 mm
Horizontal spacing = 75 mm

Parameter Value
M 37.00
b 1000.00
t 500.00
d 442.00
fcu 35.00
fy 460.00
M/bd2fcu 0.01
k 0.01
k' 0.16
z 439.33 As(req)
BS 8110 0.95d 419.90 = 220
part-1 Zcorrect 419.90 mm2/m
Cl.3.4.4.4 x 5.94
As(req) 220.18

48 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

Design for service condition

Service moment = 26.00


BS 8007 w = (3*acr*εm) / {1+2*[(acr-cmin)/(h-x)]} --- {1}
Appendix B εm = ε1 -ε2 --- {2}
ε2 = 1.5*{bt (h-x)*(a'-x)} / {3*Es*As*(d-x)} --- {3}
ε1 = {fs*(h-x)} / {Es(d-x)} --- {4}
and
(x/d) = αe*r { SQRT [ 1+2/αe*r] -1} --- {5}
Es = 200 kN/mm2
Ec = 13.5 kN/mm2 assuming creep coefficient of 1

Parameter Value
Vertical r/f 16
Horizontal r/f 16
Vertical Spacing 75
Horizontal Spacing 75
Cover 50
M 26.00
αe 15
t 500
b 1000
d 442
As 2682
ρ 0.0061
(x/d) 0.3435
x 152
z 391
fs 25 < 0.8fy OK
fcb 0.9 < 0.45fcu OK
ε1 0.0001
ε2 0.0004
εm -0.000241 w= 0.00
acr 74.96 mm
cmin 66.00
w -0.052

Shrinkage and thermal movement in immature concrete


Cl.2.6.2.3 As (min)
BS 8007 ρ crit = 0.0035 = 875
mm2/m
Refer Fig A- Minimum steel area
2 BS 8007 = 875 mm2/m

Cl A-3 BS Wmax = Smax*R*α (T1+T2)


8007 Take R= 0.5
T1 = 34.0 0
C
500mm thick wall, 400kg/m3 cement content
Table 5.1
AppendixA T2 = 0 0
C
of BS8007 α = 10*10 -6

49 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
Wmax / Smax = 0.5*(10*10 )*( 34 +
-6
0 )
= 0.00017
Table A-3 Smax = ( fct / fb )*( φ / 2ρ )
Table A-1 ( fct / fb ) = 0.67
Wmax / 0.00017 = 0.67*(φ / 2*ρ ) As
ρ = 0.000570 *φ = 2278
= 0.0091 mm2/m
Area of steel required = 2278.00

= 911.20 Bottom
(surface zone thickness is 100mm) As,bottom
= 911.2
mm2/m

Table 3.8 Check for shear


BS 8110 P-1
Shear force V = 95.00 kN
Shear stress v = 0.21 N/mm2
Shear capacity vc = 0.60 N/mm2
Shear is not critical

Check for deflection

Clause 3.4.6.3
BS 8110 Part1 Maximum deflection = 1.11 mm
1997 Maximum allowable deflection = 4500/250 (Span/250)
Clause 2.2.3.4 = 18 mm Hence OK
BS8007

Summary for Base Slab

Longitudinal Reinforcement = T16@75 (2682mm2/m) Top


= T16@150 (1340mm2/m) Bottom
Short direction Reinforcement = T16@75 (2682mm2/m) Top

50 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
= T16@150 (1340mm2/m) Bottom

Bearing capacity check (SLS)

Maximum support reaction at a corner = 0.7 kN


of the base

Effective area = 0.125*0.125


= 0.016 m2
Max. bearing pressure at a corner = 44.8 kN/m2

Maximum support reaction at the mid of the = 2.79 kN


base

Effective area = 0.25*0.25


= 0.0625 m2

Max. bearing pressure at the mid of the = 44.64 kN/m2


base

Since, Max(44.8,44.64)<< 335.93 (qa) bearing capacity check satisfactory

7.0 Bond & Anchorage

IStructE Detailing
Manual Table 28
Page 133 Tension anchorage length for member in flexure = 34φ
(ULS)
As, Asprov is greater than Asreq in flexure, this value will be reduced further.
R.D Anchor's
Book Since the bars are resisting direct tension, = 34*1.4φ
Page 63,64 The anchorage length = 48φ

IStructE Detailing Table 29


Manual Tension anchorage lengths for thermal and = 48φ
Page 133 shrinkage requirement
As Asprov exceed the Ascrit ,this value will be reduced further

Minimum Anchorage & Lap length to be provided = 48φ


for φ=16mm = 768 770mm

51 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output

8.0 Conclusion

- The chamber is stable for the possible unbalanced force due to sea
current and will never float.

- Design has been done controlling the maximum surface crack width
to 0.1mm and which is protect the reinforcement from the very severe
environment condition

- Loading on the structural elements during the installation stage


is well below the design forces and the structure is safe as long
as the lifting arrangement and equipments are satisfactory.

- Clear cover of minimum 25mm to be provided between the SS fixing


bolts and the reinforcement.

- Minimum curing time is 7 days as per the specification

- Formworks will be removed as specified in the Table 6-B-6.5 of the


Specification.

- Chamber can be lifted and transported after 7 days of casting once it reach to

52 of 53
LEADER CIVIL-GUANGZHOU Project Rehabilitation of Sea Outfalls Calc by
SALVAGE JV Cont. No: GCWMP/ADB/OF01/ICB/Works/01/2012 Che by
Component Junction Chamber- Offshore- R2 Date 02/10/2013
Reference Calculations Output
its design strength as per the following graph extracted from the mix
design report. This will be verified through the 7days concrete cube test.

53 of 53