A Preparation work
1 Site Survey 12 Kms 4,080,000 48,960,000
2 Route Map 12 Kms 816,000 9,792,000
3 Pole Position Schedule (Stacking) 300 Poles 54,400 16,320,000
4 Soil Investigation 30 Poles 1,632,000 48,960,000
5 Pole Foundation Schedule 310 Poles 20,400 6,324,000
6 Material Schedule 310 Poles 20,400 6,324,000
D Install. Cross Arm Double Supp. for below 5 degree 45 7,517,000 338,265,000
1 Concrette Pole C12 - 350 daN E 1 Pole
2 Cross Arm UNP 10 100.50.5x2000 mm 2 PC
3 U Clamp Type II 50 x 6 mm 4 PC
4 Double Arming Bolt M16x300 mm 2 PC
5 Arm Tie Brace 50.50x1270 mm 2 PC
6 Steel Plate Type I 4 PC
7 Bolt,nut and 2 washer M16 x 148 mm 12 PC
8 Bolt,nut and 2 washer M16 x 70 mm 4 PC
9 Steel Plate Type II 4 PC
10 Pin/Post Insulator 6 PC
11 Preformed Side Tie 6 PC
12 Installation Cost 1 set
E Install. Cross Arm Tension Single Supp. 2000 mm 34 Pole 9,131,000 310,454,000
1 Concrette Pole C13 - 350 daN E 1 Pole
2 Cross Arm UNP 10 100.50.5x2000 mm 2 PC
3 Arm Tie Brace 50.50x1270 mm 2 PC
4 U Clamp Type II 4 PC
5 Double Arming Bolt M16x300 mm 2 PC
6 U Clamp Type II 4 PC
7 Bolt,nut and 2 washer M16 x 148 mm 10 PC
8 Steel Plate Type I 4 PC
9 Steel Plate Type II 4 PC
10 Pin/Post Insulator 1 PC
11 Tension insulator set 6 PC
12 Preform Top Ties 1 PC
13 Parallel Groove Clamp/nobn tension Joint 6 PC
14 Installation Cost 1 set
F Install. Cross Arm Tension Single Support 2200 mm 20 Poles 9,961,000 199,220,000
1 Concrette Pole C13 - 350 daN E 2 Poles
2 Cross Arm UNP 10 100.50.5x2200 mm 2 PCS
3 U Clamp Type II 4 PCS
4 Double Arming Bolt M16x300 mm 4 PCS
5 Steel Plate Type II 6 PCS
6 Bolt,nut and 2 washer M16 x 148 mm 6 PCS
7 Pin/Post Insulator 1 PC
8 Preform Top Ties 1 PC
9 Tension insulator set 6 PCS
10 Parallel Groove Clamp/non tension Joint 6 PCS
11 Installation Cost 1 set
G Install. 2 x 1/2 Tension Support 2000 mm, 90 degree 14 Poles 10,683,000 149,562,000
1 Concrette Pole C12 - 500 daN E 1 Pole
2 Cross Arm UNP 10 100.50.5x2000 mm 4 PCS
3 Double Arming Bolt M16x300 mm 4 PCS
4 U Clamp Type II 50 x 6 mm 4 PCS
5 Steel Plate Type I 4 PCS
6 Steel Plate Type II 8 PCS
7 Bolt,nut and 2 washer M16 x 148 mm 16 PCS
8 Arm Tie Brace 50.50x1270 mm 4 PCS
9 Pin/Post Insulator 1 PCS
10 Performed Side Ties 1 PCS
11 Tension insulator set 6 PCS
12 Parallel Groove Clamp/non tension Joint 8 PCS
13 Installation Cost 1 set
I Install. Cross Arm Dead End Pole Double Support 1 Pole 14,560,000 14,560,000
1 Concrette Pole C12 - 500 daN E 2 Poles
2 Cross Arm UNP 10 100.50.5x2000 mm 2 PCS
3 U Clamp Type II 4 PCS
4 Double Arming Bolt M16x300 mm 4 PCS
5 Steel Plate Type II 6 PCS
6 Bolt,nut and 2 washer M16 x 148 mm 6 PCS
7 Tension insulator set 3 PCS
8 Arrester 20 kV 10 kA 3 PCS
9 Parallel Groove Clamp/non tension Joint 6 PCS
Installation Cost 1 set
Q MOB/DEMOB
Mobilisasi Material 1 lot 380,800,000 380,800,000
Worker 1 lot 54,400,000 54,400,000
Tools & Equipment 1 lot 18,496,000 18,496,000