ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST

I. Earthworks
Structural Excavation cu.m.
Backfilling and Compaction cu.m.
Gravel Bedding cu.m.
Embankment cu.m.
Material Cost:
Labor Cost (35%):
Sub.Total:
II. Concreting Works
Cement bags
Sand cu.m.
Gravel cu.m.
Material Cost:
Labor Cost (35%):
Sub.Total:
III. Masonry Works
4"x8"x16" CHB pcs.
Cement bags
Sand cu.m.
Material Cost:
Labor Cost (35%):
Sub.Total:
IV. Tile Works
0.40x0.40m Unglazed tiles pcs
Stone wall cladding sq.m
Cement bags
Sand cu.m.
White Cement bags
Tile Adhesive bags
Material Cost:
Labor Cost (35%):
Sub.Total:
V. Carpentry Works
4"x8"x plywood pcs.
2"x2" lumber bd.ft.
2"x3" lumber bd.ft.
Material Cost:
Labor Cost (35%):
Sub.Total:
VI. Steel Works
10mm Ø RSB pcs.
16mm Ø RSB pcs.
#16 GI Tie wire kg.
16mmx6m square bars pcs.
Material Cost:
Labor Cost (35%):
Sub.Total:
VII. Roofing Works
Trusses
2"x2"x1/4"x6m Angle bars pcs.
2"x3"x x6m C-purlins pcs.
10mm thk Gusset Plate sq.m
Turnbuckle pcs.
6m Tile span 0.5mm thk pcs.
10mm Ø Round bars pcs.
Pre-Painted Ridge Roll pcs.
Pre-Painted Gutter GA 24(0.701mm)x2.44m pcs.
Flat Bars pcs.
Fascia Board pcs.
Ceiling
4'x8'x4.5mm Hardiflex pcs.
17x49x17mmx5m Double Furring pcs.
Blind Rivets pcs.
25x25x0.60mmx2.44m Wall Angle pcs.
Material Cost:
Labor Cost (35%):
Sub.Total:
Doors & Windows(w/ complete
VIII.-IX accessories)
Window 1 sets
Window 2 sets
Window 3 sets
Window 4 sets
Window 5 sets
Window 6 sets
Door 1(wooden panel) sets
Door 2(wooden panel) sets
Door 3(wooden panel) sets
Door 4(pvc door) sets
Material Cost:
Labor Cost (35%):
Sub.Total:
X. Plumbing Works
Septic Vault
4"X8"X16" CHB pcs.
Cement bags
Sand cu.m
10mmØ RSB pcs.
#16 GI Tie wie kg.
Drainge Canal & Catch Basin
4"X8"X16" CHB pcs.
Cement bags
Sand cu.m.
10mmØ RSB pcs.
#16 GI Tie wie kg.
Plumbing Fittings
3" P-trap pcs.
3" Elbow pcs.
3" PVC Pipe pcs.
3" Wye pcs.
4" Tee pcs.
4" 45° Elbow pcs.
4" Clean out pcs.
4" PVC Pipe pcs.
4" Wye pcs.
4" End cap pcs.
4" Elbow pcs.
1/2' Elbow pcs.
1/2' PVC Pipe pcs.
Water Closet pcs.
Floor Drain pcs.
Material Cost:
Labor Cost (35%):
Sub.Total:
XI. Water System
1/2" Ø Elbow pcs.
1/2" Ø Tee pcs.
1/2" PVC Pipe pcs.
Heavy Duty Faucet pcs.
Gate Valve set
Solvent bottle
Material Cost:
Labor Cost (35%):
Sub.Total:
XII. Electrical Works
5 watts Industrial Pinlight sets
10 watts Industrial Pinlight sets
2 Gang Outlet(Flush Type) sets
1 Gand Switch (Flush Type) sets
2 Gang Switch (Flush Type) sets
Service Entrance sets
#12 THW Wire box
#14 THW Wire box
#8 THW Wire meters
Electrical Tape pcs.
Utility Box pcs.
Junction Box pcs.
Panel Board(14 Branches) pcs.
Air Condition Unit unit
Circuit Breaker
15A sets
20A sets
30A sets
70A sets
Material Cost:
Labor Cost (35%):
Sub.Total:
XIII. Painting Works
Neutralizer gal.
Primer gal.
Topcoat gal.
Masonry Putty gal.
Metal Primer gal.
Reducer gal.
Paint Brush pcs.
Roller Brush and Pan pcs.
Material Cost:
Labor Cost (35%):
Sub.Total:

XIV. Furnishing and Fixtures


Dining Set set
Bed Frame set
Sofa Set set
Wardrobe each
TV Stand each
Bowl and Toilet Sink Set set
Sub. Total:
XV. Landscaping

A. Total Material & Labor


Cost
B. Contractors Profit (10% of
A)
C. OCM (5% 0F A)
D. Tax (12% of A,B,C)
GRAND TOTAL