HASBAH OFFSHORE GAS FACILITIES INCREMENT -II

SYSTEM
MWT
External Continuous
Production Well Production Export Startup MEG Flare Electrical CONTROLLER
Signals MEG
10-01902-0002 (HIPS)

1, TD-180

1, TD-180
NOTES

4,11,17

27, 29
27, 29
3,4,17

4,6,17

10, 27

2, 16
2, 14
4,11

4,11

4,11
3,4

3,4

3,4

4,6

4,6

4,6

25
26

12
25
26

12
27
29

39

39

39

39
17

17

17

27

PERMISSIVE

PERMISSIVE

PERMISSIVE

PERMISSIVE
SHUTDOWN

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED
ACTION

ACTIVE

ACTIVE

OPEN

OPEN

OPEN

OPEN
STOP

STOP

STOP

STOP

STOP

STOP

STOP
CAUSE AND EFFECTS MATRIX

NOR. OPER.
CONDITION
HSBH 44/47

INACTIVE

INACTIVE

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED
START

START
OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN
STOP

STOP

STOP

STOP

STOP
-

-
CA-831182.024
CA-831182.001

CA-831182.001

CA-831182.001

CA-831182.016

CA-831182.008

CA-831182.007

CA-831182.008

CA-831182.008

CA-831182.007

CA-831182.007

CA-831182.007
CA-831182.001

CA-831182.002

CA-831182.003

CA-831182.002

CA-831182.003

CA-831182.002

CA-831182.003

CA-831182.002

CA-831182.003

CA-831182.006

CA-831182.006

CA-831182.006

CA-831182.005

CA-831182.004

CA-831182.004

CA-831182.016

CA-831182.006

CA-831182.008

CA-831182.011

CA-831182.011

CA-831182.010

CA-831182.006

CA-831182.010

CA-831182.024

CA-831182.024

CA-831182.024

CA-831182.024

CA-831182.024
P&ID No.

-
-

-
-
-

-
Relay Main Power supply of WHP-13.8kV (Circuit breaker at TP)
C
ABBREVIATIONS: C

WHP ESD Signal to TP2 and Close MEG Export ZV to WHP 44/47
WHP - Well Head Platform

Contactor Load Shedding Contactor of Switch rack 001/002


TP - Tie In Platform at Hasbah-II
C
MOS - Maintenance Override Switch C

UPS-001 A/B Inhibit Battery Boost Charging

UPS-002 A/B Inhibit Battery Boost Charging


Sub- Surface Safety Valve (Well No. 47) FUTURE
SUO - Start Up Override

MEG Filling ZV (from Continuous Source)


ESD - Emergency Shutdown

Surface Safety Valve (Well No. 47) FUTURE

MEG Injection Pump - A Discharge ZV


MEG Injection Pump - B Discharge ZV
CSS - Combined Safety System

Casing Vent Valve (Well No. 47) FUTURE


TAG DESCRIPTION

Emergency boat receptacle Breaker


BDV - Blow Down Valve

Sub- Surface Safety Valve (Well No. 44)

Sub- Surface Safety Valve (Well No. 45)

Sub- Surface Safety Valve (Well No. 46)

Production Export Riser MOV Bypass

Choke Valve (Well No. 47) FUTURE

ESD TRIP FOR WHP-47 (future)


MEG Filling Level Control Valve
C

Wing Valve (Well No. 47) FUTURE


Surface Safety Valve (Well No. 44)

Surface Safety Valve (Well No. 45)

Surface Safety Valve (Well No. 46)

Relay UPS-001 A/B Battery breaker

Relay UPS-002 A/B Battery breaker


Flare KOD liquid Injection ZV
Flare KOD Pump Suction ZV
C&E MATRIX SYMBOLS:

TCA Vent Valve (Well No. 44)

TCA Vent Valve (Well No. 45)

TCA Vent Valve (Well No. 46)

Production Export Riser MOV

ESD TRIP FOR WHP-44

ESD TRIP FOR WHP-45

ESD TRIP FOR WHP-46


MEG Injection Control Valve

MEG Injection Pump - A


Production Export Riser ZV

MEG Pump Suction ZV


Choke Valve (Well No. 44)

Choke Valve (Well No. 45)

Nitrogen Blanketing ZV
MEG injection Pump-B
Choke Valve (Well No.46)

Flare KO Drum Heater


X - Activate

Wing Valve (Well No. 44)

Wing Valve (Well No. 45)

Wing Valve (Well No. 46)


I- Permissive style Interlock

Flare KOD Pump-A


Flare KOD Pump-B
WHP ESD Signal to TP2
TD - Time Delay in Seconds

MEG Injection ZV
&X - All '&' inputs in a column with the same 'Action identifier must occur at the same time to initiate output action in the same column(s)

MEG Import ZV
R - Reset Action (for Latched Signals)
X00 - Time Delayed Action, Sec

Breaker
DEVICE

Heater

Signal

Signal

Signal

Signal

Signal

Signal
circuit
Valve
Valve
Valve
Valve
Valve
Valve

Valve
Valve
Pump
Pump

Pump
Pump
Signal

Signal
Alarm

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve

Valve
TYPE
C
C C

FCV-1315A/B

XS-0751 / 0752

XS-0753 / 0754
XA-0653 A/B

XS-0673 A/B
XS-802/803
C

GM-0002A
GM-0002B

GM-0001A
GM-0001B

XS-0807 &
MOV-1162
MOV-1164
HCV-1120
HCV-1080
HCV-1100
HCV-1475

LCV-1178

XS-0817
XS-0711

XS-0112
XS-0114

XS-0116

XS-0118
ZV-1000
ZV-1020
ZV-1040
ZV-1060
ZV-1001
ZV-1021
ZV-1041
ZV-1061
ZV-1003
ZV-1023
ZV-1043
ZV-1063
ZV-1012
ZV-1032
ZV-1052
ZV-1072
ZV-1166

ZV-1310
ZV-1147

ZV-1187
ZV-1200
ZV-1210
ZV-1177

ZV-1173

ZV-1232
ZV-1148
XI-0206
XI-0207

E-0001
TAG N.

-
C C C C
C
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54

SYSTEM DESCRIPTION SETTING P&ID No. LOCATION TAG No. ESD LOGIC No. NOTES # * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

1 * C C C NOTES:
ZC-1000 C 2 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X C 1. Battery Breaker will be open only on ESD 1 (ZC-1000) after 3 minutes time
Abandon Platform PB on WHP (ESD Level -1) - WHP HS-9401 1
delay.
C 3
Push Buttons (PB) 2. Valve control is via process control system. Valve function is not SIL rated.
C ESD / MAC Push Button - on WHP (ESD Level -2) - WHP HS-XXX ZC-2000 24, 43 4 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X C 3. During start-up, permissive to open SSSV only when SSV, wing valves are
Hard Wire Push Button at CCR (ESD Level -2) - CCR HS-0001 C ZC-2001 5 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X closed.
Manual ESD Pull Button on Wellhead Control Panel C CA-831182.020 WHP HS-1921 9 6 X X X X X X X X X X X X 4. Concerning valves closure, valves shall close in the sequence of Wing valve,
Manual PSD Pull Button on Wellhead Control Panel CA-831182.020 WHP HS-1922 9 7 C C X X X X X X X X C SSV and SSSV with 30 seconds delay.
C
C
5. For taking one flowarm off-line while other flowarms are producing,
Manual Pull / Push station on Wellhead Control Panel (Well No. 44) (SSSV) CA-831182.020 WHP ZHS-1000 9 8 * X X X C
C corresponding transmitters shall be put on maintenance bypass (Manually at
Manual Pull / Push station on Wellhead Control Panel (Well No. 45)(SSSV) CA-831182.020 WHP ZHS-1020 9 9 * X X X
WHP) to avoid trip.
Manual Pull / Push station on Wellhead Control Panel (Well No. 46) (SSSV) CA-831182.020 WHP ZHS-1040 9 10 * X X X 6. During start-up, permissive to open SSV only when SSSV are already open
Manual Pull / Push station on Wellhead Control Panel (Well No. 47) (FUTURE) (SSSV) CA-831182.020 WHP ZHS-1060 9 11 * X X X and wing valves is closed.
Manual Pull / Push station on Wellhead Control Panel (Well No. 44) (SSV) CA-831182.020 WHP ZHS-1001 9 12 * X X C
7. Voting for all WHPs will be 2oo3 until the future well is installed, except for
HESD Manual Pull / Push station on Wellhead Control Panel (Well No. 45) (SSV) C CA-831182.020 WHP ZHS-1021 9 13 * X X C
HSBH-52/55 for which voting will be 1oo2. In case of spurious trip alarm, 2oo3
C voting will be downgraded to 1oo2 and 1oo2 voting will lead to complete WHP
Manual Pull / Push station on Wellhead Control Panel (Well No. 46)(SSV) CA-831182.020 WHP ZHS-1041 9 14 * X X C
production shutdown.
Manual Pull / Push station on Wellhead Control Panel (Well No. 47) (FUTURE) (SSV) CA-831182.020 WHP ZHS-1061 9 15 * X X
8. Activation of ESD Level 4C at TP will activate ESD Level 4B at all Wellhead
Manual Pull / Push station on Wellhead Control Panel (Well No. 44) (WV) CA-831182.020 WHP ZHS-1003 9 16 X Platform.
Manual Pull / Push station on Wellhead Control Panel (Well No. 45) (WV) CA-831182.020 WHP ZHS-1023 9 17 C X 9. Activated directly from Hydraulic ESD Master Panel
C
Manual Pull / Push station on Wellhead Control Panel (Well No. 46) (WV) CA-831182.020 WHP ZHS-1043 9 18 X C 10. Closure of Production Export ZV-1166 will drive Production Export Riser
C MOV (MOV-1162) and Bypass MOV (MOV-1163) to close position.
Manual Pull / Push station on Wellhead Control Panel (Well No. 47) (FUTURE) (WV) CA-831182.020 WHP ZHS-1063 9 18 * X
Manual Pull / Push station on HESD Panel (Shutdown ZVs)
C
CA-831182.020 WHP HS-1381 9 19 * X X X X X X X X X X X X X X 11. During start-up, permissive to open Wing valve only when SSSV, SSV are
already open and limit switch positions of choke valves are closed.
Signal from Fire and Gas Confirmed Fire Signal (ESD Level -2) - C WHP XS_0001_O ZC-2002 20 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
12. ZV closes after 5 seconds of pump stop.
system Confirmed Gas Signal (ESD Level -3A) - WHP INTERNAL ZC-3000 21 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 13. Pump low low pressure trip active after 30 seconds of pump start.
CCR Initiated Shutdown (ESD Level- 2) - CCR HS-0005 ZC-2003 22 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 14. Closure of Import ZV will drives Flow control valve to close position (controller
CCR Initiated Shutdown (ESD Level- 3A) - CCR HS-0006 ZC-3001 23 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X C to Manual mode with Output Null).
CCR Initiated Production Shutdown (ESD Level -4A) - CCR HS-0007 ZC-4004 24 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X 15. If the injection valve remain open for more than 60 seconds on both pumps
25 * X X X X X X "NOT Running", the valve will close. C
CCR initiated Shutdown - Individual Well (Incl SSSV) (Well No.44) (ESD Level 2I) - CCR HS-0008 ZC-2209
16. Closure of ZV-1177 will drives Level Control Valve LCV-1178 to close
CCR initiated Shutdown - Individual Well (Incl SSSV) (Well No.45) (ESD Level 2I) - CCR HS-0009 ZC-2210 26 * X X X X X X
position (controller to Manual mode with Output Null).
CCR initiated Shutdown - Individual Well (Incl SSSV) (Well No.46) (ESD Level 2I) - CCR HS-0010 ZC-2211 27 * X X X X X X 17. Deleted.
CCR initiated Shutdown - Individual Well (Incl SSSV) (Well No.47) (ESD Level 2I)(FUTURE) - CCR HS-0011 ZC-2212 28 * X X X X X X C 18. All instrument tag numbers are prefixed with by "G09-H44-".
External Signal - CCR
CCR initiated Shutdown - Individual Well (Incl SSV) (Well No. 44) (ESD Level 3I) - CCR HS-0012 ZC-3205 29 * X X X X 19. The emergency Stop Local push buttons are located at safe distance from
through FGP SCADA HMI
CCR initiated Shutdown - Individual Well (Incl SSV) (Well No. 45) (ESD Level 3I) - CCR C HS-0013 ZC-3206 30 * X X X X equipment.
31 * X X X X
20. For all electrical motor and ZV's the reset function will be allowed only if no
CCR initiated Shutdown - Individual Well (Incl SSV) (Well No. 46) (ESD Level 3I) - CCR HS-0014 ZC-3207
shutdown cause are active.
CCR initiated Shutdown - Individual Well (Incl SSV) (Well No. 47) (ESD Level 3I) (FUTURE) - CCR HS-0015 ZC-3208 32 * X X X X
21. All shutdown sensing devices shall have a maintenance input bypass switch
CCR initiated Shutdown - Individual Well (Incl Wing valve) (Well No. 44) (ESD Level 4I) - CCR HS-0016 ZC-4217 33 X X X according to SAES-J-601
CCR initiated Shutdown - Individual Well (Incl Wing valve) (Well No. 45) (ESD Level 4I) - CCR HS-0017 ZC-4218 34 X X X 22. When WHP is on EDG power supply, the following are envisaged:-
CCR initiated Shutdown - Individual Well (Incl Wing valve) (Well No. 46) (ESD Level 4I) - CCR HS-0018 ZC-4219 35 X X X (A) Inhibit high rate (Boost) charging of batteries for UPS Systems -
CCR initiated Shutdown - Individual Well (Incl Wing valve) (Well No. 47) (ESD Level 4I) (FUTURE) - CCR HS-0019 ZC-4220 36 X X X 001A/001B/002A/002B.
23. When ESD1/ESD2/ESD3 level of shutdown occurs, the following are
WHP HIPS Valve Shutdown (ESD Level -4B) - HIPS XA-0101 ZC-4101 38 37 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X
envisaged:-
TP ESD Level -4C Shutdown (ESD Level -4B) - TP-2 XA-0205 ZC-4102 38 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X
(A) 480V Switch rack boat receptacle circuit breaker will open.
External Signal TP ESD Level -3 (ESD Level -4B) C TP-2 XA-XXX ZC-4103 39 X X C X X X X X X X X X X X X X X X X X X X X X X X X X X C 24. Push button available in field. Individual alarm is considered for each push
C
C C
TP ESD Level -4B Shutdown (ESD Level -4B) (PALL-1149A/B/C, Flare Pilots Off) TP-2 XA-XXX ZC-4104 C 40 X X X X X X X X X X X X X X X X X X X X X X X X X X X X buttons, refer "CAUSE AND EFFECT DIAGRAM (F&G) - HSBH 44/47; Doc. No.
Safety Network Communication Failure between ESD network at WHP and TP-2 (ESD Level -3B) - WHP INTERNAL ZC-3101 TD-12 hrs 41 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X CD -832015"
Loss of Main Power at WHP - WHP - C 42 *
C
Electrical Loss of Battery power (UPS) (ESD Level - 2) - deleted - WHP By UPS C 35 43 *
EDG Starting / Running Status to ESD C - TP-2 XA-1631 ZC-5300 22 44 * C C C X X X

Production Flowline (U/S Choke) (Well No. 44)- Low Low Pressure (ESD Level - 3B) 6060 PSIG (Note 41) CA-831182.001 WHP PIT-1009 ZC-3002 5, SUO(TD-30) 45 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 25. MEG injection pump - A Discharge ZV-1200 valve open gives permissive to
Production Flowline (U/S Choke) (Well No. 45)- Low Low Pressure (ESD Level - 3B) 6060 PSIG (Note 41) CA-831182.002 WHP PIT-1029 ZC-3003 5, SUO(TD-30) 46 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X start MEG injection pump - A.
Production Flowline (U/S Choke) (Well No. 46)- Low Low Pressure (ESD Level - 3B) 6060 PSIG (Note 41) CA-831182.003 WHP PIT-1049 ZC-3004 5, SUO(TD-30) 47 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 26. MEG injection pump - B Discharge ZV-1210 valve open gives permissive to
start MEG injection pump - B.
Production Flowline (U/S Choke) (Well No. 47- FUTURE)- Low Low Pressure (ESD Level - 3B) - - WHP C PIT-1069 ZC-3005 5, SUO(TD-30) 48 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
27. Flare KOD liquid injection ZV-1148, Production Export Riser ZV-1166 and
Production Flowline (D/S HIPS) (Well No. 44) -Low Low Pressure (ESD Level - 3B) 1085 PSIG CA-831182.005 WHP PIT-1129 ZC-3006 5, SUO(TD-7200), 37 49 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Production Export Riser MOV-1162 valves open will give permissive to start Flare
Production Flowline (D/s HIPS) (Well No. 45) -Low Low Pressure (ESD Level - 3B) 1085 PSIG CA-831182.004 WHP PIT-1089 ZC-3007 5, SUO(TD-7200), 37 50 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X KOD pumps - A/B.
Production Flowline (D/s HIPS) (Well No. 46) -Low Low Pressure (ESD Level - 3B) 1085 PSIG CA-831182.004 WHP PIT-1109 ZC-3008 5, SUO(TD-7200), 37 51 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 28. Refer below table for proposed MEG injection rates for different field life.
Production Flowline (D/s HIPS) (Well No. 47- FUTURE) -Low low Pressure (ESD Level - 3B) - - WHP C PIT-1481 ZC-3009 5, SUO(TD-7200), 37 52 * X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
Injection rate Volume
Production Flowline (D/S Choke) (Well No. 44)- Low Low Temperature (ESD Level 4I) NOTE 30 CA-831182.005 WHP TIT-1121 ZC-4205 53 * X X X Time
(m3/hr) (m3)
Production Flowline (D/S Choke) (Well No. 45)- Low Low Temperature (ESD Level 4I) NOTE 30 CA-831182.004 WHP TIT-1081 ZC-4206 54 * X X X 0 - 4 hrs 0.5 2
Production Export
Production Flowline (D/S Choke) (Well No. 46)- Low Low Temperature (ESD Level 4I) NOTE 30 CA-831182.004 WHP TIT-1101 ZC-4207 55 * X X X
C
4 - 6 hrs 4.1 8.2
Production Flowline (D/S Choke) (Well No. 47- FUTURE)- Low Low Temperature (ESD Level 4I) - - WHP C TIT-1476 ZC-4208 56 * X X X 6-7 hrs 1.5 1.5
Production Flowline (D/S HIPS) (Well No. 44)- High High Pressure (ESD Level 4I) 2200 PSIG CA-831182.005 WHP PIT-1129 ZC-4213 36, 37 57 * X X X X 7-10 hrs 1 3
Production Flowline (D/S HIPS) (Well No. 45)- High High Pressure (ESD Level 4I) 2200 PSIG CA-831182.004 WHP PIT-1089 ZC-4214 36, 37 58 * X X X X 10-14 hrs 0.5 2
59 * X X X X 29.Electric heater shall ensure that fluid temperatures are above low set point. In
Production Flowline (D/S HIPS) (Well No. 46)- High High Pressure (ESD Level 4I) 2200 PSIG CA-831182.004 WHP PIT-1109 ZC-4215 36, 37 case of fluid temperature is below 32°F, Flare KO Drum pumps can’t started and
Production Flowline (D/S HIPS) (Well No. 47- FUTURE)- High High Pressure (ESD Level 4I) - - WHP C PIT-1481 ZC-4216 36, 37 60 * X X X X if operating, it will be tripped.
Production Flowline (D/S HIPS) (Well No. 44)- High High Pressure (ESD Level 4A) 2200 PSIG CA-831182.005 WHP PIT-1129 61 * 30.Hydrate formation temperature is 85°F for normal operating condition. For
Production Flowline (D/S HIPS) (Well No. 45)- High High Pressure (ESD Level 4A) 2200 PSIG CA-831182.004 WHP PIT-1089 62 * cold start-up and cold restart hydrate is mitigated by MEG injection at choke
ZC-4001 7, 2oo3 Voting X X X X X X X X X X X X X X X X X X X X X X X X X X X X upstream.
Production Flowline (D/S HIPS) (Well No. 46)- High High Pressure (ESD Level 4A) 2200 PSIG CA-831182.004 WHP PIT-1109 63 *
Production Flowline (D/S HIPS) (Well No. 47-FUTURE)- High High Pressure (ESD Level 4A) - - WHP C PIT-1481 64 *